HomeMy WebLinkAbout _ 4.11(g)--Project Acceptance, Bid Negotiation No. 5462, Athens Area Water Improvements Project GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: June 16,2026 FROM: Michael Webb, Assistant City ITEM NO. 4.11(g} Manager/Public Works Director ***APPROVED BY*** �� � 3,�� �.nu„ ���� � � � � � �� s � ,,�� � 5� � �� �� �� �,��,� � � � � 1" irel'We, .. v: aty Vf� a�et Rubliu\ c*rA�.;�Uectetcrr f���?02G �}F������'�1'�3(JX �,�ti"�'��.��23a3�TG"I �,., .,, �I`�.a�����.7 mwebb@cityofredding.org wtarbox@cityofredding.gov SUBJECT: 4.11(g)--Project Acceptance, Bid Negotiation No. 5462, Athens Area Water Im rovements Pro'ect Recommendation Accept Bid Negotiation No. 5462 (Job No. 2680), Athens Area Water Improvements Project, awarded to Eddie Axner Construction, Inc., as satisfactorily complete, with a final cost of $5,844,749.06. Fiscal Impact Water Utility Division funding in the amount of$6,122,746.24 was approved for this project for Fiscal Year 2024-25. The total project cost, including surveying, design, bidding, construction, field engineering, inspection, and construction contract administration, is $5,844,749.06. Alternative Action The City Council (Council) may choose not to accept the project as satisfactorily complete and advise staff on how to proceed. Background/Analysis Eddie Axner Construction, I.nc. has completed all items of work on the Athens Area Water Improvements Project as of May 27, 2025, which was within the contract time frame. The project warranty period expired one year from the completion date on May 27, 2026, and the Public Works Department subsequently filed a notice of completion with the County. At its meeting of May 7, 2024, the Council awarded a construction contract to Eddie Axner Construction, Inc. of Redding, for $4,694,746.24 and approved a $470,000 construction eontingeney fund. Also authorized was $518,000 for contraet administration and eonstruction inspection fees and $340,000 for project development costs, and the City Manager was authorized to approve additional increases in either the construction management or construetion contingency amounts up to a total of$100,000, for a total authorized amount of$6,122,746.24. Report to Redding City Council June 10,2026 Re: 4.11(g)--ProjectAcceptance, Bid Negotiation No. 5462,AthensArea Waterlmprovements Project Page 2 Project development costs include engineering, environmental, and consultant services. On April 14, 2025, a request to transfer the authorized City Manager funds was approved for an increase to the contingency of$100,000 to cover the cost o�unforeseen conditions and unmarked utility conflicts that arose during construction. During construction, there were thirteen change orders in the amount of$476,181.52, leaving a balance of$93,818.48 in the contingency fund. The final project cost was $5,844,749.06. Cost Summary Awarded Revised Actual Cost Amounts Amounts Project $340,000 $340,000 $340,000 Develo ment Costs Construction Contract + 5 164 746.24 5 264 746.24 $ $ , , , , Contin enc Construction Contract + Contract � ��, $5,1'70,927.76 Chan e Orders Contract Administration & $518,000 $518,000 $333,821.30 Ins ection Additional City �100,000 $0 $0 Mana er Authorit Total $6,122,746.24 $6,122,746.24 $5,844,749.06 This project replaced over 14,000 feet of aging steel and cast-iron water mains that were installed in the 1940s through 1960s. These mains have reached the end of their service life and have had several breaks in recent years that the Water Utility has repaired. This project replaced the old steel and cast-iron piping with new polyvinyl chloride (PVC) and ductile iron piping to reduce future maintenance costs and provide reliable service in the area for the foreseeable future. Water services and fire hydrants in the area were also replaced as part of the project. Environmental Review This action, project acceptance, is not a project as defined by the California Environmental Quality Act (CEQA). On May 7, 2024, the Council determined the project is categorically exempt from CEQA review pursuant to Sections 15301 — Existing Facilities, 15302 — Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. No further action is required. Council Pr�ioNity/City Manager Goals • This agenda item is a routine operational item. Attachments Previous Staff Report - May'7, 2024, item 4.11(c) -Award Internal Communication - April 14, 2025, Transfer of CM Funds GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: May 7, 2024 FROM: Michael Webb, Public Works ITEM NO. 4.11(c) Director ***APPROVED BY*** „, �. .A,��,� ie ael � iiEali� oaks L)arector 4(?4/2424 i�}�in,Ci an � 4r'2�/2424 mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(c)--Award Bid Negotiation No. 5462 (Job Order No. 2680) Athens Area Water Im rovements Project Recommendation Authorize the following actions relative to Bid Negotiation No. 5462 (Job No. 2680), Athens Area Water Improvements Project: (1) Award to Eddie Axner Construction, Inc., in the amount of$4,694,746.24; (2) Approve an additional $518,000 to cover the cost of administration and inspection fees; (3) Approve $340,000 for project development costs; (4) Approve $470,000 to provide construction contingency funding; (5) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of$100,000; and (6) Find that the Project is categorically exempt from review under the California Environmental Quality Act, pursuant to Section 15301 - Existing Facilities, 15302- Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. Fiscal Impact The Athens Area Water Improvements Project (Project) is being funded by the Water Utility Division. The Water Utility has a sufficient budget for this project and its funding will not impact other activities or projects. Cost Summar Item Estimated Pro'ect Develo ment Costs $340,000 Construction Contract+ Contin enc $5,164,'746.24 Contract Administration, Ins ection, Testin $51$,000 Additional Cit Mana er Authorit $100,000 Total Pro'ect Costs $6,122,746.24 Report to Redding City Council Apri130, 2024 Re: 4.11(c)--Award BN No. 5462 Athens Area Water Improvements Page 2 Project cost components are estimates and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget. Alter�native Action City Council may choose not to award the bid for the project and provide staff with alternate direction. Without this project, there is greater potential for increased maintenance costs, a decrease in reliability and an increased risk of water main breaks for City of Redding (City) customers. Background/Analysis The City's water system includes approximately 2.98 million feet (565 miles) of conveyance and distribution pipelines of various pipe materials and sizes ranging from 1-inch to 48-inch. Assessments of the City's water distribution system indicate that the older steel and cast-iron pipelines have had the highest rates of failure in recent years. To reduce pipeline failures and maintenance costs and to improve reliability to its customers, the Water Utility has focused on replacing older steel and cast-iron piping in areas where breaks have occurred. This project will replace over 14,000 feet of aging steel and cast-iron water mains that were installed in the 1940s through 1960s. These mains have reached the end of their service life and have had several breaks in recent years that the Water Utility has repaired. This project will replace the old steel and cast-iron piping with new polyvinyl chloride (PVC) and ductile iron piping to reduce future maintenance costs and provide reliable service in the area for the foreseeable future. Water services and fire hydrants in the area will also be replaced as part of the project. Attached is a tabulation of bids received and opened on April 11, 2024, for construction of the project. The low bid in the amount of $4,694,746.24 was received from Eddie Axner Construction, Inc., of Redding, California. The engineer's estimate was $5,129,720. Total project development costs for this project are estimated to be $340,000. Project development costs include engineering, surveying, right-of-way, environmental, and consultant services for the proj ect. Envir�onmental Review Staff has determined that the project is categorically exempt from environmental review under California Environmental Quality Act G�uidelines, pursuant to Sections 15301 - Existing Facilities, 15302 — Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. Class 1 exemptions include the minor alteration of existing public structures and facilities. Class 2 exemptions consists of replacement or reconstruction where the new structure will be located on the same site and wi11 have substantially the same purpose and capacity. Class 3 exemptions consist of construction and location of new small facilities and equipment, or conversion of existing structures. The existing utilities will be replaced to provide reliable service that meets public health and safety standards. The project will be located in the right-of-way and will result in a negligible expansion of use. The action area does not have significant values for wildlife habitat or other environmental resources and the projeet has no potential to have a significant effeet on the environment. Report to Redding City Council Apri130, 2024 Re: 4.11(c)--Award BN No. 5462 Athens Area Water Improvements Page 3 Council P�ioNity/City Manager Goals • This agenda item is a routine operational item. Attachments ^Location Map ^Bid Tabulation ^Notice of Exemption 1 ��'� �? f,=='` i ' 3''"� �. \ �- - - ' - � `� �� Y � l �\ ` Y f'" \ ., �, �--'' ' � � � � �-- � \ � � " f _--�.- �� ; — _ — ,, � — � � , <— — — -� � � . — � -� � � � � � l � � � � � \ _ � , � � .. 1 �� � , � __ t - �. '� ��__� � � ; _ ,>� � � �` ���.,1 � i � � _ , , , , F� � � �_ � , � ,, _� , ; ��,-/� � i � � r.� _ „� f , �„ -��, , .� ,� N� �l � -�'-;� i I , '`�� ��~� ��,, �_. i -t T._-, ...�7� ;r � �,.� � � �G� �i � � � QG `` "l_ � ' ! ' /`� ' � '� _ , , ,. � _� �2� ,� -,O � � '� , � ,�� , �_1� � ' ,,v � -� �,' ,,'��,.,,'-�,, `'�� ,-�''_ :� , ,`�'y. � \ ,_ , '`\ ���. ` , _. i r r ��''' , r -f �N� --�.�,' `�� -- ' L�� r rl % � \�� � ` ; \ t ,, � - .9� �_ __a ,_ __ �_ � ,,; r r,, � `�. J� �� �r��� � J � �� _ i �' � �__ ___1 ��� , �- � _ � � _� F , � � ,2� .— f—�f --____ , \\��. ��- _ -'� --� � � � �J,� - __ r �___ ��~-f �'" 4., \\ _ ,� ,...- r � , .., ., ,--' .- t ! �� � '-- ,...���l �.�, �'-��� .. ` �� .--'. �-,.`" l � �� � yl C.,--"'.-"� �..--..�r'.- \_ „.-,� �l t_-,. -,„. ._ .,. ,,%��_w � r Y� � r � .,.... � %. r �. �. ,� �` , " � --�'""� `� � �1__ � � t �� � � , ,� . —___ � �Q _ �,�, �� _ » ____ , ,. � �-� � � �� ,� _. ��� � �•• � � � � �� � ��� � ,�� � �i , . H YJ _ _ %'��Q� , , l � ' ' % " 1 �y,�_ , . ` 1 ,��� � �f 3`�� � jf�` �`' __ .....�.� i-h-��- ,,, . � t , ,t�� '- . _ 1-_, � �` / r, � � / // � %� �,I I � � i'�-- _`�.. � - � ,�, . �, � � / � . � �f .f�` /`� ' + ��� f I � t1 ,� .., r_ � �� _., � � � , � ,, � , � � � Y �J jj jj � / )� J ..--,�.. � .,- t j i / / f / �. � t I ( �....yf f � J~T F / I / ,,,,, -""hl /, F ( �r"�'--,. J -.�� i / ! �• ��i '�1 r F ,, ,� 1 r � �-� ���' ; � � � iY��� ( �---_. � , , i � , �i�_ , r , ,--�_ �, �� � � ,,%� ���� �. __._����. � �: � i �_ �. ..���� � � � ��;�����s� _. `i ` �`r' ��� � f�. _ � _ i � ' � � � � � � 1 ��,,,�, t f � rr� �� ___�_ � -'_- �. ---�- ..� . � � ( � fj �,�t��-� J���� � � �_ l � � � � f v �J �1`..�� � >>..�. !r ` 1 � i � f � i 1 l � � i l 7 ~.,,��� _�, , � � , I � � , � __ � , 1 __ ; � �-- � _ _� I ~ / � � � � i � , � �� ,� �.. � �, , ; t � ,> ' �l ,r' �~�,� ,����� � i �' � . , _ __ - _. �j~;� �t ~ ,._._ � f f ,�) �l �� \�i� �x. �� , 4 7 '�� ___ � � � � �,�, � 7 1 � ��� , �_ r� f - .-- r ' l~ ~,I,.l jj �� f� � ' J� ��� , , � � � � �' � � � , �� 1 ��. � � �, r . � � _ f � �� 1 � _. � `�. _ —__. � . J _�._ + .. 1 t 1 �1� �-- `f �� ��� �� ��� I PROJECT , ,, ����� _ , � 1 �� ' s � r � � ,�� ,�� AREA .�� , ; , , .�- j ,� ____ , , ��.- / , � � �, � �... / j I � � � � , �� ,, r .. �� � � .��� �' �� � �' �� ,, � �� r�, � �, � � � �. � � � � _,r , f_. � ,. , � � �' _ � Y �.�_� , ; << ,- �f ,� . � }/� I ......, �y �l, d.`'�...�.. / { '�---�J.. � l � �^�... �/F �.���� \ /r`��� ,,..�� f.... t �� �RF � "� � �� �'� ������ ��°'� �.. �. . �� q � � SS �. .r ��, ' "� �'' r � r��� � � � � � ' �� , � � � , ; , � � ��� ,��o . ,rr�� � .� , �� � �� �� � �,.� � -' �� nt , ��� , , �.� / �...� ' _� i � / f� .. � ' �r�����..��,� i I ��,P ; �`'' � .J , . �, � � j �� � i � `�. -. , � � Q, ``� _ ~�1 f� , , �� �. � 1 ,�, / � . 5 � r, `� � ; ✓ ,, , ,� , , � .- , � ; � ��... / � , ,�' ' � ,r' ,'' ��/'�� `� F RFO CITY OF REDDING � OZ ATHENS AREA WATER � - ��� � PUBLIC WORKS IMPROVEMENTS PROJECT t�,9 �/�.P� DEPARTMENT LOCATION MAP <�Fo� � - -� BID TABULATION FOR: Athens Area Water Improvements Bid Schedule No.: 5462 Eddie A�cner Construction ENGINEER'S EST Inc RTA Construction Inc. 4/11/2024 UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTA� PRICE TOTA� 1 Prepare Storm Water Pollution LS 1 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $5,000.00 $5,000.00 2 Implement Storm Water Pollution LS 1 $45,000.00 $45,000.00 $14,860.46 $14,860.46 $15,000.00 $15,000.00 3 Traffic Control LS 1 $150,000.00 $150,000.00 $378,480.00 $378,480.00 $175,000.00 $175,000.00 4 Construction Area Sign EA 14 $500.00 $7,000.00 $365.00 $5,110.00 $500.00 $7,000.00 5 Project Funding Sign EA 1 $2,000.00 $2,000.00 $1,700.00 $1,700.00 $4,000.00 $4,000.00 6 Trench Sheeting & Shoring LS 1 $80,000.00 $80,000.00 $260,231.13 $260,231.13 $2,000.00 $2,000.00 7 Dewatering LS 1 $100,000.00 $100,000.00 $196,643.75 $196,643.75 $50,000.00 $50,000.00 8 Temporary Water Bypass Systems LS 1 $80,000.00 $80,000.00 $122,815.43 $122,815.43 $110,000.00 $110,000.00 9 Water (6" PVC, Slurry) LF 77 $210.00 $16,170.00 $872.80 $67,205.60 $465.00 $35,805.00 10 Water (8" PVC) LF 6315 $150.00 $947,250.00 $122.56 $773,966.40 $180.00 $1,136,700.00 11 Water (8" PVC, Slurry) LF 4674 $220.00 $1,028,280.00 $147.04 $687,264.96 $220.00 $1,028,280.00 12 Water (12" DIP, Slurry) LF 2975 $280.00 $833,000.00 $214.67 $638,643.25 $298.00 $886,550.00 13 Valve (6" Gate) EA 3 $3,000.00 $9,000.00 $2,393.64 $7,180.92 $2,000.00 $6,000.00 14 Valve (8" Gate) EA 52 $3,800.00 $197,600.00 $3,007.43 $156,386.36 $2,200.00 $114,400.00 15 Valve (12" ButterFly) EA 11 $6,300.00 $69,300.00 $4,880.05 $53,680.55 $4,500.00 $49,500.00 16 New Fire Hydrant Assembly EA 25 $13,000.00 $325,000.00 $12,334.93 $308,373.25 $12,000.00 $300,000.00 17 Water Service (1", Slurry) EA 69 $6,500.00 $448,500.00 $5,034.59 $347,386.71 $9,250.00 $638,250.00 18 Water Service (1") EA 130 $5,000.00 $650,000.00 $3,756.49 $488,343.70 $4,500.00 $585,000.00 19 Water Service (1-1/2", Slurry) EA 1 $7,500.00 $7,500.00 $28,561.77 $28,561.77 $12,000.00 $12,000.00 20 Water Service (2", Slurry) EA 2 $8,500.00 $17,000.00 $19,317.94 $38,635.88 $12,000.00 $24,000.00 21 Abandon Valve EA 36 $750.00 $27,000.00 $344.42 $12,399.12 $700.00 $25,200.00 22 Remove Valve EA 10 $1,000.00 $10,000.00 $1,327.54 $13,275.40 $1,800.00 $18,000.00 23 Remove Tree EA 2 $3,000.00 $6,000.00 $3,298.25 $6,596.50 $5,000.00 $10,000.00 24 Catch Basin#3 EA 2 $6,500.00 $13,000.00 $8,706.35 $17,412.70 $3,500.00 $7,000.00 25 Catch Basin#4 EA 1 $8,500.00 $8,500.00 $8,734.34 $8,734.34 $4,000.00 $4,000.00 26 Storm Drain (12" HDPE, Slurry) LF 66 $270.00 $17,820.00 $406.16 $26,806.56 $625.00 $41,250.00 27 Storm Drain (15" HDPE, Slurry) LF 46 $300.00 $13,800.00 $333.85 $15,357.10 $625.00 $28,750.00 28 Curb Ramp (Type A) SF 320 $50.00 $16,000.00 $39.67 $12,694.40 $40.00 $12,800.00 TOTAL -CONTRACT ITEMS $5,129,720.00 $4,694,746.24 $5,331,485.00 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 2 � - -� BID TABULATION FOR: Athens Area Water Improvements Bid Schedule No.: 5462 Site Works Solutions SnL Grou Inc Allen Gill Construction Inc AVERAG�S ' 4/11/2024 UNIT UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTA� PRICE TOTAL PRICE 1 Prepare Storm Water Pollution LS 1 $5,927.03 $5,927.03 $12,000.00 $12,000.00 $11,226.00 $11,226.00 $8,030.�1 2 Implement Storm Water Pollution LS 1 $15,127.08 $15,127.08 $6,000.00 $6,000.00 $117,914.00 $117,914.00 $33,78Q.31 3 Traffic Control LS 1 $105,381.84 $105,381.84 $375,000.00 $375,000.00 $435,813.00 $435,813.00 $293,934.9? 4 Construction Area Sign EA 14 $320.40 $4,485.60 $421.00 $5,894.00 $452.00 $6,328.00 $411.68 5 Project Funding Sign EA 1 $1,409.74 $1,409.74 $3,000.00 $3,000.00 $2,263.00 $2,263.00 $2,474.55 6 Trench Sheeting & Shoring LS 1 $10,404.85 $10,404.85 $36,000.00 $36,000.00 $63,418.00 $63,418.00 $74,4�d.8� 7 Dewatering LS 1 $121,358.58 $121,358.58 $200,000.00 $200,000.00 $68,534.00 $68,534.00 $�27,307.27 8 Temporary Water Bypass Systems LS 1 $113,005.61 $113,005.61 $75,000.00 $75,000.00 $388,812.00 $�88,812.OtI $161,926.61 ; 9 Water (6" PVC, Slurry) LF 77 $259.57 $19,986.89 $345.00 $26,565.00 $491.00 $37,807.00 $4�6.67 10 Water (8° PVC) LF 6315 $184A5 $1,162,275.75 $210.00 $1,326,150.00 $241.00 $1,521,915.00 $187.52 11 Water (8" PVC, Slurry) LF 4674 $244.04 $1,140,642.96 $310.00 $1,448,940.00 $225.00 $1,051,650.00 $229.22 12 Water (12° DIP, Slurry) LF 2975 $339.81 $1,010,934.75 $340.00 $1,011,500.00 $335.00 $996,625.00 $305.50 13 Valve (6° Gate) EA 3 $3,886.21 $11,658.63 $5,500.00 $16,500.00 $3,422.00 $10,266.00 $3,440.37 14 Valve (8" Gate) EA 52 $4,745.98 $246,790.96 $5,650.00 $293,800.00 $3,880.00 $201,760.00 $3,896.68 15 Valve (12" Butterfly) EA 11 $7,382.51 $81,207.61 $9,900.00 $108,900.00 $6,182.00 $68,002.00 $6,568.91 16 New Fire Hydrant Assembly EA 25 $14,119.89 $352,997.25 $20,000.00 $500,000.00 $15,975.00 $399,375.00 $14,885.96 ' 17 Water Service (1", Slurry) EA 69 $5,661.20 $390,622.80 $8,200.00 $565,800.00 $7,863.00 $542,547.00 $7,201.76 18 Water Service (1") EA 130 $4,195.79 $545,452.70 $5,900.00 $767,000.00 $9,576.00 $1,244,880.00 $5,585.66 ' 19 Water Service (1-1/2", Slurry) EA 1 $8,631.91 $8,631.91 $27,000.00 $27,000.00 $11,635.00 $11,635.00 $'17,565.74 20 Water Service (2", Slurry) EA 2 $8,860.30 $17,720.60 $32,000.00 $64,000.00 $12,134.00 $24,268.00 $"16,862.45 ' 21 Abandon Valve EA 36 $452.20 $16,279.20 $1,200.00 $43,200.00 $1,862.00 $67,032.00 $911.72 ' 22 Remove Valve EA 10 $834.59 $8,345.90 $4,750.00 $47,500.00 $2,906.00 $29,060.00 $2,323.63 ' 23 Remove Tree EA 2 $3,143.38 $6,286.76 $5,350.00 $10,700.00 $5,530.00 $11,060.00 $4,464.33 24 Catch Basin#3 EA 2 $8,418.94 $16,837.88 $11,000.00 $22,000.00 $9,421.00 $18,842.00 $8,2d9.26 ' 25 Catch Basin#4 EA 1 $9,109.50 $9,109.50 $11,500.00 $11,500.00 $24,179.00 $24,179.00 ; $11,504.57 ii 26 Storm Drain (12" HDPE, Slurry) LF 66 $364.96 $24,087.36 $725.00 $47,850.00 $633.00 $41,778.00 $550.82 27 Storm Drain (15" HDPE, Slurry) LF 46 $373.50 $17,181.00 $750.00 $34,500.00 $1,288.00 $59,248.00 $674.0�' 28 Curb Ramp (Type A) SF 320 $42.43 $13,577.60 $70.00 $22,400.00 $66.00 $21,120.00 $5�.62 TOTAL -CONTRACT ITEMS $5,477,728.34 $7,108,699.00 $7,477,357.0� '$6,01$,f7U3 12 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 2 1VOTICE OF EXEMPTIQN To: � Office of Planning and Researcll FRQM: City of Redding 1400 Tenth St1•�et;Room 121 Public Works Department Sacramento,CA 95814 777 Cypress Avenue Redding,CA 96d01 0 Shasta County Cierk County of Shasta P.O:Bc�x 990880, 1643 Market Street Redding, CA 96�99-Q880 Pro,�ect Title:Atherls Area Water Improvements Praiect Project Lacation—Specific: Athens Ave..Park Marina Dr. Washin�ton Ave Paris Ave London Ave Rome AVe Olvmpus Ave.. South St., Fraject Locat►on—City, Redding Project Locatian—Cauniy: Shasta Description of Project. The Citv of Reddin� (City) wi11 construct a water impravement proiect in the Athens Avenue and Park MarinaDrive area. The proiect includes the lnstallation ofapproxirnatelv 14 400 linear feet of new water line a temporarv water bvpass svstem catcl�► basins and ap_praximately_115 linear feet of storm drain �ipe Existinp watar services. meters,and hvdrants will 6e replaced or reconnected Existin�valves will be removed abandoned ar replaced Work will be conducted witilin the ri�ht of wav and within easemenf areas The public will be notified af an traffic restrictions. Name afPublic Agency Approving Pro,�ect� Citv of Reddin� Name af Fersan or Agency Carrying Out Project: Kurt iVlaire,ProicctEn�ineer Exempt Status. (check one) ❑ Ministerial [Sectron 21 Q80(b)(1), 15268� ❑ Declared Emergency[Sectiom 21480(b)(3); 15269(a)] ❑ Emergency Project[Section 21D80(b)(4}; 15269(b)] ❑ Statutory Exernptions. State code number: ❑ Comrnon Sense Exemption(This project does not fall within an exempt class;but it can be-seen with certainty that there is no possibility that the activity may have a significant effect on the environment{14 CCR 1506 T[b][3]): � Categorical Exemption. State type and section nurn6er; Section 15301.Existing Facilities 15302.Replacement or Reconstructic�n, and 15303.N�w Construction or Coriversion af Existin�Structures � No exceptions apply that would bar the use ofa categorical exernption(PRD 21084 and 14 CCR 15300.2}. Reasans why project is exempt: Class 1 exemt�tions include the minor alteration of existin� public structures and facilities. Class 2 exemptions cansists of replacement ar reconstruction where the new structure will be located on the same site and will have substantially the same�aurpose and capacity Class 3 exemptions consist of construction and location of new srnall facilities and equipment ar conversion of existin�structures The�xisting utilities will be replaced to provide reliable service that rneets public health and safety standards The praiect will b� located in the ri�ht of way and the t�raiect will result in a ne�li�ible expansion of use The aetion area does not have si�ni�cant values for wilddife habitat or other environmental resources and the project has na patential to have a si�nifieant effect on the environrnent Lead Agency Contact Person; Amber Ke11ey Telephane. 530:225.4046 If Filed by Applieant. 1, Attach certified document of exemption finding. 2. Has a notice of exemption been filed by the public agency approving the project?❑ Yes a No k � Signature: �.? � _ Date: �,,..� � Title; Environmental Corn liance na er �Signed by Lead Agency Date received for filing at OPR: ❑ Si�ned bY Applicant Cl[�();1 NC31?,C�c.v. G'?(?'?? c � T �r c� � r.�. _ � � `..=== �t"ll�E�l"1'°l c'�1 C� Ll t"1!C r."��i+C►Cl � C ,� L ! F t;� R 1*J 1 '-;�k-"' DATE. April 14, 2025 TO: Barry Tippin;Ciiy Manager FROM: Michael Webb,Director of T'ublic Works SUBJECT: Request for Transfer af Project Funds Athens Area Water Improvement Project Bid Negotiation No. 5462,Jab Na. 2680 In accardance with the Council Approved Award of Bid Negotiation No. 5462,a transfer of City Manager Funds(Job No. 26$0)to Praject Contingency Funds($100;000)is requested. Additional contingency funds are necessary to cover the change order cc�sts for unforeseen eanditions,unmarked utility conflicts as well as forthcoming changes requested by the City. Current Requested Newly Expended Balance Auth�rized Increase Authorazed Pro'ected Pxo'ected Contract $4,694,746.24 0.00 $4,694,�46.24 $4,694,746.24 0.0� Contingency $47O,Od0 ' $I00,000 $570;000 $520,000 $SO,OQO Canstruction �518,d00 0:04 $518,Odd $518,000 0:04 Management City Manager $100,000 Funds ��1�}0 OOQ� 0.00 0.00 0:00 Tota[ �5,"182,�46,24 �0.00 $5,782,746.24 �5,332,'T46.24 �SQ,001� There is currently enou�h money available in Construction Management Funds,for staff time to comple#e this project. Please call me at 225-4582 if you have any questians ar need additie�nal information. � � 1� l A "stant Direc e Date ,�°..� �,� City Engineer Bate � � � � City Mana Date chlmk c: Constructic�n Manager Resident Engineer Finance