ORDINANCE NO. 2422
AN ORDINANCE OF THE CITY OF REDDING ADOPTING A SPECIAL
PROCUREMENT PROCESS FOR CERTAIN EQUIPMENT AND
MATERIAL NECESSARY FOR THE CONSTRUCTION OF THE REDDING
POWER UNIT 6 PROJECT.
WHEREAS, the provisions of California Government Code 99 54201 et seq. require cities
to adopt procedures for acquisition of supplies and equipment; and
WHEREAS, Chapter 4.20 of the Redding Municipal Code contains the general procedures
for the purchase of goods and services for the City, including competitive bidding requirements and
dollar threshold limits for approval of contracts by the City Manager; and
WHEREAS, on September 2, 2008, the City Council considered and approved the
establishment of an alternative procurement strategy for the acquisition of certain equipment and
material necessary for the construction of the Redding Power Unit 6 Project; and
WHEREAS, it is desirable and necessary to formally adopt an alternative procurement
process to implement the procurement strategy for the Redding Power Unit 6 Project.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF REDDING DOES
ORDAIN AS FOLLOWS:
Section 1. Notwithstanding any rule or provision oflaw in the Redding Municipal Code
to the contrary, the authority to award contracts for the procurement of the specific items specified
in the table below is delegated to the City Manager, or his designee, subject to review and approval
as to form and legality by the City Attorney. These unique items are all associated with construction
of Redding Power Unit 6 and after consultation with the design engineer (Power Engineers, Inc. of
Hailey, Idaho), it has been determined that the procurement process set forth in this ordinance will
be in the best interest of ratepayers by timely capturing the best blend of competitively bid pricing
and the benefits of matching existing equipment.
Approved Procurement Process
(Authority delegated to the City Manager or designee to award)
Equipment Competitive Bid Single Vendor >$125,000
Boiler Feedwater Pumps ./ Yes
Auxiliary Transformers ./ No
Power Electrical Center ./ Yes
Fuel Heater ./ No
CG
~
~
I
,
.
.
I
Cooling Cell .I No
Auxiliary Cooling Pump .I No
Air Compressor .I No
Wire/Cable .I Yes
Pipe Bridge Structures .I Maybe
Demineralized Water Tanks .I No
Continuous Emissions Monitoring .I Yes
System
Pipe (various sizes/types) .I Yes
Valves (various sizes/types) .I No
Substation Relay Panels .I Maybe
BFP Building .I Yes
Process Flow Instrumentation .I No
(various)
Section 2. The passage of this ordinance is not a "project" according to the definition in
the California Environmental Quality Act, and therefore is not subject to the provisions requiring
environmental review.
Section 3. This ordinance shall take effect 30 days after the date of its adoption, and the
City Clerk shall certifY to the adoption thereof and cause its publication according to law.
I HEREBY CERTIFY that the foregoing ordinance was introduced and read by the City
Council at a regular meeting on the 7th day of October, 2008, and was duly read and adopted at a
regular meeting on the 21 st day of October, 2008, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
COUNCIL MEMBERS:
COUNCIL MEMBERS:
COUNCIL MEMBERS:
COUNCIL MEMBERS:
Bosetti, Dickerson, Jones, Murray, and Stegall
None
None
None
, ""
. ,':'_\ t~ .<,
Attest.: "," ";'("'''''' "~
_ ;, .,- \\1 r _~ '/
.~ . '-<:-,
:: l.-,,";,;
,"-
-:-:'...;:-
Form Approved:
'lZ/~~
RICHARD A. DUVERNAY, C. Attorney
..- ,;.-..
0,
.
,~~ - ,... ~
2