REPORT TO THE CITY COUNCIL
MEETING DATE: June 16,2026 FROM: Michael Webb, Assistant City
ITEM NO. 4.11(i} Manager/Public Works
Director
***APPROVED BY***
�� � 3,�� �.nu„
����
� � � �
�
�� s � ,,��
� 5� � �� �� �� �,��,�
� � � �
1" irel'We, .. v: aty Vf� a�et Rubliu\ c*rA�.;�Uectetcrr f���?02G �}F������'�1'�3(JX �,�ti"�'��.��23a3�TG"I �,., .,, �I`�.a�����.7
mwebb@cityofredding.org wtarbox@cityofredding.gov
SUBJECT: 4.11(i)--Award BS No. 5683 Clear Creek Wastewater Treatment Plant Building
21 Switchboard & Motor Control Center Re lacement Project
Recommendation
Authorize and approve the following actions relative to Bid Schedule No. 5683, Clear Creek
Wastewater Treatment Plant Building 21 Switchboard & Motor Control Center Replacement
Proj ect:
(1) Award to Electric Innovations Inc., in the amount of$995,000;
(2) Approve an additional$250,000 to cover the cost of administration and inspection fees;
(3) Approve $85,000 for project development costs;
(4) Approve $100,000 to provide construction contingency funding;
(5) Autharize the City Manager, or designee, to approve additional increases in either the
construction management or construction contingency amounts up to a total of $50,000;
and
(6) Find that the Project is categorically exempt from review under the California
Environmental Quality Act,pursuant to Section 15301 - Existing Facilities.
Fiscal Impact
The Clear Creek Wastewater Treatment Plant Building 21 Switchboard & Motor Control Center
Replacement Project (Project) is being funded by the Wastewater Utility Division. The
Wastewater Utility has sufficient budget in Fiscal Year 2025-26 for this project and its funding
will not impact other activities or projects.
Cost Summar
Item Estimated
Pro'ect Develo ment Costs $85,000
Construction Contract+ Contin enc $1,095,000
Contract Administration, Ins ection, Testin $250,000
Additional Cit Mana er Authorit $50,000
Total Pro'ect Costs $1,480,000
TotalPro'ectBud et $1,500,000
Report to Redding City Council June 10,2026
Re: 4.11(i)--Award BS No. 5683 CCWWTP Building 21 Switchboard&MCC Page 2
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Alter�native Action
City Council may choose not to award the bid for the project and provide staff with alternate
direction. However, the existing electrical equipment has reached the end of its service life and
will not be able to support the new technology and equipment that will be installed at Clear
Creek Wastewater Treatment Plant in the near future.
Background/Analysis
This project includes modifications to the Clear Creek Wastewater Treatinent Plant Building 21,
which will replace existing electrical equipment and incorporate modifications to accommodate
these replacements. Existing electrical equipment to be replaced include a switchboard, motor
control center, and automatic transfer switch. Modifications incl�ude disconnecting existing
feeder, branch circuit, and control conductors, reconnecting to equipment, providing temporary
power to critical infrastructure, installing a new utility bus duct, door, underground vault,
conduit, conductors, wireways, and other miscellaneous electrical equipment.
Attached is a tabulation of bids received and opened on May 21, 2026, for the project. The low
bid in the amount of $995,000 was received from Electric Innovations, Inc., of Redding,
California. The engineer's estimate was $1,185,000. Total project development costs for this
project are estimated to be $85,000. Project development costs include engineering, surveying,
right-of-way, environmental, and consultant services for the project.
Envir�onmental Review
Staff has determined that the project is categorically exempt from environmental review under
California Environmental Quality Act G�uidelines, pursuant to Sections 15301 - Existing
Facilities. Class 1 exemptions include the operation, repair, maintenance, or minor alteration of
existing facilities, structures, or equipment involving negligible or no expansion of use. The
project is a regular maintenance item and does not involve change of or expansion of use.
Therefore, the project has no potential to have a significant effect on the environment and further
environmental review is not required.
Council Pr�iority/City Manager Goals
� This agenda item is a routine operational item.
Attachments
Location Map
Bid Tab
Notice of Exemption
c5� \ �ggE
�� S o
a NTS
�,� o
�S,4CR,qMENTO �P�� �
_f-�___ RI�ER �
- =----------` _ L ALTURAS
'- - -�.,�-�%�L=-'` Z
SR 299W --"��'�
�
�a� �
�GER YpRFs�� Sl/� VIKING r
P S�� A�
% E. CYPRES
,�
� H RTNELL
_
J ��y1
z �—
W � 7 W
� = O
i� W U Q `L
\./// ! � J �m > _
�L/�/�7 w (�
S�� �
�oNN��1��� � RANCNO �
� �
� W o
�., �
� � ,
� � a
_ �,��,,� � KNIGHTON
� �o � �
a
`� r-�--=-.
� �:=.-�� � �
o � �
� ��-� �o FysTs/ `s
5 CLEAR CREEK � � �� ��`�'�G
Q' DERSCH RD
� WASTEWATER y > S,p �
� TREATMENT PLANT �Pee `'� =�SACR�'�'�ENT �'��
� o.�'` —,�_.�,.�� ���A
� �CCWWTP� � RIVERSIDE R�_�
� 2220 ME1Z ROAD �-
REDDING CA.
�^ o
�
� ; O�S�Nv�Es
� ��
= C/TY QF
o AN�V
�
0
a
�
° CITY OF REDDING �o� R-�p C' CWWTP DDI6 G
m �
v
�' PUBLIC WORKS � . , � SLUDGE DREDGING PROJECT
/���
ENGINEERING DIVISION � -�� ` `P
� ��'F�a``' FIGURE A - VICINITY MAP 1 oF 2
U
V
�
BID TABU�ATION FOR:
Clear Creek Wastewater Treatment Plant Building 21 Switchboard 8� Motor Control Center Replacement Project
Bid Schedule No.: 5683
ENGINEER'S EST Electric Innovations Bullert Industrial Electric Inc
5/21/2026 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTA� PRICE TOTAL
1 Water Pollution Control LS 1 $1,500.00 $1,500.00 $4,000.00 $4,000.00 $2,000.00 $2,000.00
2 Modifications LS 1 $90,500.00 $90,500.00 $225,000.00 $225,000.00 $57,000.00 $57,000.00
3 Generator Modifications LS 1 $4,000.00 $4,000.00 $45,000.00 $45,000.00 $45,000.00 $45,000.00
4 Switchboard LS 1 $195,000.00 $195,000.00 $280,000.00 $280,000.00 $283,000.00 $283,000.00
5 MCC LS 1 $394,000.00 $394,000.00 $220,000.00 $220,000.00 $524,500.00 $524,500.00
6 Utility Modifications LS 1 $78,000.00 $78,000.00 $56,000.00 $56,000.00 $66,000.00 $66,000.00
Conduits, Conductors
7 and Wireways LS 1 $17,000.00 $17,000.00 $130,000.00 $130,000.00 $86,000.00 $86,000.00
8 Temporary Power LS 1 $405,000.00 $405,000.00 $35,000.00 $35,000.00 $122,000.00 $122,000.00
TOTAL -CONTRACT ITEMS $1,185,000.00 $995,000.00 $1,185,500.00
Cal Electro Inc. SnL Grou Inc Avera e
UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE +
1 Water Pollution Control LS 1 $3,000.00 $3,000.00 $3,600.00 $3,600.00 $3,150.�0
Demolition and Building
2 Modifications LS 1 $296,750.00 $296,750.00 $195,100.00 $195,100.00 $193,462.5U
3 Generator Modifications LS 1 $50,000.00 $50,000.00 $55,900.00 $55,900.00 $48,975.00
4 Switchboard LS 1 $800,000.00 $800,000.00 $1,033,300.00 $1,033,300.00 $599,075.00 i
5 MCC LS 1 $600,000.00 $600,000.00 $619,900.00 $619,900.00 $491,�00.00
6 Utility Modifications LS 1 $20,000.00 $20,000.00 $40,800.00 $40,800.00 $45,70�.00
Conduits, Conductors
7 and Wireways LS 1 $160,000.00 $160,000.00 $93,200.00 $93,200.00 $117,30Q.00
8 Temporary Power LS 1 $152,500.00 $152,500.00 $117,200.00 $117,200.00 $106,675.00
TOTAL -CONTRACT ITEMS $2,082,250.00 $2,159,000.00 $1,605,437.50 '
Page 1 of 1
CDTICE (JF EXE PTI�N
TO: � Office af Plan�Ying and Research F�oM: City of Reddiilg
1400 Tenth Street,Room 121 Public Works Depart�nent
Sacramento, CA 958I4 777�ypress AVenue
Redding, CA 96001
� Shasta County Clerk
County of Shasta
P.O. Box 990880, 1643 Market Street
Redding,CA 96099-0880
Froject Title� CCWWTIP Bld�. 21 SWBU &MCC i2eplacement
Project�,ocation—Speeific: 220t�Metz Rd:
Project Locat�on—City: Anderson Projec#Lacatit�n—C�aunty: Shasta
Description af Project. The City of Redding proposes replacin e�; xisting electrical eq�ment and assaciated rnodificatio�ls
at Buildin�; 21 of the Cl�ar Creek Wastewater Treattnent Plant. Work includes xe�lacing the switchboard motor control
center, at�d aut�rnatic transfer switch. Modifications inelude disconnecting existing feeder, branch circuit, and cbntrol
conductors; reconnectin�a equipment; providing tempararv power tc� critical infrastrueture, and, installin� a new utilitv
bus duct, doar, under�round vault, conduit,conductors, wireways, and other miscellaneous electrical equipment.
Name ofPablic Agency Approving Prvjecte City of Reddin�
Name of Person ar Agency Carrying Out Prvject: Corri Vandiver,PE-Project En�ineer
Exempt Status: (check one)
� Ministerial [Section 21084(b)(l); 15268]
❑ I)eclared Emergency [Section 21080{b)(3}; 15269(a)]
❑ Emergency Project[Section 210$0(b){4); 152b9(b)]
❑ Statutory Exernptit�ns. State code number:
❑ Cominfln Sense Exemption(This project does not fall within an exempt class,but it can be seen with certainty that there is
no possibility that the activity may have a signrfieant effect on the enviranment(14 GCR 15601{b][3]),
� Gategorical Exelnption. State type and section number: Sec. 15301 Existin�Facilities
0 No exceptions apply tlxat would bar the use of a categorical exemptian(PRD 21084 and 14 CCR 15300.2).
Reasans why project is exempt: Class l exempti�ns include the operation, repair, maintenance, or minor alteration af
existing facilities, structures, or equip�nent invalvin�ne�lig ble or no exna3ision of use. The�roject is t� repla�ce a�in�
electrical equipment. The project is a re�ular rnaintenance item and does not involve chan�e of or expansion c�f use.
Therefare,the praject has no potential to have a si�nificant effect t�n the environment and further environmental review is
not required.
Lead Ageney Contact Person;Mieke Sheffield Telephone: 530225:4889
If Filed by Appiicant:
l. Aitach certified document of exemption fi il�g.
2. Has oti e o ; rnptiol n fa,led t public agency approving the project?a Yes ❑No
,