Loading...
HomeMy WebLinkAbout _ 4.5(b)-- Award of Bid Schedule No.5704 - Furnishing Electric Utility Trench & Excavation Work GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: August 18, 2026 FROM: Nick Zettel, Director of ITEM NO. 4.5(b) Redding Electric Utility ***APPROVED BY*** �� �k Ct� �rCCt01 i�4' C in, U-iC[I[rlitY 2�l�,/2()�Ei � la:acl � ;In ' it�'I�.exr��+;s;I'ula&rc ''t�skSW�ie��tc+t 4'll,'7�}2 nzettel@cityofredding.org mwebb@cityofredding.org SUBJECT: 4.5(b)--Authorize the following relative to Bid Schedule No. 5'704 for furnishing electric utilit trench and excavation work. Recommendation Authorize and approve the following relative to Bid Schedule No. 5704 for furnishing electric utility trench and excavation work: (1) Award to Chavez General Engineering Construction Inc., at the bid unit prices, for a total amount of$1,040,610.00; (2) Authorize the City Manager, or designee, to approve contingency funding in the amount of$210,000, representing 20 percent of the evaluated contract amount; (3) A�uthorize the City Manager, or designee, to extend the contract for up to two additional one-year periods, if mutually agreeable, with all prices, terms, and conditions remaining the same; and (4) Find that the activity is categarically exempt from environmental review under the California Environmental Quality Act; pursuant to Section 15301 — Existing Facilities, Section 15302 — Replacement or Reconstruction, and Section 15303 —New Construction or Conversion of Small Structures. Fiscal Impact Funds for this project, including the proposed contingency, are available within Redding Electric Utility's (REU) adopted Fiscal Year 2026-2'7 biennial General System Improvements Capital Program budget. Approval of this action will not require additional appropriations or inerease the overall adopted capital budget. Alternative Actzon The City Council could choose not to award and reject the bid and provide staff with alternate direction. Report to Redding City Council August 12,2026 Re: 4.5(b)--Award of Bid Schedule No.5704 -Furnishing Electric Utility Trench &Excavation Work Page 2 Background/Analysis This is a routine bid for procurement of services to provide electric utility excavation and associated construction services. REU relies on on-call excavation and associated construction services to install, maintain, repair, and rebuild underground electric infrastructure. The work may include trenching, potholing, conduit installation, vault and pull-box excavation, backfill, concrete and asphalt restoration, traffic control, and related site work. Maintaining access to these services allows REU to respond efficiently to planned utility improvements and unanticipated field conditions. The proposed contract will cover the period from the award of the contract through June 30, 2027. REU will issue work only as needed and subject to available budget appropriations. The contract will support residential and commercial development while also providing the construction capability needed to repair or reconstruct existing electric facilities. On June 18, 2026, four bids were opened for the subject utility excavation work as shown on the attached bid tabulation form. Chavez General Engineering Inc. of Palo Cedro, California, submitted the low bid for the evaluated total of $1,040,610.00, and is in compliance with the specifications and general conditions. The engineer's estimate for this bid was $1,823,482.00. EnviNonmental Review Staff has reviewed the activity and determined that it is categorically exempt from review under the California Environmental Quality Act Guidelines, per Section 15301 - Existing Facilities, Section 15302 - Replacement or Reconstruction, and Section 15303 - New Construction or Conversion of Small Structures. C1ass 1 exemptions include the operation, repair, maintenance, or minor alteration of existing facilities, structures, or eguipment involving negligible or no expansion of use. C1ass 2 exemptions consist of replacement or reconstruction where the new structure will be located on the same site and will have substantially the same purpose and capacity. Class 3 exemptions consist of construction and location of new small facilities and equipment, or conversion of existing structures. The trenching and excavation contract will support REU's effort to maintain, replace, upgrade, and construct sma11 new facilities and convert existing service systems. The actions will occur in previously disturbed areas, have substantially the same purpose and capacity, and result in a negligible expansion of use. The activity has no potential to have a significant effect on the environment. Council Priority/City Manager Goals � This agenda item is a routine operational it�m. Attachments Bid Tabulation for Bid Schedule No. 5704 NOE REU Trench and Excavation BID TABULATION FOR: On-Call Electric Utility Excavation and Associated Work Bid Schedule No.: 5704 Chavez General Enqineerinq Jefferson State Hiqhways, ENGINEER'S EST Const. Inc. Inc. UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 MOBILIZATION LS 10 $1,000.00 $10,000.00 $500.00 $5,000.00 $6,250.00 $62,500.00 2 STANDBY TIME HR 15 $800.00 $12,000.00 $550.00 $8,250.00 $580.00 $8,700.00 3 WATER POLLUTION CONTRO� LS 1 $3,907.00 $3,907.00 $1,000.00 $1,000.00 $32,500.00 $32,500.00 4 SAWCUT(<8") LF 1000 $15.00 $15,000.00 $9.00 $9,000.00 $15.75 $15,750.00 5 SAWCUT(>8") LF 250 $16.00 $4,000.00 $10.00 $2,500.00 $19.25 $4,812.50 6 TRENCHING EXCAVATION (<5 CY) CY 100 $645.00 $64,500.00 $490.00 $49,000.00 $200.00 $20,000.00 7 TRENCHING EXCAVATION (<60") CY 600 $405.00 $243,000.00 $290.00 $174,000.00 $145.00 $87,000.00 8 TRENCHING EXCAVATION (>60") CY 500 $420.00 $210,000.00 $290.00 $145,000.00 $180.00 $90,000.00 9 POTHO�ING EXCAVATION EA 20 $900.00 $18,000.00 $250.00 $5,000.00 $10,060.00 $201,200.00 10 BOX/VAULT EXCAVATION (<60") CY 100 $405.00 $40,500.00 $290.00 $29,000.00 $235.00 $23,500.00 11 BOX/VAU�T EXCAVATION (>60") CY 100 $420.00 $42,000.00 $290.00 $29,Ot7b.00 $235.00 $23,500.00 12 PULLBOX(2E) EA 5 $1,620.00 $8,100.00 $700.00 $3,500.00 $4,290.00 $21,450.00 13 PU��BOX (3E) EA 10 $2,340.00 $23,400.00 $900.00 $9,000.00 $5,430.00 $54,300.00 14 PULLBOX(4E) EA 5 $3,000.00 $15,000.00 $1,250.00 $6,250.00 $6,830.00 $34,150.00 15 CONDUIT (2") LF 400 $24.00 $9,600.00 $18.00 $7,200.00 $8.75 $3,500.00 16 CONDUIT (4") LF 2000 $47.00 $94,000.00 $25.00 $50,000.00 $10.00 $20,000.00 17 CONDUIT (6") LF 500 $53.00 $26,500.00 $40.00 $20,000.00 $16.50 $8,250.00 18 PROVE EXISTING CONDUIT LF 15000 $9.00 $135,000.00 $4.00 $60,000.00 $4.75 $71,250.00 19 SAND BACKFILL CY 300 $110.00 $33,000.00 $40.00 $12,000.00 $135.00 $40,500.00 20 AGGREGATE BASE BACKFILL CY 900 $110.00 $99,000.00 $80.00 $72,000.00 $165.00 $148,500.00 21 CONCRETE S�URRY BACKFI�� CY 100 $313.00 $31,300.00 $200.00 $20,000.00 $440.00 $44,000.00 22 CONCRETE CAP LF 10 $168.00 $1,680.00 $75.00 $750.00 $190.00 $1,900.00 E�ECTRICAL EQUIPMENT CONCRETE 23 PAD SF 500 $235.00 $117,500.00 $100.00 $50,000.00 $46.00 $23,000.00 24 STREET LIGHT BASE EA 4 $6,250.00 $25,000.00 $2,500.00 $10,000.00 $4,100.00 $16,400.00 25 REMOVE STREET LIGHT BASE EA 4 $2,344.00 $9,376.00 $500.00 $2,000.00 $1,400.00 $5,600.00 26 CONCRETE VALLEY GUTTER SF 10 $96.00 $960.00 $60.00 $600.00 $35.00 $350.00 27 CONCRETE SIDEWALK(4") SF 1800 $78.00 $140,400.00 $35.00 $63,000.00 $16.75 $30,150.00 28 CONCRETE SIDEWA�K (6") SF 10 $81.00 $810.00 $35.00 $350.00 $19.75 $197.50 29 CONCRETE CURB (6") LF 10 $81.00 $810.00 $50.00 $500.00 $67.00 $670.00 30 CONCRETE CURB & GUTTER (8") LF 10 $94.00 $940.00 $65.00 $650.00 $84.00 $840.00 31 CONCRETE CURB &GUTTER (6") LF 40 $94.00 $3,760.00 $65.00 $2,600.00 $76.00 $3,040.00 32 CONCRETE CURB & GUTTER (5") LF 5 $94.00 $470.00 $62.00 $310.00 $74.00 $370.00 33 CONCRETE ROLL CURB &GUTTER LF 20 $94.00 $1,880.00 $65.00 $1,300.00 $76.00 $1,520.00 34 CONCRETE DRIVEWAY(RESIDENTIAL) SF 100 $81.00 $8,100.00 $35.00 $3,500.00 $25.00 $2,500.00 35 CONCRETE DRIVEWAY SF 100 $86.00 $8,600.00 $35.00 $3,500.00 $33.00 $3,300.00 36 ASPHALT CONCRETE TON 75 $1,094.00 $82,050.00 $350.00 $26,250.00 $525.00 $39,375.00 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 4 BID TABULATION FOR: On-Call Electric Utility Excavation and Associated Work Bid Schedule No.: 5704 Chavez General Enqineerinq Jefferson State Hiqhways, ENGINEER'S EST Const. Inc. Inc. UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL 37 BOLLARD (NON-REMOVAB�E) EA 4 $1,172.00 $4,688.00 $800.00 $3,200.00 $700.00 $2,800.00 38 BOLLARD (REMOVABLE) EA 4 $1,529.00 $6,116.00 $800.00 $3,200.00 $1,750.00 $7,000.00 39 REPLACE �ANDSCAPING SF 2000 $40.00 $80,000.00 $15.00 $30,000.00 $10.50 $21,000.00 40 EARTH RETAINING STRUCTURES SF 25 $157.00 $3,925.00 $100.00 $2,500.00 $185.00 $4,625.00 41 HORIZONTA� DIRECTIONA� DRI�� LF 75 $227.00 $17,025.00 $100.00 $7,5btJ.t�b $245.00 $18,375.00 42 HORIZONTAL DIRECTIONAL DRILL LF 75 $243.00 $18,225.00 $120.00 $9,000.00 $297.50 $22,312.50 TRAFFIC CONTRO� ONE MAN / 43 FLAGGER STRAIGHT TIME HR 200 $180.00 $36,000.00 $80.00 $16,000.00 $195.00 $39,000.00 TRAFFIC CONTRO� ONE MAN / 44 FLAGGER OVERTIME HR 80 $201.00 $16,080.00 $115.00 $9,200.00 $185.00 $14,800.00 TRAFFIC CONTRO�TWO MAN / 45 FLAGGER STRAIGHT TIME HR 200 $346.00 $69,200.00 $270.00 $54,000.00 $345.00 $69,000.00 TRAFFI NTR �TW MAN 46 FLAGGER OVERTIME HR 80 $401.00 $32,080.00 $300.00 $24,000.00 $370.00 $29,600.00 TOTAL -CONTRACT ITEMS $1,823,482.00 $1,�4�;6"10.{�t7 $1,373,087.50 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 4 BID TABULATION FOR: On-Call Electric Utility Excavation and Associated Work Bid Schedule No.: 5704 Iron Mountain General Allen Gill Construction Enqineerinq, Inc. Inc AVERAGE UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE 1 MOBILIZATION LS 10 $10.00 $100.00 $4,341.00 $43,410.00 $2,775.25 2 STANDBY TIME HR 15 $750.00 $11,250.00 $346.00 $5,190.00 $556.50 ' 3 WATER POLLUTION CONTRO� LS 1 $2,500.00 $2,500.00 $9,201.00 $9,201.00 $1�,300.25 4 SAWCUT(<8") LF 1000 $12.00 $12,000.00 $8.00 $8,000.00 I $11.19 5 SAWCUT(>8") LF 250 $12.00 $3,000.00 $22.00 $5,500.00 ' $15.81 ' 6 TRENCHING EXCAVATION (<5 CY) CY 100 $900.00 $90,000.00 $387.00 $38,700.00 $494.25 7 TRENCHING EXCAVATION (<60") CY 600 $400.00 $240,000.00 $111.00 $66,600.00 i$236.50 8 TRENCHING EXCAVATION (>60") CY 500 $400.00 $200,000.00 $137.00 $68,500.00 $251.75 9 POTHO�WG EXCAVATION EA 20 $1,000.00 $20,000.00 $1,407.00 $28,140.00 $3,179.25 ' 10 BOX/VAULT EXCAVATION (<60") CY 100 $400.00 $40,000.00 $267.00 $26,700.00 $298.00 11 BOX/VAU�T EXCAVATION (>60") CY 100 $400.00 $40,000.00 $300.00 $30,000.00 $3d6.25 12 PULLBOX(2E) EA 5 $1,000.00 $5,000.00 $3,884.00 $19,420.00 $2,468.50 ' 13 PU��BOX (3E) EA 10 $2,000.00 $20,000.00 $3,939.00 $39,390.00 $3,n67.25 14 PULLBOX(4E) EA 5 $3,000.00 $15,000.00 $5,732.00 $28,660.00 $4,203.00 15 CONDUIT (2") LF 400 $25.00 $10,000.00 $77.00 $30,800.00 $32.19 ' 16 CONDUIT (4") LF 2000 $35.00 $70,000.00 $89.00 $178,000.00 $39.75 17 CONDUIT (6") LF 500 $50.00 $25,000.00 $134.00 $67,000.00 $60.13 18 PROVE EXISTING CONDUIT LF 15000 $8.00 $120,000.00 $13.00 $195,000.00 $7.44 : 19 SAND BACKFILL CY 300 $100.00 $30,000.00 $252.00 $75,600.00 ;$131.75 ' 20 AGGREGATE BASE BACKFILL CY 900 $100.00 $90,000.00 $158.00 $142,200.00 $125.75 21 CONCRETE S�URRY BACKFI�� CY 100 $250.00 $25,000.00 $273.00 $27,300.00 $29t�.75 22 CONCRETE CAP LF 10 $150.00 $1,500.00 $393.00 $3,930.00 $202.00 ' E�ECTRICAL EQUIPMENT CONCRETE 23 PAD SF 500 $200.00 $100,000.00 $119.00 $59,500.00 $116.25 24 STREET LIGHT BASE EA 4 $5,000.00 $20,000.00 $5,720.00 $22,880.00 $4,330.00 25 REMOVE STREET LIGHT BASE EA 4 $2,000.00 $8,000.00 $3,332.00 $13,328.00 $1,80$.00 26 CONCRETE VALLEY GUTTER SF 10 $75.00 $750.00 $785.00 $7,850.00 $238,75 27 CONCRETE SIDEWALK(4") SF 1800 $40.00 $72,000.00 $347.00 $624,600.00 $109.69 ' 28 CONCRETE SIDEWA�K (6") SF 10 $45.00 $450.00 $706.00 $7,060.00 ;$201.44 ' 29 CONCRETE CURB (6") LF 10 $65.00 $650.00 $883.00 $8,830.00 $2�6.25 30 CONCRETE CURB & GUTTER (8") LF 10 $75.00 $750.00 $970.00 $9,700.00 i$298.50 31 CONCRETE CURB &GUTTER (6") LF 40 $75.00 $3,000.00 $751.00 $30,040.00 $241.75 32 CONCRETE CURB & GUTTER (5") LF 5 $75.00 $375.00 $1,009.00 $5,045.00 $305.00 33 CONCRETE ROLL CURB &GUTTER LF 20 $75.00 $1,500.00 $824.00 $16,480.00 $260.00 34 CONCRETE DRIVEWAY(RESIDENTIAL) SF 100 $45.00 $4,500.00 $390.00 $39,000.00 $123.75 35 CONCRETE DRIVEWAY SF 100 $45.00 $4,500.00 $373.00 $37,300.00 $1�1.50 36 ASPHALT CONCRETE TON 75 $800.00 $60,000.00 $576.00 $43,200.00 $562.75 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 3 of 4 BID TABULATION FOR: On-Call Electric Utility Excavation and Associated Work Bid Schedule No.: 5704 Iron Mountain General Allen Gill Construction Enqineerinq, Inc. Inc AVERAGE UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE 37 BOLLARD (NON-REMOVAB�E) EA 4 $900.00 $3,600.00 $2,808.00 $11,232.00 $1,302.00 ' 38 BOLLARD (REMOVABLE) EA 4 $1,000.00 $4,000.00 $3,381.00 $13,524.00 $1,732.75 ' 39 REPLACE �ANDSCAPING SF 2000 $20.00 $40,000.00 $31.00 $62,000.00 $19.13 40 EARTH RETAINING STRUCTURES SF 25 $120.00 $3,000.00 $1,535.00 $38,375.00 $485.00 41 HORIZONTA� DIRECTIONA� DRI�� LF 75 $200.00 $15,000.00 $574.00 $43,050.00 $279.75 ' 42 HORIZONTAL DIRECTIONAL DRILL LF 75 $220.00 $16,500.00 $779.00 $58,425.00 $354.13 TRAFFIC CONTRO� ONE MAN / 43 FLAGGER STRAIGHT TIME HR 200 $200.00 $40,000.00 $174.00 $34,800.00 $162.25 TRAFFIC CONTRO� ONE MAN / 44 FLAGGER OVERTIME HR 80 $240.00 $19,200.00 $262.00 $20,960.00 '$200.50 TRAFFIC CONTRO�TWO MAN / 45 FLAGGER STRAIGHT TIME HR 200 $320.00 $64,000.00 $349.00 $69,800.00 $321.00 TRAFFI NTR �TW MAN 46 FLAGGER OVERTIME HR 80 $400.00 $32,000.00 $523.00 $41,840.00 $398.25 ' Total Average Bid " TOTAL -CONTRACT ITEMS $1,584,125.00 $2,456,060.00 $1,613,470.63 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 4 of 4 TI�� -F XE PTI N TO: � Office of Plani�ing and Research FBOM. Gity af Redding 1400 Tenih Street; Raam 121 Public Works Department Sacramento, CA 95�14 777 Cypr�ss Avenue Redding, CA 96001 C.1' Shasta County Clerk Coui�ty af Shasta P.O.Box 991�880, 1643 Market Stree# Redding,CA 96099-08�0 Project Title: Reddin�,Electric UtilitY{REU}Trench and Excavation Contract Project Lacation—Specific: Citywide Project Lacation—City: Reddin�Project Location—Coantyc Shasta Descriptiom of Project: The R.EU will contract with Chavez General En ineering Construction Inc. ta perfarrn on-cail trench and exc�vation activities. Work invalves excavation trenchin� back�ll condiiit concrete work as�shalt cancrete patcl�in�streetli�ht installation, pull box horizonYal directional drillin� and ather associated work at various locations in the REU service area. The contract Ilas a term of approximatelv ane year with a termination date of June 30 202� Name of Public Agency Approvyng Project; City of Redding Narne of Person or t�gency�arrying t7ut Project: Jeremv Ross;Electric Manager-Plannin�/Lo�istics Exempt Status: (check one) ❑ Ministerial [Section 21080(b)(7); 15268] � Declared Emergency [Section 21080(b)(3); 15269(a>] � Emergency Project[Section 21080(b)(4); 15269{b)] C� Statutory Exemptions. State code nuznber; ❑ Common Sense Exemption{This project does not fall within an exernpt class,but it catt be seen with eertainty that there is no possiiaitity that the activity rnay have a significant effect on the environment(14 CCR 15061[b][3}), � Categorical Exemptic�n. State type and section number: Sectic�n 15301. Existin� F�cilities, Sectian 15302 Replace�nent or Reconstruction,and 1�303.New Construction or Canversion of Small Structures � No exceptians apply that would bar the use of a categorical exemption(PRD 21084 and 14 CCR 15300.2). Reasons why praject is exempt. Class 1 exemptions include the aperation, repair maintenance, or minor alteration of existin� facilities, structai�es, or equipment invalvin ne ligible or no e�p�nsion of use. Class 2 exemptions consists c�f repfacement or reconstc•uction where the new structure will be located on the same site and will have substantially the same purpose and capacity. Glass 3 e�emptions consist of constiruction and lacation of new smalt facilities and equipment or conversian of existin� stru�tures. The trenchin� and excavation cc�ntract will support REU's effort to maintain replace up�i�ade; and canstruct small new facilities; and convert existin� service svstems. Tt1e actions wi11 occur in previously disturbed areas;have substantially the same p�ose and capacity and result in ne�li ib� le expansion of use.The project has no potential to have a si�nificant effect on the environment. Lead Agency Contact Person: Amber Kelley Telepho�e: 530.225.4046 If Filed by Applicant; 1. Attach certified document of�xemptian finding. 2. Has a natice of exemption been filed by the pub[ic ageney approving the praject? o Yes n N� ��"� � ��'` �a � �°� �� ".�� ���� Signaturea �,�`�,:�� ��x� Date: Title: Environrnental Com liance na�er � �Signed by Lead Agency Date received far filing at C3PR: ❑ Signed by Applicant C�,t), �:��� ,�,s. 6`?C�'�?