HomeMy WebLinkAbout _ 4.11(d)--Award Bid Schedule No. 5713, Replace AC Surfacing 2026 GI �" Y C� F
� � �- ' � ° � � i � CITY OF REDDING
��
REPORT TO THE CITY COUNCIL
MEETING DATE: August 18, 2026 FROM: Michael Webb, Interim City
ITEM NO. 4.ll(d) Manager/Public Works
Director
***APPROVED BY***
mwebb@cityofredding.org
i��hawt �•� ,� ���� r4y ��a�ca�,`L�ul�lic���'u�kh Ilicectc�r h`l it2€1�f�
mwebb@cityofredding.org
SUBJECT: 4.11(d)--Award Bid Sched�ule No. 5713, Replace AC Surfacing 2026
Recommendation
Authorize and approve the following actions relative to Bid Schedule No. 5713 (Project No.
STADM23030), Replace Asphalt Concrete Surfacing 2026:
(1) Award to T�ullis, Inc. in the amount of$1,882,564.00;
(2) Approve$359,350 to cover the cost of administration and inspection fees;
(3) Approve $254,130 for project development costs;
(4) Approve$225,000 to provide construction contingency funding;
(5) Authorize the City Manager, or designee, to approve additional increases in either the
construction management or construction contingency amounts up to a total of$50,000;
(6) Approve the project design plans, specifications, and special provisions; and
(7) Find that the project is categorically exempt from review under the California
Environmental Quality Act Guidelines, pursuant to Section 15301(c) — Existing
Facilities.
Fiscal Impact
On May 19, 2026, the City Council (Council) adopted Resolution 2026-035 which included a
proposed project list that indicated the City wi11 utilize Fiscal Year (FY) 2026-27 Road
Maintenance and Rehabilitation Account (RMRA) revenues �unded by Senate Bill 1, the Road
Repair and Accountability Act of 2017, to pay for Replace AC Surfacing 2026 Project pre-
construction and construction activities.
Additionally, on May 12, 2026, the City sent the Shasta Regional Transportation Agency
(SRTA) a Regional Surface Transportation Program Exchange Funds Project Nomination Form
whieh lists the Replace AC Surfacing 2026 Project as the City's proposed use of the $1,933,177
allocated to the City of Redding in FY 2026-2'7.
Report to Redding City Council August 12,2026
Re: 4.11(d)--Award Bid Schedule No. 5723, Replace AC Surfacing 2026 Page 2
The remaining, existing funding for the Project, one of the City's primary annual pavement
preservation projects, comes from prior year RMRA revenues received by the City of Redding's
(City) Streets Division, deposited into the City's Special Gas Tax fund, and reported on in the
Annual State Controller's Streets Expenditure Report. This remaining, unexpended, prior-year
funding for pre-construction is expected to have been carried forward to the construction phase
in this fiscal year, pending approval of administrative carryover requests pursuant to council
policy 409.
Project cost components are estimates, and adjustments may be necessary to reallocate funds and
ensure the project remains within the approved project budget.
There is no General Fund impact to accepting the recommendation.
Cost Summary
Item Estzmated
Project Development Costs $ 254,130
Construction Contract+ Contingency $ 2,107,564
Contract Administration,Inspection, Testing $ 359,350
Additional City Manager Authority $ 50,000
Total Project Costs $ 2,771,004
Project Budget $ 2,973,000
Alternative Action
The City Council may choose not to award the project or provide alternate direction to staff. If
the project is not awarded, the planned annual maintenance will not occur and the streets will
continue to deteriorate and may require complete roadway reconstruction.
Background/Analysis
Attached is a tabulation of bids opened on July 28, 2026. The low bid in the amount of
$1,882,564 was received from Tullis, Inc., of Redding, California. The engineer's estimate was
$2,073,743 Total project development costs for this project are estimated to be $254,130. Project
development costs include engineering, environmental, and consultant services (design support).
This project involves placing approximately 8,462 tons of asphalt concrete pavement in worn
and deteriorated sections of Browning St, Canby Rd, Mistletoe Ln, and Wood Ln. The project
includes other associated work items: ADA curb ramps, sidewalk replacement, pavement
delineation,pavement markings, pavement markers, and other miscellaneous items.
Environmental Review
Staff has determined that the project is categorically exempt from environmental review under
the California Environmental Quality Act Guidelines, per Section 15301 (c). Class 1 exemptions
include the operation, repair, maintenance, or minor alteration of existing facilities, structures, or
equipment involving negligible or no expansion of use. The project will extend the life of the
existing pavement, but will not create additional vehicle capacity or result in expansion of use.
The project has been reviewed for sensitive resources such as threatened or endangered speci�s
or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources. The
project has no potential to have a significant effect on the environment.
Report to Redding City Council August 12,2026
Re: 4.11(d)--Award Bid Schedule No. 5723, Replace AC Surfacing 2026 Page 3
Council Priority/City Manage� Goals
• This agenda item is a routine operational item.
Attachments
Location Map
COR BS 5713 Bid Tab
NOE_AC Surfacing Project 2026
City of Redding Project Nomination for RSTP Funds from SRTA
Resolution 2026-035
. � �
• � •
- �'-_ `,�� /�_' �. � � �� ia �
���� �1 � �I� ��� �� ..� �"
����� __�/j` � ;1 1�������1i�i �/� .
� :-.,, � . A�, I�� ,I� ..� •:i�
�I� ��I ��.. ..� ♦
�: . �� ���I ����i ���I ►�►����
. „�. .�,�I�� �i����� ��,... ��
��i ,,,,,, ,,,,,,,,,,�,,,,,,,,. ���,, � ,�� .� � 1� ���� ������. �I
�`�116iuumnmi = ��'1��' � .� ��",•. � �� �•� �1
� �,,����' ��� ■� � ��/�� �1�
� r— � ,� � S ; . .r , •, • -
r►�►1�►►����1��II������►�i
� ■ � �
��
. �� �
! � ,,
■ � �`' •��
. � � ` � � �
1..._ ���. :;, <� =��
----..: ---._....,,,_���,`� �i 1
����
1 .��.�!11
�, , �
''� �,� �■= �,:��r �
� � ��i -��■�►. ���1►� �i
� � !�I�: :��11►�i���►i'IIi�
- � � ■■. .► ��� �
� i� __� '� �IL'11�i ••. ••'► �. .►
/■ - „ -- �►��►r�������������1
,.■ �I�II�II�II�IIIII�IIII�j� �
� ■ - � e��������►I��;\
:� � �I�I�IIIIIIIL��■,,,�,� :- :: ;
��f ��•�`►...: .'rl�i���111�i :� �� ;
,�� ■■■i�■ ..� •
� s ►� �1/��I�II �� C� ;
� �-_'�� Ci:i�.�rl�,�/���11�1 �.: ��
��� , . ■ � �� ��
����. .r.i�l:ll����������� -. .-
��1�'i : ��� ��� :" ' � �= " �li�
�,�1=��►_.. :1�� IIIIII�.: :IIII�.��
. . ,
. . .
. • . . .
� ■ . . .
�
�, ' • 1 .
����, � •
�, .
, ,�.. � , � , ,
.
.
BID TABULATION FOR:
Replace AC Surfacing 2026
Bid Schedule No.: 5713
ENGINEER'S EST Tullis Inc. J. F. Shea Construction Inc.
7/28/2026 U N IT U N IT U N IT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTAL PRICE TOTAL
1 Water Pollution Control LS 1 $3,000.00 $3,000.00 $1,000.00 $1,000.00 $850.00 $850.00
2 Traffic Control �S 1 $210,000.00 $210,000.00 $200,650.70 $200,650.70 $276,022.50 $276,022.50
3 Asphalt Concrete TON 8462 $124.00 $1,049,288.00 $114.00 $964,668.00 $116.00 $981,592.00
4 Cold Mill Asphalt Concrete SY 32811 $5.00 $164,055.00 $6.10 $200,147.10 $4.50 $147,649.50
5 Geogrid Mat SY 13401 $6.75 $90,456.75 $7.20 $96,487.20 $8.00 $107,208.00
6 Utility Location �S 1 $20,000.00 $20,000.00 $5,000.00 $5,000.00 $4,131.00 $4,131.00
7 Traffic Loop EA 22 $4,000.00 $88,000.00 $2,200.00 $48,400.00 $2,200.00 $48,400.00
8 Sidewalk (4" PCC) SF 368 $22.00 $8,096.00 $60.00 $22,080.00 $60.00 $22,080.00
9 Curb And Gutter(6") LF 375 $72.00 $27,000.00 $86.00 $32,250.00 $69.00 $25,875.00
10 Concrete Curb Ramp SF 2709 $45.00 $121,905.00 $29.00 $78,561.00 $42.00 $113,778.00
11 Thermoplastic Traffic Stripe (6") LF 44742 $1.75 $78,298.50 $1.00 $44,742.00 $1.00 $44,742.00
12 Thermoplastic Traffic Stripe (8") �F 3165 $2.50 $7,912.50 $2.00 $6,330.00 $2.00 $6,330.00
13 Pavement Marking (Green - Bike Lane) SF 276 $25.00 $6,900.00 $12.00 $3,312.00 $12.00 $3,312.00
14 Thermoplastic Pavement Markings SF 4086 $16.00 $65,376.00 $6.00 $24,516.00 $6.00 $24,516.00
15 Pavement Markers EA 2138 $12.00 $25,656.00 $5.00 $10,690.00 $5.00 $10,690.00
16 Install Sign EA 4 $1,000.00 $4,000.00 $745.00 $2,980.00 $500.00 $2,000.00
17 Adjust Valve Box EA 36 $1,200.00 $43,200.00 $1,000.00 $36,000.00 $1,020.00 $36,720.00
18 Adjust Manhole EA 27 $1,200.00 $32,400.00 $1,500.00 $40,500.00 $1,760.00 $47,520.00
19 Adjust Monument EA 11 $1,200.00 $13,200.00 $1,750.00 $19,250.00 $1,200.00 $13,200.00
20 Pedestrian Push Button EA 3 $5,000.00 $15,000.00 $15,000.00 $45,000.00 $16,100.00 $48,300.00
TOTAL -CONTRACT ITEMS $2,073,743.75 $1,882,564.00 $1,964,916.00
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 2
BID TABULATION FOR:
Replace AC Surfacing 2026
Bid Schedule No.: 5713
', AVERAGE ;
7/28/2026 UNIT
ITEM DESCRIPTION UNIT QTY PRICE
1 Water Pollution Control LS 1 $925A0
2 Traffic Control �S 1 $238,336.60 '
3 Asphalt Concrete TON 8462 ' $115.00
4 Cold Mill Asphalt Concrete SY 32811 ' $5.30
5 Geogrid Mat SY 13401 $7.60 '
6 Utility Location �S 1 $4;565.50
7 Traffic Loop EA 22 $2;200.00
8 Sidewalk (4" PCC) SF 368 $60.00 I
9 Curb And Gutter(6") LF 375 '$77.50
10 Concrete Curb Ramp SF 2709 $35.50
11 Thermoplastic Traffic Stripe (6") LF 44742 ' $1.00 '
12 Thermoplastic Traffic Stripe (8") �F 3165 $2.00
13 Pavement Marking (Green - Bike Lane) SF 276 $12.00
14 Thermoplastic Pavement Markings SF 4086 $6.00
15 Pavement Markers EA 2138 $5.0�
16 Install Sign EA 4 $622.50
17 Adjust Valve Box EA 36 $1;a�0.00 '
18 Adjust Manhole EA 27 $1,630.00
19 Adjust Monument EA 11 $1,475.00 +
20 Pedestrian Push Button EA 3 $15;550.�0
Average Total '
TOTAL -CONTRACT ITEMS $1,923,740.00
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 2
TICE OF XEl�IPTION
To: � Office of Planning and Research FROM: City of Redding
140{� Tenth Street;Room 1Z1 Public Works Department
Sacramento, CA 95814 777 Cypress Av�nue
Redding; CA 96001
� S�lasta Caunty Clerlc
County of shasta
P.t�. Box 990880, 1643 Market Street
Redding,CA 96099�0880
Project Title. Iteplace AC Surfacii�r�,Prc�jeet 2fl26
Froject Laeation—Specific: Browning St, Mistletoe Ln, Canby Road,and Waad Ln.
Project Lacation--City; Reddin�Project Location—County:Shasta
Description of Project: The City of Reddin� praposes an asphalt eoncrete (AC) re�lacement pra�ect on various streets
within residential nei�hbarhaods an Brownin�St, Mistletoe Ln, Canby Road, and Wood Ln.. Work includes street surface
preparatiocl,applicatian of appl•oximately 8,462 tons of asphalt cancrete,installatian ofADA eurb ram s.stripi�pavement
markings„_and paVement lnarkers. C7ne-way traffic control or temporary street closures may be required. The public will be
nc�tified of the project.
Name of Public Agency Ap�roving Project: City of Reddin�
Name af Person or Agency Carrying Clnt Pro,�ect: Qscar C►lais,Project Engineer
Exempt Status: (check o�e)
❑ Mit�isterial [Section 21080{b}(1); 1 S 268]
❑ l7eclared Ernergency[Section 21080(b){3); 15269(a)]
❑ Emergency Froject [Section 210$tl{b)(4); 15269(b)]
❑ Statutory Exemptions. State code number.
� Common Sense Exemption{This project does not fall within an exempt class; but it can be seen with cerYainty thatxhere is
no possibility that the aetivity may have a significant effect on the environrnent(14 CGR 15�&l[b][3]).
� Categorical Exemption. State type and sectlon number: Sec. 15301(c),Existin�Facilities and 15302(c)
Replacement ar Reconstruction
C�1 No exceptians apply that would bar the use of a categorical exernption(PRU 21084 and 14 CCR 15300.2),
Reasons why project is exernpt: Class 1 exemptions include the operation, repair,rnailztenance,or minol•alteratian of
existin� public facilities.Class 2 exemptions include the replacetnent or reconstruction of existin�facilities. The proj�ct
will replace existin asphalt coricrete on multiple roadway_s and will result in no expansian of use. The �roject 11as been
reviewed for sensitive resaurces and will not have a sienificant effect on biolo�;ical or eultural resources such as threatened
e�r endan er� ed species or their habitats, sensitive vegetation cornmt�nities, tribal lands, or tiribal cultural resources The
project has no patential to have a si�nificant effect on the environment.
Lead AgencyCantact Ferson: Tiffai�v Durette Telephone�534.225.41"71
If Filed by Applicant:
1. Attach certified docurnent of eXemption finding.
2. Has a notice of exemption been filed by the public agency approving the project? o Yes ❑Na
,�
� ��
Signature. °� � ,� Date:
Title: Associat Enviranmental S ecialist
�Signed by Lead Agency I�ate received for filing at OPR:
❑ Signed by Applicant
C�,r�t� iti�(ic i aj,. 6_?i)�.:�'
:��
�€�'���L suR��c�r���sP���r��ri�� ������ t�s-r��
�xcH���� �v��s
PI�CDJECT NON111�A�T1+D1� Ff�R
To: Shasta Regionai Transpartati�n Agency(SR7A)
Fram: City af ftedding {�lame of Ftequesting Jurisdictian)
Project Title*:
Replace AC 5urfacing 2026
Total Project Cost Estimate:
$2,952,91(7
�'otal Requested RSTF Exchange �unds Amount:
$1,933,177
Fisca!Year(s) in Which Funds are to be Expended;
FY 2Q26-2027
Stre2t surface preparation, approximately 8,5(1t7+tons af asphalt concrete,
PrOj�Ct D�SCr'iption�r1d Purpi�s�: qpq�-�mps,traffit control,striping, pavement marking,pavement markers
along road section as shown in the drawings and as required by the
specifications at various locations in the City.
Map, na Larger than 8-1J2 x 11, as Appticable: Attaeh to this nomination farm.
Th� attached page includes affirmation statements. You may use the same statement for rnu<Itiple
projects, if similar. Please ensure to crass-reference the project(s)within your statement,
The sub-recipient cooperative agreement far the reimbursement of exper�ded RSTP exchange funds
wiJl inciude a ,provision for administratively modifying pr+�j�cts, as needed. Wholesale revisians to
projects that significantly chan�e the scopes of the arigirral projects, hc�wever, will nat be accepted
withaut;documentation of public r�view and acc€ptance, and wiil b� likely returned to the SRTA
Board of Directc�rs for approval.
� '
�{� ,
Submitted by; ' ����'x Date ,�.�.n���«��� ��7
Michael Webb
Tit1e : airectar of Publi�Warks
* Be specific; If a maintenance project, then out�ine the streets/roads name and what is being done, in order to
match reimbursement requests ta approved projects.
SR7A,R5TP Exchange Funds Project Nominatian Form: FY2025/26
d� >�
�
F�EGICD�1Sil. SlJR�l�lCE T�ANSPC��f7ATItJN PROC�Ft��i1 {RSYPj
E�(�i�1Ai�GE FURtCiS
RRC2JEC1'I�C� IP1�A1`fOt� F�Di�
(Cantinued}
Jurisdictic>n. ��ty of Redding
Contact IndividuaJ: �rendan Carr
Phone Number: (530) 245-?159 Emaii: b�arr@cityofredding,gc�v
2. Stateme�t attesting a good faith effort was made to involve all interested parties and public
eamment uvas invited and considered.
The project is part of the City Qf Redding Biennial b�dget v,�hich was discussed at City Ct�uncil Budget
Workshop Public Nl�etings. On May 20, 2025, the Redding City Cauncil held a Speciai Meeting to
c�nsider, and incorporate input on, the FY 2�26=27 Streets bu�lget dev�lt�pment.
2, Statement �ttesting that the propc�sed project is con�istenC with �dopted plans and progr�ms
and cr�nft�rms with the Shasta 2t322 Regiona! Transpc�rtation Pl�n. Please cite applicable
page(s).
The project is consistent with adopted plans and prograrns.This prQject also helps achieve several gc�als of
the Shasta 2022 Regional Tr�nsportation Plan by keepong "people and freight maving safely, effici�ntly, and
effectively,"' irnproving"the reii�bility, s�fety, efficiency, and resiliency of regionally significant roadw�ys,"'
and optimizing".. regionally significant r�aadways to prol�ng functionality and maximize return on
investment". {'Page 51}
SRTA RSTP Exchange Funds Project Norr�ination�orm. FY 2025/26
. � �
• � •
- �'-_ `,�� /�_' �. � � �� ia �
���� �1 � �I� ��� �� ..� �"
����� __�/j` � ;1 1�������1i�i �/� .
� :-.,, � . A�, I�� ,I� ..� •:i�
�I� ��I ��.. ..� ♦
�: . �� ���I ����i ���I ►�►����
. „�. .�,�I�� �i����� ��,... ��
��i ,,,,,, ,,,,,,,,,,�,,,,,,,,. ���,, � ,�� .� � 1� ���� ������. �I
�`�116iuumnmi = ��'1��' � .� ��",•. � �� �•� �1
� �,,����' ��� ■� � ��/�� �1�
� r— � ,� � S ; . .r , •, • -
r►�►1�►►����1��II������►�i
� ■ � �
��
. �� �
! � ,,
■ � �`' •��
. � � ` � � �
1..._ ���. :;, <� =��
----..: ---._....,,,_���,`� �i 1
����
1 .��.�!11
�, , �
''� �,� �■= �,:��r �
� � ��i -��■�►. ���1►� �i
� � !�I�: :��11►�i���►i'IIi�
- � � ■■. .► ��� �
� i� __� '� �IL'11�i ••. ••'► �. .►
/■ - „ -- �►��►r�������������1
,.■ �I�II�II�II�IIIII�IIII�j� �
� ■ - � e��������►I��;\
:� � �I�I�IIIIIIIL��■,,,�,� :- :: ;
��f ��•�`►...: .'rl�i���111�i :� �� ;
,�� ■■■i�■ ..� •
� s ►� �1/��I�II �� C� ;
� �-_'�� Ci:i�.�rl�,�/���11�1 �.: ��
��� , . ■ � �� ��
����. .r.i�l:ll����������� -. .-
��1�'i : ��� ��� :" ' � �= " �li�
�,�1=��►_.. :1�� IIIIII�.: :IIII�.��
. . ,
. . .
. • . . .
� ■ . . .
�
�, ' • 1 .
����, � •
�, .
, ,�.. � , � , ,
.
.
RESOLUTION NO. 202G-035
A RESOrLUTIOI�T OF THE CITY t?F REDIDING ADUPTING THE LIST ()F
PR{�JE+CT� F C►lt F I S C A]L Y E A R 2 02 6-2 7 FUNDED BY SB 1: THE ROAI)
REPAIR ACCt?UNTABILITY ACT(?F 2017
WHEREAS, Senate Bill 1 {SB 1), the Road Repair and Aceauntability Act c�f�(317 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed inta law by the Govemor in April
2017 in order to address the significant multi-modal transportation funding shartfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of the City of Redding {City) are aware of the projects p�aposed for funding ir� our
comrnunity and which projects have been cornpleted each fiscal year; and
WHEREAS, the City must include a list of all projects (Attachment A) proposed to receive
funding from the Road Maintenance and Rehabilitation Account {RMRA), created by SB 1, in
the Gity budget, which must include a description and the location of each proposed project, a
propased schedule for fihe prc�ject's completion, and the estimate� useful life af the improvement,
and
WHEI2EAS, the �iiy will receive an estimated $2,b30,375 in RIVIRA funding in Fiscal Year
2026-27 frc�m SB 1;and
WHE12EA5,this is the tenth year in which the City is receiving SB 1 funding and will enable the
City to continue essential road tnaintenance and rehabilitation projects, safety improvements,
increasing access and inobility options for the traveling public that wauld not have atherwise been
possible without SB1; and
WHEi�EAS,the City has undergone a public process ta ensure public input into aur community's
project list; and
WHEREAS, the City used a Pavement Management Systern tt� develop portions of the SB 1
project list to ensure revenues are being used on the mast high-priarity and cost-effective projects
that also meet the carnmunity's priarities for transpartation investment�and
WHEREAS, the funding from SB 1 will h�lp the City maintain and rehabilitate streets and roads
and add active transpartation infrastructure throughout the City this year and numerous similar
projects into the future, and
WHEREAS, the SB l project list and overall investment in our local streets and raads
infrastructure with a focus Qn basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technolagy, materials and practices, will have significant
positive ca-benefits statewide,
NUW THE FO , BE IT RESOLVED THAT the City Couneil of Redding, Gounty of
Shasta, State of California, accepts the proposed projects whlch will utilize Fiscal Year 2026-
27 Road Maintenance and Rehabilitation revenues in their delivery. With the listing of
these projects in the adapted �iscal year resolution, the City is reaffirming ta the public �nd
the State our intent to fund these projects {Attachment A) with Road Maintenance and
Rehabilitation Accc�unt revenues funded by SB 1, the Road Maintenance and Rehabilitation
Account for Fiscal Year 2026-27.
I HEREBY CERTIFY that the foregaing resolution was introduced at a regular meeting of the
City Council of the City of Redding an the 19th day of May, 2026, and was duly adopted at
said rneeting by the following vote:
AYES: COUN�II.ME ERS:-Audette,Dr.Dhanaka,Munns,Resner,and L'attau
NQESc �C'QUNCIL ME ERSc - I�1one
ABSENT� �OUNCIL ME ERSs - Nvne
ABSTAIN: C+QUNCIL MEMF3ERS�- None
�.��`'t��� ��;��.:��
MIKE,Z,ITTAu,Mayor
ATTEST. FO APPROVED:
�
���` �
' �� ;�` �' a ,� �
`�w.. �''�,�' �,� � ."��-;�' .3`�� � � �'�
{f,��'SHA ENE TIPTQN, �ity Clerk SENJA N L. STOCK
� Interirn City Attarney
������"'� � � �
sx�a��r��� t�° ��. -� ��a �r s� ��a cc� ;t���c+�a
�����t��ift{����Pco�r�«��e�#�€c�yect�a�i F�r���
����� ������� ��� ����� �������
���r����l����, a���r�c�t`c�r�tact. �� �
�� ���
� � ����"?�5����� ,..__. _a.,..�_�. �,._..��._.wd�
t,c� E�C° �a h' � . �«
� ""��
... . . .. . . . Ese.Sc#�eciul� Usetl�ak
Ltfe
Prrarity
7iite D�scri tion L<cattai� �oan o��ertt Statcas Start C�tnt lete �9ita Max Asseiafi 8er#aCe
FY2�-77 Ttis prtsjeet sa•,It nn:#uae.Pracur�nee�z;ot Ru�sS{c uYortts� .. . �.�Procur�m�kU � ... D7r�.C26 ���{kz`st�t�'7 � .
c3�r�eral Stt�i EquipmettC Procuteritea�i ot Pui;lic a4'Q�:S Sat�F/ .Grt,��'ta�. ����pFtati4ttaV t�eyv 2N>.t � t :�� i t
M1,�taktale��3t�ee Po�53tc�r�ls�and G�ar.F'r�cureEa���?I aE P�st�lte'�ttsrf��� ..�Needs
... . . 5y�tero�`�atai�a�es.��PrYacepeent�n:c�C Ra2d Rka+rt�en�tnCe
;�nd fteRal�h1aien�.t5..PuS1Yt V�'.orks SCaffrng.RePa�r�e�d�
Serv�cv#t7�t Ru�zi�c VS"nths EqUspnaent Re{x�ir�+d
SefYiCtt�.'.a1 Put7tiC 4Jz1rkS 3 Stenfs.'E}AfabaS:S�
Thts prv��ct v,�3i e�etutfe'Cost Est'rw�tatir,c�.Doturr�ent Pre_ Q7t:42t� �3#�#�2?
C�p�Seai. Prepaeaiion.EnvironnroznCai Stutl;{potun�enf�.Pavem?tkt �urt5et C�r NeighUorhoot4�nd .:Cs�t�steuct�o+r C4e�v�?,a?27 �+ ��1�� 1 4
2�?c �2�haBitRepafe(Ex�siinr�y Pam��rg�andtot Stripic} Gtverhilt Dr Nesght�+athccd .antl� . . .. . ... €l3f'Ct�23` 6ritt�??
6�ehai�rR�patr(E*ast«oig aatefy},Preirmanan{:�esfgn,. �Catisfructuart
Pro�pct�c,Pe CteveitaA�'ent.Rdght n€.Nay.�Si�e•u�tk.
andFor�Grossova�k�RehahlRe a�r:�Exi42i��'t �
nei313Ce�;C 7itiS ittOjaCt�rrR mUetde'�DA CUil�Rnntp RBhat�7�t8F�¢� Rtu4f�Dte kJC�tvr�ns alotfq Fe9- 47I.�.6?r3 tk3t�2T
Scarf�czng'�0�& EEr.�tw+�9)B�c;Pc4e tat�a{New),Gcsst Est�rvl�tFxag. Er��fi�¢rng St f�om H�Iltmp?�r 4o Cdnstruet��s {�evr�tax27 n 24 f 7.
C�,�cument Preparahtn3.Cp�.�irc�tri3entak StudyPGrrcum�tt#s. Ci€d�ituras Rd antl alang� � �and {k3,,.G27 �p�.r�Q27
?aventenE R�h�al�YRepaer QExist#r�g},P3u�ng�r�d�os`� Mfstt�tae Enfronr H,1liesp��rE�r �GonsinicCto�i
�tnpAngR�h�q7R�p;�ir(Existxng��afei�+l Pr�#in�lntw��+ ��CfSusn Crac�;€2�i
Cresagn�,�PralectSco�EfevelApnqent n�5�ht.ot.R�':a�Y,
Side.vatk�,andtar Crasses�a4k f2eh32�lRePatr(Er,tst�i��.�..