Loading...
HomeMy WebLinkAbout _ 4.5(a)--Award of Bid Schedule No. 5715 – 200-Amp Loadbreak and 600-Amp Deadbreak Elbows GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: September 1,2026 FROM: Nick Zettel, Director of ITEM NO. 4.5(a) Redding Electric Utility ***APPROVED BY*** �� �k Ct� �rCCtOt i�4' e in, U-iC[1['rlitY �r'1�Sf2()�(i � la:acl � ;In ' it�'I�,exr��+;s;I'ula&'rc ''t�sk5 W�ie��tc+t 4'.'7'2(�2 nzettel@cityofredding.org mwebb@cityofredding.org SUBJECT: 4.5(a)--Award of Bid Schedule No. 5715 — 200-Amp Loadbreak and 600-Amp Deadbreak Elbows Recommendation Authorize and approve the following relative to Bid Schedule No. 5715 — 200-Amp Loadbreak Elbows and 600-Amp Deadbreak Elbows and Assemblies for the Redding Electric Utility: (1) Award Bid Schedule No. 5715 to OneSource Supply Solutions for an annual evaluated contract total of$740,327.98, including sales tax; (2) A�uthorize the Purchasing Officer to extend the bid award annually with OneSource Supply Solutions through Ju1y 31, 2030, if mutually agreeable, with all prices changing in direct proportion to the Producer Price Index and all terms and conditions remaining the same; and (3) A�uthorize the City Manager, or designee, to approve an additional $148,000 per contract term as a contingency to support operational requirements and higher-than-anticipated contract expendit�ures. Fiscal Impact Funding for the purchase of 200-amp loadbreak elbows and 600-amp deadbreak elbows and assemblies is included in Redding Electric Utility's (REU) adopted Fiscal Year 2025-27 Biennial Budget General System Improvements (GSI) Capital Program. These expenditures represent recurring capital investments necessary to install and r�place electric infrastructure to maintain reliable elec�ric service. In the five-year plan presented to the City Council (Council) in June 2025, this and other General System Improvements, were anticipated to be funded, in whole or in part, th.rough Electric System Revenue Bond proceeds. Approval of this action will not require additional appropriations or increase the adopted biennial budget. Alternatzve Action Council may reject staffs recommendation and provide alternative direction. Report to Redding City Council August27,2026 Re: 4.5(a)--Award of Bid Schedule No. 5715-200-Amp Loadbreak and 600-Amp Deadbreak Elbows Page 2 Background/Analysis REU maintains a comprehensive inventory of electric distribution system components to support ongoing operations, system reliability, and infrastructure replacement projects. Separable insulated connectors, 200-amp loadbreak elbows and 600-amp deadbreak elbows, together with their associated assemblies, mounting brackets, and parking stands, are the standard means of terminating and sectionalizing underground primary distribution cable. These components are installed at pad-mounted transformers, switchgear, junction enclosures, and sectionalizing cabinets throughout REU's service territory. REU consumes these components continuously across new underground residential and cominercial development, cable replacement, emergency repairs, and planned capital improvement projects. Maintaining an adequate supply ensures REU can respond effectively to planned construction, scheduled replacements, and unplanned emergency repairs, and supports safe restoration of underground facilities. Consistent with prior awards, staff separated Bid Sched�ule No. 5715 into three bid groups: (1) Bid Group I - 200-Amp Elbows and Assemblies, (2) Bid Group II - 600-Amp Elbows and Assemblies, and (3) Bid Group III - Mounting Bracket and Parking Stands. This format allows for more competitive pricing across different groups of similar equipment. Six bid opportunity notices were distributed to potential vendors, in addition to posting the bid on the City's website and advertising in the Record Searchlight. On July 20, 2026, staff opened bids for Bid Schedule No. 5715, with two bids received. Bids were evaluated on the basis of responsiveness, technical specification compliance, and evaluated unit pricing applied to annual estimated quantities. OneSource Supply Solutions submitted the lowest responsive and responsible bid, at a combined net cost delivered price of$690,282.50, or $740,327.98 including sales tax. Their proposal was confirmed to meet a11 bid specifications and product requirements, including conformance to IEEE Std 3$6, Standard for Separable Insulated Connector Systems for Power Distribution Systems Above 600 V, and to REU construction standards far 15 kV class underground distribution. Awarding this contract will provide price stability, maintain appropriate warehouse inventory levels, and support reliable electric utility operations. The requested contingency includes a standard allowance for unforeseen cost escalations, including future price increases associated market conditions. The contingency also allows REU to purchase additional material as needed to meet operational requirements, including emergency repairs, unplanned replacement of failed equipment, accelerated inventory replenishment, and other reliability or maintenance needs necessary to support uninterrupted utility operations. Should total costs exceed both the base award and authorized contingency amounts, staff will return to the City Council with recommendations for any necessary adjustments. Environmental Review This is not a project defined under the California Environmental Quality Act, and no further action is required. Council Prio�ity/City Manager Goals Report to Redding City Council August27,2026 Re: 4.5(a)--Award of Bid Schedule No. 5715-200-Amp Loadbreak and 600-Amp Deadbreak Elbows Page 3 • This is a routine operational item. Attachments 5715 Bid Tab CITY OF REDDING PURCHASING DIVISION-TABULATION OF BIDS 200-AMP LOADBREAK ELBOWS AND 600-AMP DEAD BREAK ELBOWS AND ASSEMBLIES WESCO OneSource Supply Solutions BID SCHEDULE NO. DATE OF OPENING 5715 July 20, 2026 TIME OF OPENING �:�� �.�. ITEM DESCRIPTION EVALUATED TOTA� EVALUATED TOTAL GROUP I -200-AMP Elbows and Assemblies $269,551.00 $261,026.00 GROUP II -600 AMP Elbows and Assemblies $390,898.00 $395,989.50 GROUP III - Mounting Bracket and Parking Stand $33,780.00 $33,267.00 EVALUATED TOTAL A�L GROUPS I -I11 $694,229.00 $690,282.50 Purchasing