HomeMy WebLinkAbout _ 4.11(b)--Accept Grant Funds and Adopt Budget Resolution for Eastside Road Bridge over Canyon Hollow GI �" Y C� F
� � �- ' � ° � � i � CITY OF REDDING
��
REPORT TO THE CITY COUNCIL
MEETING DATE: June 2,2026 FROM: Michael Webb, Assistant City
ITEM NO. 4.11(b} Manager/Public Works
Director
***APPROVED BY***
�� � 3,�� �.nu„
����
� �
� ,,�
5 � �� � �� �� �����,�
1" i;��l S�"e. .. s�.: aty Vfa a�et Pu�,Iiv\ G>rl��,C?ecect~rr Sa..r'rG:'�ts �}���������`�303:��',�:"�r��.�.13a3�CI µ,.: " 51��..����1��.7
mwebb@cityofredding.org wtarbox@cityofredding.gov
SUBJECT: 4.11(b)--Accept Grant Funds from the State of California Department of
Transportation and Ado t Bud et Resolution Appropriatin Funds
Recommendation
Authorize and approve the following actions regarding the Highway Bridge Program (HBP)
grant funding from the State of California, Department of Transportation:
(1) Accept additional $248,770 awarded to the City of Redding for the Eastside Road Bridge
over Canyon Hollow Project(Project); and
(2) Adopt Resolution approving and adopting the 38th Amendment to City Budget
Resolution No. 2025-049 appropriating $248,770 of HBP Funds and $32,230 of Traffic
Impact Fee Funds for a total of$2$1,000 for the Project.
Fiscal Impact
An additional $248,770 in Highway Bridge Program (HBP) grant funds has been allocated to the
City of Redding (City) for the Eastside Road Bridge over Canyon Ho11ow Creek Project(Project)
in order to complete design and advertise the Project. The HBP requires an 11.4'7 percent
($32,230) local funds match, which staff has identified as Traffic Impact Fee (TIF) funds.
Previous Project allocations for preliminary engineering, environmental and right-of-way total
$619,000 ($548,000 HBP and$71,000 TIF).
Alternative Actzon
The City Council (Council) may choose not to accept the additional grant funding. Tn this case,
the City would forfeit $248,770 in grant funding for the project and additional City funds would
need to be identified in order to complete the project. Alternatively, the Council could choose not
to proceed with the project and the City would need to reimburse the State of California for costs
incurred to date.
Report to Redding City Council May 28,2026
Re: 4.11(b)--Accept Grant Funds and Adopt Budget Resolution for Eastside Road Bridge over
Canyon Hollow Page 2
Background/Analysis
The project is located on the east side of State Route 273, approximately 650 feet south of the
intersection of State Route 273 and Buenaventura Boulevard. The project wi11 replace the
existing Eastside Road Bridge with a new two-lane, two-span cast-in-place reinforced concrete
slab bridge. The proposed structure wi11 provide two 12-foot travel lanes, 8-foot shoulders, one
6-foot-wide sidewalk, and concrete barriers. Approximately 300 feet of roadway will be
reconstructed at both approaches to conform to the new bridge. Construction of the bridge wi11
be staged to allow a single lane of alternating traffic, controlled by temporary signals.
Unanticipated additional coordination with Union Pacific Railroad (UPRR) and CalTrans
regarding project sequencing, staging, and drainage design resulted in the need for additional
preliminary engineering activities.
EnviNonmental Review
This action, accepting additional grant funding, is not a project as defined by the California
Environmental Quality Act (CEQA). On June 16, 2020, the Council adopted the Mitigated
Negative Declaration, the Mitigation Monitoring Program, and approved the Eastside Road and
Westside Road Bridge Replacement Projects, thereby satisfying the requirements of CEQA
(CEQA G�uidelines §15074). No further action is required.
Council Priority/City Manage� Goals
• This agenda item is a routine operational item.
Attachments
Budget Resolution
Previous Staff Report 6-16-2020
Location Map
Resolution No. 2026 -
A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTiNG THE
38Tx AMENDMENT TO CITY BUDGET RESOLUTION NO. 2025-049
APPROPRIATING $248,770 IN ADDITIONAL HIGHWAY BRIDGE PROGRAM (HBP)
GRANT FUNDS AND $32,230 IN ADDITIONAL TIF FUNDING FOR THE EASTSIDE
ROAD OVER CANYON HOLLOW BRIDGE PROJECT FOR FISCAL YEAR 2025-26.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDDING
THAT Budget Resolution No. 2025-049 be and is hereby amended as follows:
FUND DNISION DESCRIPTION 1NCREASE DECREASE
151 1671 Transportation Grants $248,770
151 1691 Traff'ic Impact Fee Capital $32,230
THAT account titles and numbers requiring adjustments by this Resolution are as follows:
USE SOURCE
OF FUNDS OF FUNDS
Increase(Decrease)Revenue
151-1671-3608005-00000 Federal Grant Capital $ 248,770
151-0000-2910000-00000 Fund Balance $ 32,230
Increase Expenditures
151-1671-7700010-00000 Bridges $ 248,770
151-1691-7700010-00000 Bridges $ 32,230
Total $ 2$1,000 $ 281,000
THAT the purpose is to appropriate $281,000 in additional funding for the Eastside Road over
Canyon I�ollow Bridge project for the fiscal year 2025-2026.
I HEREBY CERTIFY that the foregoing Resolution was introduced at a regular meeting of the
City Council of the City of Redding on the 2nd day of June, 2026 and was duly adopted at said
meeting by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL 1VIEMBERS:
MIKE LITTAU,Mayor
ATTEST: FORIYI APPROVAL:
SHARLENE TIPTON, City Clerk BENJAMIN L. STOCK, City Attorney
lii
V Y ,"
,�` CITY OF REDDING
. ,,
� � REPORT TO THE CITY COUNCIL
MEETiNG DATE: June 16,2020 FROM: Chuck Aukland, Public
ITEM NO. 4.11(b} Works Dire�tor
***APPROVED BY***
,
� ��,..,;. ...�.��
, ,� �.
• �, �
ti�kl�sizrl, F'ubl��, ��`�I�1ar�� �; t� �i��/�(Y2(l ��������Y iP�ain,Ci �� an ea �/8/'���420
r �
caukland@c�red„"`�,' ��a.us ,��,„,: btippin@cityofredding.org
SUBJECT: �3�'1(b)--Adoption of t���astside Road and Westside Road Bridges Replacement
Project, Mltl���d Negative Decl�rat���,�and the Mitigation and Monitoring Pragram
> t
Recommendatio�z '
�� � � � ,
�, t
�,
Adopt the Mitigated Negative I���ration (MN� �<the �Mitigation �Monitoring Program (MMP),
�
and approve the Eastside Roa� ��d Westside �.��d Bridges Replacement Project (Project) as
s,,
described, thereby satisfying i-�� requiremer��� �� the���lifornia Environmental Quality Act
(CEQA Guidelines §15074). ' ' '
�;, , ,
� � � �
, �
, ;,,,
Fiscal Impact � '
�{
' ,��� �.
Adoption of the Mitigated Negative Declax�.���,�VIND) and t1����Iltig��on Monitoring Program
(MMP) allows the project to move tow����e ���1 design,���,�onst����on phases. There is no
, � 5 � � ,
fiscal impact as a direct result of ado���ig the ���t��`��� ��gative ��laration and Mitigation
Mo�itoring Program. �`�"' ���� ��
The Eastside Road bridge replacement is estimated to cost $2,C���;�0t�� ������'�`Westside Road
bridge replacement rs estimated to cost $2,985,612 Approxim����'��„���cent of the cost for the
Project will be funded through a grant from the �`�d��� ����iway Bridge Program. The
remaining $650,000 will be a local match from the Traf'�t�����act Fee Program.
Alternative Action
The City Council (Council) can choose to not adopt the MND and the MMP. Withouti approval,
the project would not proceed, as it wou]d not be in compliance with the California
Environmental Quality Act (CEQA). Future opportunities for I�ighway Bridge Program grant
funding would also be jeopardized.
Report to Redding City Council June 8,2020
Re: 4.11(b)--Eastside Road and Westside Road Bridges Replacement Project Page 2
BackgroundlAnalysis
The project is located on the east side and west side of State Route 2�3, respectively,
approximately 650 feet south of the intersection of State Route 273 and Buenaventura
Boulevard. The project will replace the existing Eastside Road Bridge with a new two-lane, two-
span cast-in-place reinforced concrete slab-bridge. The proposed structure wi11 provide two 12-
foot travel lanes, 8-foot shoulders, one 6-foot wide sidewalk, and concrete barriers.
Approxi�nately 300 feet of roadway will be reconstructed at both approaches to conform to the
new bridge.
The Westside� Road Bridge wi11 be replaced with a new two-lane, three-span cast-in-place
reinforced concrete slab-bridge. The propased bridge will provide two 12-foot travel lanes, 4-
foot shoulders, one 6-foot wide sidewalk, and barriers. The roadway will be reconstructed
approximately 175 fe���� ��i�����th and 325 feet to the north to conform to the new bridge.
Construction of bo�����es��wi������aged to allow a single lane of alternating traffic, controlled
by temporary si��� `
,�
The in-channs����ork area extends ap���imately 25 feet upstream and downstream of the new
bridges to allt��'access into the char����during construction and underground utility relocations.
Additional pr���t work includes extending the sidewalk along select approaches, storm drain
modification, ��,��,ng, striping, and sign installation. Speci�cally, Paci�c Gas and Electric
(PG&E) gas lm�`��s�'��r a��,��ding (����� ���er lines, and AT&T underground phone and fiber
lines would require ���������i at t���������� ��stside Road Bridge and Westside Road Bridge.
The PG&E gas line relocations ��i� ,��"�I'&T unde� �aund will require trench excavation depths up
to approximately 12 feet deep � � �;�„
>
Two staging areas are proposed �'�' the pro���� �'he fix'��=��aging area is within a disturbed dirt
area located at the northeast qua�����p����'��stsld�'���,,���,dge The second staging area is a
paved section of abandoned roadwa� ����ted 1,�� ��et no��=�f the Westside Road Bridge.
Roadway and stnact�re improvements fa11 wltl�� ��'ty and priv���right-of-way. It is anticipated
the project will require temporary constructlt����ements, and��oachment permits/agreements
will be obtained from California Departn:���c���'�ransportat�� ��a1tr���and the Union Pacific
Railroad for construction access. The��'��sidex���l Br�����`i�'anti����'�ed to be built in 2021,
}w s
and would require two seasons of cons�ction. "1������'��'t�e Roac� ��'idge is anticipated to be
constructed in 2022, and would also require two seasons of constru���'n.
, j
, �z,�, ,.
An Initial Study (IS) was prepared to satisfy the requirements of��� C��,�' a����c�escribes why the
project is being proposed and the potential impacts t� the ex��������ronment. The IS shows
that the proposed project could have a significant s��'�'��`�.��� '�iological resources, but with
implementation of mitigation measures, those impacts w1�1 ��e reduced to a level considered less
than significant. The mitigation m�asures and conservation measures to be implemented are
common practices and include, but are not limited to, biological pre-construction surveys, impact
minimization, exclusionary fencing, and erosion control.
Based on the conclusions made in the IS, a MND was prepared. The MND describes the project,
including mitigation measures, and makes the determination that there will be no significant
effect on the environment provided that the de�ned mitigation measures are implemented as part
of the project. In addition, a MMP has been written and incorporated into the MND (CEQA
Section 21081,6). The MMP wi11 be used by City staff, contractors, agencies, and monitoring
personnel during and after the proj ect to ensure effective implementation of the adopted
mitigation measures outlined in the MND.
Report to Redding City Council June 8,2020
Re: 4.11(b)--Eastside Road and Westside Road Bridges Replacement Project Page 3
The IS/MND/MMP documents were sent to the State Clearinghouse for a 30-day public review
period and distribution to pertinent state agencies. They were sent to 1oca1 resource agencies, the
Shasta County C1erk, and posted on the Public Works Department website. A public notice was
also sent to landowners in the vicinity of the project and posted in the local newspaper. Two
comipent letters were received during the public comment period. Responses to the comment
letters have been prepar�d and are att�ched to the final MND.
The City is the l�ad agency for the project pursuant to CEQA. As the lead CEQA agency, the
Council is authori�ed to adopt the MND per Redding Municipal Code Section §18.24.070.E and
state law. Upon adoption of the MND and approval of the project by the Council, a Notice of
Determin�tion wi11 be filed wi�h the Shasta County Clerk's Office and the State Clearinghouse,
completing the environmental review process.
f '�
The IS/1VIND is a������;� ������� ���� Clerk's office for review and is also available online at
https:llwww cltu���'���in�.argldepa������nts/public-works/environmental-mana e�.
� r,
Council Praox����ity Manager Goal� ',
~t
• This a���da item is a routine operational item.
,,;;,,,
,
Attachments � � , ,,� , ��
�� t3 �
e� ���.
Location Map ` '�
Mitigated Negative Declaration � ��
Mitigation Monitoring Prograrri���ailable on11r��� '
Eastside&Westside Bridges In�����eStudy 1V������0 (a����ble online)
s , s
1 � 4� t
�lt 1 1�
/
/ b
U,
� "
� /
+ 1
) t .
1
y t
��.
�
tf � S, �
� t: t
; �
i �},
s1"�
ty:
ii if
3
} ,3,
G,��,� �� _.
� , � , - -
/ � �
� ,
,�
�
,
; �
�
'
'�
�
� ;
U
q ------
�
( `�
R '
�,,;; �
LO
;
��.
� 0
- � � �
a =•� eRes�a�ER
- 0 � � WAY
, � � �
, W
U �
3 �pp:
3 `�1
� Y: ��I ,
l
0
a
N�
Q �oF RFo� CITY OF REDDING EXHIBIT A
a ,� .
> � f1f� � PUBLIC WORKS Eastside Road Bridge over Canyon Hollow
� t� � .Q DEPARTMENT
� �t,Foa�' LOCATION MAP
�
�