Loading...
HomeMy WebLinkAbout _ 6.1--Public Hearing Regarding Capital Improvement Plan GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: June 16,2026 FROM: Michael Webb, Assistant City ITEM NO. 6.1 Manager/Public Works Director ***APPROVED BY*** �� � 3,�� �.nu„ ���� � � � � � �� s � ,,�� � 5� � �� �� �� �,��,� � � � =µ 1" irel'We, .. v: aty Vf� a�et Rubliu\ c*rA�.;�Uectetcrr f�ts�_'U2G �}F������'�1'�3(JX �,�ti"�'��.��23a3�TG"I �,. �f������.7 mwebb@cityofredding.org wtarbox@cityofredding.gov SUBJECT: 6.1--Public Hearing to consider Resol�ution approving the City of Redding's Capital Improvement Plan for Fiscal Years 2025-26 to 2030-31. Recommendation Conduct a Public Hearing and, upon conclusion, adopt Resolution approving the City of Redding's Capital Improvement Plan for Fiscal Years 2025-26 to 2030-31. Fiscal Impact The City of Redding's (City) Capital Improvement Plan (CIl') is not binding, nor is it a formal budget document; therefore, it, alone, does not have direct budget implications. However, the CIl' functions as a major reference tool to help in future budgeting decisions. Alter�native Action The City Council (Council) may choose not to adopt the CIP as proposed and provide alternative direction to staff This will render the City out of compliance with the California Government Code and may impact the collection and use of certain funds designated for capital improvement proj ects. Background/Analysis Attached for public review and consideration by the Council is the draft CIP for Fiscal Years (FY) 2025-26 to 2030-31. The CIP is a multi-year schedule of public improvem�nts planned by various City departments. It provides a general prioritization of capital improvements so that the City and the public wi11 be able to determine with greater certainty when projects might move to construetion subject to sufficient revenue collection. The draft CIP is representative of the City's capital improvement needs bas�d on the existing budget, the General Plan, and the individual department master plans. The CIP has several general benefits and funcrions that inelude: Report to Redding City Council June 9,2026 Re: 6.1--Public Hearing Regarding Capital lmprovement Plan Page 2 • Providing a comprehensive look at the City's projected capital and infrastructure plan; • Assisting in forecasting workload and aiding in project coordination between departments (e.g., attempt to prevent paving a street one year and following it up the next year with a waterline); • Assisting in scheduling improvements that require more than one year to construct; • Helping with long-term financial planning; • Providing a tool for setting priorities and obtaining citizen participation in determining those priorities; • Being an essential component in meeting the state legal requirements for public accounting of development impact fee funds; and • Helping to ensure that plans for community facilities are carried out. On May 26, 2026, the Planning Commission reviewed the draft CIP and adopted a finding of consistency with the General Plan pursuant to Sections 65103(c) and 65401 of the Government Code. The main term for the draft CIl' is for FY 2025-26 to FY 2030-31. Additional projects are also identified that are either currently unfunded or are scheduled beyond the FY 2030-31. These additional projects must be funded when needed to provide for anticipated growth based on the City's General Plan. The CIl' contains projects from the following departments/divisions: Airports, Community Services, Redding Electric Utility, Redding Fire Department, Solid Waste, Storm Drain Utility, Streets, Wastewater Utility, and Water Utility. Combined, the main term of the CIl' contains 189 projects, totaling over $751 million. The CIP incl�udes a discussion of current facilities and services, a statement of consistency with the General Plan, and a list of projects with basic descriptions and anticipated funding sources. The Resolution has been approved as to form by the City Attorney. Environmental Review This action is not a project as defined by the California Environmental Quality Act (CEQA), and no further action is required. As projects advance to the design phase, from the approved CIP, environmental review will be conducted to ensure compliance with CEQA. Council Priority/City Manager Goals � Communication and Transparency — "Improve the quality and quantity of communication with the public and City employees to enhance knowledge and increase transparency to improve public trust." � Government of the 21st Century — `Be relevant and proactive to the opportunities and ehallenges of today's residents and workforee. Anticipate the future to make better decisions today." Attachments Resolution Attachment A- Draft Capital Improvement Plan 2025-26 through 2030-31 RESOLUTION NO. 2026- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING ADOPTING THE REDDING CAPITAL IMPROVEMENT PLAN FOR 2025-26 to 2030-31 WHEREAS, a Capital Improvement P1an (CIP) has been prepared which identifies the City's long-term capital iinprovement project needs in a comprehensive and consistent format; and WHEREAS, the CIP was prepared in a format and with content that is consistent with the requirements of Government Code section 66002, which establishes requirements for the preparation of a CIP that includes projects subject to development impact fees; and WHEREAS, the CIP was reviewed by the Redding Planning Commission on May 26, 2026, and was approved as consistent with the General P1an pursuant to Government Code section 65103; and WHEREAS, on June 16, 2026, the City Council held a duly noticed public hearing to allow opportunity for public comment on the draft CIP; and WHEREAS,having satisfied the requirements of law governing preparation, content,general plan consistency, and opportunity for public review, the City Council wishes to adopt said CII' to formalize the document so it can become available for consideration in budgeting, land use planning, and accounting, among other benefits; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Redding does hereby approve and adopt the Redding Capital Improvement Plan for 2025-26 to 2030-31 included herewith as Attachment "A." I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 16th day of June,2026,and was adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: NOES: COUlYCIL MEMBERS: ABSENT: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: lYIIKE LITTAU,Mayor ATTEST: FORIYI APPROVED: SHARLENE TIPTON, City Clerk BENJAMIN L. STOCK, Interim City Attorney t�, ���."�ti ���t �� : �����. 1� � � , . , ,.. ;��?� ' „' �,t w.� ,� �t �. , ., � ��, � ���e .� � � . ..i.,.�—, „��� ,.., ��� ._ .0 � _.:;.. �� .,� zlw �c� � ��.' � i t � �'�� R � � � �� •� A ����~ ��1�c�1�Ij(lYi r'c. ` ., �'�. ��r:; � �,,m�". ����� i7iJt�t41��� ��'.d 3t��°S,��Y� su �t�}47 ;� � ( r � � �s���V{{?}ff <41l � W � " .s.. � i �'d" y,t tt " � * � {� �r � 9 1 f " ` � . i r t � � h � ( � . t W � •• �� �� � �.. � ��' .,.�`..�' . , c � Y, W. � � ,. ,,, �� � '�"'� 'd�i I '� , �, , � . � � � � �� . ,.M�,���, � � �. a e u,��.�, �,_�..w . �' �Q �� �`•.,j��, , , „� . v�,� � � • � � �� ,�� � �� � � _ _� � r7 � �'� t=.,,z; w , .� .�:`���� �� � �� �� ��� ��;��� � � � � �� �� � � � �, � � w �� � � � � �.. . i � • � , , , 1 1 1 T � t �s INTRODUCTION..........................................................................................................................................A-1 A�IGNMENT WITH THE GENERA�P�AN.................................................................................................A-1 RE�ATIONSHIP TO THE CITY'S FINANCIAL PLAN.....................................................................................A-3 CITYWIDE COORDINATION AND PROJECT DEVELOPMENT ...................................................................A-4 CIP ORGANIZATION................................................................................................................................A-5 SECTION B - GENERAL OVERVIEW...................................................................................................A-5 SECTION C - DETAILED PROGRAM SUMMARIES..............................................................................A-5 SECTION D - FUTURE PROJECTS AND UNMET NEEDS......................................................................A-5 GENERA�OVERVIEW..................................................................................................................................B-1 AIRPORTS ...............................................................................................................................................B-1 COMMUNITYSERVICES..........................................................................................................................B-2 PUBLICSAFETY.......................................................................................................................................B-2 REDDING ELECTRIC UTILITY....................................................................................................................B-3 SOLIDWASTE .........................................................................................................................................B-4 STORMDRAINS......................................................................................................................................B-5 STR E ETS..................................................................................................................................................B-5 BUILDING MAINTENANCE......................................................................................................................B-5 WASTEWATE R........................................................................................................................................B-6 WATER....................................................................................................................................................B-6 PROJECT SUMMARY...................................................................................................................................B-7 FUNDING OVERVIEW BY DIVISION...........................................................................................................B-14 FUNDING OVERVIEW BY SOURCE............................................................................................................B-17 DETAILED PROGRAM SUMMARIES............................................................................................................C-1 AIRPORTS ...............................................................................................................................................C-2 COMMUNITY SERVICES........................................................................................................................C-16 REDDING E�ECTRIC UTI�ITY..................................................................................................................C-23 REDDING FIRE DEPARTMENT...............................................................................................................C-28 SOLIDWASTE .......................................................................................................................................C-32 STORMDRAINS....................................................................................................................................C-36 STREETS................................................................................................................................................C-38 WASTEWATER......................................................................................................................................C-51 WATER..................................................................................................................................................C-59 UNMET NEEDS & FUTURE PROJECTS.........................................................................................................D-1 FUTUREPROIECTS..................................................................................................................................D-4 FUTURE PR0IECTS WITH IMPACT FEES .................................................................................................D-7 SECTI�IV A The City of Redding's 2025-26 to 2030-31 Capital Improvement Plan (CIP)serves as a comprehensive five- year planning document that identifies anticipated capital projects, estimated project costs, proposed funding sources, and projected implementation schedules for major public infrastructure investments throughout the city. The CIP is intended to guide the orderly development, maintenance, rehabilitation, and replacement of public facilities necessary to support existing services, accommodate future growth, and protect the long-term health, safety, and welfare of the community. The CIP functions as both a planning and financial management tool. It provides a framework for evaluating infrastructure needs, prioritizing capital investments, coordinating project delivery across departments, and aligning available resources with the City's short- and long-term objectives. Through this process,the City is better able to anticipate future capital needs, identify funding constraints, pursue outside funding opportunities, and make informed decisions regarding the timing and scope of capital projects. The City prepares and adopts the CIP in accordance with applicable provisions of California Government Code Section 66002 and other local planning and budgeting requirements.The CIP provides a coordinated overview of the City's planned capital expenditures and the facilities necessary to implement the City's General Plan, master plans,development impact fee programs,and other long-range planning documents. LI 1` f T' The projects included in the Capital improvement Plan are generally rooted in the City's General Plan, departmental master plans,infrastructure studies,regulatory requirements,asset condition assessments, and other long-range planning efforts. These planning documents establish the policy direction, service level expectations, growth assumptions, and infrastructure needs that inform the development of individual capital projects. The General Plan is the City's primary long-range planning document and serves as the foundation for future growth,development, public services, infrastructure,environmental protection, mobility, housing, economic development, and community quality of life. It establishes the City's overall vision and provides the goals, objectives, and policies that guide decision-making over time. Because public infrastructure is necessary to support both existing development and future growth,the Capital Improvement Plan is one of the key tools used to help implement the General Plan. The CIP translates long-range policy direction into a coordinated program of capital projects. While the General Plan identifies the City's broad goals and policy framework, the CIP identifies specific infrastructure improvements, estimated project costs, anticipated funding sources, and projected implementation schedules. In this way,the CIP helps connect the City's long-term vision with the practical investments needed to maintain and improve public facilities. For example,the General Plan includes goals and policies related to the City's wastewater treatment and collection system.The Wastewater Master Plan builds upon that direction by evaluating projected growth, system capacity, regulatory requirements, infrastructure condition, revenue assumptions, and long-term A-� SECTI�IV A operational needs.Those identified needs are then developed into individual capital projects, prioritized, scheduled, and incorporated into the CIP. This process ensures that capital improvements are considered within the broader context of community needs, infrastructure condition, financial capacity, regulatory obligations, and adopted City policy. By linking capital planning to the General Plan, departmental master plans, and other long-range planning documents, the CIP helps ensure that public investments are coordinated, strategic, and consistent with the City's overall vision for growth and service delivery. The Planning Commission plays an important role in this process. Under California Government Code Section 65103(c), planning agencies are responsible for reviewing the City's capital improvement program for consistency with the adopted General Plan. This review helps ensure that proposed capital projects support the City's adopted land use policies, infrastructure goals, public facility needs, and long-term planning objectives. FIGURE 1:GOALS AND POLICIES LISTED BY MAJOR PROGRAM AREA � � �. -� 0� -w Airports CDD2,EJ6,PF11,T9 CDD2E,EJ6A-D,PF11A-E,T9A-C Community Services EJ6,PF12,PF13,R2,R5,R11-R13 EJ6A-G,PF12A-C,PF13A-C,R2A-C, R5A-C,R11A-F,R12A-B,R13A-H REU CDD18,EJ6,PF6 CDD18A-D,E16B-D,PF6A-H RFD PF3,PS4 PF3A-F,PS4H-R Solid Waste CDD2,EJ6,PF7 CDD2E,EJ66-D,PF7A-H Storm Drain CDD2,CDD4,CDDS,PF1,PF8,PS2 CDD2E,CDD4H/I,CDDSA-D,PF11, PF8A-F,PS2F T1A/D/G/H/I/J,T2A/B,T4A,TSA, Streets T1,T2,T4,T5,T6,T8,PF10 T6B/D,T8A/B,PF10A/C Wastewater CDD2,CDD18,E16,PF1,PFS,NR9 CDD2E,CDD18D,EJ6B,PF11/J,PFSA-E, NR9A-I as applicable Water CDD2,CDD18,EJ6,PF1,PF4,NR2,NR9 CDD2E,CDD18D,E166,PF1I/J,PF4A-H, NR2A-D,NR9A-I as applicable The Planning Commission's review does not replace the City Council's authority to approve the CIP or appropriate funding for specific projects. Rather, the Planning Commission's role is to evaluate whether the proposed CIP is consistent with the General Plan. This provides an important planning-level review before the CIP is considered as part of the City's broader budget and financial planning process. �,-2 The Planning Commission reviewed the 2025-26 to 2030-31 Capital Improvement Plan on May 26th,2026, and made the finding that it is consistent with the City of Redding General Plan. � 1"I 1 �' Bl" ' 1 1 � Development of the CIP is closely coordinated with the City's two-year budget and ten-year financial planning process. This biennial process includes detailed staff analysis, review of existing and projected revenues, evaluation of operational and infrastructure needs, and opportunities for public involvement. Through this process, the City identifies both basic municipal service needs and specific infrastructure priorities,then evaluates available funding from local, state, and federal sources. The CIP reflects the City's ongoing effort to balance infrastructure needs with available financial resources. Capital projects often require multiple years of planning, design, environmental review, right-of-way acquisition, permitting, construction, and closeout. As a result, the CIP provides an important bridge between long-range infrastructure planning and annual or biennial budget implementation. The 2025-26 to 2030-31 CIP represents a projected $751 million dollar investment in the City's public infrastructure. Funding for the plan is anticipated from 48 different sources, which are grouped into 10 funding source categories. A detailed breakdown of CIP funding by individual funding source begins on page B17, and a summary by funding source category is provided in the accompanying chart. FIGURE 2:TOTAL PROJECTED FUNDING BY MAJOR FUNDWG CATEGORY -^� 1 ► o � ! o i e t � i ', Airport Fund , 1,275,776 613,853 1,074,450 1,394,910 275,702 '', 382,727 Anticipated Grant I, 5,296,166 8,062,176 13,356,151 54,099,915 59,412,675 '', 5,866,944 Developer Contribution I 977,347 ' 75,000 , General Fund ', 65,000 6,531,940 9,522,052 15,499,000 ; 6,000,000 ', 6,000,000 --- - --- —— — -- - -- -- — --- - --- - Grant 46,399,935 � 34,169,836 50,759,237 � 11,627,041 75,000 75,000 , Impact Fees ', 3,001,684 9,379,938 35,368,399 10,200,000 3,922,000 , 15,595,000 - -- -- ----- --- �- - - - —__ _ --- �ocal Streets and Roads �263 926 9 484 828 5 491 296 5 330 000 5 330 000 5 330 000 ' Fund , , , , , , , , , , , , , , Park In-�ieu l 41,503 100,000 - - - - ', SRF Loan ', - 50,000,000 - - - ', - Utility Rates '', 76,996,091 40,866,039 50,317,476 33,369,114 25,721,326 '', 19,295,470 Total 140,34U,081 160,1�5,956 165,8$9,061 131,519,9$0 100,736,703 52,620,141 a SECTI�IV A 11`Y I 1 1"1 J T" L 1" Preparation of the Capital Improvement Plan is a collaborative, citywide effort led by the Engineering Division of the Public Works Department, with input from departments throughout the City. Because capital projects support a wide range of public services and infrastructure systems, development of the CIP requires coordination among multiple departments, divisions, commissions, community groups, and partner agencies. Projects included in the CIP are identified through a variety of sources, including the City's General Plan, departmental master plans, infrastructure condition assessments, regulatory requirements, operational needs, public safety considerations, grant opportunities, and long-term financial planning efforts. Each proposed project is evaluated within the context of service needs, available funding, project readiness, implementation timing, and consistency with adopted City plans and policies. The CIP includes projects from across the City's major infrastructure systems, including streets, wastewaterfacilities,waterfacilities,storm drain facilities,airports,parks,and other public improvements. These projects support the continued delivery of essential municipal services and help preserve, improve, and expand the public infrastructure relied upon by residents, businesses,visitors, and City operations. A major emphasis of the 2025-26 to 2030-31 CIP is the rehabilitation and replacement of aging infrastructure, particularly within the City's rate-funded utilities and streets program.These investments are necessary to maintain reliable service, reduce long-term maintenance costs, improve system resilience, and support an acceptable level of service for the community. FIGURE 3:TOTAL PROJECTED FUNDING NEED BY MAJOR PROGRAM AREA !-e< / / a 1 ! W ! ° F / ! Airports 29,678,095 3,576,029 7,561,776 18,495,000 31,997,300 1,249,671 --- - --- ----- ---- Community Z�658,137 19,534,426 25,855,000 23,400,000 5,000,000 - Services REU 24,670,861 11,610,000 15,160,000 13,950,000 13,950,000 8,750,000 RFD - 4,256,280 2,059,000 15,499,000 6,000,000 6,000,000 Solid Waste 100,000 1,790,000 4,200,000 2,145,000 2,000,000 2,345,000 Storm Drain 8,582,176 610,000 610,000 610,000 610,000 610,000 Streets 25,047,497 41,086,182 48,704,164 34,256,866 29,296,077 15,105,000 Wastewater 33,293,378 16,458,290 37,419,985 4,098,540 5,860,370 14,243,880 Water 16,309,937 61,264,749 24,319,136 19,065,574 6,022,956 4,316,590 Total 140,340,081 160,185,95fi 165,8&9,d61 131,519,980 100,736,703 52,620,141 q_� SECTI�IV A ' ' 1 The Capital Improvement Plan is organized to provide both a broad overview of the City's capital program and detailed information regarding individual projects and funding needs. The document includes a general overview, detailed program summaries, and a listing of future projects and unmet needs. SECTIQN B — C�EIVER�� C�VERVIEVid Section B provides a general overview of the CIP, including summaries of each City division contributing to the plan. This section includes division-by-division summaries of all projects, projected project costs, anticipated timing for project development and construction, and an overview of the various funding sources supporting the CIP. The City's 2025-26 to 2030-31 CIP includes 189 projects with a projected funding need of $751 million. Section B provides a summary-level view of these projects and the funding sources anticipated to support the five-year capital program. SE�TION � — �ETAILED PRCiGft�4 SUMMAR6ES Section C provides detailed summaries for each CIP program. These summaries include program overviews as well as individual project descriptions, project locations, funding sources, and anticipated schedules for project development and construction funding. This section is intended to provide a more detailed understanding of the purpose, scope, timing, and funding plan for each capital project included in the five-year CIP. SECTI�RI D — FlJTl1RE PROJECTS AN[� UNMET RlEEf�S Section D identifies future projects and unmet infrastructure needs.This includes projects that fall outside the five-year CIP planning window, projects for which full funding has not yet been identified,and projects that may require additional evaluation before being advanced into the funded CIP. This section also includes projects identified through the City's Development Impact Fee programs and is intended to support compliance with California Government Code Section 66000 et seq. In addition, Section D includes projects identified by City departments as unfunded needs related to ongoing maintenance, rehabilitation, replacement, or improvement of City infrastructure. These projects represent future investment needs that may be necessary to maintain an acceptable level of service for the community. A-5 SECTtOIV� GENERAtL O\/ER�BIEVV 1 The City of Redding owns and operates two airports within City limits: Redding Regional Airport(RDD)and Benton Field (085). The Redding Regional Airport, located in the southeast portion of the City, is listed in the National Plan of Integrated Airport Systems (NPIAS) as a non-hub primary airport based on the availability of scheduled commercial air service and passenger enplanement levels. Benton Field, located close to Downtown Redding at Placer Street and Airpark Drive, is included in the NPIAS as a non-primary general aviation airport and is home to a variety of local aviation users, both private and commercial. Both facilities are primarily funded by the Airport Enterprise Fund and receive federal and state assistance in the form of capital improvement grants for infrastructure development and replacement. The availability of convenient air transportation for residents and businesses is an asset to the community and a significant force multiplier for the local economy; in 2021 the Airports Division commissioned an economic contribution assessment which determined that for each dollar invested in airport capital improvements the Airport generated $325 of economic output. The City of Redding Airports Division is finalizing a new Airport Master Plan (AMP)for RDD to replace the existing master plan which was most recently updated in 2015.The new AMP will address changes to the 20-year outlook for RDD based on an inventory of current infrastructure, FAA-approved passenger enplanement forecasts, and proposed development alternatives. The City of Redding Airports Division annually prepares an Airport Capital Improvement Plan (ACIP) for submittal to the FAA which includes a 6-year outlook of capital improvement projects for which Airport Improvement Plan entitlement and discretionary, or other available federal funding sources, may be requested to assist in developing a given project.The Airport prepared its most recent ACIP for RDD on August 20,2025 and the projects presented have been included with the same detail in this City of Redding Capital Improvement Plan. Development and improvements at Benton Field are guided by the 2005 Benton Airpark AMP.The City of Redding Airports Division prepared the current Benton Field ACIP on August 20, 2025. In addition to FAA grants, Benton Field is also eligible to receive some forms of funding from State grants through the California Department of Transportation, these include annual credits, state AIP-matching grants, and airport loans. In addition to submitting ACIP information to the FAA, the Airports Division includes all current and anticipated federally funded infrastructure projects in the California Department of Transportation Capital Improvement Plan. While projects at RDD are not eligible for state funding, inclusion in the Caltrans CIP ensures that the City of Redding meets its obligations as an airport sponsor and that projects at Benton Field remain eligible for financial assistance from state programs. General Plan Consistency: The projects planned for both airports are consistent with the General Plan's goals, objectives, and policies, which promote the maintenance and enhancement of our airports to provide convenient airport service for the community and strive to minimize any adverse impacts resulting from aircraft operations or airport expansion. Reference:Goals CDD2,EJ6, PF11,T9; Policies CDD2E, EJ6A— D, PF11A—E,T9A—C. B-i SECTtOIV� ������'��E��/f�E� The Community Services Department is comprised of several operational and functional divisions which include Administration, Parks, Recreation, Redding Aquatic Center, Redding Sports Park, Library,the Civic Auditorium, the Building Maintenance Division, and Communications, Media, and Public Relations Division.The Department's Administration manages over$40 million in projects. In addition to projects, the Department oversees multiple lease agreements, including the Redding Rodeo Grounds, California Soccer Park, Old City Hall, the Diestelhorst Non-profit Office Park, the Civic Auditorium, North Valley Art League, and others.Their oversight also includes various City art projects,the Certified Redding Farmer's Market, the contract for tourism and marketing, and convening the Community Services Advisory Commission, Library Citizens Advisory Committee, Park Naming Committee, and the Art in Public Places Committee. The City's parks system includes 71 developed parks and facilities.The sites encompass over 480 acres with a wide range of facilities, including 32 playgrounds, water play areas, picnic areas, soccer, baseball and softball fields,volleyball,and pickleball courts,a disc golf course, horseshoe pits,skateboard park, roller hockey rink, aquatics center, off-leash dog areas, the Redding Sports Park, and additional special purpose facilities. Among these special purpose facilities are the Senior Citizens Center, the Dr. Martin Luther King Jr. Center, the Benton Dog Park, three boat ramp facilities that provide access to the Sacramento River, and almost 1,000 acres of natural open space. Financial resources continue to be committed to developing neighborhood parks and reactivating City- owned properties to better serve the community's needs. There is a two-member team that cares for all City-owned trees located in parks and the public-right-of-way.A grant-funded team focuses on enhancing and maintaining Redding's boat ramp facilities. A second fire fuel mitigation crew funded by a state grant will work to reduce and maintain hazardous fuels on City property. The Panorama project is scheduled to break ground in 2026, while the Caldwell and South City Park Projects are in their final design phases. Overall, staff continues to apply for and utilize grant funding for other large-scale park development and improvement projects for Panorama, Caldwell, and South City parks. General Plan Consistency: The proposed park and recreation projects are consistent with the General Plan's goals, objectives, and policies which promote the improvement of park and recreation facilities Citywide. Reference: Goals EJ6, PF12, PF13, R2, R5, R11—R13; Policies EJ6A—G, PF12A—C, PF13A—C, R2A—C, R5A—C, R11A—F, R12A—B, R13A—H. �I F T'Y Pc�lrce C?epartrrrerat The Redding Police Department has the primary responsibility of providing police protection and emergency-service response within the City limits. A mutual aid agreement is in effect with agencies on a statewide basis. The Redding Police Department has three main divisions — Administrative Services, Field Operations, and Investigations. Officers are assigned to seven beats throughout the City and are dispatched to calls via radio and mobile data computer. There are currently no planned S-year capital improvements for the Police Department. Fire l���z�rtment The Redding Fire Department has the primary responsibility of providing fire B_2 SECTtOIV� protection and emergency-service response within the City limits.A mutual aid agreement is in effect with California Department of Forestry and Fire Protection (CDF) during the wildland fire season for wildland and structure fires within a one-mile fringe area surrounding the City. An automatic aid agreement with the Shasta County Fire Department is also in effect for structure fires outside the wildland fire season. Under these agreements, the Redding Fire Department responds within a one-mile fringe area surrounding the City and to county islands. Shasta County Fire Department responds to a small geographic area on the east side of the City. The Redding Fire Department has three main divisions: Administration, Operations, and Fire Prevention. It operates from eight stations and a Fire Headquarters at City Hall.The projects proposed for the Fire Department are consistent with the General Plan's goals, objectives and policies, which promote public safety, reliability, and improve necessary facilities citywide. Reference: Goals PF3 and PS4; Policies: PF3A-F, PS4H-R. I L 1' I IL11"Y As a municipal corporation in California,the City of Redding owns,operates,and maintains its own power generation,transmission, and distribution infrastructure within the City limits. In line with its investment in these facilities and its commitment to delivering electricity at the lowest possible cost, The City has historically maintained a policy of being the exclusive electric service provider within the City limits.When new areas are annexed, electric service from the City is extended either by acquiring PG&E facilities or by logically expanding the City's existing electric distribution system. Redding Electric Utility (REU) currently serves customers across 61-square miles, with approximately 72 miles of 115-kV transmission lines and 767 miles of overhead and underground 12-kV distribution lines. REU is proud of its record over the past five years of 99.9935 percent electric service reliability. To address evolving state regulations related to wildfire prevention and the growth of distributed energy installations,the Electric Utility continues to adapt through the following measures: Distribution System Hardening: Continue with implementation measures detailed in the 2024 REU Wildfire Mitigation Plan. Operational Efficiency Enhancement: Utilizing an Outage Management System and workforce management tools to swiftly identify,track, and restore outages, ensuring minimal disruptions. Technology Improvements: Continue to implement communication and system upgrades related to the communication network to provide real-time data to Operations&Engineering,including customer usage, circuit load, and system voltage information for identifying system bottlenecks. The City of Redding filed its second comprehensive Integrated Resource Plan (IRP) with the California Energy Commission (CEC) in 2024 as required by state regulation, and will update the plan at least every five years as required. The IRP is a guidance document outlining the utility's plan for meeting clean energy mandates and customer resource needs over the next 20 years,system upgrades needed to support load growth, managing load impacts from increased electrification adoption, and provides a framework for future resource procurements needed to support customer demands. a-� SECTtOIV� California Senate Bill 901, enacted in 2018, requires electric utilities with overhead infrastructure in high fire threat areas to implement wildfire mitigation plans (WMPs), as outlined in Public Utilities Code §8387(b)(2). REU launched its first WMP program in May 2019, followed by three more programs in December 2019.Annual Monitoring&Auditing Reports and WMP updates were approved in 2020, 2021, and 2022, with the 2023 WMP incorporating recommendations from the Wildfire Safety Advisory Board and an independent audit by Dudek.The 2024 WMP includes minor updates, completed capital projects, revised target dates, and enhanced system protection settings to reduce wildfire risk. As California increases efforts to reduce carbon emissions through building and transportation electrification,the City has started implementing policies and procedures to support related infrastructure. To ensure reliable energy delivery, it will assess the need to expand its electric transmission and distribution systems through transmission assessments and distribution planning studies. In addition to securing a mix of short-and long-term power purchase contracts, the City also owns and operates 183 MW of gas-fired generation within the City limits. General Plan Consistency. The projects planned for the Electric Utility are consistent with the General Plan's goals, objectives, and policies, which promote programs that provide safe, reliable, and competitively priced electricity for existing and future City electric customers. Reference: REU's 2021 Strategic Plan, 2024 Integrated Resource Plan, 2024 Wildfire Mitigation Plan; Goal CDD18, EJ6 and PF6; Policies CDD18A—D, EJ6B—D, PF6A—H. L� T' Solid waste generated in the City is disposed of at Shasta County's Richard W.Curry/West Central Sanitary Landfill. Under existing state permits, the landfill has sufficient capacity to accommodate the disposal of solid waste at least to the year 2030. Expansion of the facility also appears to be plausible at such time as increased capacity is warranted beyond the extent of existing permits. Although Shasta County owns the Richard W. Curry �andfill, it has contracted with the City of Redding for the operation and management of the facility. This arrangement was formalized in 1988. All residential, commercial, and industrial refuse in Redding is collected by City personnel. Since 1995, the City has operated its own Solid Waste Transfer Station for the transfer of City-collected residential, commercial, and industrial refuse and the transfer of self-haul public refuse. The facility also has the capability of processing materials collected by curbside recycling programs and contains a household hazardous waste drop-off/processing area and a composting area. General Plan Consistency: The proposed solid waste projects are consistent with the Solid Waste Facility Master Plan and the City's General Plan goals, objectives, and policies, which promote the efficient collection and disposal of solid waste, while maintaining an adequate waste-disposal capacity. Reference: Goals CDD2, EJ6 and PF7; Policies CDD2E, EJ6B—D, PF7A—H. B-4 SECTtOIV� Sl`OR11d0 �Ft�INS The Redding Planning Area contains 15 watershed basins. Public storm drain facilities within the City limits are operated and maintained by the City. Surrounding unincorporated areas are the responsibility of the County of Shasta.As new areas are annexed,the City assumes responsibility for stormwater management. The City currently maintains a range of public and private storm drain facilities that provide for the safe and efficient capture and conveyance of stormwater runoff and help minimize flood risk. Storm drain facilities include more than 200 miles of storm drain pipe, over 7,000 inlets, 1,300 outfalls, and 200 miles of open channel.These systems typically discharge into natural ravines or tributaries and ultimately flow to the Sacramento River. General Plan Consistency:The proposed storm drain projects are consistent with the General Plan's goals, objectives, and policies, which support the coordinated provision of public infrastructure, protection of river and creek corridors, functional and attractive stormwater detention and retention facilities, maintenance of adequate public facilities, reduction of flood hazards, and proper management of stormwater runoff from development. Reference: Goals CDD2, CDD4, CDDS, PF1, PF8, and PS2; Policies CDD2E, CDD4H/1, CDDSA—D, PF11, PF8A—F, and PS2F. T Redding is both defined and constrained by its network of highways, roads, trails, railroads, and transit services that move its residents and goods in,through,and out of the community. The City is responsible for ensuring the construction and maintenance of all public streets, sidewalks, bridges, bikeways, traffic signals, and street signage within the City limits. The City also maintains a variety of Caltrans facilities consistent with the terms of various cooperative agreements. Developers are either partially or totally responsible for new street construction depending on the type and location of the project. The City uses public funds to build or improve major streets when the improvements were not constructed as part of a land development project. General Plan Consistency: The projects planned for streets are consistent with the General Plan's goals, objectives, and policies, which promote the development and maintenance of a safe and efficient public- street and bicycle-route system. Reference: Goals T1, T2, T4, T5, T6, T8, PF10; Policies T1A/D/G/H/I/J, T2A/B,T4A,TSA,T6B/D,T8A/B, PF10A/C. B I I The Building Maintenance Division is responsible for many internal City functions including the maintenance and repair of the City's facilities such as City Hall, the Corporation Yard and the multiple Redding Fire Stations to name a few.There are currently no planned S-year capital improvements for the division. a-s SECTtOIV� �/9/��'TE�/AT'E Ft The City provides wastewater service to nearly all developed property within the City and to a few small developments in the surrounding unincorporated area. The wastewater system is served by two treatment plants and a collection system. Facilities include:the Clear Creek Wastewater Treatment Plant, initially constructed in 1966,which has a design capacity of 9.4 million gallons per day(mgd) average dry weather flow and 40 mgd peak wet weather flow; the Stillwater Wastewater Treatment Plant, put into service in 1992,which has a design capacity of 3.4 mgd average dry weather flow and 14.4 mgd peak wet weather flow; and the City's wastewater collection system, which has approximately 445 miles of sewer mains, 18 lift stations,and over 8,250 manholes.The City is the sole provider of wastewater service within the City limits. The wastewater utility provides service to more than 43,000 household equivalents. One household equivalent is the average amount of wastewater produced by an average single-family residence, which is approximately 240 gallons per day. General Plan Consistency:The proposed wastewater projects are consistent with the General Plan's goals, objectives,and policies,which support efforts to maintain an adequate level of service in the City's sewage collection and treatment system as needed to meet existing and future needs. Reference: Goals CDD2, CDD18, EJ6, PF1, PF5, NR9; Policies CDD2E, CDD18D, EJ6B, PF11/J, PF5A—E, NR9A—I as applicable. � The City provides water for domestic and fire-suppression uses to most of Redding and to small portions of the surrounding unincorporated area.The water system is supplied by two treatment plants and well fields. Facilities include: the Foothill Treatment Plant, which has a capacity of 28 million gallons per day (mgd); the Buckeye Treatment Plant, which has a capacity of 14.0 mgd; the Enterprise and Cascade well systems, which have a capacity of 19.1 mgd; and the City's water distribution system, which has approximately 560 miles of water mains. The water system serves about 83 percent of the current population of Redding and about 1,800 residents in the surrounding unincorporated area. The water utility provides service to approximately 30,000 households. General Plan Consistency: The proposed water projects are consistent with the General Plan's goals, objectives, and policies,which support efforts to maintain an adequate level of service in the City's water treatment and distribution system as needed to meet existing and future needs. Reference: Goals CDD2, CDD18, EJ6, PF1, PF4, NR2, NR9; Policies CDD2E, CDD18D, EJ6B, PF11/1, PF4A—H, NR2A—D, NR9A—I as applicable. �_& SECTI�iV B � � I �� I����"�S Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page A-BEN-26-1 Eastside T-Hangar Taxilane Reconstruction 2026-27 $370,000 C-2 A-BEN-26-2 Benton Field Vehicle Gate Replacement 2026-27 $36,000 G2 A-BEN-27-1 Security Fencing- North RPZ 2026-27 $357,000 C-2 A-BEN-27-2 Benton Field West Side Open Hangar Pavement 2027-28 $100,000 C-3 Rehabilitation A-BEN-28-1 Reconstruct Eastside T-Nangar Taxilanes and Drainage 2027-28 $3,570,000 C-3 Improvements- Phase 2-Construct A-BEN-28-10 Cameras at Access Control Gates 2027-28 $50,100 C-3 A-BEN-28-2 Westside T-Hangar Taxilane Reconstruction- Design 2029-30 $378,000 C-4 A-BEN-28-6 FBO HVAC Replacement 2027-28 $40,000 G4 A-BEN-28-7 CHP Hangar HVAC Replacement 2027-28 $18,000 G4 A-BEN-28-8 Cardan Hangar Swamp Coolers 2027-28 $15,000 C-5 A-BEN-29-1 Westside T-Hangar Taxilane Reconstruction -Construction 2029-30 $4,000,050 C-5 A-BEN-29-2 Rehab Parallel Taxiway A- Design 2029-30 $89,250 G5 A-BEN-30-1 Rehabilitate Parallel Taxiway"A"-Construction 2029-30 $420,000 C-6 A-BEN-30-2 Runway 16 Approach Obstruction Removal 2029-30 $105,000 C-b A-BEN-31-1 Northeast Apron and Taxilanes Reconstruction 2030-31 $344,170 C-b A-BEN-31-2 Airport Pavement Management Study 2030-31 $52,501 C-7 A-BEN-31-4 Airport Beacon 2030-31 $8,000 G7 A-BEN-31-b AWOS System Upgrades 2030-31 $50,000 C-7 A-MUN-22-2 Terminal Assessment Study 2025-26 $239,315 C-8 A-MUN-22-8 Master Plan Update 2025-26 $476,990 C-8 A-MUN-23-2 PassengerTerminal Public Parking Design/Construction 2025-26 $1,239,043 C-8 A-MUN-24-1 R�nway 16-34, 12-30 and Taxiway Connectors-Phase I, II, 2025-26 $28,188,345 G9 & III A-MUN-26-1 Wildlife Hazard Assessment 2026-27 $175,000 C-9 A-MUN-26-2 Master Drainage Study-Comprehensive Property Analysis 2026-27 $585,200 C-9 A-MUN-26-3 Runway Closure Marker Procurement 2026-27 $100,000 C-10 A-MUN-26-4 Runway 16-34 Safety Area Improvements- Design 2026-27 $1,147,231 C-10 A-MUN-27-1 Acquire Snow Removal Equipment 2027-28 $315,000 C-10 A-MUN-27-2 GA Transient Apron Rehabilitation- Design 2027-28 $150,000 C-1 1 A-MUN-27-3 GA Transient Apron Rehabilitation-Construction 2027-28 $650,000 C-1 1 A-MUN-27-4 Rental Car Lot Improvement Reimbursement 2026-27 $240,000 C-1 1 A-MUN-28-1 Security & Perimeter Fencing (incl. Cameras) 2028-29 $4,725,000 C-12 A-MUN-28-10 Acquire Snow Plow Attachments for Utility Vehicles 2026-27 $40,000 C-12 A-MUN-28-2 Taxiway Connector Reconstruction & Electrical 2028-29 $29,498,676 G12 Improvements A-MUN-28-4 RJC Fuel Truck Maintenance Building Improvements 2028-29 $35,000 C-13 A-MUN-28-5 Cornucopia Building HVAC Replacement 2028-29 $20,000 C-13 A-MUN-28-6 Peri Hangar Roof Replacement 2028-29 $300,000 C-13 A-MUN-28-7 Terminal Building Ticket Counter Expansion 2028-29 $300,000 G14 A-MUN-28-8 Cameras for Access Control Gates (Phase I) 2028-29 $100,000 C-14 A-MUN-28-9 Forkiift Replacement 2026-27 $80,000 C-14 A-MUN-29-1 R�nway 17-35 Safety Area Improvements- Phase 2 2028-29 $13,650,000 C-15 A-MUN-30-1 Airport Rental Car Wash Facility 2030-31 $300,000 C-15 $92,557,871 �-7 SECTI�iV B � � I �� ��C`Y1 1J�11�� � ��/���5 Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page BRLIB23001 Burney Library Infrastructure Grant 2025-26 $449,442 C-16 BR�IB23002 Anderson �ibrary Infrastructure Grant 2025-26 $415,993 C-16 CS-2019-01 California Soccer Park 2027-28 $20,000 C-16 CS-2024-07 Jenny Creek 2025-26 $2,125,427 C-17 CS-2024-12 Redding Aquatic Center Improvements 2025-26 $100,000 C-17 CS-2025-01 Overlook Project 2026-27 $1,130,000 C-17 CS-2025-02 Redding Sports Park 2025-26 $10,100,000 C-18 CS-2025-03 The Peaks Subdivision Park 2028-29 $3,400,000 C-18 CS-2025-04 Civic Auditorium 2028-29 $3,500,000 C-18 CS-2025-05 Oregon Gulch Trails 2028-29 $2,600,000 C-19 LIBRA23001 Redding Library Infrastructure Grant 2025-26 $1,200,000 C-19 PARKG23003 Caldwell Park Expansion Project 2026-27 $5,006,000 C-19 PARKG23005 Panorama Park 2026-27 $26,000,000 C-20 PARKG23007 Turtle Bay Boat Ramp Improvements 2025-26 $6,198,268 C-20 PARKG23029 South City Park 2027-28 $7,000,000 C-21 PARKS23002 MLK JR. Center& Park 2027-28 $3,985,000 C-21 PARKS23025 Salt Creek Heights Park Phase II 2028-29 $1,500,000 G21 PARKS23026 Shastina Ranch Park&Trail Development Phase II 2027-28 $1,717,433 G22 $76,447,563 E� Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page REU-2017-15 Redding Power Substation Controls Modernization 2025-26 $99,360 C-23 REU-2019-02 Unit 5 Breaker Replacement 2025-26 $349,901 C-23 REU-2021-05 Fire Protection Monitoring System 2025-26 $109,633 C-23 REU-2022-01 Stillwater Substation 2025-26 $220,810 C-24 REU-2023-02 Workforce Management System 2025-26 $137,376 C-24 REU-2024-01 Power Plant Cathodic Protection System 2025-26 $1 15,350 C-24 REU-2024-02 Power Plant Administration Building 2025-26 $4,862,670 G25 REU-2024-03 Overhead/Underground Replacement 2025-26 $2,597,800 C-25 REU-2024-04 Substation Security Upgrades 2025-26 $4,437,786 C-25 REU-2024-05 Substation Circuit Switcher Replacement 2025-26 $492,270 C-26 REU-2025-01 Whiskeytown Unit 9 FERC Relicensing 2025-26 $575,000 C-26 REU-2026-01 General System Improvements Ongoing $52,922,905 C-26 REU-2026-02 GIS Utility Network Upgrades/Software Replacement 2025-26 $2,000,000 C-27 REU-2026-03 Future Revenue Funded Capital Projects Ongoing $19,170,000 G27 $88,090,861 �-8 SECTI�iV B � � I �� � Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page RFD-2024-01 Fire Station 1 BC Quarters Plumbing 2025-26 $40,000 C-28 RFD-2024-02 SCBA Replacement 2026-27 $966,280 G28 RFD-2025-02 Fire Station 2 Upgrades 2030-31 $6,000,000 C-28 RFD-2025-03 Fire Station 3 Reb�ild 2028-29 $7,000,000 C-29 RFD-2025-04 Fire Station 4 Upgrades 2028-29 $6,000,000 C-29 RFD-2025-06 Fire Station 6 Upgrades 2029-30 $6,000,000 C-29 RFD-2026-07 Fire Station 6 Burn Building 2026-27 $750,000 C-30 RFD-2026-08 Fire Station 6 Training Tower 2026-27 $400,000 C-30 RFD-2026-09 Hose Replacement 2026-27 $600,000 C-30 RFD-2026-12 Engine Replacement 2026-27 $3,375,000 C-31 RFD-2027-10 Communications Replacement 2028-29 $2,499,000 C-31 RFD-2027-11 MDT/AVL Replacement 2027-28 $184,000 C-31 $33,814,280 II � Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page SW-2026-01 West Side Hauling Yard 2026-27 $3,360,000 C-32 SW-2026-02 MRF Tipping Building Expansion 2026-27 $2,100,000 C-32 SW-2026-03 Pit Area Lift Station Retrofit 2026-27 $500,000 C-32 SW-2026-05 Transfer Station Gate Repair 2026-27 $100,000 C-33 SW-2029-01 Organics Pre-Processing Expansion 2026-27 $1,540,000 C-33 SW-4941-01 Transfer Station Tipping Floor 2025-26 $600,000 C-33 SW-4941-02 Transfer Facility Resurface Asphalt Ongoing $600,000 C-34 SW-4941-03 Slurry Seal 2028-29 $50,000 C-34 SW-4941-06 Crane Repairs 2025-26 $280,000 C-34 SW-4941-13 Materials Recovery Facility Expansion 2026-27 $3,200,000 C-35 SW-4941-14 Marshalling Room Remodel 2027-28 $250,000 C-35 $12,580,000 t���'t ��ICI Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page FINAN23002 Bonnyview Boat Ramp Culvert 2025-26 $3,335,794 C-36 FINAN23003 Tarmac Culvert Storm Drain Repair 2025-26 $3,500,000 C-36 SD-2026-01 Storm Drain Replacement Ongoing $4,088,053 C-36 SDADM23005 Full Trash Capture Project Pilot 2025-26 $708,328 C-37 $11,632,176 B-9 SECTI�iV B � � I �� �� ��� Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page PWENG23003 Canyon Road Bridge over ACID Canal 2027-28 $3,822,789 C-38 PWENG23004 Turtle Bay to Downtown 2025-26 $2,349,237 C-38 PWENG23005 Bridge Maintenance Program Ongoing $721,809 C-38 PWENG23006 Systemic Left Turns 2025-26 $2,056,180 C-39 PWENG23007 Systemic Intersection Safety Lighting 2025-26 $775,130 C-39 PWENG23009 Victor&Cypress ATP (VCAT) 2026-27 $8,992,143 G40 PWENG2301 1 Old Oregon Trail Widening 2025-26 $2,414,913 C-40 PWENG23012 Old Alfiuras Road Bridge over Churn Creek 2025-26 $700,000 C-41 PWENG23013 Girvan Road Bridge over Olney Creek 2026-27 $8,134,420 G41 PWENG23014 Westside Road Bridge over Canyon Hollow 2025-26 $6,126,626 C-41 PWENG23015 Eastside Road Bridge over Canyon Hollow 2026-27 $3,839,000 C-42 PWENG23016 Eastside Road Bridge over Olney Creek 2025-26 $5,334,086 C-42 PWENG23017 Sacramento Drive Bridge over Olney Creek 2027-28 $9,625,000 C-42 PWENG23020 Airport Corridor Phase II 2026-27 $1,803,423 C-43 PWENG23024 Churn Creek/Rancho/Victor Roundabout 2025-26 $16,760,000 C-43 PWENG23025 Stiliwater Business Park-Phase II 2025-26 $9,542,052 C-43 PWENG23030 California St Bikeway Project 2025-26 $1,499,691 G44 PWENG23035 Shasta View North 2026-27 $4,044,244 C-44 PWENG23036 Butte Street Boogie 2027-28 $7,491,959 C-45 PWENG23037 Victor Improvement Project 2027-28 $6,317,268 C-45 PWENG23039 Eastside RRX 2025-26 $67,646 C-45 PWENG23041 Oregon Street Improvements 2025-26 $1,640,605 C-46 PWENG23042 Calaboose Creek Core Revitalization 2026-27 $3,672,940 C-46 PWENG23044 RR Ave Corridor 2025-26 $88,900 C-46 ST_2026-001 Buenaventura Fill Repair 2026-27 $1,150,000 G47 ST_2026-003 Victor Avenue North Improvement 2029-30 $15,490,727 G47 ST-4226-08 Canby Road Widening 2027-28 $555,000 C-47 STADM23012-1 Traffic Calming Ongoing $300,000 C-48 STADM23012-2 Small Projects Ongoing $1,200,000 G48 STADM23014-1 Replace Asphalt Concrete Ongoing $15,000,000 G48 STADM23014-2 Cape Seal Ongoing $15,000,000 G49 STADM23014-3 Citywide Pavement Rehab Backlog Ongoing $30,000,000 C-49 STADM23016-1 Sidewalk Replacement Ongoing $1,500,000 C-49 STADM23016-2 ADA Curb Ramps Ongoing $825,000 G50 ST-NRTBD-01 Oasis Road Specific Plan Update 2026-27 $155,000 C-50 ST-TIF-CIX WB SR299 @ Churn Creek Roundabout 2030-31 $4,500,000 C-53 $193,495,787 8-10 SECTI�iV B � � I �� �5���! t � Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page WSADM23006 Canter Court Siphon 2025-26 $896,053 C-51 WSADM23008 Clarifier Rehab 2025-26 $1,044,098 G51 WSADM23015 Magnums Remote Lining 2025-26 $3,205,040 C-51 WSADM23017 Oasis Rd Replacement 2026-27 $1,049,891 G52 WSADM23020 SWWTP Sludge Lagoons & Drying Beds 2025-26 $389,845 C-52 WSADM23023 Bisulfite Project 2025-26 $275,880 C-52 WSADM23024 Westside Interceptor-Phase III 2027-28 $15,071,645 C-53 WSADM23031 Clear Creek Wastewater Treatment Plant Ongoing $5,957,335 C-53 WSADM23032 Stillwater Wastewater Treatment Plant Ongoing $2,884,190 C-53 WSADM23035 Infiltration and Inflow Control Ongoing $11,907,556 C-54 WSADM23037 �ift Station Improvements Ongoing $2,066,028 C-54 WSADM23038 Lake Redding Interceptor I 2027-28 $5,300,000 C-54 WSADM23040 RODEO 2025-26 $7,307,261 G55 WSADM23045 Rancho Lift Station 2025-26 $494,621 C-55 WSADM23047 Victor Pipe Replacement 2026-27 $3,775,000 C-55 WSADM23048 Magnolia Sewer Repair Phase II 2026-27 $13,000,000 C-56 WSADM23053 CCWWTP Biosolids Pyrolysis-Phase III/IV 2025-26 $16,000,000 G56 WW-CS-26-01 Stillwater Business Park Sewer 2027-28 $3,000,000 C-56 WW-CS-27-01 Garden Tract Area Replacement 2027-28 $4,000,000 C-57 WW-CS-28-01 Mercury Drive Sewer 2029-30 $1,450,000 C-57 WW-CS-29-01 �akeside Sewer 2029-30 $1,750,000 C-57 WW-CS-29-02 Lake Keswick 2029-30 $3,550,000 C-58 WW-P-CC-01 Lake Redding Interceptor II 2029-30 $6,000,000 G58 WW-TP-CGO6 InfluentScreening 2027-28 $1,000,000 G58 $111,374,443 B-11 SECTI�iV B � � I �� ���� Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Start Date CIP Timeframe Page EW_25 Fig Tree Well 2029-30 $4,500,000 C-59 RS-07-02 Buckeye 2MG Reservoir 2028-29 $5,000,000 C-59 WAADM23006 Cypress Booster Pump Station 2025-26 $737,815 C-59 WAADM23008 EW 12 Wellhead Treatment 2025-26 $429,469 C-60 WAADM23010 Forest Hills-Cascade Racquet Water Main 2025-26 $554,280 C-60 WAADM2301 1 Hill 900 Reservoir 2027-28 $6,205,150 G60 WAADM23016 North Willis Area Water Line Replacement 2025-26 $6,968,604 C-61 WAADM23017 Pump Station 1 Replacement 2026-27 $67,449,275 C-61 WAADM23019 Foothill WaterTreatment Plant Maintenance Ongoing $1,588,370 C-61 WAADM23022 Electrical Control System Upgrades Ongoing $741,550 C-62 WAADM23026 Buckeye Water Treatment Plant Maintenance Ongoing $908,970 C-62 WAADM23042 Pump Station Improvements Ongoing $1,749,754 C-62 WAADM23048 Country Oaks Water Main 2025-26 $3,492,304 C-63 WAADM23050 Keswick Valve Upgrades 2028-29 $2,000,000 C-63 WAADM23051 Canyon Bridge Water Line Replacement 2027-28 $1 12,500 C-63 WAADM23054 Foothill Control Building 2027-28 $4,776,902 C-64 WAADM23060 North Willis Area Water Line Replacement- Phase II 2027-28 $5,000,000 C-64 W-CONV-01 Hill 900 to Placer 2026-27 $2,000,000 C-64 W-CONV-04 Ranchettes 12"WaterMain 2026-27 $1,500,000 G65 W-CONV-O6 Benton 16"Water Main 2027-28 $500,000 C-65 W-CONV-07 West/Court 12"Water Main 2029-30 $714,000 C-65 W-CONV-08 16"Twin View- B8-V24 to Oasis Cntr 5630 2030-31 $3,130,000 G66 W-CONV-09 Stiliwater Business Park Water Main 2027-28 $4,240,000 C-66 W-CONV-10 S Bonnyview Pump Station Upgrades 2025-26 $1,500,000 C-66 W-CONV-14 Cascade Slip Line 12"Water Main 2027-28 $1,400,000 G67 W-FS-03 Railroad Booster Pump Station 2026-27 $500,000 C-67 W-FS-13 Palisades PRVI & PRV2 Upgrades 2030-31 $350,000 C-67 W-PS-03 Pump Station 3 &4 Upgrades 2026-27 $1,000,000 C-68 W-PS-1 1 Linden Pump Station 2028-29 $2,250,000 C-68 $131,298,942 B-12 SECTI�N B � � 1 �� � Y ��1 A[r��1��5 PotentialFunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $1,275,776 $613,853 $1,074,450 $1,394,910 $275,702 $382,727 $5,017,418 Federal FAAGrant $26,837,332 $2,815,495 $6,035,859 $16,658,775 $28,952,070 $829,503 $82,129,034 PFC $1,564,987 $124,938 $290,817 $441,315 $2,568,500 $0 $4,990,557 State Aviation Grant $0 $21,743 $160,650 $0 $201,028 $37,441 $420,862 Total $29,678,095 $3,576,029 $7,561,776 $18,495,000 $31,997,300 $1,249,671 $92,557,871 �c�rr�r��r���y Ser�i��s PotentialFunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total CDFA Grant $100,000 $5,050,000 $4,250,000 $0 $0 $0 $9,400,000 Clean CAGrant $50,000 $1,080,000 $0 $0 $0 $0 $1,130,000 EHCRP Grant $0 $1,000,000 $1,000,000 $0 $0 $0 $2,000,000 General Fund $0 $550,000 $3,170,000 $0 $0 $0 $3,720,000 OR�P Grant $100,000 $200,000 $3,200,000 $0 $0 $0 $3,500,000 ORLP Grant (Federal) $100,000 $2,050,000 $2,000,000 $0 $0 $0 $4,150,000 Park Development Fund $0 $1,217,433 $3,050,000 $2,500,000 $0 $0 $6,767,433 Restricted $41,503 $100,000 $0 $0 $0 $0 $141,503 Section 108 Loan, Park $100,000 $200,000 $3,200,000 $0 $0 $0 $3,500,000 Development State Library Grant $1,449,442 $615,993 $0 $0 $0 $0 $2,065,435 State Park Grant $635,000 $7,371,000 $5,000,000 $0 $0 $0 $13,006,000 Unidentified Grant $0 $100,000 $985,000 $20,900,000 $5,000,000 $0 $26,985,000 WCB Public Access $82,192 $0 $0 $0 $0 $0 $82,192 Total $2,658,137 $19,534,426 $25,855,000 $23,400,000 $5,000,000 $0 $76,447,563 8-13 SECTI�N B � � 1 �� � Y ��1 ��� PotentialFunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Electric Rates $2,311,620 $500,000 $0 $0 $0 $0 $2,81 1,620 System Financing $22,359,241 $11,110,000 $15,160,000 $13,950,000 $13,950,000 $8,750,000 $85,279,241 Total $24,670,861 $11,610,000 $15,160,000 $13,950,000 $13,950,000 $8,750,000 $88,090,861 ��� PotentialPunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Fire Impact Fees $0 $3,274,340 $0 $0 $0 $0 $3,274,340 General Fund $0 $981,940 $1,875,000 $15,499,000 $6,000,000 $6,000,000 $30,355,940 Unidentified Grant $0 $0 $184,000 $0 $0 $0 $184,000 Total $0 $4,256,280 $2,059,000 $15,499,000 $6,000,000 $6,000,000 $33,814,280 S�lic� VV�s�� PotentialPunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $100,000 $1,790,000 $1,000,000 $2,145,000 $2,000,000 $2,345,000 $9,380,000 State Grant $0 $0 $3,200,000 $0 $0 $0 $3,200,000 Total $100,000 $1,790,000 $4,200,000 $2,145,000 $2,000,000 $2,345,000 $12,580,000 St�rrr� �rc�ir� PotentialPunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Storm Drain Rates $1,746,381 $610,000 $610,000 $610,000 $610,000 $610,000 $4,796,381 Wastewater Rates $6,835,794 $0 $0 $0 $0 $0 $6,835,794 Total $8,582,176 $610,000 $610,000 $610,000 $610,000 $610,000 $11,632,176 B-i4 SECTI�N B � � 1 �� � Y ��1 S�C���S PotentialFunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total AHSC Grant $53,759 $0 $0 $0 $0 $0 $53,759 Anticipated Grant $0 $0 $0 $7,000,000 $7,000,000 $0 $14,000,000 Carbon Reduction Program $253,237 $246,763 $0 $0 $0 $0 $500,000 Clean CAGrant $1,087,343 $1,512,343 $2,697,940 $0 $0 $0 $5,297,626 CRRSSA State Grant $25,000 $63,900 $0 $0 $0 $0 $88,900 Dana Traffic Impact Fees $5,000 $50,000 $500,000 $0 $0 $0 $555,000 Developer Contribution $0 $977,347 �0 $0 $0 $0 $977,347 Developer Contribution 2240055 �0 $0 �0 $0 $0 $75,000 $75,000 Electric Utility Rates $0 $1,500,000 $0 $0 $0 $0 $1,500,000 Federal CDBG Grant $76,194 $75,000 $75,000 $75,000 $75,000 $75,000 $451,194 Federa) EDA Grant/CA SHOPP ��,344,257 $0 $0 $0 $0 $0 $1,344,257 Federal Grant $46,763 $6,052,328 $2,017,443 $0 $0 $0 $8,1 16,535 Federal HBP Grant $3,204,267 $7,177,840 $13,122,833 $9,545,000 $0 $0 $33,049,941 Federal HSIP Grant $993,987 $0 $0 $0 $0 $0 $993,987 Federal Section 130 Grant $38,000 $29,646 $0 $0 $0 $0 $67,646 General Fund $65,000 $5,000,000 $4,477,052 $0 $0 $0 $9,542,052 �ocal Streets and Roads Fund $7,263,926 $9,484,828 $5,491,296 $5,330,000 $5,330,000 $5,330,000 $38,230,049 North Redding Traffic Benefit �0 $0 $155,000 $0 $0 $0 $155,000 District Fees State ATP Grant $1,916,330 $824,866 $7,100,000 $0 $0 $0 $9,841,197 State Grant $1,376,470 $620,156 $3,896,021 $2,007,041 $0 $0 $7,899,688 Traffic Impact Fees $2,297,964 $2,471,165 $3,471,754 $1,200,000 $1,200,000 $4,625,000 $15,265,883 Unidentified Grant $5,000,000 $5,000,000 $5,699,825 $9,099,825 $15,691,077 $5,000,000 $45,490,727 Total $25,047,497 $41,086,182 $48,704,164 $34,256,866 $29,296,077 $15,105,000$193,495,787 B-15 SECTI�N B � � 1 �� � Y ��1 Y�/C�S�� �!$�� PotentialFunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total CalRecycle Grant $4,707,261 $0 $0 $0 $0 $0 $4,707,261 Wastewater Connection Fees $544,857 $627,000 $22,371,645 $1,000,000 $1,710,000 $7,840,000 $34,093,502 Wastewater Rates $28,041,260 $15,831,290 $15,048,340 $3,098,540 $4,150,370 $6,403,880 $72,573,680 Total $33,293,378 $16,458,290 $37,419,985 $4,098,540 $5,860,370 $14,243,880$111,374,443 �V���r PotentialFunding Sources 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Grant $554,280 $0 $0 $0 $0 $0 $554,280 SRF Loan $0 $50,000,000 $0 $0 $0 $0 $50,000,000 Water Connection Fees $153,863 $1,740,000 $5,820,000 $5,500,000 $1,012,000 $3,130,000 $17,355,863 Water Rates $15,601,795 $9,524,749 $18,499,136 $13,565,574 $5,010,956 $1,186,590 $63,388,800 Total $16,309,937 $61,264,749 $24,319,136 $19,065,574 $6,022,956 $4,316,590$131,298,942 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Grand Total $140,340,081 >160,185,956 i165,889,061 >131,519,980 >100,736,703 $52,620,141 $751,291,923 Note: The above is an overview of potentia/funding sources for projects contained in the main term of the Capital Improvement Plan and each project is subject to Redding City Council budgetary approval. 8-16 SECYIOIV B i � r�i r Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total AirportFund $1,275,776 $613,853 $1,074,450 $1,394,910 $275,702 $382,727 $5,017,418 Total $1,275,776 $613,853 $1,074,450 $1,394,910 $275,702 $382,727 $5,017,418 Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Anticipated Grant $0 $0 $0 $7,000,000 $7,000,000 $0 $14,000,000 Federal FAA Grant $193,989 $2,815,495 $6,035,859 $16,658,775 $28,952,070 $829,503 $55,485,691 PFC $19,985 $124,938 $290,817 $441,315 $2,568,500 $0 $3,445,555 State Aviation Grant $0 $21,743 $160,650 $0 $201,028 $37,441 $420,862 Unidentified Grant $5,000,000 $5,100,000 $6,868,825 $29,999,825 $20,691,077 $5,000,000 $72,659,727 WCB Public Access $82,192 $0 $0 $0 $0 $0 $82,192 Total $5,296,166 $8,062,176 $13,356,151 $54,099,915 $59,412,675 $5,866,944 $146,094,027 ���r�lc���r C:c�r�tr����tie�r� Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Developer Contribution $0 $977,347 $0 $0 $0 $0 $977,347 Developer Contribution 2240055 $0 $0 $0 $0 $0 $75,000 $75,000 Total $0 $977,347 $0 $0 $0 $75,000 $1,052,347 C�P�'IF�rC�I F[JYlC� Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $65,000 $6,531,940 $9,522,052 $15,499,000 $6,000,000 $6,000,000 $43,617,992 Total $65,000 $6,531,940 $9,522,052 $15,499,000 $6,000,000 $6,000,000 $43,617,992 8-17 SECYIOIV B i � r�i r Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total AHSC Grant $53,759 $0 $0 $0 $0 $0 $53,759 CalRecycle Grant $4,707,261 $0 $0 $0 $0 $0 $4,707,261 Carbon Reduction Program $253,237 $246,763 $0 $0 $0 $0 $500,000 CDFA Grant $100,000 $5,050,000 $4,250,000 $0 $0 $0 $9,400,000 Clean CA Grant $1,137,343 $2,592,343 $2,697,940 $0 $0 $0 $6,427,626 CRRSSA State Grant $25,000 $63,900 $0 $0 $0 $0 $88,900 EHCRP Grant $0 $1,000,000 $1,000,000 $0 $0 $0 $2,000,000 Federal CDBG Grant $76,194 $75,000 $75,000 $75,000 $75,000 $75,000 $451,194 Federal EDA Grant/CA SHOPP $1,344,257 $0 $0 $0 $0 $0 $1,344,257 Federal FAA Grant $26,643,343 $0 $0 $0 $0 $0 $26,643,343 Federal Grant $46,763 $6,052,328 $2,017,443 $0 $0 $0 $8,116,535 Federal HBP Grant $3,204,267 $7,177,840 $13,122,833 $9,545,000 $0 $0 $33,049,941 Federal HSIP Grant $993,987 $0 $0 $0 $0 $0 $993,987 Federal Section 130 Grant $38,000 $29,646 $0 $0 $0 $0 $67,646 Grant $554,280 $0 $0 $0 $0 $0 $554,280 ORLP Grant $100,000 $200,000 $3,200,000 $0 $0 $0 $3,500,000 ORLP Grant (Federal) $100,000 $2,050,000 $2,000,000 $0 $0 $0 $4,150,000 PFC $1,545,002 $0 $0 $0 $0 $0 $1,545,002 Section 108 Loan, Park $100,000 $200,000 $3,200,000 $0 $0 $0 $3,500,000 Development State ATP Grant $1,916,330 $824,866 $7,100,000 $0 $0 $0 $9,841,197 State Grant $1,376,470 $620,156 $7,096,021 $2,007,041 $0 $0 $11,099,688 State Library Grant $1,449,442 $615,993 $0 $0 $0 $0 $2,065,435 State Park Grant $635,000 $7,371,000 $5,000,000 $0 $0 $0 $13,006,000 Total $46,399,935 $34,169,836 $50,759,237 $11,627,041 $75,000 $75,000 $143,106,049 I �}C7C`� � .S Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Dana Traffic Impact Fees $5,000 $50,000 $500,000 $0 $0 $0 $555,000 Fire Impact Fees $0 $3,274,340 $0 $0 $0 $0 $3,274,340 North Redding Traffic Benefit $0 $0 $155,000 $0 $0 $0 $155,000 District Fees Park Development Fund $0 $1,217,433 $3,050,000 $2,500,000 $0 $0 $6,767,433 Traffic Impact Fees $2,297,964 $2,471,165 $3,471,754 $1,200,000 $1,200,000 $4,625,000 $15,265,883 WastewaterConnection Fees $544,857 $627,000 $22,371,645 $1,000,000 $1,710,000 $7,840,000 $34,093,502 WaterConnection Fees $153,863 $1,740,000 $5,820,000 $5,500,000 $1,012,000 $3,130,000 $17,355,863 Total $3,001,684 $9,379,938 $35,368,399 $10,200,000 $3,922,000 $15,595,000 $77,467,020 B-1� SECYIOIV B i � r�i r Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total �ocal Streets and Roads Fund $7,263,926 $9,484,828 $5,491,296 $5,330,000 $5,330,000 $5,330,000 $38,230,049 Total $7,263,926 $9,484,828 $5,491,296 $5,330,000 $5,330,000 $5,330,000 $38,230,049 Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Restricted $41,503 $100,000 $0 $0 $0 $0 $141,503 Total $41,503 $100,000 $0 $0 $0 $0 $141,503 SRF Lcac�r� Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total SRF Loan $0 $50,000,000 $0 $0 $0 $0 $50,000,000 Total $0 $50,000,000 $0 $0 $0 $0 $50,000,000 �ellt� �"E�� Funding Source 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Electric Rates $2,311,620 $500,000 $0 $0 $0 $0 $2,811,620 Electric Utility Rates $0 $1,500,000 $0 $0 $0 $0 $1,500,000 Solid Waste Rates/Fees $100,000 $1,790,000 $1,000,000 $2,145,000 $2,000,000 $2,345,000 $9,380,000 Storm Drain Rates $1,746,381 $610,000 $610,000 $610,000 $610,000 $610,000 $4,796,381 System Financing $22,359,241 $11,110,000 $15,160,000 $13,950,000 $13,950,000 $8,750,000 $85,279,241 Wastewater Rates $34,877,055 $15,831,290 $15,048,340 $3,098,540 $4,150,370 $6,403,880 $79,409,475 Water Rates $15,601,795 $9,524,749 $18,499,136 $13,565,574 $5,010,956 $1,186,590 $63,388,800 Total $76,996,091 $40,866,039 $50,317,476 $33,369,114 $25,721,326 $19,295,470 $246,565,517 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Grand Total $140,340,081 >160,185,956 �165,889,061 >131,519,980 �100,736,703 $52,620,141 $751,291,923 Note: The above is an overview of potential funding sources for projects contained in the main term of the Capital Improvement Plan and each project is subject to Redding City Councii budgetary approval. B-19 SEC710N C C�ET°�ILEC� PROGI2�IVI StJMMARIES This section provides an overview of each capital project included in the five-year Capital Improvement Plan. Each project summary is intended to clarify the project's purpose, scope, anticipated timing, and funding plan. Funding sources are identified within each individual project summary. FIGURE 4:TOTAL FUNDING PER CATEGORY BY MAJOR PROGRAM AREA �•a e i w a f i % { e W t 1 Airports 29,678,095 3,576,029 7,561,776 1$,495,000 31,997,300 1,249,671 Benton Airpark 2,962 860,038 3,693,100 - 4,467,300 979,671 Redding Municipal 29,675,133 2,715,991 3,868,676 18,495,000 27,530,000 270,000 Airport Community Services 2,658,137 19,534,426 25,555,000 23,400,000 '5,OOU,008 Boat Ramp 98,268 - 100,000 6,000,000 - - Infrastructure 1,449,442 1,065,993 3,150,000 5,000,000 5,000,000 - Improvement Park Development 1,085,000 18,268,433 22,105,000 8,400,000 - - Trail Development 25,427 200,000 500,000 4,000,000 - - REU 24,670,861 11,610,OOd 15,160,000 13,950,Q00 13,950,000 8,750,000 ' System Improvements 24,670,861 11,610,000 15,160,000 13,950,000 13,950,000 8,750,000 RFD 4�256�280 ;2„059�000 15�499y000 6��OOi000 6�000�000 Fire Station 4,256,280 2,059,000 15,499,000 6,000,000 6,000,000 Improvements $olid Waste' 100,000 1,790,000 ',4,200,000 2,145,000 '2,0OO,OdO 2,345,000 ' Facility Improvements 100,000 750,000 4,200,000 2,000,000 2,000,000 2,000,000 Facility Maintenance - 1,040,000 - 145,000 - 345,000 Storrn Drain 8,582,176 ' 610,000 610,000 61d,000 b10,000 61Q000 System Improvements 8,582,176 610,000 610,000 610,000 610,000 610,000 Streets 25,047,497 41,086,182 4$,704,164 34,256,$66 29,296,077 15,105,000 Bridges Improvements 4,393,716 8,103,824 16,171,190 9,575,000 30,000 30,000 Street Improvement 16,213,518 30,455,049 32,332,975 24,606,866 29,191,077 15,000,000 Street 4,440,263 2,527,310 200,000 75,000 75,000 75,000 Widening/Extension WasteWater 33,293,378 16,458,290 37,419,985 4,098,540 5,$60,370 14,243,$80 _�_ _.____ms__e___:.��_� _�___ ._�_�_ _��_._._._ M____ , _e_____��._._..�_ Collection System 13,747,529 9,275,000 33,198,325 2,837,270 4,558,210 12,899,500 Improvement Treatment System 19,545,849 7,183,290 4,221,660 1,261,270 1,302,160 1,344,380 Improvements Water 16,309,937 61,264,749 24,319,136 19,065,5�4 '6,022,956 4,316,590 Distribution System 13,958,152 5,000,000 13,252,500 7,750,000 714,000 3,480,000 Improvements Treatment System 2,351,784 56,264,749 11,066,636 11,315,574 5,308,956 836,590 Improvements a � �� �w �e e� e �e e� �� e � � C-1 SECTION C � �������� ������������������ ��������������� ������� �� ����������� Description: This project includes the reconstruction of 16,000 square yards of taxilanes on the eastside of Benton Airpark. These taxilanes are deteriorated and are needed to access City-owned t-hangars. �ocation: 2600 Gold Street Project Cost: Prior Years/Future Costs: �0 Project Type: One-timeBenton Airpark CIP Costs(detailed below) $370,000 Total Project Cost: $370,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $2,962 $918 $0 $0 $0 $0 $3,880 Federal FAA Grant $0 $348,686 $0 $0 $0 $0 $348,686 State Aviation Grant $0 $17,434 $0 $0 $0 $0 $17,434 Total $2,962 $367,038 $0 $0 $0 $0 $370,000 Project Development $2,962 $367,038 $0 $0 $0 $0 $370,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $2,962 $367,038 $0 $0 $0 $0 $370,000 ��������� ������� ��������� ���� ������������� �������� � ���������� Description: Replace Vehicle gate at Benton Field Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $36,000 Total Project Cost: $36,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $36,000 $0 $0 $0 $0 $36,000 Total $0 $36,000 $0 $0 $0 $0 $36,000 Project Development $0 $3,600 $0 $0 $0 $0 $3,600 Construction $0 $32,400 $0 $0 $0 $0 $32,400 Total $0 $36,000 $0 $0 $0 $0 $36,000 �����������4 ��������� � ����°�� ��� I�C�°������ � ������������ Description: Installing security fencing around North Runway Protection Zone location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeBenton Airpark CIP Costs(detailed below) $357,000 Total Project Cost: $357,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $31,391 $0 $0 $0 $0 $31,391 Federal FAA Grant $0 $321,300 $0 $0 $0 $0 $321,300 State Aviation Grant $0 $4,309 $0 $0 $0 $0 $4,309 Total $0 $357,000 $0 $0 $0 $0 $357,000 Project Development $0 $35,700 $0 $0 $0 $0 $35,700 Construction $0 $321,300 $0 $0 $0 $0 $321,300 Total $0 $357,000 $0 $0 $0 $0 $357,000 C-2 SECTION C � I��������� ����� ����� ����� ������� �������µ ����������� ������������������ ��������� �� ���i�������� Description: Pavement Rehabilitation for West Side Open Hangar location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $100,000 Total Project Cost: $100,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $100,000 $0 $0 $0 $0 �100,000 Totql $0 $100,000 $0 $0 $0 $0 $100,000 Project Development $0 $10,000 $0 $0 $0 $0 $10,000 Construction $0 $90,000 $0 $0 $0 $0 $90,000 Total $0 $100,000 $0 $0 $0 $0 $100,000 ���,�,�,µ��������.� �����°�����,� "��„�I����rt���� ���i����i���� ����� ���������� �s�°���r���� I��°�����,�� �� ,����;����.�� Description: Reconstruct Eastside T-Hangar Taxilanes and Drainage Improvements-Phase 2-Construct Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $3,570,000 Total Project Cost: $3,570,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $196,350 $0 $0 $0 $196,350 Federal FAA Grant $0 �0 $3,213,000 �0 $0 $0 $3,213,000 State Aviation Grant $0 $0 $160,650 $0 $0 $0 $160,650 Total $0 $0 $3,570,000 $0 $0 $0 $3,570,000 Project Development $0 $0 $357,000 $0 $0 $0 $357,000 Construction $0 $0 $3,213,000 $0 $0 $0 �3,213,000 Total $0 $0 $3,570,000 $0 $0 $0 $3,570,000 ��������m��� �� �������� ���N���°�� ��������� ��°�.���r.� � �aa..���µ������ Description: Cameras at Access Control Gates Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $50,100 Total Project Cost: $50,100 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $50,100 $0 $0 $0 $50,100 Total $0 $0 $50,100 $0 $0 $0 $50,100 Project Development $0 $0 $5,010 $0 $0 $0 $5,010 Construction $0 $0 $45,090 $0 $0 $0 $45,090 Total $0 $0 $50,100 $0 $0 $0 $50,100 C-3 SECTION C � �������.�� �'���������� �"�������� ���������������� � ������ ��������� �� ���i�����.,a� Description: Westside T-Hangar Taxilane Reconstruction- Phase 1 -Design location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $378,000 Total Project Cost: $378,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $20,790 $0 �20,790 Federal FAA Grant $0 $0 $0 $0 $340,200 $0 $340,200 State Aviation Grant $0 $0 $0 $0 $17,010 $0 $17,010 Total $0 $0 $0 $0 $378,000 $0 $378,000 Project Development $0 $0 $0 $0 $378,000 $0 $378,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $378,000 $0 $378,000 ���� ����P ��������i ��"���' �������� � ���������� Description: HVAC Replacement Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeBenton Airpark CIP Costs(detailed below) $40,000 Total Project Cost: $40,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $40,000 $0 $0 $0 $40,000 Totql $0 $0 $40,000 $0 $0 $0 $40,000 Project Development $0 $0 $4,000 $0 $0 $0 $4,000 Construction $0 $0 $36,000 $0 $0 $0 $36,000 Total $0 $0 $40,000 $0 $0 $0 $40,000 �1���� ����°����� ������ �������������°� I���.���� � �,��I�������� Description: HVAC Replacement Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeBenton Airpark CIP Costs(detailed below) $18,000 Total Project Cost: $18,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $18,000 $0 $0 $0 $18,000 Total $0 $0 $18,000 $0 $0 $0 $18,000 Project Development $0 $0 $1,800 $0 $0 $0 $1,800 Construction $0 $0 $16,200 $0 $0 $0 $16,200 Total $0 $0 $18,000 $0 $0 $0 $18,000 C-4 SECTION C � ���������µ� ��������a �����°�� ���������� ��������� �� ���i�����.,a� Description: Swamp Coolers Replacement for Cardan Hangar location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $15,000 Total Project Cost: $15,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $15,000 $0 $0 $0 �15,000 Total $0 $0 $15,000 $0 $0 $0 $15,000 Project Development $0 $0 $1,500 $0 $0 $0 $1,500 Construction $0 $0 $13,500 $0 $0 $0 $13,500 Total $0 $0 $15,000 $0 $0 $0 $15,000 ��������� �"�������� "���������� ���������i�Q�,�������� � �����������,w������ I��°�����,�� �� �����m=����� Description: Reconstruct Taxilane for Westside Hangar-Phase 2-Construction Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $4,000,050 Total Project Cost: $4,000,050 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $220,003 $0 $220,003 Federal FAA Grant $0 �0 $0 �0 $3,600,045 $0 $3,600,045 State Aviation Grant $0 $0 $0 $0 $180,002 $0 $180,002 Total $0 $0 $0 $0 $4,000,050 $0 $4,000,050 Project Development $0 $0 $0 $0 $400,005 $0 $400,005 Construction $0 $0 $0 $0 $3,600,045 $0 �3,600,045 Total $0 $0 $0 $0 $4,000,050 $0 $4,000,050 ������;� �������� �`�.��������� � � ��������� ���������° � ���I��w,.���� Description: Rehabilitate Parallel Taxiway A Design Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeBenton Airpark CIP Costs(detailed below) $89,250 Total Project Cost: $89,250 Proposed Funding: 2025-26 2026-27 202�-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $4,909 $0 $4,909 Federal FAA Grant $0 $0 $0 $0 $80,325 $0 $80,325 State Aviation Grant $0 $0 $0 $0 $4,016 $0 $4,016 Total $0 $0 $0 $0 $89,250 $0 $89,250 Project Development $0 $0 $0 $0 $89,250 $0 $89,250 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $89,250 $0 $89,250 C-5 SECTION C � ���°����������� ��������C�� �`�������r �K.��°' � ����������.������ ��������� �� ���i������� Description: Rehabilitate Parallel Taxiway A Construction location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $420,000 Total Project Cost: $420,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $0 $23,100 �23,100 Federal FAA Grant $0 $0 $0 $0 $0 $378,000 $378,000 State Aviation Grant $0 $0 $0 $0 $0 $18,900 $18,900 Total $0 $0 $0 $0 $0 $420,000 $420,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $420,000 $420,000 Total $0 $0 $0 $0 $0 $420,000 $420,000 ���°���� "�� ����������� �����°��w�������� I��������� ���n����° � �����wp���� Description: Remove Obstructions on Runway 16 Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeBenton Airpark CIP Costs(detailed below) $105,000 Total Project Cost: $105,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $0 �9,810 $9,810 Federal FAA Grant $0 $0 $0 $0 $0 $94,500 $94,500 State Aviation Grant $0 $0 $0 $0 $0 $690 $690 Total $0 $0 $0 $0 $0 $105,000 $105,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $105,000 $105,000 Total $0 $0 $0 $0 $0 $105,000 $105,000 ��������� ������� ����� ��������� ����������,������� ����,����� �� ���i��.,u���� Description: To replace pavement rated as poor by the Airport Pavement Management Plan. Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $344,170 Total Project Cost: $344,170 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $0 $18,929 $18,929 Federal FAA Grant $0 $0 $0 $0 $0 $309,753 $309,753 State Aviation Grant $0 $0 $0 $0 $0 $15,488 $15,488 Total $0 $0 $0 $0 $0 $344,170 $344,170 Project Development $0 $0 $0 $0 $0 $17,209 $17,209 Construction $0 $0 $0 $0 $0 $326,962 $326,962 Total $0 $0 $0 $0 $0 $344,170 $344,170 C-s SECTION C � ����������� ������������� ������������� ������� ��������� �� ���i�����a� Description: Create Pavement Management Plan for Benton Airpark location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeBenton Airpark CIP Costs(detailed below) $52,501 Total Project Cost: $52,501 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $0 $2,888 $2,888 Federal FAA Grant $0 $0 $0 $0 $0 $47,250 $47,250 State Aviation Grant $0 $0 $0 $0 $0 $2,363 $2,363 Total $0 $0 $0 $0 $0 $52,501 $52,501 Project Development $0 $0 $0 $0 $0 $52,501 $52,501 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $52,501 $52,501 ������°� ��������� ���n����° � �������`��� Description: Airport Beacon Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeBenton Airpark CIP Costs(detailed below) $8,000 Total Project Cost: $8,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $0 �8,000 $8,000 Totql $0 $0 $0 $0 $0 $8,000 $8,000 Project Development $0 $0 $0 $0 $0 $800 $800 Construction $0 $0 $0 $0 $0 $7,200 $7,200 Total $0 $0 $0 $0 $0 $8,000 $8,000 ������ ��}������� �����„����� I���.���� ;� �,��1���-���� Description: AWOS System Upgrades Location: 2600 Gold Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeBenton Airpark CIP Costs(detailed below) $50,000 Total Project Cost: $50,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $0 $0 $50,000 $50,000 Total $0 $0 $0 $0 $0 $50,000 $50,000 Project Development $0 $0 $0 $0 $0 $5,000 $5,000 Construction $0 $0 $0 $0 $0 $45,000 $45,000 Total $0 $0 $0 $0 $0 $50,000 $50,000 C-7 SECTION C � ����������� ������������� ����� ��������� �� �����������.,w� Description: Assessment for new terminal. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $260,685 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $239,315 Total Project Cost: $500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $33,771 $205,544 $0 $0 $0 $0 �239,315 Total $33,771 $205,544 $0 $0 $0 $0 $239,315 Project Development $33,771 $205,544 $0 $0 $0 $0 $239,315 Construction $0 $0 $0 $0 $0 $0 $0 Total $33,771 $205,544 $0 $0 $0 $0 $239,315 ���s"���"` ���� ����������� I��`�����;�`� �� ��,�������� Description: Airport Layout Plan Update & Narrative Report, including an Aeronautical AGIS Survey,Terminal Expansion Study, Energy Audit Assessment, Environmental Surveys, and Land Use Analysis Study. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $576,348 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $476,990 Tofial Project Cost: $1,053,338 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $193,989 $238,450 $0 $0 $0 $0 $432,439 PFC $19,985 $24,566 $0 $0 $0 $0 $44,551 Total $213,974 $263,016 $0 $0 $0 $0 $476,990 Project Development $213,974 $263,016 $0 $0 $0 $0 $476,990 Construction $0 $0 $0 $0 $0 $0 $0 Total $213,974 $263,016 $0 $0 $0 $0 $476,990 ������������ °��°��µ������ ���,�����,� �������� ����������,�'�w��������������� �������� � ��w���!����,w��� Description: Public Parking for Airport Passengers Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $98,610 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $1,239,043 Total Project Cost: $1,337,653 Proposed Funding: 2025-26 2026-27 202�-28 2028-29 2029-30 2030-31 Total Airport Fund $1,239,043 $0 $0 $0 $0 $0 $1,239,043 Total $1,239,043 $0 $0 $0 $0 $0 $1,239,043 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $1,239,043 $0 $0 $0 $0 $0 $1,239,043 Total $1,239,043 $0 $0 $0 $0 $0 $1,239,043 C-s SECTION C � ��������� �����.� ����� ��� ���������� �������:,e���� �� ������� I�.� I��, � ��� ������� �� ����������� Description: Construction phase for project including 4-inch mill and overlay, blast pad reconstruction and initial electrical. �ocation: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $996,477 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $28,188,345 Total Project Cost: $29,184,822 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $26,643,343 $0 $0 $0 $0 $0 $26,643,343 PFC $1,545,002 $0 $0 $0 $0 $0 $1,545,002 Total $28,188,345 $0 $0 $0 $0 $0 $28,188,345 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $28,188,345 $0 $0 $0 $0 $0 $28,188,345 Total $28,188,345 $0 $0 $0 $0 $0 $28,188,345 ���������� ������� �����lt���°�°������ I��w������ � �,����„v�l������'� Description: Wildlife hazard assessment and wildlife hazard management plan development. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeRedding Municipal Airport CIP Costs(detailed below) $175,000 Total Project Cost: $175,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $0 $166,250 $0 $0 $0 $0 $166,250 PFC $0 $8,750 $0 $0 $0 $0 $8,750 Total $0 $175,000 $0 $0 $0 $0 $175,000 Project Development $0 $175,000 $0 $0 $0 $0 $175,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $175,000 $0 $0 $0 $0 $175,000 �������� ������°���� ������ � �'��������������� �'��������� �������� ��E������ � ��������.���� Description: Comprehensive Airport Property Analysis for Drainage Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeRedding Municipal Airport CIP Costs(detailed below) $585,200 Total Project Cost: $585,200 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $0 $555,940 $0 $0 $0 $0 $555,940 PFC $0 $29,260 $0 $0 $0 $0 $29,260 Total $0 $585,200 $0 $0 $0 $0 $585,200 Project Development $0 $585,200 $0 $0 $0 $0 $585,200 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $585,200 $0 $0 $0 $0 $585,200 C-� SECTION C � ���°������ �������°� ������ ��a���.������°����� ��������� �� ������������.,w� Description: Runway Closure Marker Procurement (Lighted X's) Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $100,000 Total Project Cost: $100,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $0 $95,000 $0 $0 $0 $0 �95,000 PFC $0 $5,000 $0 $0 $0 $0 $5,000 Total $0 $100,000 $0 $0 $0 $0 $100,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construcfiion $0 $100,000 $0 $0 $0 $0 $100,000 Total $0 $100,000 $0 $0 $0 $0 $100,000 ��������� ����� ���'��� ��°���� �i�����,������������ ������� ��°������ � ����������� Description: Design and Construction for 16-34 RSA Improvements Location: 6751 Woodrum Circle Project Cost: Prior Years/F�ture Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $1,147,231 Total Project Cost: $1,147,231 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAAGrant $0 $1,089,869 $0 �0 $0 $0 $1,089,869 PFC $0 $57,362 $0 $0 $0 $0 $57,362 Total $0 $1,147,231 $0 $0 $0 $0 $1,147,231 Project Development $0 �1 14,723 $0 $0 $0 $0 $1 14,723 Construction $0 $1,032,508 $0 $0 $0 $0 $1,032,508 Total $0 $1,147,231 $0 $0 $0 $0 $1,147,231 ���,������ ����� I�������r�re�� ��������������� I�������P� � �,���I�.,����� Description: Acquire Snow Removal Equipment (Plow and Broom Attachments) Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeRedding Municipal Airport CIP Costs(detailed below) $315,000 Total Project Cost: $315,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $0 $0 $285,579 $0 $0 $0 $285,579 PFC $0 $0 $29,421 $0 $0 $0 $29,421 Total $0 $0 $315,000 $0 $0 $0 $315,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $315,000 $0 $0 $0 $315,000 Total $0 $0 $315,000 $0 $0 $0 $315,000 C-10 SECTION C � ��� �`�rv��������� ������ ����������������� � ������� ��������� �� �����������4'�W� Description: GA Transient Apron Rehabilitation (1000'x320') Crack Seal,Slurry Seal, Markings) -Design location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $150,000 Total Project Cost: $150,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $0 $0 $135,990 $0 $0 $0 �135,990 PFC $0 $0 $14,010 $0 $0 $0 $14,010 Total $0 $0 $150,000 $0 $0 $0 $150,000 Project Development $0 $0 $150,000 $0 $0 $0 $150,000 Construcfiion $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $150,000 $0 $0 $0 $150,000 �� ���������;�� ������°� ������������°���°���� a.. ��������������°� ��°������ � ���������`�� Description: GA Transient Apron Rehabilitation (1000'x320') Crack Seal,Slurry Seal, Markings) -Construct Location: 6751 Woodrum Circle Project Cost: Prior Years/F�ture Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $650,000 Total Project Cost: $650,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $0 $0 �589,290 �0 $0 $0 $589,290 PFC $0 $0 $60,710 $0 $0 $0 $60,710 Total $0 $0 $650,000 $0 $0 $0 $650,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $650,000 $0 $0 $0 $650,000 Total $0 $0 $650,000 $0 $0 $0 $650,000 ��������� ���� ���� �������°����������°�� ������������������������ �������� � �,�,.�������`'�� Description: Reimbursement of prior rental car lot parking improvements representing the facility's 16%share of the $1.5M airport parking infrastructure loan location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeRedding Municipal Airport CIP Costs(detailed below) $240,000 Total Project Cost: $240,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $240,000 $0 $0 $0 $0 $240,000 Total $0 $240,000 $0 $0 $0 $0 $240,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $240,000 $0 $0 $0 $0 $240,000 Total $0 $240,000 $0 $0 $0 $0 $240,000 c-11 SECTION C � ��������� � ����°�������° �������� �����a�R �&���°������� ��������� �� ������������..,w� Description: Security/Perimeter Fencing,Access Control System,and Wildlife Mitigation Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $4,725,000 Total Project Cost: $4,725,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $0 $0 $0 $4,283,685 $0 $0 $4,283,685 PFC $0 $0 $0 $441,315 $0 $0 $441,315 Total $0 $0 $0 $4,725,000 $0 $0 $4,725,000 Project Development $0 $0 $0 �236,250 $0 $0 $236,250 Construcfiion $0 $0 $0 $4,488,750 $0 $0 $4,488,750 Total $0 $0 $0 $4,725,000 $0 $0 $4,725,000 �����w���°�,° ������ ������� ,����������������`� �����° ������� ���,°����:���� I��°������ � ������������� Description: Purchase of Snow Plow Attachments for Utility Vehicles Location: 6751 Woodrum Circle Project Cost: Prior Years/F�ture Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $40,000 Total Project Cost: $40,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $40,000 $0 $0 $40,000 Total $0 $0 $0 $40,000 $0 $0 $40,000 Project Development $0 $0 $0 $4,000 $0 $0 $4,000 Construction $0 $0 $0 $36,000 $0 $0 $36,000 Total $0 $0 $0 $40,000 $0 $0 $40,000 ............................ ......... ..................... ............................... .......................... ....._............. .............................. ....................... ......................... �`������ �����������u �����������°�,�����i�k� � ����������� ����rc�����i������� ��������� �� ������a����� Description: Taxiway Connector Reconstruction and Electrical Improvements- Phase 1 �ocation: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $29,498,676 Total Project Cost: $29,498,676 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal FAA Grant $0 $0 $1,812,000 $0 $24,931,500 $0 $26,743,500 PFC $0 $0 $186,676 $0 $2,568,500 $0 $2,755,176 Total $0 $0 $1,998,676 $0 $27,500,000 $0 $29,498,676 Project Development $0 $0 $1,998,676 $0 $0 $0 $1,998,676 Construction $0 $0 $0 $0 $27,500,000 $0 $27,500,000 Total $0 $0 $1,998,676 $0 $27,500,000 $0 $29,498,676 C-12 SECTION C � ���� ���� �'����i� ��������������� ���������°��� ��i�°�������������� ��������� �� �����������..,w� Description: RJC Fuel Truck Maintenance Building Improvements Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $35,000 Total Project Cost: $35,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $35,000 $0 $0 $0 �35,000 Total $0 $0 $35,000 $0 $0 $0 $35,000 Project Development $0 $0 $3,500 $0 $0 $0 $3,500 Construction $0 $0 $31,500 $0 $0 $0 $31,500 Total $0 $0 $35,000 $0 $0 $0 $35,000 �w������������ �����,����� ����"� �����������°����� I��°�����,�� �� ,��������•�� Description: Cornucopia Building HVAC Replacement Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $20,000 Total Project Cost: $20,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $20,000 $0 $0 $0 $20,000 Total $0 $0 $20,000 $0 $0 $0 $20,000 Project Development $0 $0 $2,000 $0 $0 $0 $2,000 Construction $0 $0 $18,000 $0 $0 $0 $18,000 Total $0 $0 $20,000 $0 $0 $0 $20,000 ���z� �w�������,�� ������ ��������������°������� ���������� � �����1�����µ� Description: Peri Hangar Roof Replacement Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeRedding Municipal Airport CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $300,000 $0 $0 $0 $300,000 Total $0 $0 $300,000 $0 $0 $0 $300,000 Project Development $0 $0 $30,000 $0 $0 $0 $30,000 Construction $0 $0 $270,000 $0 $0 $0 $270,000 Total $0 $0 $300,000 $0 $0 $0 $300,000 C-13 SECTION C � �`���������� ��������� �`������ ������������ ����������� ��������� �� �����������..,w� Description: Terminal Building Ticket Counter Expansion Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $300,000 $0 $0 $0 �300,000 Total $0 $0 $300,000 $0 $0 $0 $300,000 Project Development $0 $0 $30,000 $0 $0 $0 $30,000 Construction $0 $0 $270,000 $0 $0 $0 $270,000 Total $0 $0 $300,000 $0 $0 $0 $300,000 �w���fl�������� ��� �������� �������� ������� ������� �� I��°�����,�� �� �����•���•�� Description: Cameras for Access Control Gates (Phase I) Location: 6751 Woodrum Circle Project Cost: Prior Years/F�ture Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $100,000 Total Project Cost: $100,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $100,000 $0 $0 $0 $100,000 Total $0 $0 $100,000 $0 $0 $0 $100,000 Project Development $0 $0 $10,000 $0 $0 $0 $10,000 Construction $0 $0 $90,000 $0 $0 $0 $90,000 Total $0 $0 $100,000 $0 $0 $0 $100,000 ���a��z����� �,������������°�� ���������� � �����1�����µ� Description: Replace Forklift Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeRedding Municipal Airport CIP Costs(detailed below) $80,000 Total Project Cost: $80,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $80,000 $0 $0 $80,000 Totql $0 $0 $0 $80,000 $0 $0 $80,000 Project Development $0 $0 $0 $8,000 $0 $0 $8,000 Construction $0 $0 $0 $72,000 $0 $0 $72,000 Total $0 $0 $0 $80,000 $0 $0 $80,000 c-14 SECTION C � ��������� "����� �������� ����� �����������������.� ������ � ��������� �� ������������.� Description: Runway 17-35 Safety Area Improvements Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $13,650,000 Total Project Cost: $13,650,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 $1,274,910 $0 $0 $1,274,910 Federal FAA Grant $0 $0 $0 $12,375,090 $0 $0 $12,375,090 Total $0 $0 $0 $13,650,000 $0 $0 $13,650,000 Project Development $0 $0 $0 $1,365,000 $0 $0 $1,365,000 Construction $0 $0 $0 $12,285,000 $0 $0 $12,285,000 Total $0 $0 $0 $13,650,000 $0 $0 $13,650,000 ____ ____. ....... ........ ......... ......._ ......... ____. ____ ____. ._.._.... ........ ____. ........ ____. ......... ......... ......... ����������� �������� ��� ���� ��������� ��°������ � ����������� Description: Construction of a city-owned car wash facility for use by rental car agencies. Location: 6751 Woodrum Circle Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeRedding Municipal Airport CIP Costs(detailed below) $300,000 Total Project Cost: $300,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Airport Fund $0 $0 $0 �0 $30,000 $270,000 $300,000 Total $0 $0 $0 $0 $30,000 $270,000 $300,000 Project Development $0 $0 $0 $0 $30,000 $0 $30,000 Construction $0 $0 $0 $0 $0 $270,000 $270,000 Total $0 $0 $0 $0 $30,000 $270,000 $300,000 C-15 SECTION C � � I���°��� �������°�� I����������x����r��� ������ I��F��������� � ���„�������� Description: Projects include a new backup generator,security and lighting,roof replacement,solar,and HVAC UV filtration system. �ocation: 371 16 Main St. � Burney,CA 96013 Project Cost: Prior Years/Future Costs: $3,668 Project Type: One-timelnfrastructure Improvement CIP Costs(detailed below) $449,442 Total Project Cost: $453,1 10 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total State Library Grant $149,442 $300,000 $0 $0 $0 $0 $449,442 Total $149,442 $300,000 $0 $0 $0 $0 $449,442 Project Development $44,944 $0 $0 $0 $0 $0 $44,944 Construction $104,498 $300,000 $0 $0 $0 $0 $404,498 Total $149,442 $300,000 $0 $0 $0 $0 $449,442 ............................. ....................................... ... . .......__........_. ....... .... . ............................... .................... ........................ .. .......... ......_.............m_ �, , , , , , , , , , ,. ��v.,,,. �.,.,.,.,.� ,,,,,,,,,,,u,u,u,u,u,u.....................................�. . ,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.�,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.�,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.� ,,,,.,.,.,.,.,.,.,.,.,.�. �������� ����°���� ��������������s��W� �;��°�i��` i��������.� � ���y��������� Description: The City is working on security improvements, HVAC UV filtration system, new roof and solar, backup generator consultant and design, backup generator construction �ocation: 3200 W. Center St,Anderson,CA 96007 Project Cost: Prior Years/Future Costs: $13,229 Project Type: One-timelnfrastructure Improvement CIP Costs(detailed below) $415,993 Total Project Cost: $429,222 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total State Library Grant $100,000 $315,993 $0 $0 $0 $0 $415,993 Total $100,000 $315,993 $0 $0 $0 $0 $415,993 Project Development $41,599 $0 $0 $0 $0 $0 $41,599 Construction $58,401 $315,993 $0 $0 $0 $0 $374,394 Total $100,000 $315,993 $0 $0 $0 $0 $415,993 �"�������������� �������w ���� ��m������ �� ��;,��nµ������� Description: Replace four synthetic t�rf fields at the existing athletic facility and install additional shade structures.The artificial turf and the underlying drainage system installed during the Park's construction were defective. Location: NE Quadrant Project Cost: Prior Years/Future Costs: $5,150,000 Project Type: One-timePark Development CIP Costs(detailed below) $20,000 Total Project Cost: $5,170,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $0 $20,000 $0 $0 $0 $20,000 Total $0 $0 $20,000 $0 $0 $0 $20,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $20,000 $0 $0 $0 $20,000 Total $0 $0 $20,000 $0 $0 $0 $20,000 C-16 SECTION C � � ��������� �������. ���������� � ����������� Description: The Jenny Creek Trail project is located off Royal Oaks Drive, connecting T.R.Woods Memorial Park to the Overhill Drive connector to the Sacramento River Trail.The first phase of the project is an approximately .8- mile trail corridor,created by clearing,grading, and placing base rock in preparation for asphalt paving. �ocation: SW Quadrant Project Cost: Prior Years/Future Costs: $34,573 ProjectType: One-timeTrail Development CIP Costs(detailed below) $2,125,427 Total Project Cost: $2,160,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Restricted $25,427 $100,000 $0 $0 $0 $0 $125,427 Unidentified Grant $0 $0 $0 $2,000,000 $0 $0 $2,000,000 Total $25,427 $100,000 $0 $2,000,000 $0 $0 $2,125,427 Project Development $2,543 $100,000 $0 $0 $0 $0 $102,543 Construction $22,884 $0 $0 $2,000,000 $0 $0 $2,022,884 Total $25,427 $100,000 $0 $2,000,000 $0 $0 $2,125,427 ��������� ���������� �������� �������������������� I���������� � ���������„�� Description: Updating bathrooms and other improvement projects location: 44 Quartz Hill Road, Redding, CA Project Cost: Prior Years/Future Costs: $300,000 ProjectType: One-timePark Development CIP Costs(detailed below) $100,000 Total Project Cost: $400,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $100,000 $0 $0 $0 $0 $100,000 Total $0 $100,000 $0 $0 $0 $0 $100,000 Project Development $0 $10,000 $0 $0 $0 $0 $10,000 Construcfiion $0 $90,000 $0 $0 $0 $0 $90,000 Total $0 $100,000 $0 $0 $0 $0 $100,000 ������P���� ��������� I��������.� �� ���������� Description: Grant funding for the Redding Cultural Trail Overlook project will be used for the construction of an overlook plaza to serve as a vista point and rest stop along the new Diestelhorst to Downtown Trail.The theme of the design is a blend of native cultures and active transportation.The location provides scenic views of the Sacramento River,train trestle, and Caldwell Park. Funding will also address litter abatement and waste removal and include an ed�cational component and physical infrastructure to beautify and encourage cleanliness and public safety along this important corridor. �ocation: Benton Rd Area Project Cost: Prior Years/Future Costs: $1 10,000 ProjectType: One-timePark Development CIP Costs(detailed below) $1,130,000 Total Project Cost: $1,240,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Clean CAGrant $50,000 $1,080,000 $0 $0 $0 $0 $1,130,000 Total $50,000 $1,080,000 $0 $0 $0 $0 $1,130,000 Project Development $50,000 $0 $0 $0 $0 $0 $50,000 Construction $0 $1,080,000 $0 $0 $0 $0 $1,080,000 Total $50,000 $1,080,000 $0 $0 $0 $0 $1,130,000 C-17 SECTION C � � �������� �������� ���°� I��F��������� � ��.,������� Description: Updates to infrastructure, modernization, and improvement of the Redding Sports Park to provide adequate playing fields and facilities for contin�ed public use. �ocation: NE Quadrant Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timelnfrastructure Improvement CIP Costs(detailed below) $10,100,000 Total Project Cost: $10,100,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $50,000 $50,000 $0 $0 $0 $100,000 Unidentified Grant $0 $0 $0 $5,000,000 $5,000,000 $0 $10,000,000 Total $0 $50,000 $50,000 $5,000,000 $5,000,000 $0 $10,100,000 Project Development $0 $50,000 $50,000 $0 $0 $0 $100,000 Construction $0 $0 $0 $5,000,000 $5,000,000 $0 $10,000,000 Total $0 $50,000 $50,000 $5,000,000 $5,000,000 $0 $10,100,000 ���� ������ ��W�������������� ���� I���,�����,�� � ��a�������,���� Description: Design and construction of a new park to go into the future Peaks Subdivision Location: Quartz Hill Project Cost: Prior Years/Future Costs: $0 Project Type: One-timePark Development CIP Costs(detailed below) $3,400,000 Total Project Cost: $3,400,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Park Development Fund $0 $0 $100,000 $1,000,000 $0 $0 $1,100,000 Unidentified Grant $0 $0 $300,000 $2,000,000 $0 $0 $2,300,000 Total $0 $0 $400,000 $3,000,000 $0 $0 $3,400,000 Project Development $0 $0 $400,000 $0 $0 $0 $400,000 Construction $0 $0 $0 $3,000,000 $0 $0 $3,000,000 Total $0 $0 $400,000 $3,000,000 $0 $0 $3,400,000 ����� ����i���������� ��E������ � ���wr�����,w.��� Description: Maintenance to Facility Location: Civic Auditorium Project Cost: Prior Years/Future Costs: $0 Project Type: One-timelnfrastructure Improvement CIP Costs(detailed below) $3,500,000 Total Project Cost: $3,500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $400,000 $3,100,000 $0 $0 $0 $3,500,000 Total $0 $400,000 $3,100,000 $0 $0 $0 $3,500,000 Project Development $0 $400,000 $0 $0 $0 $0 $400,000 Construction $0 $0 $3,100,000 $0 $0 $0 $3,100,000 Total $0 $400,000 $3,100,000 $0 $0 $0 $3,500,000 c-sa SECTION C � � �����a�� ��„���,��� `��°����� ���������� � ����������� Description: Design and construction of an upgraded trail system in Oregon Gulch Open Space Location: SW Quadrant, off Kenyon Dr. Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeTrail Development CIP Costs(detailed below) $2,600,000 Total Project Cost: $2,600,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Unidentified Grant $0 $100,000 $500,000 $2,000,000 $0 $0 $2,600,000 Total $0 $100,000 $500,000 $2,000,000 $0 $0 $2,600,000 Project Development $0 $100,000 $200,000 $0 $0 $0 $300,000 Construction $0 $0 $300,000 $2,000,000 $0 $0 $2,300,000 Total $0 $100,000 $500,000 $2,000,000 $0 $0 $2,600,000 ���,�,������ ���������µ�� �����.���������°�°�.�i�°� �.��°���� I��°�����,�� �� ����������� Description: Projects include new generator housing, backup generator, new carpet/LVT, lighting control panels, batteries for ELESCO Emergency Lighting, New HVAC controls, and HVAC UV filtration Location: 1 100 Parkview Ave., Redding,CA 96001 Project Cost: Prior Years/Future Costs: $313,463 ProjectType: One-timelnfrastructure Improvement CIP Costs(detailed below) $1,200,000 Total Project Cost: $1,513,463 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total State Library Grant $1,200,000 $0 $0 $0 $0 $0 $1,200,000 Total $1,200,000 $0 $0 $0 $0 $0 $1,200,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $1,200,000 $0 $0 $0 $0 $0 $1,200,000 Total $1,200,000 $0 $0 $0 $0 $0 $1,200,000 ................................ ..... . ...................... ....................... ...... .._.......... ��������� ���� I������������� ����������� i��°�����,��� �� ���I�������� Description: A grant funded expansion and improvement of Caldwell Park,featuring a new bike park, expanded skate park, lighting, and parking. Project also includes a new restroom, exercise equipment,shade structures and public art. Location: NW Quadrant Project Cost: Prior Years/Future Costs: $463,975 ProjectType: One-timePark Development CIP Cosfis(detailed below) $5,006,000 Total Project Cost: $5,469,975 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total State Park Grant $135,000 $2,871,000 �2,000,000 �0 $0 $0 $5,006,000 Total $135,000 $2,871,000 $2,000,000 $0 $0 $0 $5,006,000 Project Development $135,000 $135,000 $0 $0 $0 $0 $270,000 Construction $0 $2,736,000 $2,000,000 $0 $0 $0 $4,736,000 Total $135,000 $2,871,000 $2,000,000 $0 $0 $0 $5,006,000 C-19 SECTION C � � I��������� ������ I��F��������� � ������������ Description: Grant funded project on dedicated land and recreation facility. Includes construction of trails, landscaping, playground and parking. �ocation: Lake Boulevard Project Cost: Prior Years/Future Costs: $500,000 Project Type: One-timePark Development CIP Costs(detailed below) $26,000,000 Total Project Cost: $26,500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total CDFAGrant $100,000 $5,050,000 $4,250,000 $0 $0 $0 $9,400,000 EHCRP Grant $0 $1,000,000 $1,000,000 $0 $0 $0 $2,000,000 ORLP Grant (Federal) $100,000 $2,050,000 $2,000,000 $0 $0 $0 $4,150,000 Park Development Fund $0 $1,000,000 $1,450,000 $0 $0 $0 $2,450,000 State Park Grant $500,000 $4,500,000 $3,000,000 $0 $0 $0 $8,000,000 Total $700,000 $13,600,000 $11,700,000 $0 $0 $0 $26,000,000 Project Development $500,000 $300,000 $0 $0 $0 $0 $800,000 Construction $200,000 $13,300,000 $11,700,000 $0 $0 $0 $25,200,000 Total $700,000 $13,600,000 $11,700,000 $0 $0 $0 $26,000,000 °���..,���� ��� ����� �������� ��m������������������, I��°������ �� ���������,���� Description: To complete planning, design,engineering,CEQA and permitting for enhancements to the Turtle Bay Boating Access. Improvements to be designed include a widened,two-lane boat ramp and a boating beach/non-motorized launch, additional parking,ADA-compliant restroom, non-motorized capacity and access improvements, and interpretive signage. �ocation: SW Quadrant Project Cost: Prior Years/Future Costs: $13,924 ProjectType: One-timeBoat Ramp CIP Costs(detailed below) $6,198,268 Total Project Cost: $6,212,192 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Restricted $16,076 $0 $0 $0 $0 $0 $16,076 Unidentified Grant $0 $0 $100,000 $6,000,000 $0 $0 $6,100,000 WCB Public Access $82,192 $0 $0 $0 $0 $0 $82,192 Total $98,268 $0 $100,000 $6,000,000 $0 $0 $6,198,268 Project Development $9,827 $0 $100,000 $0 $0 $0 $109,827 Construction $88,441 $0 $0 $6,000,000 $0 $0 $6,088,441 Total $98,268 $0 $100,000 $6,000,000 $0 $0 $6,198,268 c-za SECTION C � � �������� ����� ������ ���������� � ���������� Description: Revitalization of South City Park with new design and construction. Location: SW Quadrant Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timePark Development CIP Costs(detailed below) $7,000,000 Total Project Cost: $7,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total ORLP Grant $100,000 $200,000 $3,200,000 $0 $0 $0 $3,500,000 Section 108 Loan, Park $100,000 $200,000 $3,200,000 $0 $0 $0 $3,500,000 Development Total $200,000 $400,000 $6,400,000 $0 $0 $0 $7,000,000 Project Development $200,000 $400,000 $0 $0 $0 $0 $600,000 Construction $0 $0 $6,400,000 $0 $0 $0 $6,400,000 Total $200,000 $400,000 $6,400,000 $0 $0 $0 $7,000,000 ��� ���w ������" � ���"� I��°���"��"�� � �'' ����A;�����,� Description: Remodel of Dr.Martin Luther King Jr. Building & Park. Location: SW Quadrant Project Cost: Prior Years/Future Costs: $15,000 Project Type: One-timePark Development CIP Costs(detailed below) $3,985,000 Total Project Cost: $4,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Unidentified Grant $0 $0 $85,000 $3,900,000 $0 $0 $3,985,000 Total $0 $0 $85,000 $3,900,000 $0 $0 $3,985,000 Project Development $0 $0 $85,000 $0 $0 $0 $85,000 Construction $0 $0 $0 $3,900,000 $0 $0 $3,900,000 Total $0 $0 $85,000 $3,900,000 $0 $0 $3,985,000 ���� ������ ���������� ���� ������ �� I��°�����,�� � ���������� Description: Design and construction of 8-acre park site on dedicated land in the SE quadrant located in Salt Creek Heights subdivision.The project will include a mulfii-purpose playing field, playgrounds,shaded picnic areas, trail connections, and a restroom. Location: SW Quadrant, off Eureka Way Project Cost: Prior Years/Future Costs: $1,480,000 ProjectType: One-timePark Development CIP Costs(detailed below) $1,500,000 Total Project Cost: $2,980,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Park Development Fund $0 $0 $0 $1,500,000 $0 $0 $1,500,000 Total $0 $0 $0 $1,500,000 $0 $0 $1,500,000 Project Development $0 $0 $0 $150,000 $0 $0 $150,000 Construction $0 $0 $0 $1,350,000 $0 $0 $1,350,000 Total $0 $0 $0 $1,500,000 $0 $0 $1,500,000 c-21 SECTION C � � ���������� �������°� ����� � �'����� ��������������� ����x� �� ���������� � ���������� Description: Construct 7-acre park site on dedicated land in the SE quadrant located in a subdivision under development. Includes a m�lti-purpose playing field, playgrounds,shaded picnic areas, and trail connections to adjacent public open-space areas. �ocation: SE Quadrant, Rancho Road/Shasta View Drive Project Cost: Prior Years/Future Costs: $2,1 17,033 ProjectType: One-timePark Development CIP Costs(detailed below) $1,717,433 Total Project Cost: $3,834,466 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Park Development Fund $0 $217,433 $1,500,000 $0 $0 $0 $1,717,433 Total $0 $217,433 $1,500,000 $0 $0 $0 $1,717,433 Project Development $0 $21,743 $150,000 $0 $0 $0 $171,743 Construction $0 $195,690 $1,350,000 $0 $0 $0 $1,545,690 Total $0 $217,433 $1,500,000 $0 $0 $0 $1,717,433 C-22 SECTION C _._._._ _._._._.. _._._._.. _._._._. ......._._._._ _._._._ _._._._.. _._._._.. _._._._. ........ .............. _._._._ _._._._.. _._._._.. _._._._. ......._._._._ ...... .........,. �������� �����°� ���������� ������rv��� ������°����������� ������� �� I�������°�n,w�� Description: Systemwide substation control modernization project to improve communications to all substations as well as remove known obsolescence. �ocation: Multiple Substations Project Cost: Prior Years/Future Costs: $38,640 Project Type: One-timeSystem Improvements CIP Costs(detailed below) $99,360 Total Project Cost: $138,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Electric Rates $99,360 $0 $0 $0 $0 $0 $99,360 Total $99,360 $0 $0 $0 $0 $0 $99,360 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $99,360 $0 $0 $0 $0 $0 $99,360 Total $99,360 $0 $0 $0 $0 $0 $99,360 ............................. ....................................... ... ...... ...................................... ............................... .................... ........................ .. ........... .... �,m���� � ������������ ��°������:��������� ��������.� � ������������ Description: Replace generator breaker with improved system. Location: 17120 Clear Creek Road Project Cost: Prior Years/Future Costs: $99 Project Type: One-timeSystem Improvements CIP Costs(detailed below) $349,901 Total Project Cost: $350,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Electric Rates $349,901 $0 $0 $0 $0 $0 $349,901 Total $349,901 $0 $0 $0 $0 $0 $349,901 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $349,901 $0 $0 $0 $0 $0 $349,901 Total $349,901 $0 $0 $0 $0 $0 $349,901 ................................ ..................... ........ ....... ................. ...._.. ................. ........................ ....................... ................ ... .._ ���� �������,.�i���°� ������������ �������°� i��°���,��� �" ���w,������n�� Description: Based on the recommendation identified during an evaluation, a fire monitoring system is being installed at the Power Plant. Location: Redding Power Plant Project Type: Ongoing System Improvements Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Electric Rates $109,633 $0 $0 $0 $0 $0 $109,633 Total $109,633 $0 $0 $0 $0 $0 $109,633 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $109,633 $0 $0 $0 $0 $0 $109,633 Total $109,633 $0 $0 $0 $0 $0 $109,633 C-23 SECTION C _._._._ _._._._.. _._._._.. _._._._. ......._._._._ _._._._ _._._._.. _._._._.. _._._._. ........ .............. _._._._ _._._._.. _._._._.. _._._._. ......._._._._ ...... .........,. ������������ �����°�������� ������� �� I��������n,ri�� Description: Future development plans on the east side of Redding necessitate REU building a new substation.Addresses system capability and service reliability as Redding adds new load. �ocation: Venture Parkway Project Cost: Prior Years/Future Costs: $379,190 Project Type: One-timeSystem Improvements CIP Costs(detailed below) $220,810 Total Project Cost: $600,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total System Financing $220,810 $0 $0 $0 $0 $0 $220,810 Total $220,810 $0 $0 $0 $0 $0 $220,810 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $220,810 $0 $0 $0 $0 $0 $220,810 Total $220,810 $0 $0 $0 $0 $0 $220,810 �������������.�� ���������������� �������� ��������.� �� ������������ Description: Deploying a Workforce Management Software Program (SSP Lifecycle-MIMS) to provide REU the ability to access a single system to show c�rrent and fut�re work efforts and to automate tasks and business processes enabling data integration and universal access by staff. Location: Citywide Project Cost: Prior Years/Future Costs: $1,092,624 Project Type: One-timeSystem Improvements CIP Costs(detailed below) $137,376 Total Project Cost: $1,230,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Electric Rates $137,376 $0 $0 $0 $0 $0 $137,376 Total $137,376 $0 $0 $0 $0 $0 $137,376 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $137,376 $0 $0 $0 $0 $0 $137,376 Total $137,376 $0 $0 $0 $0 $0 $137,376 ������� ������ ���������� ������������� ������_����°� �"��°������ �� �����������`� Description: Design and installation of a cathodic protection system for unprotected natural gas transmission piping within the Redding Power Plant. Location: Redding Power Plant Project Cost: Prior Years/Future Costs: $4,650 ProjectType: One-timeSystem Improvements CIP Costs(detailed below) $115,350 Total Project Cost: $120,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Electric Rates $115,350 $0 $0 $0 $0 $0 $115,350 Total $115,350 $0 $0 $0 $0 $0 $115,350 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $115,350 $0 $0 $0 $0 $0 $115,350 Total $115,350 $0 $0 $0 $0 $0 $115,350 C-24 SECTION C I������� ������ ������°��������°������� �������°����� ��������� �� ����.��;������ Description: Construction of a 4,500 square foot building at Redding Power Plant to replace existing office trailers. Location: Redding Power Plant Project Cost: Prior Years/Future Costs: $277,330 ProjectType: One-timeSystem Improvements CIP Costs(detailed below) $4,862,670 Total Project Cost: $5,140,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total System Financing $4,862,670 $0 $0 $0 $0 $0 $4,862,670 Total $4,862,670 $0 $0 $0 $0 $0 $4,862,670 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $4,862,670 $0 $0 $0 $0 $0 $4,862,670 Total $4,862,670 $0 $0 $0 $0 $0 $4,862,670 ��°����������������,��������� ������������������ I��°�����,�� �� ��������w��� Description: Recruitment of 2 contract line crews working 250 days per year to accelerate replacement of aging infrastructure location: Citywide Project Cost: Prior Years/Future Costs: $6,234,650 ProjectType: One-timeSystem Improvements CIP Costs(detailed below) $2,597,800 Total Project Cost: $8,832,450 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total System Financing $2,597,800 $0 $0 $0 $0 $0 $2,597,800 Total $2,597,800 $0 $0 $0 $0 $0 $2,597,800 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $2,597,800 $0 $0 $0 $0 $0 $2,597,800 Total $2,597,800 $0 $0 $0 $0 $0 $2,597,800 ................................ ... .. ........ .................. ....._................. ..... ................... ........................ .... _.. ������������� �������°���� ������������� i��°������� �� ���w,��������� Description: Substation security upgrades project. �ocation: Citywide Project Cost: Prior Years/Future Costs: $532,214 ProjectType: One-timeSystem Improvements CIP Costs(detailed below) $4,437,786 Total Project Cost: $4,970,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total System Financing $4,437,786 $0 $0 $0 $0 $0 $4,437,786 Total $4,437,786 $0 $0 $0 $0 $0 $4,437,786 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $4,437,786 $0 $0 $0 $0 $0 $4,437,786 Total $4,437,786 $0 $0 $0 $0 $0 $4,437,786 C-25 SECTION C ������������� ����������� ������������ ����������������� ��������� �� ����.��;������ Description: Replacement of various substation circuit switchers to enhance the reliability of the system. Location: Citywide Project Cost: Prior Years/Future Costs: $7,730 ProjectType: One-timeSystem Improvements CIP Costs(detailed below) $492,270 Total Project Cost: $500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total System Financing $492,270 $0 $0 $0 $0 $0 �492,270 Total $492,270 $0 $0 $0 $0 $0 $492,270 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $492,270 $0 $0 $0 $0 $0 $492,270 Total $492,270 $0 $0 $0 $0 $0 $492,270 ����������r������ �,���� � ���� ������������� I��°�����,�� �� ��������•��� Description: Relicensing process for 50-year license for hydroelectric facility at Whiskeytown Lake Location: Whiskeytown Lake Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeSystem Improvements CIP Costs(detailed below) $575,000 Total Project Cost: $575,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total System Financing $575,000 $0 $0 $0 $0 $0 $575,000 Total $575,000 $0 $0 $0 $0 $0 $575,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $575,000 $0 $0 $0 $0 $0 $575,000 Total $575,000 $0 $0 $0 $0 $0 $575,000 ���������� ��������� ���°���°����������� ����������� � ����..������� Description: General system improvements including the installation of transformers, capacitor banks, poles,overhead and underground conductors and switches,splices/connectors,conduit,splice boxes and vaults. Location: Citywide Project Type: Ongoing System Improvements Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total System Financing $9,172,905 $8,750,000 $8,750,000 $8,750,000 $8,750,000 $8,750,000 $52,922,905 Total $9,172,905 $8,750,000 $8,750,000 $8,750,000 $8,750,000 $8,750,000 $52,922,905 Project Development $458,645 $437,500 $437,500 $437,500 $437,500 $437,500 $2,646,145 Construction $8,714,260 $8,312,500 $8,312,500 $8,312,500 $8,312,500 $8,312,500 $50,276,760 Total $9,172,905 $8,750,000 $8,750,000 $8,750,000 $8,750,000 $8,750,000 $52,922,905 C-26 SECTION C _._._._ _._._._.. _._._._.. _._._._. ......._._._._ _._._._ _._._._.. _._._._.. _._._._. ........ .............. _._._._ _._._._.. _._._._.. _._._._. ......._._._._ ...... .........,. ��� �,����i����� ����°�����°� ����������������������� ���.�������������� ������� �� I����������� Description: The GIS Division is preparing to transition its electric GIS model to Esri's Utility Network (UN) ahead of the current system's end of support in 2028.This migration is a strategic move to ensure long-term success, as the Utility Network offers enhanced connectivity modeling,scalability, and compliance with industry standards. Without this upgrade, maintaining the existing system will become increasingly difficult, affecting efficiency and reliability.Additionally, adopting the UN will enable REU to leverage advanced technologies and workflows that improve productivity and decision-making.The GIS Department plans to complete the transition by the end of the next biennial budget to keep REU future-ready. Location: Citywide Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeSystem Improvements CIP Costs(detailed below) $2,000,000 Total Project Cost: $2,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Electric Rates $1,500,000 $500,000 $0 $0 $0 $0 $2,000,000 Total $1,500,000 $500,000 $0 $0 $0 $0 $2,000,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $1,500,000 $500,000 $0 $0 $0 $0 $2,000,000 Total $1,500,000 $500,000 $0 $0 $0 $0 $2,000,000 ���°�°��i�R� ��������� I�������� ��������� �������.� ������� � ���,��������� Description: Future Revenue Funded Capital Projects. Location: Citywide Project Type: Ongoing System Improvements Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total System Financing $0 $2,360,000 $6,410,000 $5,200,000 $5,200,000 $0 $19,170,000 Total $0 $2,360,000 $6,410,000 $5,200,000 $5,200,000 $0 $19,170,000 Project Development $0 $1 18,000 $320,500 $260,000 $260,000 $0 $958,500 Construction $0 $2,242,000 $6,089,500 $4,940,000 $4,940,000 $0 $18,211,500 Total $0 $2,360,000 $6,410,000 $5,200,000 $5,200,000 $0 $19,170,000 c-27 SECTION C ���°� �����i���� � ��;� ����a����� �����°����� ��������� �� ���wr��,������ Description: Plumbing update to Battalion Chief Quarters of Fire Station 1 location: 1335 Shasta St Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $40,000 Total Project Cost: $40,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $40,000 $0 $0 $0 $0 �40,000 Total $0 $40,000 $0 $0 $0 $0 $40,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $40,000 $0 $0 $0 $0 $40,000 Total $0 $40,000 $0 $0 $0 $0 $40,000 ���� �������������i��°�• I��°�����,�� �� �����.������ Description: New self-contained breathing apparatus units for fire stations. Location: All Fire Stations Project Cost: Prior Years/F�ture Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $966,280 Total Project Cost: $966,280 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Fire Impact Fees $0 $324,340 $0 $0 $0 $0 $324,340 General Fund $0 $641,940 $0 �0 $0 $0 $641,940 Total $0 $966,280 $0 $0 $0 $0 $966,280 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $966,280 $0 $0 $0 $0 $966,280 Total $0 $966,280 $0 $0 $0 $0 $966,280 ............................ . ................. .. ...._.. . . ���� ���������� �� ��������°�,����� ���,�����m� � ���mm:��°������ Description: Remodel and expansion of Fire Station #2, including adding 2,000 square feet, exterior paint and a generator. Location: 3491 Placer St Project Cost: Prior Years/F�ture Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $6,000,000 Total Project Cost: $6,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $0 $0 $0 $0 $6,000,000 $6,000,000 Total $0 $0 $0 $0 $0 $6,000,000 $6,000,000 Project Development $0 $0 $0 $0 $0 $300,000 $300,000 Construction $0 $0 $0 $0 $0 $5,700,000 $5,700,000 Total $0 $0 $0 $0 $0 $6,000,000 $6,000,000 C-28 SECTION C ���°� �����i���� � �������� ��������� �� ���r��,������ Description: Rebuild of Fire Station #3. location: 4255 Westside Rd Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $7,000,000 Total Project Cost: $7,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $0 $0 $7,000,000 $0 $0 $7,000,000 Totql $0 $0 $0 $7,000,000 $0 $0 $7,000,000 Project Development $0 $0 $0 $350,000 $0 $0 $350,000 Construction $0 $0 $0 $6,650,000 $0 $0 $6,650,000 Total $0 $0 $0 $7,000,000 $0 $0 $7,000,000 ���� �������� � ��������������,�� I��°�����,�� �� �����.������� Description: Remodel and 2,000 sq.ft expansion of Fire Station #4. Location: 2605 S Bonnyview Rd Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $6,000,000 Total Project Cost: $6,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $0 $0 $6,000,000 $0 $0 $6,000,000 Total $0 $0 $0 $6,000,000 $0 $0 $6,000,000 Project Development $0 $0 $0 $300,000 $0 $0 $300,000 Construction $0 $0 $0 $5,700,000 $0 $0 $5,700,000 Total $0 $0 $0 $6,000,000 $0 $0 $6,000,000 ������ ����°����� � ���������� ��������:� � ���.���������� Description: Remodel and 2,000 sq. ft expansion of Fire Station #6. Location: 1695 Beltline Rd Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $6,000,000 Total Project Cost: $6,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $0 $0 $0 $6,000,000 $0 $6,000,000 Total $0 $0 $0 $0 $6,000,000 $0 $6,000,000 Project Development $0 $0 $0 $0 $300,000 $0 $300,000 Construction $0 $0 $0 $0 $5,700,000 $0 $5,700,000 Total $0 $0 $0 $0 $6,000,000 $0 $6,000,000 C-29 SECTION C ���°� �����i���� � ����� ���������� ��������� �� ���wr��,������� Description: Fire Station 6 Burn Building location: 1695 Beltline Rd Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $750,000 Total Project Cost: $750,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Fire Impact Fees $0 $750,000 $0 $0 $0 $0 �750,000 Total $0 $750,000 $0 $0 $0 $0 $750,000 Project Development $0 $75,000 $0 $0 $0 $0 $75,000 Construction $0 $675,000 $0 $0 $0 $0 $675,000 Total $0 $750,000 $0 $0 $0 $0 $750,000 ���� �������� �� "�"rµ����°����� �"����° I��°�����,�� �� ����������°�� Description: Fire Station b Training Tower Location: 1695 Beltline Rd Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $400,000 Total Project Cost: $400,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Fire Impact Fees $0 $400,000 $0 $0 $0 $0 $400,000 Total $0 $400,000 $0 $0 $0 $0 $400,000 Project Development $0 $40,000 $0 $0 $0 $0 $40,000 Construction $0 $360,000 $0 $0 $0 $0 $360,000 Total $0 $400,000 $0 $0 $0 $0 $400,000 ���ti� ��������u�������ti���" ���������� � ���.���������� Description: Hose Replacement Location: All Fire Stations Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $600,000 Total Project Cost: $600,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Fire Impact Fees $0 $300,000 $0 $0 $0 $0 $300,000 General Fund $0 $300,000 $0 $0 $0 $0 $300,000 Total $0 $600,000 $0 $0 $0 $0 $600,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $600,000 $0 $0 $0 $0 $600,000 Total $0 $600,000 $0 $0 $0 $0 $600,000 C-3o SECTION C �������� �������������� ��������� �� ���wr��,������A� Description: Engine Replacement Location: All Fire Stations Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $3,375,000 Total Project Cost: $3,375,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Fire Impact Fees $0 $1,500,000 $0 $0 $0 $0 $1,500,000 General Fund $0 $0 $1,875,000 $0 $0 $0 $1,875,000 Total $0 $1,500,000 $1,875,000 $0 $0 $0 $3,375,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construcfiion $0 $1,500,000 $1,875,000 $0 $0 $0 $3,375,000 Total $0 $1,500,000 $1,875,000 $0 $0 $0 $3,375,000 �,:������������������ �������as�������� I��°������ � ���������'���� Description: Communications Replacement Location: All Fire Stations Project Cost: Prior Years/F�ture Costs: $0 Project Type: One-timeFire Station Improvements CIP Costs(detailed below) $2,499,000 Total Project Cost: $2,499,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $0 $0 $0 $2,499,000 $0 $0 $2,499,000 Total $0 $0 $0 $2,499,000 $0 $0 $2,499,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $2,499,000 $0 $0 $2,499,000 Total $0 $0 $0 $2,499,000 $0 $0 $2,499,000 ............................ ......... ..................... ............................... .......................... ....._.. .. ................... ................... ........................ . ...._._ _..................... ��������. ���������w��"���"�� ��������'� �' ������������,�w� � Description: MDT/AV�Replacement �ocation: All Fire Stations Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeFire Station Improvements CIP Costs(detailed below) $184,000 Total Project Cost: $184,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Unidentified Grant $0 $0 $184,000 $0 $0 $0 $184,000 Total $0 $0 $184,000 $0 $0 $0 $184,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $184,000 $0 $0 $0 $184,000 Total $0 $0 $184,000 $0 $0 $0 $184,000 c-31 SECTION C � � �'��� �����4 ��������� �`��°� ������� � ��.,.�������°� Description: To expand the facility to the City-owned property on the west side of Abernathy Lane,relocating driver and truck parking and marshalling room. �ocation: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFacility Improvements CIP Costs(detailed below) $3,360,000 Total Project Cost: $3,360,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $0 $480,000 $960,000 $960,000 $960,000 $3,360,000 Total $0 $0 $480,000 $960,000 $960,000 $960,000 $3,360,000 Project Development $0 $0 $48,000 $96,000 $96,000 $96,000 $336,000 Construction $0 $0 $432,000 $864,000 $864,000 $864,000 $3,024,000 Total $0 $0 $480,000 $960,000 $960,000 $960,000 $3,360,000 ............................. ........................................_____.. .............. ............................. ......._................ ... . ........ ... ............ ........ ........ �...... ............. �v.,.,.,.,.,.,.,.,.,.,.,.,.,..�,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,..�v.,.,.,.,.,�. e uv.,.,.,.,.,.,�.,.,.,.,.,.,.,.,.,.,.,u,u,u,u,u,�.,.,.,.,.,.,.,..�,.,.,.,.,.,.,.,.,.,...,.,.,.,..v.,.,.,.,.,.,.,.,�,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,�.�.�.�.� ���� ����������� ������������� ����������� ������� � ��.w,����de���� Description: Expand the MRF processing building for additional receiving,storing, and processing recyclables, inclusive of upgrades to sorting and screening equipment with innovative technology. �ocation: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFacility improvements CIP Costs(detailed below) $2,100,000 Total Project Cost: $2,100,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $0 $300,000 $600,000 $600,000 $600,000 $2,100,000 Total $0 $0 $300,000 $600,000 $600,000 $600,000 $2,100,000 Project Development $0 $0 $30,000 $60,000 $60,000 $60,000 $210,000 Construction $0 $0 $270,000 $540,000 $540,000 $540,000 $1,890,000 Total $0 $0 $300,000 $600,000 $600,000 $600,000 $2,100,000 i��� ����� ���`� ����7���� �����r°����� ��m������° � ���u,�������`��� Description: To increase stormwater handling capacity in Pit area. �ocation: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeFacility Improvements CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $500,000 $0 $0 $0 $0 $500,000 Total $0 $500,000 $0 $0 $0 $0 $500,000 Project Development $0 $50,000 $0 $0 $0 $0 $50,000 Construction $0 $450,000 $0 $0 $0 $0 $450,000 Total $0 $500,000 $0 $0 $0 $0 $500,000 C-32 SECTION C � � �"���������� �������� ���� ��������� ��������� �� ��.,e���������� Description: Repair and upgrade of entrance gate system for Transfer station Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeFacility Improvements CIP Costs(detailed below) $100,000 Total Project Cost: $100,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $100,000 $0 $0 $0 $0 $0 �100,000 Total $100,000 $0 $0 $0 $0 $0 $100,000 Project Development $10,000 $0 $0 $0 $0 $0 $10,000 Construction $90,000 $0 $0 $0 $0 $0 $90,000 Total $100,000 $0 $0 $0 $0 $0 $100,000 ��rr����p���w� ���������.�������� ��������i���� I��°�����,��° �� ���������.�� Description: Installation of organics pre-processing equipment for food waste as part of a" Food Waste to Energy" project in collaboration with the City's wastewater treatment plant. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeFacility Improvements CIP Costs(detailed below) $1,540,000 Total Project Cost: $1,540,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $0 $220,000 $440,000 $440,000 $440,000 $1,540,000 Total $0 $0 $220,000 $440,000 $440,000 $440,000 $1,540,000 Project Development $0 $0 $22,000 $44,000 $44,000 $44,000 $154,000 Construction $0 $0 $198,000 $396,000 $396,000 $396,000 $1,386,000 Total $0 $0 $220,000 $440,000 $440,000 $440,000 $1,540,000 ................................ ............................ ........ ................ .... . ........ ..... ......... . °�`��������� ,��������� �°��������� ������� i��°������ �� ��mm������� Description: The tipping floor is subject to use by heavy equipment and garbage trucks and wears down over time, requiring periodic resurfacing. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $600,000 $0 $0 $0 $0 $600,000 Total $0 $600,000 $0 $0 $0 $0 $600,000 Project Development $0 $60,000 $0 $0 $0 $0 $60,000 Construction $0 $540,000 $0 $0 $0 $0 $540,000 Total $0 $600,000 $0 $0 $0 $0 $600,000 C-33 SECTION C � � ����°�������° ��������� �����,��°����� �������� ������� � ��•r������� Description: The asphalt within the facility is over 18 years old and failing due to aging and daily use by heavy equipment and trucks. �ocation: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $350,000 $0 $0 $0 $250,000 $600,000 Total $0 $350,000 $0 $0 $0 $250,000 $600,000 Project Development $0 $35,000 $0 $0 $0 $25,000 $60,000 Construction $0 $315,000 $0 $0 $0 $225,000 $540,000 Total $0 $350,000 $0 $0 $0 $250,000 $600,000 ........................... ...______.. .............. ............... .. ........... ................. ............................. .... .... ....____.... .... �, , ,. . , , , , , , �v...........................�, ,,.,.,.,.,.,.,.,.� ,,,,,,,, .������v.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.�, .,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.�v.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.� ..v.,.,.,.,� �,.,.,., , ,, �������� ����� ��������.� � ���.u����de���� Description: Slurry seal to seal and maintain the driveways within the Transfer and Recycling Facility. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $0 $0 $50,000 $0 $0 $50,000 Total $0 $0 $0 $50,000 $0 $0 $50,000 Project Development $0 $0 $0 $5,000 $0 $0 $5,000 Construction $0 $0 $0 $45,000 $0 $0 $45,000 Total $0 $0 $0 $50,000 $0 $0 $50,000 ................................ ..................... ................. .............................. ........ ................. ...._.. ............. ............................. ....................... ................... ........... ������ ���������� i��°������ �� ��������aµ�"�� Description: The crane is used to adjust loads in the transfer trailers prior to hauling to the landfill. Crane repairs cover the cost of replacing parts due to daily wear and tear on the machine. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $90,000 $0 $95,000 $0 $95,000 $280,000 Total $0 $90,000 $0 $95,000 $0 $95,000 $280,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $90,000 $0 $95,000 $0 $95,000 $280,000 Total $0 $90,000 $0 $95,000 $0 $95,000 $280,000 C-34 SECTION C � � ����������I�� ������,������� �������� ����������� ��������� �� ��.,e����n,w��� Description: Replacement of sorting screens and conveyor belts to update machine and improve processing capacity. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeFacility Improvements CIP Costs(detailed below) $3,200,000 Total Project Cost: $3,200,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total State Grant $0 $0 $3,200,000 $0 $0 $0 $3,200,000 Total $0 $0 $3,200,000 $0 $0 $0 $3,200,000 Project Development $0 $0 $320,000 $0 $0 $0 $320,000 Construction $0 $0 $2,880,000 $0 $0 $0 $2,880,000 Total $0 $0 $3,200,000 $0 $0 $0 $3,200,000 �������I���� ����� ����°�������� I��°�����,�� �� ������'���� Description: Extensive remodel of both the men and women's bathroom facilities increasing the size of the men's restroom by removing walis and relocating plumbing and electrical. Location: 2255 Abernathy Lane Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeFacility Improvements CIP Costs(detailed below) $250,000 Total Project Cost: $250,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Solid Waste Rates/Fees $0 $250,000 $0 $0 $0 $0 $250,000 Total $0 $250,000 $0 $0 $0 $0 $250,000 Project Development $0 $25,000 $0 $0 $0 $0 $25,000 Construction $0 $225,000 $0 $0 $0 $0 $225,000 Total $0 $250,000 $0 $0 $0 $0 $250,000 C-35 SECTION C � I������������� ���'�� I������� ��������� ������� ��� ���������� Description: Emergency Storm Drain repair at Bonnyview Boat Ramp location. Project will be funded by Wastewater Rates and loan repaid to Wastewater Utility via Storm Drain Rates. Grant funding request submitted. �ocation: Bonnyview Boat Ramp Project Cost: Prior Years/Future Costs: �0 Project Type: One-timeSystem Improvements CIP Costs(detailed below) $3,335,794 Total Project Cost: $3,335,794 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $3,335,794 $0 $0 $0 $0 $0 $3,335,794 Total $3,335,794 $0 $0 $0 $0 $0 $3,335,794 Project Development $166,790 $0 $0 $0 $0 $0 $166,790 Construction $3,169,005 $0 $0 $0 $0 $0 $3,169,005 Total $3,335,794 $0 $0 $0 $0 $0 $3,335,794 ............................. ....................................... ... ...... ......................... ............................... .................... ........................ .. ...... ......... �`������� ��������� ������� ����� ������ ��������.� � �i����������� Description: Tarmac Road emergency Storm Drain repair. Location: Tarmac Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeSystem Improvements CIP Costs(detailed below) $3,500,000 Total Project Cost: $3,500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $3,500,000 $0 $0 $0 $0 $0 $3,500,000 Total $3,500,000 $0 $0 $0 $0 $0 $3,500,000 Project Development $175,000 $0 $0 $0 $0 $0 $175,000 Construction $3,325,000 $0 $0 $0 $0 $0 $3,325,000 Total $3,500,000 $0 $0 $0 $0 $0 $3,500,000 ................................ ........... ...... ........... ....... ................. ...._.. ................. ........................ ....................... ......... ................ ........ ���I�"�� ������ �������"������� I��"���,��� �"' ������������ Description: Critical pipe replacement and or lining at vario�s locations thro�ghout the City. �ocation: Citywide Project Type: Ongoing System Improvements Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Storm Drain Rates $1,588,053 $500,000 $500,000 $500,000 $500,000 $500,000 $4,088,053 Total $1,588,053 $500,000 $500,000 $500,000 $500,000 $500,000 $4,088,053 Project Development $158,805 $50,000 $50,000 $50,000 $50,000 $50,000 $408,805 Construction $1,429,248 $450,000 $450,000 $450,000 $450,000 $450,000 $3,679,248 Total $1,588,053 $500,000 $500,000 $500,000 $500,000 $500,000 $4,088,053 C-36 SECTION C � ���� ��°��� ��������� ��a������ ����,�� ��������� �� ����������� Description: Installation of full trash capture devices in storm drain system to comply with state mandates. Location: Citywide Project Cost: Prior Years/Future Costs: $126,360 ProjectType: One-timeSystem Improvements CIP Costs(detailed below) $708,328 Total Project Cost: $834,688 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Storm Drain Rates $158,328 $110,000 $1 10,000 $110,000 $1 10,000 $110,000 �708,328 Total $158,328 $110,000 $110,000 $110,000 $110,000 $110,000 $708,328 Project Development $7,916 $5,500 $5,500 $5,500 $5,500 $5,500 $35,416 Construction $150,411 $104,500 $104,500 $104,500 $104,500 $104,500 $672,911 Total $158,328 $110,000 $110,000 $110,000 $110,000 $110,000 $708,328 c-3� SECTION C �����°��� ������ ��������� ����4� �;��� ������°���� ��������� �� ������������� Description: Replace the bridge on Canyon Road over the ACID Canal. location: Canyon Road Project Cost: Prior Years/Future Costs: $879,091 ProjectType: One-timeBridges Improvements CIP Costs(detailed below) $3,822,789 Total Project Cost: $4,701,880 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal HBP Grant $34,215 $0 $2,120,369 $0 $0 $0 $2,154,584 Traffic Impact Fees $42,407 $0 $1,625,798 $0 $0 $0 $1,668,205 Total $76,622 $0 $3,746,167 $0 $0 $0 $3,822,789 Project Development $76,622 $0 $0 $0 $0 $0 $76,622 Construcfiion $0 $0 $3,746,167 $0 $0 $0 $3,746,167 Total $76,622 $0 $3,746,167 $0 $0 $0 $3,822,789 ���fi���� ��� ��� i����������� ��°������ � ������������ Description: Turtle Bay to Downtown Multi-use trail connecting Dana to Downtown and Turtle Bay boat ramp to Continental. Includes a tunnel;shared use path; and pedestrian safety lighting. Location: North of (parallel to) SR44 Project Cost: Prior Years/Future Costs: $551,509 ProjectType: One-timeStreet Widening/Extension CIP Costs(detailed below) $2,349,237 Total Project Cost: $2,900,747 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Local Streets and Roads $0 $0 $0 $0 $0 $0 $0 F�nd State ATP Grant $1,770,351 $578,887 $0 $0 $0 $0 $2,349,237 Total $1,770,351 $578,887 $0 $0 $0 $0 $2,349,237 Project Development $33,691 $0 $0 $0 $0 $0 $33,691 Construction $1,736,660 $578,887 $0 $0 $0 $0 $2,315,547 Total $1,770,351 $578,887 $0 $0 $0 $0 $2,349,237 I������� ��������i����� ���������� I�������,�� � ���`����������� Description: Bridge Maintenance Grant funding various repairs of 7 Bridges. Location: Various Project Cost: Prior Years/Future Costs: $71,836 ProjectType: One-timeBridges Improvements CIP Costs(detailed below) $721,809 Total Project Cost: $793,645 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal HBP Grant $23,645 $24,000 $511,704 $0 $0 $0 $559,349 Local Streets and Roads $3,064 $3,100 $66,296 $30,000 $30,000 $30,000 $162,460 Fund Total $26,709 $27,100 $578,000 $30,000 $30,000 $30,000 $721,809 Project Development $26,709 $27,100 $3,000 $3,000 $3,000 $3,000 $65,809 Construction $0 $0 $575,000 $27,000 $27,000 $27,000 $656,000 Total $26,709 $27,100 $578,000 $30,000 $30,000 $30,000 $721,809 C-38 SECTION C ������������n ����� '"�`����r��� ������� �� ������������� Description: Provide left turn lanes and left turn protected phasing where none exists at selected intersections. Includes striping between intersections to facilitate intersection modifications. �ocation: Citywide Project Cost: Prior Years/Future Costs: $308,753 ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $2,056,180 Total Project Cost: $2,364,933 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Local Streets and Roads $296,836 $285,304 $0 $0 $0 $0 $582,140 Fund State Grant $445,950 $445,950 $0 $0 $0 $0 $891,900 Traffic Impact Fees $296,836 $285,304 $0 $0 $0 $0 $582,140 Total $1,039,621 $1,016,559 $0 $0 $0 $0 $2,056,180 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $1,039,621 $1,016,559 $0 $0 $0 $0 $2,056,180 Total $1,039,621 $1,016,559 $0 $0 $0 $0 $2,056,180 ����������. ��°���������p������� ������� ��������� I��a������� � ��'���������'� Description: Install new intersection safety lighting where none exists and correct deficient existing lighting at un- signalized intersections. Location: Citywide Project Cost: Prior Years/Future Costs: $150,089 ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $775,130 Total Project Cost: $925,219 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total �ocal Streets and Roads $84,610 $0 $0 $0 $0 $0 $84,610 Fund State Grant $690,520 $0 $0 $0 $0 $0 $690,520 Total $775,130 $0 $0 $0 $0 $0 $775,130 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $775,130 $0 $0 $0 $0 $0 $775,130 Total $775,130 $0 $0 $0 $0 $0 $775,130 c-ss SECTION C ������� �� �,��`��"`���� ��M�`� ����,��fl�� ��"�����' �� �`��������'��a��� Description: The project will complete sidewalk gaps,install ADA ramps, narrow travel lanes to provide standard bike lanes, and add street lighting along Churn Creek Road and Maraglia Street.An enhanced crosswalk will also be installed on Churn Creek Road with a refuge island and rectangular rapid flashing beacons. �ocation: Churn Creek Rd. between Hartnell and Cypress Project Cost: Prior Years/Future Costs: $1,732,486 and Maragiia St. between Churn Creek and Hilltop. ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $8,992,143 Total Project Cost: $10,724,629 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Carbon Reduction Program $253,237 $246,763 $0 $0 $0 $0 $500,000 Federal Grant $46,763 $6,052,328 $2,017,443 $0 $0 $0 $8,116,535 Traffic Impact Fees $16,834 $269,081 $89,694 $0 $0 $0 $375,608 Total $316,834 $6,568,172 $2,107,136 $0 $0 $0 $8,992,143 Project Development $316,834 $246,763 $0 $0 $0 $0 $563,598 Construction $0 $6,321,409 $2,107,136 $0 $0 $0 $8,428,545 Total $316,834 $6,568,172 $2,107,136 $0 $0 $0 $8,992,143 ���� ��m����°�� ��„���� '������������ ��°����� � ���������i �i Description: Widen and realign Old Oregon Trail from Paso Robles to Bear Mountain Road. Location: Old Oregon Trail Project Cost: Prior Years/Future Costs: $1,154,1 10 ProjectType: One-timeStreet Widening/Extension CIP Costs(detailed below) $2,414,913 Total Project Cost: $3,569,023 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal NSIP Grant $993,987 $0 $0 $0 $0 $0 �993,987 �ocal Streets and Roads $1,233,016 $0 $0 $0 $0 $0 $1,233,016 Fund Traffic Impact Fees $187,910 $0 $0 $0 $0 $0 �187,910 Total $2,414,913 $0 $0 $0 $0 $0 $2,414,913 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $2,414,913 $0 $0 $0 $0 $0 �2,414,913 Total $2,414,913 $0 $0 $0 $0 $0 $2,414,913 C-4a SECTION C ���� ���������� ��;���� ������� ���a ��������� ������ ��������� �� ������������� Description: Replace the bridge on Old Alturas Road over Churn Creek. location: Old Alturas Road Project Cost: Prior Years/Future Costs: $8,237,145 ProjectType: One-timeBridges Improvements CIP Costs(detailed below) $700,000 Total Project Cost: $8,937,145 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal HBP Grant $50,000 $0 $0 $0 $0 $0 �50,000 Traffic Impact Fees $650,000 $0 $0 $0 $0 $0 $650,000 Total $700,000 $0 $0 $0 $0 $0 $700,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construcfiion $700,000 $0 $0 $0 $0 $0 $700,000 Total $700,000 $0 $0 $0 $0 $0 $700,000 �������� ����� i��������� ������� ������� ����� ��°������ � ������������� Description: Replace the bridge on Girvan Road over Olney Creek. Location: Girvan Road Project Cost: Prior Years/F�ture Costs: $850,215 ProjectType: One-timeBridges Improvements CIP Costs(detailed below) $8,134,420 Total Project Cost: $8,984,635 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal HBP Grant $39,453 $355,448 $6,753,511 $0 $0 $0 $7,148,412 Traffic Impact Fees $64,967 $46,052 $874,989 $0 $0 $0 $986,008 Total $104,420 $401,500 $7,628,500 $0 $0 $0 $8,134,420 Project Development $104,420 $0 $0 $0 $0 $0 $104,420 Construction $0 $401,500 $7,628,500 $0 $0 $0 $8,030,000 Total $104,420 $401,500 $7,628,500 $0 $0 $0 $8,134,420 ��������k��� ����� ��°����� ������ ���°������ ��I�I���� I�������P� � ������������ Description: Replace the bridge on Railroad Avenue over Canyon Hollow Creek Location: Westside Road Project Cost: Prior Years/Future Costs: $819,491 ProjectType: One-timeBridges Improvements CIP Costs(detailed below) $6,126,626 Total Project Cost: $6,946,1 17 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal HBP Grant $655,822 $4,238,976 $529,872 $0 $0 $0 $5,424,671 Traffic Impact Fees $84,1 Ol $549,204 $68,651 $0 $0 $0 $701,955 Total $739,923 $4,788,181 $598,523 $0 $0 $0 $6,126,626 Project Development $141,400 $0 $0 $0 $0 $0 $141,400 Construction $598,523 $4,788,181 $598,523 $0 $0 $0 $5,985,226 Total $739,923 $4,788,181 $598,523 $0 $0 $0 $6,126,626 C-41 SECTION C ���������� ����� ��������� ����� ��r������ ������I��� ��������� �� ������������� Description: Replace the bridge on Eastside Road over Canyon Hollow Creek Location: Eastside Road Project Cost: Prior Years/Future Costs: $682,179 ProjectType: One-timeBridges Improvements CIP Costs(detailed below) $3,839,000 Total Project Cost: $4,521,179 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal HBP Grant $0 $168,283 $3,197,377 $0 $0 $0 $3,365,660 Traffic Impact Fees $39,000 $21,717 $412,623 $0 $0 $0 $473,340 Total $39,000 $190,000 $3,610,000 $0 $0 $0 $3,839,000 Project Development $39,000 $0 $0 $0 $0 $0 $39,000 Construcfiion $0 $190,000 $3,610,000 $0 $0 $0 $3,800,000 Total $39,000 $190,000 $3,610,000 $0 $0 $0 $3,839,000 ��������� ����� ����,���� ���e�� ������� �:����� ��°������ � ����������`�� Description: Replace the bridge on Eastside Road over Olney Creek. Location: Eastside Road Project Cost: Prior Years/F�ture Costs: $2,930,604 ProjectType: One-timeBridges Improvements CIP Costs(detailed below) $5,334,086 Total Project Cost: $8,264,690 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal HBP Grant $2,361,133 $2,361,133 $0 �0 $0 $0 $4,722,266 Traffic Impact Fees $305,910 $305,910 $0 $0 $0 $0 $611,820 Total $2,667,043 $2,667,043 $0 $0 $0 $0 $5,334,086 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $2,667,043 $2,667,043 $0 $0 $0 $0 $5,334,086 Total $2,667,043 $2,667,043 $0 $0 $0 $0 $5,334,086 �����m����������� ����� ������ ������� �I����� ��°��I� I�������P� � ���������� �, Description: Replace the bridge on Sacramento Drive over Olney Creek. Location: Sacramento Drive Project Cost: Prior Years/Future Costs: $908,799 Project Type: One-timeBridges Improvements CIP Costs(detailed below) $9,625,000 Total Project Cost: $10,533,799 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal HBP Grant $40,000 $30,000 $10,000 $9,545,000 $0 $0 $9,625,000 Total $40,000 $30,000 $10,000 $9,545,000 $0 $0 $9,625,000 Project Development $40,000 $30,000 $10,000 $0 $0 $0 $80,000 Construction $0 $0 $0 $9,545,000 $0 $0 $9,545,000 Total $40,000 $30,000 $10,000 $9,545,000 $0 $0 $9,625,000 c-42 SECTION C ����������� ������������� ����� �� ��������� �� ������������� Description: Widen Airport Road for additional capacity and operational safety. Location: Airport Road Corridor Project Cost: Prior Years/Future Costs: $264,359 ProjectType: One-timeStreet Widening/Extension CIP Costs(detailed below) $1,803,423 Total Project Cost: $2,067,782 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Local Streets and Roads $55,000 $1,748,423 $0 $0 $0 $0 $1,803,423 Fund Total $55,000 $1,748,423 $0 $0 $0 $0 $1,803,423 Project Development $55,000 $0 $0 $0 $0 $0 $55,000 Construction $0 $1,748,423 $0 $0 $0 $0 $1,748,423 Total $55,000 $1,748,423 $0 $0 $0 $0 $1,803,423 ������� ��������,������������������� �������������� ��fl������� � ����1�������� Description: Construct roundabout at convergence of Churn Creek Road with both Victor Avenue and Rancho Road. Location: Churn Creek/Ranch/Victor Intersection Project Cost: Prior Years/Future Costs: $588,153 ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $16,760,000 Total Project Cost: $17,348,153 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Anticipated Grant $0 $0 $0 $7,000,000 $7,000,000 $0 $14,000,000 Traffic Impact Fees $360,000 $200,000 $200,000 $1,000,000 $1,000,000 $0 $2,760,000 Total $360,000 $200,000 $200,000 $8,000,000 $8,000,000 $0 $16,760,000 Project Development $360,000 $200,000 $200,000 $0 $0 $0 $760,000 Construction $0 $0 $0 $8,000,000 $8,000,000 $0 $16,000,000 Total $360,000 $200,000 $200,000 $8,000,000 $8,000,000 $0 $16,760,000 ��°��������., �������� ����� I�°������� �� ��°������� � �������,������ Description: Improvements to Stiliwater Business Park. Location: Stiliwater Business Park Project Cost: Prior Years/Future Costs: $609,446 Project Type: One-timeStreet Improvement CIP Costs(detailed below) $9,542,052 TotalProjectCost: $10,151,498 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total General Fund $65,000 $5,000,000 $4,477,052 $0 $0 $0 $9,542,052 Total $65,000 $5,000,000 $4,477,052 $0 $0 $0 $9,542,052 Project Development $65,000 $300,000 $200,000 $0 $0 $0 $565,000 Construction $0 $4,700,000 $4,277,052 $0 $0 $0 $8,977,052 Total $65,000 $5,000,000 $4,477,052 $0 $0 $0 $9,542,052 C-43 SECTION C ������������ �� ��������� ��a����� ��������� �� ������������� Description: Construction of a two-way Class IV bikeway along California Street between Yuba Street and Tehama Street. Improvements of pedestrian access by rebuilding curb ramps,creating bulb-outs, and increasing crossing visibility. �ocation: California St between Yuba and Tehama Project Cost: Prior Years/Future Costs: $8,273,296 ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $1,499,691 Total Project Cost: $9,772,987 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total AHSC Grant $53,759 $0 $0 $0 $0 $0 $53,759 Federal EDA Grant/CA $1,344,257 $0 $0 $0 $0 $0 $1,344,257 SNOPP �ocal Streets and Roads $101,674 $0 $0 $0 $0 $0 $101,674 Fund Total $1,499,691 $0 $0 $0 $0 $0 $1,499,691 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $1,499,691 $0 $0 $0 $0 $0 $1,499,691 Total $1,499,691 $0 $0 $0 $0 $0 $1,499,691 ����"�� ����� ���"�'� I�§"�',����� �a� �"���������� Description: Widening to provide one travel lane in each direction,a center turn lane,five-foot bike lanes on both sides, a five-foot sidewalk, curb and gutter on both sides,ADA curb ramps and corner bulb outs at all cross streets, driveways,storm drain pipe and catch basin relocations, asphalt concrete resurfacing and tie-ins, pavement striping and markings,signage and relocation of overhead electrical lines to underground. location: Shasta View Dr from Hartnell Ave to approx.573ft Project Cost: Prior Years/Future Costs: $56,103 north of Kerry Ave ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $4,044,244 Total Project Cost: $4,100,347 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Developer Contribution $0 $977,347 $0 $0 $0 $0 $977,347 Electric Ufiility Rates $0 $1,500,000 $0 $0 $0 $0 $1,500,000 �ocal Streets and Roads $0 $923,000 $0 $0 $0 $0 $923,000 F�nd Traffic Impact Fees $50,000 $593,897 $0 $0 $0 $0 $643,897 Total $50,000 $3,994,244 $0 $0 $0 $0 $4,044,244 Project Development $50,000 $885,000 $0 $0 $0 $0 $935,000 Construction $0 $3,109,244 $0 $0 $0 $0 $3,109,244 Total $50,000 $3,994,244 $0 $0 $0 $0 $4,044,244 C-44 SECTION C I������ ������� ������� ��������� �� ������������� Description: Construction of low-stress bike/walk network to connect DACs to downtown services, schools, grocery stores,regional transit center,and Bike Depot/E-Bikeshare. �ocation: Placer Street, Butte Street,and downtown West Project Cost: Prior Years/Future Costs: $263,041 Street &Shasta Street. ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $7,491,959 Total Project Cost: $7,755,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total State ATP Grant $145,980 $245,980 $7,100,000 $0 $0 $0 $7,491,959 Total $145,980 $245,980 $7,100,000 $0 $0 $0 $7,491,959 Project Development $145,980 $245,980 $0 $0 $0 $0 $391,959 Construction $0 $0 $7,100,000 $0 $0 $0 $7,100,000 Total $145,980 $245,980 $7,100,000 $0 $0 $0 $7,491,959 ���,m��� ������������������� ��°������� ��w������ � �������n���� Description: Construction of low-stress active transportation facilities on Victor Ave, Mistletoe Lane and adjacent neighborhood streets, and encourages people to walk and bike. Locntion: Victor Avenue, Mistletoe Lane, Derby Lane, Oxford Project Cost: Prior Years/Future Costs: $285,794 Road,Oakdale Lane, Penn Drive, Dusty Lane, and Canby Road. Project Type: One-timeStreet Improvement CIP Costs(detailed below) $6,317,268 Total Project Cost: $6,603,062 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total State Grant $240,000 $174,206 $3,896,021 $2,007,041 $0 $0 $6,317,268 Total $240,000 $174,206 $3,896,021 $2,007,041 $0 $0 $6,317,268 Project Development $240,000 $174,206 $0 $0 $0 $0 $414,206 Construction $0 $0 $3,896,021 $2,007,041 $0 $0 $5,903,062 Total $240,000 $174,206 $3,896,021 $2,007,041 $0 $0 $6,317,268 �:�������"„�� ��� �����"�������' � �������;������ Description: Design of an improved at-grade railroad crossing �ocation: Eastside Road at UPRR Railroad Crossing Project Cost: Prior Years/Future Costs: $12,354 ProjectType: One-timeStreet Improvement CIP Costs(detailed belowj $67,646 Total Project Cost: $80,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal Section 130 Grant $38,000 $29,646 $0 $0 $0 $0 $67,646 Total $38,000 $29,646 $0 $0 $0 $0 $67,646 Project Development $38,000 $29,646 $0 $0 $0 $0 $67,646 Construction $0 $0 $0 $0 $0 $0 $0 Total $38,000 $29,646 $0 $0 $0 $0 $67,646 C-45 SECTION C ������� ������ �������������������� ������� �� ������������°� Description: Extend concrete box culvert for Calaboose Creek along Oregon Street from Shasta Street to Yuba Street. Fill sidewalk gaps, tie in paving and install pedestrian lighting, �ocation: Oregon Street Project Cost: Prior Years/Future Costs: $381,504 ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $1,640,605 Total Project Cost: $2,022,109 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Clean CA Grant $812,343 $812,343 $0 $0 $0 $0 $1,624,686 Local Streets and Roads $15,919 $0 $0 $0 $0 $0 $15,919 Fund Total $828,262 $812,343 $0 $0 $0 $0 $1,640,605 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $828,262 $812,343 $0 $0 $0 $0 $1,640,605 Total $828,262 $812,343 $0 $0 $0 $0 $1,640,605 ������������ �����. ����� �����°������������ I���������� � ��'�������� Description: Design and construct road and trail improvements including frontage improvements, landscaping and angled parking spaces along the frontage with a 10' separated trail. Location: Placer Rd to Lincoln on Railroad Ave,Gold St, and Project Cost: Prior Years/Future Costs: $422,060 Waldon St. ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $3,672,940 Total Project Cost: $4,095,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Clean CA Grant $275,000 $700,000 $2,697,940 $0 $0 $0 $3,672,940 Total $275,000 $700,000 $2,697,940 $0 $0 $0 $3,672,940 Project Development $275,000 $175,000 $0 $0 $0 $0 $450,000 Construction $0 $525,000 $2,697,940 $0 $0 $0 $3,222,940 Total $275,000 $700,000 $2,697,940 $0 $0 $0 $3,672,940 �� ����u� ��������i������° �"��N��������� ���� ������.������ Description: Design, and feasibility study, of an improved, Complete street along Railroad Avenue. �ocation: Railroad Avenue from Court St to Buenaventura Project Cost: Prior Years/Future Costs: $21,286 Project Type: One-timeStreet Improvement CIP Costs(detailed below) $88,900 Total Project Cost: $1 10,186 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total CRRSSA State Grant $25,000 $63,900 $0 $0 $0 $0 $88,900 Total $25,000 $63,900 $0 $0 $0 $0 $88,900 Project Development $25,000 $63,900 $0 $0 $0 $0 $88,900 Construction $0 $0 $0 $0 $0 $0 $0 Total $25,000 $63,900 $0 $0 $0 $0 $88,900 C-46 SECTION C I������������� ���� ������° ��������� �� ��`_._����n,w��°� Description: Evaluation and repair of a speed depression that has developed on Buenaventura Boulevard Location: Buenaventura Blvd approx. 1750 ft north of SR299 Project Cost: Prior Years/Future Costs: $10,000 ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $1,150,000 Total Project Cost: $1,160,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Local Streets and Roads $50,000 $1,100,000 $0 $0 $0 $0 $1,150,000 Fund Total $50,000 $1,100,000 $0 $0 $0 $0 $1,150,000 Project Development $50,000 $0 $0 $0 $0 $0 $50,000 Construction $0 $1,100,000 $0 $0 $0 $0 $1,100,000 Total $50,000 $1,100,000 $0 $0 $0 $0 $1,150,000 ���„�:����� �������� ����� ���������������� ��fl������� � ��" ��������� Description: Construction of Complete Street elements along the northern section of Victor Ave; Install Sidewalks,Shared Use Path, Roundabouts, Buffered Bike Lanes,ADA Ramps, Crosswalks, Rectangular Rapid Flashing Beacons, and Green Conflict Zone Markings �ocation: Victor Ave, Old Alturas Rd, Dana Dr, and Bradford Project Cost: Prior Years/Future Costs: $0 Wy ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $15,490,727 Total Project Cost: $15,490,727 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Unidentified Grant $0 $0 $699,825 $4,099,825 $10,691,077 $0 $15,490,727 Total $0 $0 $699,825 $4,099,825 $10,691,077 $0 $15,490,727 Project Development $0 $0 $699,825 $4,099,825 $0 $0 $4,799,650 Construction $0 $0 $0 $0 $10,691,077 $0 $10,691,077 Total $0 $0 $699,825 $4,099,825 $10,691,077 $0 $15,490,727 ������ ����� ��������°�� ������°� �� �,��������� Description: Widen Canby Road north of Browning along the west side. Includes curb, gutter, and sidewalk. Construction Timeline from prior CIP extended to FY27-28 due to availability of project funding. �ocation: Canby Road (Dana Traffic Benefit District) Project Cost: Prior Years/Future Costs: $61,558 Project Type: One-timeStreet Improvement CIP Costs(detailed below) $555,000 Total Project Cost: $616,558 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Dana Traffic Impact Fees $5,000 $50,000 $500,000 $0 $0 $0 $555,000 Total $5,000 $50,000 $500,000 $0 $0 $0 $555,000 Project Development $5,000 $50,000 $0 $0 $0 $0 $55,000 Construction $0 $0 $500,000 $0 $0 $0 $500,000 Total $5,000 $50,000 $500,000 $0 $0 $0 $555,000 C-47 SECTION C �'������ ���������� ��������� �� ������������� Description: Install devices to reduce speeds and cut-through traffic in residential neighborhoods. Location: Various Project Type: Ongoing Street Improvement Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Local Streets and Roads $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 �300,000 Fund Total $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 Project Development $5,000 $5,000 $5,000 $5,000 $5,000 $5,000 $30,000 Construction $45,000 $45,000 $45,000 $45,000 $45,000 $45,000 $270,000 Total $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 ��"���� ��`������� ��"������ � ����������a�„,�� Description: Various traffic operation and capacity improvements. Funds will be used as match for grant-funded projects or leverage for development projects. �ocation: Various Project Type: Ongoing Street Improvement Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Traffic Impact Fees $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 Total $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 Project Development $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $120,000 Construction $180,000 $180,000 $180,000 $180,000 $180,000 $180,000 $1,080,000 Total $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 ��������� �������,��� ������������� ��������°� � ������.���°���'� Description: Roadway surface maintenance work conducted annually on various streets. �ocation: Citywide Project Type: Ongoing Street Improvement Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total �ocal Streets and Roads $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $15,000,000 F�nd Total $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $15,000,000 Project Development $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 Construction $2,250,000 $2,250,000 $2,250,000 $2,250,000 $2,250,000 $2,250,000 $13,500,000 Total $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $15,000,000 C-48 SECTION C ���� �����"�� ��������� �� �����������i`�� Description: Roadway surface maintenance work conducted annually on various streets. Location: Citywide Project Type: Ongoing Street Improvement Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Local Streets and Roads $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $15,000,000 Fund Total $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $15,000,000 Project Development $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 Construction $2,250,000 $2,250,000 $2,250,000 $2,250,000 $2,250,000 $2,250,000 $13,500,000 Total $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $15,000,000 ���������� ������������� ������ ������� �������� � �R�kn������������ Description: Additional roadway surface maintenance work (techniques such as crack sealing) conducted annually on various streets (pending funding) �ocation: Citywide Project Type: Ongoing Street Improvement Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Unidentified Grant $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $30,000,000 Total $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $30,000,000 Project Development $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $3,000,000 Construction $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $27,000,000 Total $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $30,000,000 ____ ____. ......... ......... ......... ......... ......... ......... ......... .____ ......... ......... ........ ......... ......... _........ ........ ........ ���.�������� �������������� ��°�,����� � �������;������� Description: Annual project to replace worn and/or damaged sections of existing sidewalks. �ocation: Citywide Project Type: Ongoing Street Improvement Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total �ocal Streets and Roads $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 F�nd Total $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 Project Development $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $150,000 Construction $225,000 $225,000 $225,000 $225,000 $225,000 $225,000 $1,350,000 Total $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 C-49 SECTION C ��� ����� ��a����� ��������� �� ������������� Description: Install ADA-accessible curb ramps at various intersections throughout the city. location: Various Project Type: Ongoing Street Widening/Extension Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Federal CDBG Grant $76,194 $75,000 $75,000 $75,000 $75,000 $75,000 �451,194 Local Streets and Roads $123,806 $125,000 $125,000 $0 $0 $0 $373,806 Fund Total $200,000 $200,000 $200,000 $75,000 $75,000 $75,000 $825,000 Project Development $20,000 $20,000 $20,000 $7,500 $7,500 $7,500 $82,500 Construction $180,000 $180,000 $180,000 $67,500 $67,500 $67,500 $742,500 Total $200,000 $200,000 $200,000 $75,000 $75,000 $75,000 $825,000 ����� ������ ���������� ������ ���,���� ���������� � �����"������ Description: Update the Oasis Road Specific Plan.Timeline extended from prior CIP f�e to funding availability. Location: North Redding Traffic Benefit District Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeStreet Improvement CIP Costs(detailed below) $155,000 Total Project Cost: $155,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total North Redding Traffic Benefit $0 $0 $155,000 $0 $0 $0 $155,000 District Fees Total $0 $0 $155,000 $0 $0 $0 $155,000 Project Development $0 $0 $155,000 $0 $0 $0 $155,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $155,000 $0 $0 $0 $155,000 ��� ������ �' �"������°��� ���������� ���������������� ��°����� � �"�`�"��i����� Description: Construct a roundabout at the onramp of WB SR299 at Churn Creek Road Location: Churn Creek Road @ WB299 onramp (north side) Project Cost: Prior Years/F�ture Costs: $0 ProjectType: One-timeStreet Improvement CIP Costs(detailed below) $4,500,000 Total Project Cost: $4,500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Developer Contribution $0 $0 $0 $0 $0 $75,000 $75,000 2240055 Traffic Impact Fees $0 $0 $0 $0 $0 $4,425,000 $4,425,000 Total $0 $0 $0 $0 $0 $4,500,000 $4,500,000 Project Development $0 $0 $0 $0 $0 $450,000 $450,000 Construction $0 $0 $0 $0 $0 $4,050,000 $4,050,000 Total $0 $0 $0 $0 $0 $4,500,000 $4,500,000 C-5o SECTION C ������ ������°� ��j����� ��������� � �������������� Description: Replacing existing siphon with gravity system. Location: Canter Court Project Cost: Prior Years/Future Costs: $729,682 Project Type: One-timeCollection System CIP Costs(detailed below) $896,053 Total Project Cost: $1,625,736 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $296,053 $600,000 $0 $0 $0 $0 �896,053 Total $296,053 $600,000 $0 $0 $0 $0 $896,053 Project Development $29,605 $30,000 $0 $0 $0 $0 $59,605 Construction $266,448 $570,000 $0 $0 $0 $0 $836,448 Total $296,053 $600,000 $0 $0 $0 $0 $896,053 �`���i������ ������� I��°�����,�� �� ������������� Description: Maintenance and rebuild of Clear Creek WWTP Clarifiet Location: 2220 Metz Road Project Cost: Prior Years/F�ture Costs: $4,435 ProjectType: One-timeTreatmentSystem CIP Costs(detailed below) $1,044,098 Total Project Cost: $1,048,533 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $1,044,098 $0 $0 $0 $0 $0 $1,044,098 Total $1,044,098 $0 $0 $0 $0 $0 $1,044,098 Project Development $52,205 $0 $0 $0 $0 $0 $52,205 Construction $991,893 $0 $0 $0 $0 $0 $991,893 Total $1,044,098 $0 $0 $0 $0 $0 $1,044,098 ����������� I��:�������� ������� ���°������ � ������������ Description: Installation of 23,725 linear feet of sewer line in the Magnums Lane remote area. Includes rehabilitation of all existing manholes. Location: Lake Blvd E to Beltline Rd Project Cost: Prior Years/Future Costs: $494,960 Project Type: One-timeCollection System CIP Costs(detailed below) $3,205,040 Total Project Cost: $3,700,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Connection $544,857 $0 $0 $0 $0 $0 $544,857 Fees Wastewater Rates $2,660,183 $0 $0 $0 $0 $0 $2,660,183 Total $3,205,040 $0 $0 $0 $0 $0 $3,205,040 Project Development $320,504 $0 $0 $0 $0 $0 $320,504 Construction $2,884,536 $0 $0 $0 $0 $0 $2,884,536 Total $3,205,040 $0 $0 $0 $0 $0 $3,205,040 C-51 SECTION C ����� ��� ���������������� ������� ��� �������������� Description: Replacement of approximately 1200 feet of 8-inch diameter ABS pipe constructed in the late 1980s from manhole NY9-2 to NZ9-10 with 10-inch diameter pipe. �ocation: Oasis Road Project Cost: Prior Years/Future Costs: $109 ProjectType: One-timeCollection System CIP Costs(detailed below) $1,049,891 Total Project Cost: $1,050,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Connection $0 $627,000 $0 $0 $0 $0 $627,000 Fees Wastewater Rates $99,891 $323,000 $0 $0 $0 $0 $422,891 Total $99,891 $950,000 $0 $0 $0 $0 $1,049,891 Project Development $99,891 $95,000 $0 $0 $0 $0 $194,891 Construction $0 $855,000 $0 $0 $0 $0 $855,000 Total $99,891 $950,000 $0 $0 $0 $0 $1,049,891 ����� �������� ����������� � ���°����� ������ I���������� � �'��������� Description: Construction of sludge lagoons at Stillwater Treatment Plant location: 6475 Airport Road Project Cost: Prior Years/Future Costs: $9,188,974 Project Type: One-timeTreatment System CIP Costs(detailed below) $389,845 Total Project Cost: $9,578,819 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $389,845 $0 $0 $0 $0 $0 $389,845 Total $389,845 $0 $0 $0 $0 $0 $389,845 Project Development $0 $0 $0 $0 $0 $0 $0 Construcfiion $389,845 $0 $0 $0 $0 $0 $389,845 Total $389,845 $0 $0 $0 $0 $0 $389,845 ���������� �������rv� I��������.� �� ������������ Description: Alternate de-chlorination chemical process for Clear Creek WWTP. Location: 2220 Metz Road &6475 Airport Rd Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeTreatment System CIP Costs(detailed below) $275,880 Total Project Cost: $275,880 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $275,880 $0 $0 $0 $0 $0 $275,880 Total $275,880 $0 $0 $0 $0 $0 $275,880 Project Development $27,588 $0 $0 $0 $0 $0 $27,588 Construction $248,292 $0 $0 $0 $0 $0 $248,292 Total $275,880 $0 $0 $0 $0 $0 $275,880 c-sz SECTION C �'��������� I�������°�u���°��� � ������ ��� ������� ��� �������������,� Description: Expansion of the main sewer serving the west region of the City to accommodate growth. Phase III will run from Girvan Road south to the Clear Creek Wastewater Treatment Plant. �ocation: Girvan Road to the Clear Creek WWTP Project Cost: Prior Years/Future Costs: $1,285,122 ProjectType: One-timeCollection System CIP Costs(detailed below) $15,071,645 Total Project Cost: $16,356,767 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total WastewaterConnection $0 $0 $14,071,645 $1,000,000 $0 $0 $15,071,645 Fees Total $0 $0 $14,071,645 $1,000,000 $0 $0 $15,071,645 Project Development $0 $0 $703,582 $50,000 $0 $0 $753,582 Construction $0 $0 $13,368,063 $950,000 $0 $0 $14,318,063 Total $0 $0 $14,071,645 $1,000,000 $0 $0 $15,071,645 ������ ���fi���� ������������° �°�������w����� ������� ��w������ � ���������"� Description: Ongoing major maintenance Location: 2220 Metz Road Project Type: Ongoing Treatment System Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $2,158,025 $712,160 $735,250 $759,090 $783,700 $809,110 $5,957,335 Total $2,158,025 $712,160 $735,250 $759,090 $783,700 $809,110 $5,957,335 Project Development $107,901 $35,608 $36,763 $37,955 $39,185 $40,456 $297,867 Construction $2,050,124 $676,552 $698,488 $721,136 $744,515 $768,655 $5,659,468 Total $2,158,025 $712,160 $735,250 $759,090 $783,700 $809,110 $5,957,335 �����������° ������������� ����°�������° ����� ��������� � ������,�������� Description: Ongoing major maintenance �ocation: 6475 Airport Road Project Cost: Prior Years/Future Costs: $1,042,595 Project Type: One-timeTreatment System CIP Costs(detailed below) $2,884,190 Total Project Cost: $3,926,785 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $370,740 $471,130 $486,410 $502,180 $518,460 $535,270 $2,884,190 Total $370,740 $471,130 $486,410 $502,180 $518,460 $535,270 $2,884,190 Project Development $18,537 $23,557 $24,321 $25,109 $25,923 $26,764 $144,210 Construction $352,203 $447,574 $462,090 $477,071 $492,537 $508,507 $2,739,981 Total $370,740 $471,130 $486,410 $502,180 $518,460 $535,270 $2,884,190 C-53 SECTION C �������������� ����� �������� ������� ������� ��� �������������� Description: Repair and rehabilitation of various aging sewer mains throughout the City as needed to reduce rainwater intrusion into the sewer system. �ocation: Citywide Project Type: Ongoing Collection System Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $4,907,556 $1,000,000 $500,000 $1,500,000 $2,000,000 $2,000,000 $11,907,556 Total $4,907,556 $1,000,000 $500,000 $1,500,000 $2,000,000 $2,000,000 $11,907,556 Project Development $245,378 $50,000 $25,000 $75,000 $100,000 $100,000 $595,378 Construction $4,662,178 $950,000 $475,000 $1,425,000 $1,900,000 $1,900,000 $11,312,178 Total $4,907,556 $1,000,000 $500,000 $1,500,000 $2,000,000 $2,000,000 $11,907,556 ����� ������.�� ��;���°���������°i�� i��F������ � ������������ Description: Repair/Rehab �ift Stations Location: Citywide Project Type: Ongoing Collection System Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $319,368 $375,000 $326,680 $337,270 $348,210 $359,500 $2,066,028 Total $319,368 $375,000 $326,680 $337,270 $348,210 $359,500 $2,066,028 Project Development $31,937 $37,500 $32,668 $33,727 $34,821 $35,950 $206,603 Construction $287,431 $337,500 $294,012 $303,543 $313,389 $323,550 $1,859,425 Total $319,368 $375,000 $326,680 $337,270 $348,210 $359,500 $2,066,028 ................................ . ....... ............. ........... .......... .... ....... . ..... ����� �������� ��������������°��� � i��°��������� � ���������������� Description: Construct approximately 790 feet of 27"pipe, 4,710 feet of 24"pipe,and 60 feet of 21"pipe from N Market Lift Station to Elk Drive. Location: �ake Redding Estates Project Cost: Prior Years/F�ture Costs: $72,228 Project Type: One-timeCollection System CIP Costs(detailed below) $5,300,000 Total Project Cost: $5,372,228 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Connection $0 $0 $5,300,000 $0 $0 $0 $5,300,000 Fees Total $0 $0 $5,300,000 $0 $0 $0 $5,300,000 Project Development $0 $0 $265,000 $0 $0 $0 $265,000 Construction $0 $0 $5,035,000 $0 $0 $0 $5,035,000 Total $0 $0 $5,300,000 $0 $0 $0 $5,300,000 C-54 SECTION C ������ ��������� � ������������� Description: CalRecycle Grant- Redding Organics Diversion to Energy Operation location: 2220 Metz Road Project Cost: Prior Years/Future Costs: $5,292,738 Project Type: One-timeTreatment System CIP Costs(detailed below) $7,307,261 Total Project Cost: $12,599,999 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total CalRecycle Grant $4,707,261 $0 $0 $0 $0 $0 $4,707,261 Wastewater Rates $2,600,000 $0 $0 $0 $0 $0 $2,600,000 Total $�,307,261 $0 $0 $0 $0 $0 $7,307,261 Project Development $235,363 $0 $0 $0 $0 $0 $235,363 Construcfiion $7,071,898 $0 $0 $0 $0 $0 $7,071,898 Total $7,307,261 $0 $0 $0 $0 $0 $7,307,261 �������� �ni��� ������� ��°������ � ������4����� Description: Regional lift station. Location: Rancho Lift Station Project Cost: Prior Years/F�ture Costs: $5,378 Project Type: One-timeCollection System CIP Costs(detailed below) $494,621 Total Project Cost: $499,999 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $494,621 $0 $0 �0 $0 $0 $494,621 Total $494,621 $0 $0 $0 $0 $0 $494,621 Project Development $24,731 $0 $0 $0 $0 $0 $24,731 Construction $469,890 $0 $0 $0 $0 $0 $469,890 Total $494,621 $0 $0 $0 $0 $0 $494,621 ............................ ...................... ...... ......................... ....._.................... ..... .................... ....................... ........_................ .._ �����i�� ����� ���������������� ��������� �� ����������� Description: Victor Area Water and Sewer Improvements �ocation: Victor Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeCollection System CIP Costs(detailed below) $3,775,000 Total Project Cost: $3,775,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $25,000 $3,750,000 $0 $0 $0 $0 $3,775,000 Total $25,000 $3,750,000 $0 $0 $0 $0 $3,775,000 Project Development $25,000 $187,500 $0 $0 $0 $0 $212,500 Construction $0 $3,562,500 $0 $0 $0 $0 $3,562,500 Total $25,000 $3,750,000 $0 $0 $0 $0 $3,775,000 C-55 SECTION C ���������� ������°� �������� ������� �� ������� ��� �������������� Description: Rehabilitation for sanitary sewer mains and lowers laterals. Includes manhole replacement and cover installation. �ocation: Magnolia Area Project Cost: Prior Years/Future Costs: �0 Project Type: One-timeCollection System CIP Costs(detailed below) $13,000,000 Total Project Cost: $13,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $4,400,000 $2,600,000 $6,000,000 $0 $0 $0 $13,000,000 Total $4,400,000 $2,600,000 $6,000,000 $0 $0 $0 $13,000,000 Project Development $220,000 $130,000 $300,000 $0 $0 $0 $650,000 Construction $4,180,000 $2,470,000 $5,700,000 $0 $0 $0 $12,350,000 Total $4,400,000 $2,600,000 $6,000,000 $0 $0 $0 $13,000,000 ........................... _ _.. ........_ ....._.__.................... ... ........................ .................... ........................ .. ....... ��'�:����� �i�����1����� ����������� �r ������� ������ ��������.� � ������������� Description: Future scale build-out for Biosolids final processing. Location: 2220 Metz Road Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeTreatment System CIP Costs(detailed below) $16,000,000 Total Project Cost: $16,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $8,000,000 $6,000,000 $2,000,000 $0 $0 $0 $16,000,000 Total $8,000,000 $6,000,000 $2,000,000 $0 $0 $0 $16,000,000 Project Development $400,000 $300,000 $100,000 $0 $0 $0 $800,000 Construction $7,600,000 $5,700,000 $1,900,000 $0 $0 $0 $15,200,000 Total $8,000,000 $6,000,000 $2,000,000 $0 $0 $0 $16,000,000 ................................ . ...... ........ ......................... ..... ................... ........................ .... .............................. ����������� ��������� I�����: ������ i��°���,��� �� ���.����n,.������ Description: Sewer main installation at Stillwater Business Park. �ocation: Stiliwater Business Park Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeCollection System CIP Costs(detailed below) $3,000,000 Total Project Cost: $3,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Connection $0 $0 $3,000,000 $0 $0 $0 $3,000,000 Fees Total $0 $0 $3,000,000 $0 $0 $0 $3,000,000 Project Development $0 $0 $300,000 $0 $0 $0 $300,000 Construction $0 $0 $2,700,000 $0 $0 $0 $2,700,000 Total $0 $0 $3,000,000 $0 $0 $0 $3,000,000 C-56 SECTION C ������� ��°��� ��°�� ����������°����� ��������� � ����',�������n,w�� Description: Pipe replacement project location: Garden Tract Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeCollection System CIP Costs(detailed below) $4,000,000 Total Project Cost: $4,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $0 $0 $4,000,000 $0 $0 $0 $4,000,000 Total $0 $0 $4,000,000 $0 $0 $0 $4,000,000 Project Development $0 $0 $200,000 $0 $0 $0 $200,000 Construction $0 $0 $3,800,000 $0 $0 $0 $3,800,000 Total $0 $0 $4,000,000 $0 $0 $0 $4,000,000 ��������������p ������� ������� I��°�����,�� �� ���`����„u,����� Description: The Mercury Drive Improvement project consists of two separate sections.The northern section consists of replacing approximately 1400 feet of six inch AC pipe constructed in the mid-1960s that lacks adequate capacity and needs to be replaced with 8-inch diameter pipe.The southern section is approximately 750 feet of 8-inch diameter AC of the same vintage needing to be replaced with 12-inch diameter pipe to increase capacity. �ocation: Mercury Drive Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeCollection System CIP Costs(detailed below) $1,450,000 Total Project Cost: $1,450,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $0 $0 $0 $0 $250,000 $1,200,000 $1,450,000 Total $0 $0 $0 $0 $250,000 $1,200,000 $1,450,000 Project Development $0 $0 $0 $0 $12,500 $60,000 $72,500 Construction $0 $0 $0 $0 $237,500 $1,140,000 $1,377,500 Total $0 $0 $0 $0 $250,000 $1,200,000 $1,450,000 �u�������.��� ������ �"��°�°������ � ���������������� Description: Increasing size of approximately 1200 feet of 8-inch diameter pipe to 12-inch diameter, 750 feet of 10-inch diameter pipe to 18-inch diameter and 700-feet of 12-inch pipe to 18 inches in diameter. Locntion: �akeside Dr Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeCollection System CIP Costs(detailed below) $1,750,000 Total Project Cost: $1,750,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $0 $0 $0 $0 $250,000 $1,500,000 �1,750,000 Total $0 $0 $0 $0 $250,000 $1,500,000 $1,750,000 Project Development $0 $0 $0 $0 $12,500 $75,000 $87,500 Construction $0 $0 $0 $0 $237,500 $1,425,000 $1,662,500 Total $0 $0 $0 $0 $250,000 $1,500,000 $1,750,000 C-5� SECTION C I������ �.������ ��������� � ������������� Description: Increase the 12-inch diameter pipes to 15-inches in diameter for approximately 2010 feet. Location: Lake Keswick Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeCollection System CIP Costs(detailed below) $3,550,000 Total Project Cost: $3,550,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Connection $0 $0 $0 $0 $710,000 $2,840,000 $3,550,000 Fees Total $0 $0 $0 $0 $710,000 $2,840,000 $3,550,000 Project Development $0 $0 $0 $0 $71,000 $284,000 $355,000 Construction $0 $0 $0 $0 $639,000 $2,556,000 $3,195,000 Total $0 $0 $0 $0 $710,000 $2,840,000 $3,550,000 I������ ���������� ����°��w������° �� ��fl������� � ��u„��.������� Description: Construct approximately 790 feet of 27"pipe,4,710 feet of 24"pipe,and 60 feet of 21"pipe from N Market �ift Station to Elk Drive. �ocation: Lake Redding Estates Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeCollection System CIP Costs(detailed below) $6,000,000 Total Project Cost: $6,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total WastewaterConnection $0 $0 $0 $0 $1,000,000 $5,000,000 $6,000,000 Fees Total $0 $0 $0 $0 $1,000,000 $5,000,000 $6,000,000 Project Development $0 $0 $0 $0 $50,000 $250,000 $300,000 Construcfiion $0 $0 $0 $0 $950,000 $4,750,000 $5,700,000 Total $0 $0 $0 $0 $1,000,000 $5,000,000 $6,000,000 ������������� ��� ��������� ��������� �� ���°�xi��..������ Description: Screening at influent pump station. Location: 2220 Metz Road Project Cost: Prior Years/F�ture Costs: $0 ProjectType: One-timeTreatmentSystem CIP Costs(detailed below) $1,000,000 Total Project Cost: $1,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Wastewater Rates $0 $0 $1,000,000 $0 $0 $0 $1,000,000 Total $0 $0 $1,000,000 $0 $0 $0 $1,000,000 Project Development $0 $0 $50,000 $0 $0 $0 $50,000 Construction $0 $0 $950,000 $0 $0 $0 $950,000 Total $0 $0 $1,000,000 $0 $0 $0 $1,000,000 C-5$ SECTION C ��� "��"��� �'��'�I� I�"�`�����,�� �� ��� �� Description: Construction of new well location: Fig Tree Lane Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeTreatment System CIP Costs(detailed below) $4,500,000 Total Project Cost: $4,500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Connection Fees $0 $0 $0 $0 $900,000 $0 �900,000 Water Rates $0 $0 $0 $0 $3,600,000 $0 $3,600,000 Total $0 $0 $0 $0 $4,500,000 $0 $4,500,000 Project Development $0 $0 $0 $0 $450,000 $0 $450,000 Construcfiion $0 $0 $0 $0 $4,050,000 $0 $4,050,000 Total $0 $0 $0 $0 $4,500,000 $0 $4,500,000 ���������� ���� ������������� ��������� � �������,�� Description: Construction of a 2MG Reservoir located in the Buckeye Zone. Location: Buckeye Zone Project Cost: Prior Years/F�ture Costs: $0 Project Type: One-timeTreatment System CIP Costs(detailed below) $5,000,000 Total Project Cost: $5,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Connection Fees $0 $0 $0 $2,500,000 $0 $0 $2,500,000 Water Rates $0 $0 $0 $2,500,000 $0 $0 $2,500,000 Total $0 $0 $0 $5,000,000 $0 $0 $5,000,000 Project Development $0 $0 $0 $250,000 $0 $0 $250,000 Construction $0 $0 $0 $4,750,000 $0 $0 $4,750,000 Total $0 $0 $0 $5,000,000 $0 $0 $5,000,000 �������� ����_���� �������,� ��������� �������� �� ����������� Description: Construction of a 7 MGD pump station at the existing supervisory valve.This pump station will have the ability to pump in either direction between the Foothill and Enterprise pressure zones and greatly increase the flexibility of wafier delivery in the distribution system. Location: Cypress Avenue Project Cost: Prior Years/Future Costs: $4,797,023 Project Type: One-timeDistribution System CIP Costs(detailed below) $737,815 Total Project Cost: $5,534,838 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $737,815 $0 $0 $0 $0 $0 $737,815 Total $737,815 $0 $0 $0 $0 $0 $737,815 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $737,815 $0 $0 $0 $0 $0 $737,815 Total $73�,815 $0 $0 $0 $0 $0 $737,815 c-5s SECTION C �� °�� ����������� ������������ ��������� �� ������������ Description: Rehabilition of Well 12. Location: E-Well 12 Project Cost: Prior Years/Future Costs: $7,170,531 Project Type: One-timeTreatment System CIP Costs(detailed below) $429,469 Total Project Cost: $7,600,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total WaterRates $429,469 $0 $0 $0 $0 $0 �429,469 Total $429,469 $0 $0 $0 $0 $0 $429,469 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $429,469 $0 $0 $0 $0 $0 $429,469 Total $429,469 $0 $0 $0 $0 $0 $429,469 ���R���� ����� � ����������� ��w������_���° ��������° ���,���°� I��°�����,�� �� ������������ Description: Installation of water main Location: Cascade Area Project Cost: Prior Years/Future Costs: $654,597 ProjectType: One-timeDistribution System CIP Costs(detailed below) $554,280 Total Project Cost: $1,208,877 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Grant $554,280 $0 $0 $0 $0 $0 $554,280 Total $554,280 $0 $0 $0 $0 $0 $554,280 Project Development $27,714 $0 $0 $0 $0 $0 $27,714 Construction $526,566 $0 $0 $0 $0 $0 $526,566 Total $554,280 $0 $0 $0 $0 $0 $554,280 ���� ���� ����������� ���°������� � ����������� � Description: Determine location and construct additional reservoir. Location: West Side of Redding Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeDistribution System CIP Costs(detailed below) $6,205,150 Total Project Cost: $6,205,150 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total WaterConnection Fees $153,863 $0 $1,500,000 $3,000,000 $0 $0 $4,653,863 Water Rates $51,288 $0 $500,000 $1,000,000 $0 $0 $1,551,288 Total $205,150 $0 $2,000,000 $4,000,000 $0 $0 $6,205,150 Project Development $205,150 $0 $100,000 $200,000 $0 $0 $505,150 Construction $0 $0 $1,900,000 $3,800,000 $0 $0 $5,700,000 Total $205,150 $0 $2,000,000 $4,000,000 $0 $0 $6,205,150 C-60 SECTION C ���rr�� ��i���� ��µ���� �������� ����� �������������°�� ������� �� ���������� Description: Install approximately 15,000 linear feet of new 8" diameter PVC water main and over 2,000 linear feet of 12" diameter DIP water main. �ocation: North Willis Area Project Cost: Prior Years/Future Costs: $531,396 Project Type: One-timeDistribution System CIP Costs(detailed below) $6,968,604 Total Project Cost: $7,500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $6,968,604 $0 $0 $0 $0 $0 $6,968,604 Total $6,968,604 $0 $0 $0 $0 $0 $6,968,604 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $6,968,604 $0 $0 $0 $0 $0 $6,968,604 Total $6,968,604 $0 $0 $0 $0 $0 $6,968,604 ............................. ....................................... ... ......................... ................... ............................... .................... ........................ .. ...... .. .. �...................... ��.. .,.,.,.,.,.. .�v.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,�v.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,..�. ..,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,..�,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,..�,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,..�.,.,.,.,.,.,.,.,.,.,�,u,u,u,u,�,.,�, ������� ���������i� � �������������°�� i��������.� � ����t���:����� Description: Environmental review for replacing Pump House 1 on the Sacramento River.Alternatives include rehabbing at current location or constructing a new pump house at various upstream locations. �ocation: 2300 Riverside Drive Project Cost: Prior Years/Future Costs: $7,372,668 Project Type: One-timeTreatment System CIP Costs(detailed below) $67,449,275 Total Project Cost: $74,821,943 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total SRF Loan $0 $50,000,000 $0 $0 $0 $0 $50,000,000 Water Rates $849,255 $5,533,340 $5,533,340 $5,533,340 $0 $0 $17,449,275 Total $849,255 $55,533,340 $5,533,340 $5,533,340 $0 $0 $67,449,275 Project Development $849,255 $1,110,667 $276,667 $276,667 $0 $0 $2,513,255 Construcfiion $0 $54,422,673 $5,256,673 $5,256,673 $0 $0 $64,936,019 Total $849,255 $55,533,340 $5,533,340 $5,533,340 $0 $0 $67,449,275 ��������I� ������°������ ����� ������� ������n������������ ��°������ � �����I��������� Description: Upgrades at the Foothill Water Treatment Plant to accommodate growth and replace aging equipment. Location: 3100 Foothill Bo�levard Project Type: Ongoing Treatment System Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $250,000 $250,000 $258,540 $267,372 $276,506 $285,952 $1,588,370 Total $250,000 $250,000 $258,540 $267,372 $276,506 $285,952 $1,588,370 Project Development $12,500 $12,500 $12,927 $13,369 $13,825 $14,298 $79,418 Construction $237,500 $237,500 $245,613 $254,004 $262,681 $271,654 $1,508,951 Total $250,000 $250,000 $258,540 $267,372 $276,506 $285,952 $1,588,370 C-61 SECTION C ����µ�������� ������������ ��������� ��������� ��������� �� ������������ Description: Electrical control system updates at Foothill Water Treatment Plant Location: Foothill Water Treatment Plant Project Type: Ongoing Treatment System Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $262,098 $89,559 $92,618 $95,782 $99,054 $102,438 �741,550 Total $262,098 $89,559 $92,618 $95,782 $99,054 $102,438 $741,550 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $262,098 $89,559 $92,618 $95,782 $99,054 $102,438 $741,550 Total $262,098 $89,559 $92,618 $95,782 $99,054 $102,438 $741,550 ��a=�;������ �������� °�'�������,���°�� ������ ���������°��.��°���� ���°����,� � ������������ Description: Various maintenance projects at the Buckeye Water Treatment Plant. Location: 1 1501 Benson Drive/3100 Foothill Boulevard Project Type: Ongoing Treatment System Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $139,064 $143,814 $148,727 $153,808 $159,062 $164,496 $908,970 Total $139,064 $143,814 $148,727 $153,808 $159,062 $164,496 $908,970 Project Development $6,953 $7,191 $7,436 $7,690 $7,953 $8,225 $45,448 Construction $132,110 $136,623 $141,291 $146,117 $151,109 $156,271 $863,521 Total $139,064 $143,814 $148,727 $153,808 $159,062 $164,496 $908,970 .._.... .._.._. ......... ......... ......... ......... ......... ........ ......... .._..... ......... ......... ......... ......... ........_ ......... ........ .......... ������� �������:��� ������°������������ ��������� � ������������ Description: Various rehab/repair to pump stations. location: Various Project Type: Ongoing Treatment System Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $421,899 $248,036 $256,509 �265,272 $274,334 $283,705 $1,749,754 Total $421,899 $248,036 $256,509 $265,272 $274,334 $283,705 $1,749,754 Project Development $21,095 $12,402 $12,825 $13,264 $13,717 $14,185 $87,488 Construction $400,804 $235,634 $243,684 $252,008 $260,617 $269,520 $1,662,267 Total $421,899 $248,036 $256,509 $265,272 $274,334 $283,705 $1,749,754 C-62 SECTION C ���������� ���� �`����� ����� ��������� �� ������������ Description: Replace water mains Country Oaks Area Location: Country Oaks Area Project Cost: Prior Years/Future Costs: $142,488 ProjectType: One-timeDistribution System CIP Costs(detailed below) $3,492,304 Total Project Cost: $3,634,792 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $3,492,304 $0 $0 $0 $0 $0 $3,492,304 Total $3,492,304 $0 $0 $0 $0 $0 $3,492,304 Project Development $174,615 $0 $0 $0 $0 $0 $174,615 Construction $3,317,689 $0 $0 $0 $0 $0 $3,317,689 Total $3,492,304 $0 $0 $0 $0 $0 $3,492,304 �������6� �`�I���� �n�����°������� I��°�����,�� �� ������������ Description: Keswick Valve Upgrades Location: Buckeye Zone Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $2,000,000 Total Project Cost: $2,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $500,000 $0 $0 $1,500,000 $0 $0 $2,000,000 Total $500,000 $0 $0 $1,500,000 $0 $0 $2,000,000 Project Development $500,000 $0 $0 $0 $0 $0 $500,000 Construction $0 $0 $0 $1,500,000 $0 $0 $1,500,000 Total $500,000 $0 $0 $1,500,000 $0 $0 $2,000,000 ���,������� ���������� �����° ���� ���������,������� ��������� � ���,���������'� Description: Installation of water main surrounding Canyon Bridge. Location: Canyon Bridge Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeDistribution System CIP Costs(detailed below) $1 12,500 Total Project Cost: $1 12,500 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $0 $0 $1 12,500 $0 $0 $0 $1 12,500 Total $0 $0 $112,500 $0 $0 $0 $112,500 Project Development $0 $0 $1 12,500 $0 $0 $0 $1 12,500 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $112,500 $0 $0 $0 $112,500 C-63 SECTION C ��������� �"���������� ��,������� ��������� �� ������������ Description: Upgrades to the Foothill Water Treatment Plant. location: Foothill Water Treatment Plant Project Cost: Prior Years/Future Costs: $3,098 Project Type: One-timeTreatment System CIP Costs(detailed below) $4,776,902 Total Project Cost: $4,780,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $0 $0 $4,776,902 $0 $0 $0 $4,776,902 Total $0 $0 $4,776,902 $0 $0 $0 $4,776,902 Project Development $0 $0 $238,845 $0 $0 $0 $238,845 Construction $0 $0 $4,538,057 $0 $0 $0 $4,538,057 Total $0 $0 $4,776,902 $0 $0 $0 $4,776,902 ������ �'����� ����� ������� �.���� �����������������5 � �������� �� I��°�����,�� �� ������������� Description: Continuation of NWA Water Line Replacement project. Location: North Willis Area Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $5,000,000 Total Project Cost: $5,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $0 $0 $5,000,000 $0 $0 $0 $5,000,000 Total $0 $0 $5,000,000 $0 $0 $0 $5,000,000 Project Development $0 $0 $250,000 $0 $0 $0 $250,000 Construction $0 $0 $4,750,000 $0 $0 $0 $4,750,000 Total $0 $0 $5,000,000 $0 $0 $0 $5,000,000 .._.... .._.._. ......... ......... ......... ......... ......... ......_.. ......... ...._.... ........ _........ ........ _____.... ......... ......... .......__ .......... ���� ���� �� ����,���° �����������' � ��..��"����.�� Description: Outlet pipe installation from Hill 900 Reserviours to Placer Street. Location: Placer Street Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeDistribution System CIP Costs(detailed below) $2,000,000 Total Project Cost: $2,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total WaterConnection Fees $0 $1,000,000 $0 $0 $0 $0 $1,000,000 Water Rates $0 $1,000,000 $0 $0 $0 $0 $1,000,000 Total $0 $2,000,000 $0 $0 $0 $0 $2,000,000 Project Development $0 $320,000 $0 $0 $0 $0 $320,000 Construction $0 $1,680,000 $0 $0 $0 $0 $1,680,000 Total $0 $2,000,000 $0 $0 $0 $0 $2,000,000 C-64 SECTION C �����,���������� `���g ������� ������ ��������� �� �.,e����4����� Description: Install approximately 4,100 LF of new 12-inch piping for a second supply and redundancy to the Ranchettes Area, at the so�thwest end of the Cascade Zone. Install the Clear Creek crossing during Westside Wastewater Interceptor construction,while the creek is bypassed. �ocation: Ranchettes Area Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $1,500,000 Total Project Cost: $1,500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Connection Fees $0 $240,000 $0 $0 $0 $0 $240,000 Water Rates $0 $1,260,000 $0 $0 $0 $0 $1,260,000 Total $0 $1,500,000 $0 $0 $0 $0 $1,500,000 Project Development $0 $150,000 $0 $0 $0 $0 $150,000 Construction $0 $1,350,000 $0 $0 $0 $0 $1,350,000 Total $0 $1,500,000 $0 $0 $0 $0 $1,500,000 ��^������ ����` �'���� ������� I���������� � �`��,��������� Description: Installation of a 16"water main. Location: Benton Rd Area Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Connection Fees $0 $0 $80,000 $0 $0 $0 $80,000 Water Rates $0 $0 $420,000 $0 $0 $0 $420,000 Total $0 $0 $500,000 $0 $0 $0 $500,000 Project Development $0 $0 $50,000 $0 $0 $0 $50,000 Construction $0 $0 $450,000 $0 $0 $0 $450,000 Total $0 $0 $500,000 $0 $0 $0 $500,000 ����°��������� ���� ���°��� ����� ��������,� .� �����"����`��'� Description: Installation of 12"water main at the intersection of West and Court. Location: West/Court Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $714,000 Total Project Cost: $714,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Connection Fees $0 $0 $0 $0 $1 12,000 $0 $1 12,000 Water Rates $0 $0 $0 $0 $602,000 $0 $602,000 Total $0 $0 $0 $0 $714,000 $0 $714,000 Project Development $0 $0 $0 $0 $71,400 $0 $71,400 Construction $0 $0 $0 $0 $642,600 $0 $642,600 Total $0 $0 $0 $0 $714,000 $0 $714,000 C-65 SECTION C ���" �`��� ����� � ������ �� ��������� ������° ���m�� ��������� �� ��.,e����4����� Description: 16°Twin View- B8-V24 to Oasis Cntr 5630 Location: Twin View Area Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $3,130,000 Total Project Cost: $3,130,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Connection Fees $0 $0 $0 $0 $0 $3,130,000 $3,130,000 Total $0 $0 $0 $0 $0 $3,130,000 $3,130,000 Project Development $0 $0 $0 $0 $0 $313,000 $313,000 Construction $0 $0 $0 $0 $0 $2,817,000 $2,817,000 Total $0 $0 $0 $0 $0 $3,130,000 $3,130,000 ������������ ��������� ���� ��,����h� ����� I��°�����,�� �� ���,�������� Description: Installation of water main at Stillwater Business Park Location: Stiliwater Business Park Project Cost: Prior Years/F�ture Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $4,240,000 Total Project Cost: $4,240,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Connection Fees $0 $0 $4,240,000 $0 $0 $0 $4,240,000 Total $0 $0 $4,240,000 $0 $0 $0 $4,240,000 Project Development $0 $0 $424,000 $0 $0 $0 $424,000 Construction $0 $0 $3,816,000 $0 $0 $0 $3,816,000 Total $0 $0 $4,240,000 $0 $0 $0 $4,240,000 � ����������i��� ������ ���������� �����°������ ���������� � ��..��"����.°�� Description: Upgrades to S Bonnyview Pump Station. Location: S Bonnyview Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $1,500,000 Total Project Cost: $1,500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Total $1,500,000 $0 $0 $0 $0 $0 $1,500,000 Project Development $75,000 $0 $0 $0 $0 $0 $75,000 Construction $1,425,000 $0 $0 $0 $0 $0 $1,425,000 Total $1,500,000 $0 $0 $0 $0 $0 $1,500,000 C-66 SECTION C ��������� ��i��� ����� `�;���� ����� ����� ��������� �� �.,e����4����� Description: Installation of 12"water main location: Cascade Area Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $1,400,000 Total Project Cost: $1,400,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $0 $0 $1,400,000 $0 $0 $0 $1,400,000 Total $0 $0 $1,400,000 $0 $0 $0 $1,400,000 Project Development $0 $0 $140,000 $0 $0 $0 $140,000 Construction $0 $0 $1,260,000 $0 $0 $0 $1,260,000 Total $0 $0 $1,400,000 $0 $0 $0 $1,400,000 ���i�������� �������� ������� ,��°�������� I��°�����,�� �� ��w�`,�,W�� Description: Upgrades to Railroad Booster Pump Station Location: Railroad Ave Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Connection Fees $0 $500,000 $0 $0 $0 $0 $500,000 Total $0 $500,000 $0 $0 $0 $0 $500,000 Project Development $0 $25,000 $0 $0 $0 $0 $25,000 Construction $0 $475,000 $0 $0 $0 $0 $475,000 Total $0 $500,000 $0 $0 $0 $0 $500,000 ������������ ���� �� ���� �����,���� ���°������ � ��..���.°��� Description: Pressure Reducing Valve Location: Palisades Area Project Cost: Prior Years/Future Costs: $0 Project Type: One-timeDistribution System CIP Costs(detailed below) $350,000 Total Project Cost: $350,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $0 $0 $0 $0 $0 $350,000 $350,000 Total $0 $0 $0 $0 $0 $350,000 $350,000 Project Development $0 $0 $0 $0 $0 $35,000 $35,000 Construction $0 $0 $0 $0 $0 $315,000 $315,000 Total $0 $0 $0 $0 $0 $350,000 $350,000 C-67 SECTION C I������ �������� � � � �,��������� ��������� �� �.,e���w���� Description: Rehab and repair project for Pump Station 3. Location: Pump Station 3 Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $1,000,000 Total Project Cost: $1,000,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $0 $1,000,000 $0 $0 $0 $0 $1,000,000 Totql $0 $1,000,000 $0 $0 $0 $0 $1,000,000 Project Development $0 $50,000 $0 $0 $0 $0 $50,000 Construction $0 $950,000 $0 $0 $0 $0 $950,000 Total $0 $1,000,000 $0 $0 $0 $0 $1,000,000 ��������p� ������� �������W� I��°�����,�� �� ��w��,W�� '� Description: Rehab and repair project for Linden Pump Station Location: �inden Pump Station Project Cost: Prior Years/Future Costs: $0 ProjectType: One-timeDistribution System CIP Costs(detailed below) $2,250,000 Total Project Cost: $2,250,000 Proposed Funding: 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 Total Water Rates $0 $0 $0 $2,250,000 $0 $0 $2,250,000 Total $0 $0 $0 $2,250,000 $0 $0 $2,250,000 Project Development $0 $0 $0 $1 12,500 $0 $0 $1 12,500 Construction $0 $0 $0 $2,137,500 $0 $0 $2,137,500 Total $0 $0 $0 $2,250,000 $0 $0 $2,250,000 Note The Engineering Division Cost Allocation section provides an approximation of costs for the project development and construction for projects requiring the involvement of the Engineering Division. Project development costs include preliminary engineering, environmental and permitting, right-of-way, design, consuitant oversight, and bidding. Construction costs inciude the construction contract, contract administration, inspection, and consuitant ,.,,......��� C-68 SECTIAN D 11lVI�IE`T RIEE�S $� F111"l1RE PR�.�E�TS Projects labeled as not fully funded represent projects the City anticipates financing through competitive grant or loan programs at the state and federal level, as well as other funding sources not yet secured. The Streets Division's unfunded projects reflect the City's ongoing need to maintain and improve its transportation network, with anticipated funding from federal and state programs such as the Active Transportation Program (ATPj, Highway Safety Improvement Program (HSIP), Local Highway Bridge Program (HBP), and the State Transportation Improvement Program (STIP). The Airports Division is actively pursuing Airport Improvement Program (AIP) entitlement and discretionary grants through the FAA for both Redding Regional Airport and Benton Field, as well as California Department of Transportation grants for eligible Benton Field projects. The Water Division is applying for a State Revolving Fund (SRF) loan through the California State Water Resources Control Board to fund the replacement of Pump House 1. The Redding Fire Department's unfunded projects reflect anticipated capital needs that are similarly dependent on grant or other non-local funding sources. Community Services projects, including improvements to parks such as Panorama, Caldwell, and South City parks, are actively being advanced through grant applications. The City will continue pursuing all available funding opportunities to advance these projects. Projects included in this section represent capital investments that are planned and prioritized but are contingent upon the successful award of competitive grants, loans, or identification of other funding sources. Inclusion in the CIP does not constitute a commitment of local funds; rather, it signals the City's intent to pursue these improvements as resources become available. FIGURE S:TOTAL PROJECTED FUNDED AND NOT FULLY FUNDED PROJECT NEEDS R��. � � � � Airports 32,726,922 59,830,950 92,557,871 35% 65% Community 48,264,295 28,183,268 76,447,563 63% 37% Services REU 88,090,861 88,090,861 100% 0% RFD 966,280 32,848,000 33,814,280 3% 97% Solid Waste 12,580,000 12,580,000 100% 0% Storm Drain 11,632,176 11,632,176 100% 0% Streets 115,399,585 78,096,202 193,495,787 60% 40% Wastewater 111,374,443 111,374,443 100% 0% Water 81,298,942 50,000,000 131,298,942 62% 38% Grand Total 502,333,503 ' 248,958,420 751,291,923' 67% ' 33% D-1 SECTIAN D FIGURE 6:TOTAL EXPENSE OF NOT FULLY FUNDED PROJECTS BY DEPARTMENT � w e Airports 59,83ti,950 Acquire Snow Removal Equipment 315,000 Airport Pavement Management Study 49,613 Eastside T-Hangar Taxilane Reconstruction 370,000 GA Transient Apron Rehabilitation-Construction 650,000 GA Transient Apron Rehabilitation-Design 150,000 Master Drainage Study-Comprehensive Property Analysis 585,200 Master Plan Update 476,990 Northeast Apron and Taxilanes Reconstruction 325,241 Reconstruct Eastside T-Hangar Taxilanes and Drainage Improvements-Phase 2- 3,570,000 Construct Rehab Parallel Taxiway A-Design 89,250 Rehabilitate Parallel Taxiway"A"-Construction 420,000 Runway 16 Approach Obstruction Removal 105,000 Runway 16-34 Safety Area Improvements-Design 1,147,231 Runway 17-35 Safety Area Improvements-Phase 2 12,375,090 Runway Closure Marker Procurement 100,000 Security&Perimeter Fencing(incl.Cameras) 4,725,000 Security Fencing-Nortn RPZ 325,609 Taxiway Connector Reconstruction&Electrical Improvements 29,498,676 Westside T-Hangar Taxilane Reconstruction-Construction 4,000,050 Westside T-Hangar Taxilane Reconstruction-Design 378,000 Wildlife Hazard Assessment 175,000 tarnmun�ty;Seruices 28,183,2�8 Jenny Creek 2,000,000 MLK JR.Center&Park 3,985,000 Oregon Gulch Trails 2,600,000 Redding Sports Park 10,000,000 The Peaks Subdivision Park 3,400,000 Turtle Bay Boat Ramp Improvements 6,198,268 R�Q 32,84$,000 __�____._._. �__._____..__..____v_______ ._ _ _____. __----------------- Communications Replacement 2,499,000 Engine Replacement 3,375,000 Fire Station 1 BC Quarters Plumbing 40,000 Fire Station 2 Upgrades 6,000,000 Fire Station 3 Rebuild 7,000,000 Fire Station 4 Upgrades 6,000,000 Fire Station 6 Burn Building 750,000 Fire Station 6 Training Tower 400,000 R-2 SECTIAN D Fire Station 6 Upgrades 6,000,000 Hose Replacement 600,000 MDT/AVL Replacement 184,000 Streets 78,096,202 Airport Corridor Phase 11 1,803,423 Churn Creek/Rancho/Victor Roundabout 16,760,000 Citywide Pavement Rehab Backlog 30,000,000 Stillwater Business Park-Phase 11 9,542,052 Victor Avenue North Improvement 15,490,727 WB SR299 @ Churn Creek Roundabout 4,500,000 Water 50,t�00,Od0 Pump Station 1 Replacement 50,000,000 � � Q-3 SECTI� Q fi r r ) fiS �ir�ar�s CIP No. Project Funding Source A-BEN-31-4 New Hangar Development A-BEN-28-4 Sun Shade Hangar Replacement Airport Fund A-BEN-28-3 Open Nangar Replacements Airport Fund A-BEN-36-5 Cameras at Access Control Gates A-BEN-36-3 FBO Building Re-Design & Construction A-BEN-36-2 Hangar Row C Replacement A-BEN-36-1 Hangar Row B Replacement A-BEN-28-5 New Hangar Development Airport Fund A-BEN-31-5 AWOS System Upgrades A-MUN-32-1 Terminal Remodel for Rental Car Counters/Office A-BEN-31-3 Airport Beacon A-BEN-31-2 Hangar Row A Replacement A-BEN-31-1 T-HangarTaxilineConstruction A-BEN-30-4 Runway 16 Approach Obstruction Removal A-BEN-30-3 East Apron Pavement Rehabilitation A-BEN-30-2 Rehab Parallel Taxiway A A-BEN-30-1 Westside T-Hangar Taxilane Reconstruction A-BEN-31-6 Cameras at Access Control Gates A-BEN-31-5 New Hangar Development Airport Fund A-BEN-36-4 Electrical Va�lt Transformer A-MUN-28-3 Hangar Replacement (Port-a-Ports) Airport Fund A-BEN-31-3 Hangar Row A Replacement Airport Fund A-BEN-28-9 Cardan Hangar Row Roof Replacement Airport Fund D-4 SECTI� Q fi r r ) fiS RF� CIP No. Project Funding Source RFD-2030-02 Training Center General Fund RFD-2030-05 Fire Station 1 Rebuild General Fund RFD-2030-04 Fire Station 8 Remodel General Fund RFD-2030-01 Fire Station 9 Build General Fund RFD-2030-03 Fire Station 7 Remodel General Fund RFD-2030-06 Fire Station 5 Remodel General Fund S�r���s CIP No. Project Funding Source ST-2005-51 Traffic Control Device: Hartnell Avenue- Lawrence Road 2240037 ST-F-SV Shasta View Drive/College View Drive 151-104 ST-2005-50 Traffic Control Device: Lake Boulevard- Panorama Drive 2240029 ST-IN-AL Churn Creek/Alrose Intersection 2240042 ST-2005-62 Traffic Control Device: Victor Avenue-EI Vista Street 2240035 ST-2005-b1 Traffic Control Device: Lake Boulevard-Santa Rosa Way 2240052 ST-2005-60 Canyon Creek Road Area Improvements -CC/2240047/2240053 ST-2005-57 Traffic Control Device:Airport Road-Meadowview Drive 2240041 ST_2026-002 Buenaventura Bridge over Sacramento River ST_2026-003 Hartnell/Cypress Ave Intersection 2240050 ST_2026-005 Shasta View Dr/Goodwater Ave Intersection 2240061 ST_2026-004 Hartnell Ave/Alta Mesa Dr Intersection 2240060 ST-IN-HA Churn Creek/Hartmeyer Intersection 2240043 ST-F-104 Shasta View Drive Extension 2240056 �a��r CIP No. Project Funding Source FWTP-02 Foothill WTP Floc Basins & PH2 Water Rates D-5 SECTI� Q fi r r ) fiS Note: The Future Projects list includes a variety of projects that are either beyond the 5-year window of the CIP and/or do not have aii funding sources identified at this time. The identified Water, Wastewater, and Traffic impact fee program projects represent the basis of the relative Mitigation Fee Act (Government Code 66000J compiiant programs. Reimbursement for construction of these impact fee projects may be considered in accordance with Section 16.20.090 of the Redding Municipal Code. D-E� SECTI� Q fi r r � �s Ifi I t fi s��rr� �rai� Anticipated Construction CIP No. Project Date Punding Source SD-2030-01 Regional Detention Ponds 2031-32 Storm Drain Impact Fees S�r���S Anticipated Construction CIP No. Project Date Funding Source ST-4226-02-2 Placer Street Improvements-Airpark to Pleasant 2031-32 Traffic Impact Fees ST-TIF-OLD Old Alturas Road-ROW and Roundabouts at Victor Avenue, 2031-32 Traffic Impact Fees Lema Road,and Edgewood Drive ST-TIF-RA Railroad Avenue Widening-Grandview Ave.to Schley Ave. 2031-32 Traffic Impact Fees ST-TIF-VC 1,2,3 Victor Avenue Widening- Hartnell to Old Alturas 2031-32 Traffic Impact Fees ST-TIF-HIL Hilltop Drive Widening- River Bend Road to Browning Street 2031-32 Traffic Impact Fees ST-TIF-CCl Churn Creek Road Widening- Browning to Bodenhamer 2031-32 Traffic Impacfi Fees Note: The Future Projecfs list includes a variefy of projects that are either beyond the 5-year window of the CIP and/or do not have all funding sources identified at this time. The identified Water, Wastewater, and Traffic impact fee program projects represent the basis of the relative Mitigation Fee Act(Government Code 66000) compliant programs. Reimbursement for construction of these impact fee projects may be considered in accordance with Section 16.20.090 of the Redding Municipal Code. D-7