REPORT TO THE CITY COUNCIL
MEETING DATE: May 19, 2026 FROM: Travis Menne, Director of
ITEM NO. 4.6(a) Community Services/Airports
***APPROVED BY***
e ��� ��
��H� s
� � y � �� �� �.�
� �
�"" �� �'°�� � � ,,� � � '
Ci.s��i..'���nn,� �rc�.ir�r�if�C�iianiinitj��i�ice�r'1V,irpc�rts 412�,'2026 ����Ilft1��e�'�il'�3t�x,�'�ti"�"1���IIdgUr � . Sl�41�t72f�
:�
tmenne@cityofredding.org wtarbox@cityofredding.gov
SUBJECT: 4.6(a)--Approve Authorization of Service 26-03 with Mead&H�unt, Inc.
Recommendation
Authorize and approve the following actions:
(1) Approve the Authorization of Service #26-03 with Mead & Hunt, Inc. (C-8976) for
airport engineering consulting services related to the Benton Field Eastside T-Hangar
Taxilane Pavement Reconstruction & Drainage Improvement Project in the amount of
$376,162.00; and
(2) Authorize the Mayor to execute the contract and any future amendments necessary to
complete the project.
Fiscal Impact
On June 17, 2025, City Council approved the submission of grants by City of Redding (City)
Airports Division staff to the Federal Aviation Administration (F'AA) Airport Improvement
Program and Airport Infrastructure Grant program grants for the Reconstruct Eastside T-Hangar
Taxilanes and Drainage Improvements Project(Project) at Benton Fie1d.
Under FAA grant numbers 3-06-0308-029-2025 and 3-06-0308-030-2025, the Airports Division
received grant approval in the amounts of$255,459 and $170,306, respectively. Each FAA grant
is able to cover up to 95% of eligible project expenditures. The remaining project funds are
comprised of a State Matching Grant from the California Department of Transportation (up to
$8,515) and local match (approximately $14,000) from the Airport Division's O&M budget.
Staff administrative costs associated with the project are eligible for reimbursement under all
FAA grants. Future reimbursements are anticipated to offset some staff administrative costs and
create savings in regular staff time for the Airports Division. These reimbursements will also
eontribute towards the City's required local match.
Report to Redding City Council May 14,2026
Re: 4.6(a)--Approve Authorization of Service (AOS)26-03 with Mead&Hunt Page 2
Alter�native Actzon
City Council may choose not to approve the contract with Mead & Hunt, Inc. and provide
alternate direction to staff.
Background/Analysis
The Authorization of Service #26-03 airport engineering consulting services contract (Contract)
with Mead & Hunt in the amount of $376,162 is related to the design of the Project. Council
authorized an initial engineering budget of $448,173 at the June 17, 2025 meeting. The
remaining $72,011 will be used for other preliminary expenses, including development of the
required independent fee estimate, preparation of the Categorical Exclusion (as described
below), and project administration time charged to the grant.
The proposed Project will reconstruct deteriorating and age-distressed pavement within the East
T-hangar Taxilanes (Taxilanes) area, located on the eastern side of Benton Field. The Taxilanes
were visually inspected, are detailed in the Airport Pavement Management System report (dated
November 2016), and rated as "failed." The Taxilanes pavement and adjacent pavement areas are
identified in the Project Schematic included as Attachment 1 to the contract.
The site drainage configuration is anticipated to change based on the recent Drainage Master
Plan completed in September 2022. New storm drain infrastructure is also included in the
Project, and will collect and convey stormwater runoff to the existing catch basin per the
Drainage Master Plan Alternative "A".
The Scope of Services for this project was developed by Mead & Hunt, Inc., the City Airports
staff and the FAA. The scope of the consulting services includes: Preliminary, 60 percent, 90
percent, and Final Design, as we11 as Contract Administration. Staff anticipates submitting
additional grant applications to fund construction after the design is complete.
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA) or
the National Environmental Policy Act (NEPA). Contract approval will allow the design to
progress to a stage in which the project can be reviewed for CEQA compliance. No action is
required at this time.
As part of the grant application process for FAA funding the City has requested determination of
a NEPA categorical exclusion for projects eligible for a categorical excl�usion (CATEX) that
have greater potential for extraardinary circumstances or that otherwise require additional
doeumentation, as described in the FAA Order 1050.1 (current version) and FAA Order 5050.4B
(collectively, FAA Environmental Orders). The City has requested a determination of categorical
exclusion based on paragraphs 5-6.4 (e) and (o) — Categorical Exclusions for Facility Siting,
Construction, and Maintenance. The NEPA CATEX documentation is currently being reviewed
by the FAA under a request for a NEPA CATEX determination on this project.
Council Priority/City Manage� Goals
• Budget and Financial Management — "Achieve balanced and stable 10-year Financial
Plans for all funds."
Report to Redding City Council May 14,2026
Re: 4.6(a)--Approve Authorization of Service (AOS)26-03 with Mead&Hunt Page 3
Attachments
Authorization of Service #26-03 (C-8976)
Staff Repot 06-17-2025
AUT ()1tI TIt7�N ((�►F SER�ICE #26-Q3
BENTON F LD
EASTS E T- NGAR TAXILANE PAVE ENT RECC)NST UCTIC►N &
A �GE PROVE ENT PRUJECT
(C-89'76)
Tlhis Authorization of Service #26-03 is made at Redding, Califamia, by and between the
City of Redding (City), a Municipal Corparation, and Mead & Hunt, Inc. (Consultant),
whase address is 1360 19x�' Ho1e I)rive, Suite 2U(3, Windsar, CA 94592, (collectively the
"Parties", individually a "1'arty,>), for airpart engineering consulting services related to the
Eastside T-Hangar Taxilane Pavement Recanstruction &Drainage Improvement I'roject.
ECITALS
W REAS, on July 23, 2021 the parties entered into that certain Consulting and
Professional Services Contract (C-8976); and whereas, that Consulting and Professional
Services Contract cantemplated that the parties would, from time to time, enter inta one
or more specific Authorizatian of Service Agreements.
NOW "I` REF(? E, IT IS AGREED AS FOLLqWS.
l. Introductaon. In entering into this Autharization of Ser�ice (`°A(JS #26-03"), the
Parties agree that each and every term of the Consulting and Prafessional Services
Contract dated �uly 23, 2021, {"Contract"} is binding upon the �'arties. Ifany term
or covenant made in the Cantract conflicts with a term or cc�venant of this AOS
#26-03, the language t�f the Cantract, as may be time to time amended, shall prevail.
Ifthis AOS #26-03 is silent an an issue addressed in the Contract, then the terms
and covenants e�ntained in the Contract shall control. This AOS #26-03 is hereby
incorporated by this reference and added as an addendum to tihe Contract and made
part trf the Contract-:
2. Scope of Work. The Scope of Wark for this Authc�rization of Servzee agreement
is set farth in Exhibit A, attached hereto and incc�rparated herein by reference, and
comprises airport engineering consulting services related to the Benton Field Eastside
T-Hangar Taxilane Pavement Recanstruction&Drainage Improvement praject.
3. Fee for Services. It is expressly understoad and agreed that the total compensatian
to be paid under this A4S #26-03 to Consultant is for an arn�unt of$37b,162.04 on
a lum�-sum basis as specified in Exhibit A.
4. Consultant Responsibilit�e� for Compensation. The Consultant shall prepare
m�nthly invoices and progress reports which clearly indicate the progress to date
and the arnount of cc�rnpensation. Consultant shall provide a fina� inv€�ice upon
completion of serviees after which z�o later znvoices will be paid by the City.
5. City Respansibilities for Compensation_ City agrees to pay the Cansultant°s invoices
within 30 days fram the date of receipt by City,unless City decides tc�withhc�ld payments
as set forth herein. Consultant agrees that City has the right in City's �ole discretion to
withhold payment fln any Consultant's invoice if City feels that the Consultant has not
performed work under this ,At3S #26-03 in a rnanner satisfact�ry to City. City shall
promptly notify Gonsultant in writhing,outlining the disputed items,the arnount withheld
and actions Consultant must take to resolve the disputed items,
6. Sulbcontracts. At the time subcantracted services are anticipated, Consultant shall
notify City af the nature Qf such serviees and identify the proposed subcontracting fi�m:
Cc�nsultant must receive appro�al in writing from City priar to utilization of a
subcantractor. Any subcontractor shall have the same resp�nsibility and obligatic�ns as
Consultant to comply with the provisions herein. Consultant shall remain sc�lely and
wholly responsible fc�r all the acts ar oznissians of subcontractors as if they were the acts
or ornissions of Consultant and �nsure that any such subcontractor is in position to
comply with all its obligations under this AOS #26-t�3 anici the�ontract,
?. Effect�ve Da#e of Authorizatian of S�rviee #26-�3. The effective date of this AOS
#26-Q3 shall be the date it is signed by the City:
Signature Page to Follow
IN TNESS REOF, City and Consultant have executed this Contract on the day� and
year set forth below:
4.+11.[ VY 1ZL'� 11�\15:9.
A Municipal Corporation
Dated: , 2026
Bya `ke Lfttau, ayar
r�TTEST: APPROVETT7► A� TO FCtit :
City �ittorney
S RLENE 'I'IF`Tt�1�T, Ciiy Clerk Bye Ben,�amin Stock,Inter�m Cifiy Attorney
CQNSLTLTANT
�ad & unt, Inc.
�y: J��F LEa�a�n
Vice President, Aviat°ron
Attachment°
Exhibit A—Scope af Serv�ces
�XHI 11"
BE T�N �I�LD AtR�'C?12T'(C�85j
CI taF€��adl�lC
�A�'T T-HANC�4R T_ 1 NE�PAVE ENT
�ECC►t��TFtll�Tlt?N,AND 0 INAGE I RR�QVE �PlTS
Engine�ring Design�c��ae c�f Servtces
April 28,2025
�JECT ��SGRI Tl Ri
This Scope caf Services details the preliminary design, 60°fo desigr�,9�°lo design,�nai d�sign, and bid
adminiskratian services to be presvided by MEAa 8�Hl1NT� [�lC. (Gt�NStJLT°RNT),for the East T-h�ngar
Taxilanes P�vem�!nt Reconstr�uc#ic�n and Drainage tmpr�vements Prc�jeck(ProJect)�t the Benton�ield
Airporf{Airpc�rt)tc�r the City c�f Redding,California (t�WNER car CITY).
Backgt°ound
The propcssetl Pro}ect is to reccrnstruct deteric�r�ting and age-distressed pavement within the East l'-
hangar T��ilanes(T�xilanesj area, laac�ted csn#he e�stern side offihe Airpork.
The Taxil�n�s w�re visu�lly inspected �nd�re detafled in the Airport Pav�ment M�nagem�nt�System
r�pork(dated t�crvember 2C►1�)and r�ted��"#aiHed." The Taxilanes pav�ment ar�d adjacent paverner�t
areas ar�id�ntafied in th�Projact Schamatic includ�d�s Aftachment 1,
The site drainage configuration is anticipated tc�change based an th�recent Qrainage Master Plan
complet�d in September 2�22.A n�v�netw�rk c�f pipes will capture run�fF and exterrd tcr the existing cafeh
basin wikh a new stc�rm drain pip�n�h�vc�rk can the west side of the hang�ars�nd a new sta�m drain pipe
n�twdrk�n the east side ofi th�hangars(�r�inage Ma�ter Plan Altern�tive"A").
MEAD& HUNT, ING. is the prime consultant�nd i� hereinaffer referred to as"CC�NSULTANT."This
Scope csf Services was develaped t�y the Gt�fVSUL'TAN7 with input from the C?WNER and Federai
�luiatian Administr�tion(FAA).
R .1 CT El.E E T�
The Prc�ject vvill consist af the fallowing�iements:
1} f�econstructian of the T-hanqar'Taxilanes
The recor�structlon is anticipat�d to includ�a ne�r asphait concrete{AC)s�ction that will inc#ude,
subject to the findings of the gecstechnical invesfigatian, lime treated subgrade, P-209 aggregate
base, and a P-403 asphalt concrete surFace caurse.The existing asphalt concr�te surface will be
pulverizedlc�ld miil�d and used as recycled base fc�r pavem�;nt�haulde�s; As part ca#the Praject,
th�existing water valve bc�x located�n the southeast side of#he northernmost T-hangar rc,w wifl be
adjusted to th�ne�AC�nished gr��ie. Exc�s�materi�f g�ner�ted during cc�n�truction wi�E b�
hauled caff-site and becc�me the prQperty caf the Con#ractor.
�, , ,,.
;.�, , , ,,. . _:�, F__ � � . _ , , � -
,... r•..;_ _,` � - •1 "'. _ `, , . .. . �^,-,,
� . i t
Benton 1�1eta.Airport
East 7=Nangar Taxilanes Pau�ment Reconstruction and Drainag�Impmv�ements
Engineering�esign Scope af 5srvices
Februarv 26 2425
2} prainac�e lmart�vements
The I�rc�ject gaal is ta improve the drainage csanditport of the sit�thrcrugh a nekwork af valley gutters,
are�dcains,and storm drain pip�s that connect to the new storm dr�in pipe networ-k�. Valley
gutters and area drain�will be installed in�ach taxiBan�to.reduce surfac�runofiF from the site. Area
drains surraunded by F'ortland Cement Cancrete(P�C)pads will be install�d can the western side of
each hangar r�w to rntercept runoff from 7�xiway R�nd mini'mize the p�stenti�l for surfac�water
tha#ponds an the western side of the 7-hangar raws. The construction of an infil#r�tian trench or
c�ther runc�ff mitigation sotutic�ns are nat�nticipated as the a�ea af imp�rvic�us surface will nr�t
incr�a�e as a resul#�f the Project. imprflvements to the existing detention E�asin will includ�
additianal excavatlon to increase depth for ne�+pipe networks as well as m�difications tca the exit
pipe and installatic�n af a struc#ure:
The Project will be c�mpleted under�single �id pa�kage writh a single Bid Alternate. Due to FAA
eligibility r�quirements, Portians c�utsitie th�fi�xilanes#hat ar�not affected by drainage improv�ments wiil
t�e required to ae fully funded by the GlTY. Separate b�d i#ems will be Eder�tified for CIIY-only elegibGe
items. The Praject is anticipated#o begin design�n January of 2025 and competitively bid in Sept�mber
caf 2026.
A ProJect graphic ciepicting these elements is included as A#tachment�1.
PR�,��CT TEA
The G�NSULT'AN1`will�ssign a Project(�anager(PNI)to this Project to monitor cor�tinuity through eact�
task, as described in-this scope.The PM wilf b�respc�nsible ftir wrork perfc�rrr�ed by the C4NSULl"ANT
team; Specific Pr�aject management kasks are detailed within each task.
The�C}�l�ULTANT team will cansist ofi ciuil sngineers,drainage engineers,d�signers,gecs#schnical
engineers;surveyors and administr�ti�r�staff.
The CQtiVSU�TAtV�'wi31 subcontract with the fallcawing subconsultan#s for sp�ci�lty services:
1) Sharrah Dunl��a Saw�r, lnc. SC�Sl: SDS wi11 perE�rm topographic surveying s�rvices and
dfainage analysis design.
2) CGi Technical Services. Inc. fCGil: CGI will perfc�rm geot�chnicaf r�view s�n+ices.
SC�F`E IC�� �ERVIC�S
The CUNSl1LTANT's sccspe csf work f�r the Praject will be tracked as follows:
Task'1: Preliminary C�esign
Task 2: 6C1°l<i and 9fl°la Desogn
1'ask 3° �ir�al C�esign
��S�C�: �It�AdYC66CliS�i'c'1�tC7fi
All tasks defined in this Sccspe caf Services shaN be performed in aecordance with the t�rms and
ct�ndititans af th� Cl7"Y C7�REI�t.}1NG C't�1VSULTtNG ANL?PRC7FESS1C3Nr4L ,ERV/CES C{)N7'RAGT
daied July 23,2t��1 between the f�WNER and the CC,�NSI}LTANT.
Page 2 of 27
Benton�ield A(ry>ort
East T-Hangar Taerilanes Pavement Reconstruction and 1?raina�e tmprovements
Engin�ering Design Scap��f Services
February 2S 2025
CQI�SULTANT wil!provitle the services described in the ft�llowing tasks.
TA�K 9 PRELf iNARY [�ESICAI
1,9 P�I�JECT NIANAGE EN7�N�GCIARIJIT�,4TION
�'rcaject man�gem�n#ta�ks during Task 1 wiN consist�f#he fcalic�wing:
1.1.1 Prepare Gonfiract and Prt�jeet ietup
The PM and administrative stafF will revi�w and execute the contract between the
C4NSULT�NT and the C}WNER. The PM wiil establish a wcsrk breakdc�wn struc#ure to
track task-feveP progress.AdmPnistr�tiv�stafF will create the interna!pr�ject database
for finance tr�cking and internal pr�ject direcfiory:
1.1.2 P�e�are Pro',Le�t Manaqement P6an
The PM wili prepare a Praject Management Plan{F'MP)that wil6 address the foifowing
Pr�j�ct elem�n#s:Project�'eam Rol�s and Responsibilities, i7�cument"t3istreb�tican
Plan, Communications Plan,Quality Control Milestane Summa'ry,and Scope Change
Management P1an.
1.1.3 Preesare Schedul�
The PM will prepare a design and bidding schedule upon receiving tt�e Nc�tice to
Proc�ed (NTP)from the OWNER.7his schedule wiA be updated as preliminary design
pr�gresses, adjusting far review times by the C7WNER and FAA+.
1.1.4 Coordinate lr�ternal 1?esiqn Tearn
The PM will assign a design tea�n to the Prcrject.Once a design te�sm Es established; the
PM will implement a task cr�ardinatiran program t4 assign specific respan�Gbiliti�s t+�
team memb�rs.Through�ut the design,th� P1v1 will coordinate and mcanitor internai
w�rk prc�gress.
1.1:5 Coordirtate Sutaconsultants
The PM wilP prep�re subcontracfshvcark carders ftar the subccansu{t�nis ernpltayed by
CQNSULTANT far the Prtr�ect upon rec�iving the NTP from the t7WNER.Unce
subcontractslwork arders are�x�cuted,#h�; PM wi11 cc�esrdinate subc�snsultant vuork
efforts, Th�PM wilB ccaordin�t�with#he�}WNER for subconsulfi�nt field activikies and
monitor subcansultant wc�rk pragress.
1.1,6 Qualitv C�tral P'rQt�ram
7he PM�+ill cr�a#e and implement a quality cantrca!(QG�program.As part caf this
prograt�r,the PM wrill assign bt�th QC�nd quality assurance (C1A}te�m members tcs the
Projec�.The RM wili prep�re a detail�d QC check�ist that will b�shared with tfie int�rrral
design team.l'he d�sign team will maint�in a design I�g tcs trac�C design decisiar�s
thrc�ughout the 1'roject that can be r�viewed internally,
1.3.7 Proiect Gontrt�ls
The FM v�ill rnaintain a Pr4ject budget spreadsheet to track design cc�st�monthly.A,t
the beginning crf each month,the PM wilB review�ccrued cc�sts frc�m tt�e prevlous mc�n#h
and w+c�rk with acccsuntin�staff to prep�re invtsices for the t�WNER.The invoices wiBl be
subrnitted per the C}WNER's standard invoice requirements.The invoi�e will ref�:rence
� Page 3 of 27
Benton FieldAirporf
East T-Nangar Taxilanes Pavement R�eonstntctian antf t3rafnage lrnprovements
Engineering Desfgn 5cope ot S�rvie�s
Fekruar�+�B�2025
the percent campiete caf each task based csn the work breakdc�wn struc#ure and this
scvpe.The PM will review subconsultant invflices. �t is anticipated th�t five(5)invtaic�s
wil'1 be prepared during Task`1.
1,1.8 Sce�pe Qevelapment
The Ct�NSU�TANT wilt d�velop a sc�pe+�f senrices and fes proposal f�r ths Pr�s�ect
and negc�ti�fe a sct�pe af services,fe�praposal, artd a�r�em�nt far sutaeonsulf�nts.
The CI�NSUI.TANT�ill submit the init�al Project scc�pe e�f services e(ectPonically to the
QWhlER and the�AA for review and camment.The CC}N�U��TAN7 wil!revise the
sccspe of servic�s and s�nd it electrt�nically alang with a blank fee spreadshee#in Excel
farm�t to fhe OWN�R for establishment of an indep�ndent fee estimate as requir�d by
Section 31J0—Procureanent c�f ProfessionaC Services,tsf the�11��pansor Guide.
Transmitt�l ta an t�ptional third-paaty cansuitant fcar the independent fee estimate(1FE)
will b�the respc�nsibility taf the C7WNER.The tFE will be a sepatat�contract managed
by the{JWNER; '�"fi�CU�JSULTANT will not have ccantact�ith tt�e 1FE ccansultant.
f�nc�the IFE is campfete,the CQNSULTANT will prc�vide the ccrst pr�apos�l and tha Plti�
will work with the t)W�JER t€�clarify the scnpe and fee if the F'raject,or any task,is
c�utside of the 10%o standard margin a�defined in FP,A A� 1501�'100-1�E,,4rehitecfurat,
Engineering,and Planntng Consultarat Servlces. Sectic�n 2.14.3.
t1WN�R shall ke�p a reec�rd of negotiati�ns as requir�d by FAA AC 15t}l510i1-14E.
1.2 PRt?JECT MEI�TI�G�,4NC�Ct?�tlMlIN1CATIQN
The GC7h1SULTANT will participate in meetings and phane cails during Task 1. Me�tings�and
ccrrnmunic�ticrn items will be as follows:
1.2.1 Internal Pr�ie�t KickofF Meetins�
The PM wSll cranduct a meeting, up to c�r�e ht�ur;with the int�rn�l design team
(anficipated tca ccansist of PM, Seni�r,4ssaciate, Senicar F'sojec#Enginee�, Engineer I}I>
Engineer I,�nd Administrat3v�Assistant),ta presee�t the Prc�jeet; Prc�ject budget, design
schedule,maJor Pr�jec#elements;�nd internal �rritc�col.
1',2.2 Prai�ct Kickcsff�eeting wifh C?WIVER
The CC7NSULTANT wiil prepare fc�r and cc�nduct a meeting,up ta ar�e�1 j hour:with th�
�WkV�R and FAA to present the Project, rncluding intr�ductians, �'raject Manag�ment
Pian,design scheciule,�nd m�jor Presject elements. lJp t�fc�ur(A�}rroemb�rs#rc�m
COtVSULTANT#eam will aftend(arrticipated to consist e�f P�,senic�r Pro�ect Engineer,
and Engineer Ill,Sub-Gc�nsultant),7he meeting is anticipated tts b� h�1d�t the Airport
with the F,4A in teleconferenc�.The Ct)NSU�1'RNT wilf pr�pare an agenda and
exhibits tca support the meeting.GtJNSUI.TANT te�m will c�,llabcarate to creat�meeting
minutes�nd distribute uia email ta all that akteetdec!the me�frng.The Praj��t kickc�if
meeting will consi�t of 5 h4urs frawel time f€�r the Gt?N5l1LTA�T team .
1.2,3 Sit�Inv�stia�ti�n
The�t'��I�ULTANT will perform an inifial site investigati�n. The inv�stigatian will
include the fcsilc�wing t�sks:
a. i'he CfJiVSULTARIT well review exisfing recor�d dr�wings.
� � Page 4 of 27
B�nton�ield Adrport
Erast T-Hang�r Taxri�n�s Pavement Reconstruction and Dreinage Irraprovements
Enginearing 17esign Scope eaf Servrces
Fe6ntarY 26 2t125
b. Th�CONSULT�NT will gen�rate a map of the Airpt�rt ta use in dcscumenting the
existing condition�.
c. Up tco three(3}members frcam Gt�NSULT�N'T team(anticipated fo cc�nsist of PM,
Senior Prc��ect�ngineer and Engin�er III,Sub-Ccansultant�wiN travel to the,Airport
and conduct a site investigatian. This will be concurrent with the Praject kick-off
meeting.
d. The Ct��iSUL,TANT#eam will walk tfie site tcs olaserve existing pavement and
drainag�ct�nd►ticrns;,and�xist'sng fea#ures khat are within Project lirnits,
e, Existing p�iv�ment conditian will nc�t be evaluated fcar this Praject.
1.2.4 6i-Weekly Int�rnal Proc�ress Meetings
The RM will�onduc#bi-we�kly m�etings,up ta 3Q minut�s,with the internal design
team to discuss the Praject schedule and work progress. tJp to fiv�{5)mernb�rs fr�m
GOtVSULTAN7 team(anticip�ted ta consist of�Wl, Senior Project Engineer,Engineer
Iti, �ngineer 1,Technici�n IV j will attend each�nee#ing.Up ta eigh�{8) me�tings�re
anticipated during Task 1:
1.2.5 Mc�nthiv ProqLss Meetincas with OWNER
TI�e CQNSULTANT will c�anduct monthly meetings,�p fo carae{1)haur,wath the
l7WNER tc�discuss the Project sch��iule,wc�rk�arr�gress, and cc�s�edinatic�n items. Up ts�
two(�}members frc�m CONSU�.I'AN"f#eam wil! attenc!e�ch meefiing(an#icipated ta
c�nsist af E'M and Senior Project Engineer). Up tq five(5}meetings are anticipat�d
during Task 1.The meetings�ill be held vrrfuaHy. The�C?NSULTARIT will provide an
agenda and minutes for each me�eting,
1.2,6 Monthlv Pre�press Niaetin�s witb QWN�R and FAA
The CC?NSULTA(VT will�ttend monthly meetings with the t�WNER and the F�IA tca
diseuss#h�c�varail Airport prcrgram, inc4u�ling but nca#�imi#ed tca schedta�e, Aragress, and
coordination items. Up tca two{2}members from CQNSULTANT Team will attend each
meeting {anticipated to consist caf PM and S�nic�r F'roject Engine�r}. Up to five{�}
meetings�re anticipated during Task'I.1'he m�etings are anticipated to be held
virtu�[ly and be conducted by th� FAA.
1.2.7 Pr�sent Preliminary Submittaf to t'�WNER
The C(JIVSl1LTAfVT will pcepare f�r�nd cc�nduct a meeting, up tca t�vo (2)hflurs,with
the CIWNER to present the preliminary design submittal. Up to three{3)m�mbers from
CU�lSULTAPlT#e�m will attend {anticipat�;d ta consist caf Pt�, Senic�e Pro,�ect Engineer,
and Engineer I!1). The meeting wiH be held in person.The CQNSULTANT will-prepare
an ag�ntia, exhibifs and minut�s t�supperrt the meeting.
1.2;8 General G�ammunication with CIWNER
7he COMSIlI.TANT wiH communicate with the OWNER.thrcrughout Task 1 via phcrne
calPs ar em�il in addition#ta the meekings fisted herein.
1.3 TORCIG PHIC SIJRVEYtNt3
Th�CC7NSkJLT,�tVT will subcontract�ith Sharrah dunlap Sawryer, I�c. (SDS}tea canduct a
tapographic survey c�f the Project Bimifs.
� �� Page 5 of 27
8enton Fietd Airpart
Eas#T Hang�r i`axilanes Aavement Recanstructior�and Drainage fmprovements
Engln$ering Design Seope of Services
�ebruarY 25,2fl25
1.3.1 Cc�ordinatican and File Preqaration for SDS dCQNSULTAN3}
The CQNStJL1"RRIT wifl c��rdinate the wcark efforts ofi SDS and prepare files to facilitate
#h�tapographi�survey. �'he work will inelude the fc�IBovving su�tasks:
a. CC?NSIJLT�NT wid!prepare an exhibit for SCIS sho�ring the apprc�x�mat�susvey
limi#s and specific feature�t�be surveyed.A prelirninary versiran of this e�chibitis
in�lud�d as Attachmenf 2,
b, �4NSIJLTAIUT will�aordinate with the UWNER and S[�S ta det�rmine a schedule
for survey fielciwcark and Icsgistics of Airpc�rt access.
1.3.2 Field Wc�rk and Drewina Pret�aratican {Subccsnsultant—SDS1
Topt�gra�shic Survey: SD5 will ccanduct a tcspagraphic survey consisting af th�;fc+llowing
elements:
a. Rttend an�irfield safety training sessian as required by the QWNEF2. Daytime work
wiil be performed on a p�1l-back basis. St�S wilf be equipped with a radics to
monitor pilc�t communi�atic�ns; if needed.
b. Tie tc�pographic survey tc�Cafifornia Stat�Pt�ne Caordinat�System,Zone 1 and
existing vertic�!(NAVD 88}and hc�ri�antal{N,AI�83}ccrntral pc�ints,'including a#
least tvvo Primary Airport Cc�n#rc�l manuments(PACs).
c. Perform bench Ic�op and traverse procedur�s#o uerify+accur�cy of vertica!and
horizc�nt�i control points.
d. Provide temporary survey control points fcar the plan set{minimum of four}for
cor�tractor I�yout during canstruction.
e. Survey pa�ement on a 25-fc�at grid�nd 25 fieet alon�consfrucfion limits: Survey
will includ�the pavement center8in�,edge of p�sv�ment, 1 b feet from edge afi
pavernent; and 5�-focat incremersts b�yond edge ofi pav�ment. Include�It grade
breaks,flowlines,and taper and curv�startJ�nd,
#. Survey ident'�'iab4e flc�w lines>9r�d�brakes,top of bank pcaints, p�v�ment jains, and
markings.
g. Survey location and elevatians of puA boxes,catch basins, I�ghts, airfield signs,and
�ather structu�eslutiiities within�he survey limits:
h. Sunrey undergraund utiiities at encountered structure�s where access is pc�ssible;
and pcavide rim elevakinn, pi�re sizes,P�P��YA�,dire�tic�n, �nd invert elevations af
utilities. 5urvey autlet structures,including those autside e�f survey limits fhat lead
into car away From#he site. aurvey�iIP ncrt perform canfened space access.
i. Sunrey location c�P pavernent borings (if g�otechnical wark weas perf�rrned prioe tc�
trapographic sun+ey}.
j, Pr+�vide 3D digital terrain madel (DTM}and line wcark frrr sucveyed feafur°es
compatible wi#h AutoCAD Civil 3C7 20�4 ror prevr�u�ver�ie�ns,
k, Upon Ct�t��IJLTAN�`revi�w; SI�S will pre�vid�a PaF af the final tc�pographic
surv�y stamped and sealed by a Prc�fessic�r��!Licensed Surveyc�r; along w�th a
� F'age 6 of 27
Eanton Field,4itport
East T-Nangar T�xilanes Pauement Reccanstruction and t�rainaga Improvements
Engineering Design Scope af Senrices
Febrtrary 2E 2t12S
coenma d�:[imited file(*.csv)for all points surrreyed and copy nf fr�ld sunrey nates
for utilik�es.
I. Prouide up to one(1)addikian�l day c�f fieCd wrork(8-hcsur shift during ciaytime h�uPs)
fallow-up items:
1.3:3 Convert Survev Data fcar GAD Software�;GONSIJLTRNT�
The CC}NSULTANT will analyze the topogr�phical surveying data and pr�;pare the d�ta
for use with ccamputer modeling. included aee the following sub-tasks:
a: The CONSIJLTANT wiBl review the survey drawing pr�vided by SC?S and campare it
with nr�tes taken dur�ng sste waRk, Prior sunrey drawings,the mas#er base map,
satellit�imagery,and available site phr�tos.
b. The CU�ISULTANI"wi11 update the master base map drawing ta replace existing
line work with surveyed features.The mast�r bas�map will th�n be the Project
base map t+��e d�picted as�xisting c4nditions in the pians.
c. T"he CONSlJL1",4NT wilC review the DTM provided by SC7S and check that th�
c�ntaurs reflect the expecked ground surfiace canditions. GONSUI:TANT will review
survey point elevatians�t ti�-in I�catic�ns and confirm Project limits,
d. 1"he CCtNSULTA�lT uvirl establish runway and taxiway alignments based on the
surveyed runway threshQld monuments and as-built data.'"These alignments will be
depict�d in the plans and used f�r contractar lay�ut:
1,4 CECll'EC�NICAL INVESTICvATI+C1fV
The�C}NSULTANT will subcontract with CGI Technica!Services, lr�c.{GGl)tcs ccsnduct a
geotechnica[investigatic�n csf the Project site.
1.4.1 Coardination and Testina Reauirem�nts fvr CGl (CGNSUL7AN'C�
Th�CaNSIJLTANT wi4l caa�rdinate the w�rk effcarts ofi�G1 and establish#esting
requirements for the ge�technicaf investigatic�n.The varork wil!include the f�It�wing
subtasks:
a. The CONSULTRNT will revie�record drawings and geatechnical�eports to gather
infarmation an�xisting scail conditians�nd pavemen#se+ctians.The CC?NSULTAPI�'
will prov�de this inform�tion to CGt tc�support their investigatic�n.
b. 7he Ct7NSlJLi'ANT will determine the typ�and firequency of geotechnical tes#ing
required for the design.The testing wi61 c�nsicfer pavemer�t type,design
methodalogY;tYpe af wheet loading.and weight of design a,ircra�t.Anticipated t�s#s
are included in CGI's scope of wcrrk below.
c. 7he GUiVSIJLTAN'f will pcepar�an�xh'rbit fcsr C�I showing the�pproximat�k�€�ring
locations:A preliminary version caf this��hibit is includ�d as �ttachm�nt 3.
d. 7'�e�GhlSl1�.TA1Vi"wi11 coardina#e with the QWNEFt and CG�to d�termine a
sche�iule far geotechnical field wark and Icagistics of Airp�rrt access.
� Page 7 of 27
1
8enton Field,4irport
East T Hangar Taxitanes Paverrrsnd Reconsfructian and Drainage lmprovements
Eregineering Design Sco;os ot Senrices
Febru�ry 26,2Ct25
1.4.� Field Wr�rk, Labor�tory Testina:and Repcart Pr�;paratian f�ubcc�n�ultant—Ctail
Conduct a geotechnical investigati�n per FAA Advisory Circular(AC) 15Ul532U-6G,
Aerpc�r#Pavernenf�esign and Evaluation.The inv�stigation will ct�nsisf c�f the fc�llo�ving
elements:
Field Wt�rk
a: Perform u#ility mark-out via 811 {ca11811.com}in advance of field wrork tca coordina�e
the Bocation of utilities within the s�lected site IQcation.
b; Attend an�irfield s�fety traininc�session as required'by the QWNER.Itis
anticipated that daytime work wili be requir�d. CG9 wili be equipped with a radio to
monitor pilofi ccammunicati€�ns 1f n�eded.
c. [�rill twelue ('12)borings at a minimum depth of#en feet(10') below Che surface
elevation.
d. Backfilk borings under pav�ment and in c�pen field with cuttings,compact�d by
aufc,matic deap hammer. Core all pavement borings to prt�vide a smooth wa11 to
pafch agains#:
e. Patch all pavement ccares with high strength, quick se#tin�,non-shrink mortar.Dy�
mc�rt�r black in asphaft pavement patches.
fi. In-situ infiltration tests will nc�t'be required.
Sc�il Inv�stinaficsn and t��rinc�L�q
a: S�mpl�,icientify, and cl�rssiiy sc�ils per with A.STM D420, Standard Guicle fcar Sife
Charaeteriza#ia�n fi�r En�ineerir�g L7esign ancf Constructic�n Pur,00ses,ASTM D2488,
Sfand�rd Practice fcar Deseripfion and Identificatinn of Scails(Visual-A�lanuad
F'racedure),and ASTIVi C�248"7, Standard Practice for Cl�ssification of Soils for
Engine�rirrg Purpt�ses{flnified Soit Cl�ssificatfon System).
b, Develcrp a graphic lag that summarizes the results of the sail expltaratlor�s tttat
in�lud�s focatie�n, date performed� tYPe of expear�tion, surfac�elevatian, thickness
of pavement section lay�rs,depth of scaif materi�ls,sampl�I�rcations and
id�ntificatic�n numb�rs,sc�il elassification>water table;p�netratican tests, maistur�
ccantent, unit weight, �nd rernarks. Graphic Pogs shall be nca farger tt�an 8.5x11
forrn�t:
Sc�il Tests and�nalvsis
a. It�situ mc�isture cc�ntent and unit dry w�eight for split-ring samples froen th�:borings
andlor test pit(ASTM I7�937}: lder�lify in-place compaction. C3ne(1)test per 6oring.
b. ASTM D421, Standard Prac#ice fcrrL?ry Preparatinn of Soi1 Samples for Particle_
Size Anafysrs and t7eferminatiQn of Soi!Consfants.Four(�#}#ota9 iests.
c. ASTM C3 422, Standa�d Test�feth�d for P�rticJe-Size Anatysis of Sc�ils and�xisting
Aggregafe t3ase. Fc�ur(4)tata!tests.
d. AS1"M a 4318, Sfand�rd Test M�thnds far£iquid Limif,P'fasfic Limat, an�'Pl�sticity
#ndex nf Soils. �our(4)tc�tal tests.
j Page 8 af 27
8enton F1eld AirporE
Ea�t T-Hangar Taxi/�nes Pavernent Recorzstrucfi€rn and Drainage tmprovemenfs
Enc�in�enng Design�'�ope of 8ervices
�ebfuarY 26;2�25
e. Moisture-C7ensity Relations af Soils.7he pavements will be designed t€�
acce�mmodat�the design aircraft(maximum t�kecrff weight less than 60,OOt1
poundsj. Use ASTM M�thc�d D 698, Sfandard Test fu9ethods fcar La.b�ratory
Cornpaction�i�aracterrs#ics c�f Sc�ii tlsing S#andard Eff�rt(�2,4t10 ft-tbflft�.Four(4}
total tests.
f. Estimates r�f�arthwork shrinkage?swell bas�d on in-situ density test results and
assurr►ed final density values, [include mo�sture-induced shrink/sweli determinatic�n
for existing clays p�r A57M D4546-21, Stand�rd Test t��#hcads fe�r C7ne-
L7im�nsic�nal Swetl ar Ccallapse Qf SaiJs:l
g. ASTM D 1883,Standard T`est Method far Califc�rnia Be�rrng Ratio c�f Laboratory-
�ompacfed Soits. Pr�vide ane(1)CBR t�st far each different maj�r soil type. Refer
tc�FAA A�15(7l5320-6G,Section 2.3.�.11.3 fior additional infc�rmat�c�n re�arding
nurn�er o�'CB�t tests, It is antieipated there will be four{4)total C�sts csn native
subgrade, and twa(2)t�tal��sts c�n lfine andlor c�ment stabilized subgr�de{at
apfiimum eontent caf stabilizing agent)j.
h. Historically,subgrade stabilization is required ai this site; prcrvide recc�mmendatiflns
for subgrade stabilization by chemic�l means (wiih lime and/or c�ment}-and
�ptimum percentage.
Geo#echnical Re�ort arad 17�si�qn R�uiew
a. Prepare a draft report detailing the findings csf the geat�chnical investig�tian.The
report will include a summary csf th��e�d investigation, site cctnditions, soil
materials,groundwater analysis, r�commend�ations far s�il streng€h values and
sukagr�de preparatian,fresst depth,patential for enc€�untering unsuitable materials,
and appendices cc�nfaining the baring Ic�gs and tests perFormed.
b. A�ter G{�NSUCTANT,and C3WPlER review r�f the drafk report, cc�rnplete the final
report.
c. Review the Engineer's besign Rep�rk prepared by the COIVSUl�TANT for
confarmance with�h�geot�eehrsecal recc�mmendations:
1,4.3 Anal ze C1ata CCINSULTANT�;
Analyze the data from the draft repcart and existing previQus geotechnical da#a,
consisting c�f the failawing su�-tasks:
a. R�view geotechnieal recommendations.
b, [}etermin�appropriate data for pavement design.
c. Evaluate existing paVement sections�or potential reGycling and reuse.
d. Evaluate sh�nk, swe41, and consolidation potentiai.
1.5 ��ELI INARI`P,�►V�MEWT CIIESIGiU
Th��dNStJLTAt�T will use-inf�rmation obtained in the gecatechnical investigati�n ta calculat�the
pavement s�ctieans required ta suppcart the design aircraft using F,4A�AC 15t3/532(}-6G,Airporf
Pavemer�t Destgn�r�d Evalu�fic�n.This work wilB consist af the ferticrwin�sub�tasks�
�
Page 9 caf 27
B�nfan Field Airport
East T Hengar 7ax!larres Pavement Reconstruction and Drainage Improv�ments
Engineering Design Scap�at Servrces
February 26,2025
a. The CQNSULTANT vuil9 develop an aircraft fleet mix. This w�ll include reviewing FAA Traffic
Flow Man�gement System C€�unts(7FMSC)� reviewing fleet mixes fc�r previc�us proajects at
the,�irpo�t,cabtaining t?V�{NER input csn obserued aircrafE operations,organizing the data into
a tab�e with aircraft type, Maxirnum Take-t':�fiF Wefgh#{MTt�W),and annual departures.
b. The Ct?RISULTANT will perFarm pavement design using the FAA program FAARF'lELQ.This
will incfude esta�lish�ng an existing subgrade stren�th based on CBR data fr�m the
geot�chnsca[repcsrt, inputting the fleet mi�into th�model,and running th�pr�gram tcr c�bt�in
the requi�ed thicknesses for r�ew pauemen#and aggrega#e base. GQNSIJLTANT will ev�luate
up to three{3}pav€�ment sectie�ns:
c. Th€�GUNSULTP�N7 will use FAARFIELD to determine requi�ed subgrade c�mpactian
percentages at specific dep#hs.This wiBf be ee�mpared with gecatechnical rec�mmendations,
existing soil conditions,and earthwork an�lysis tc� identify subgr�de c�rr�paction requ'r�ements
for the Project are�s.
d. The CC?NSULTANT will evaluate pavement r�habilitati�n optic�ns for existing pavem�r�ts
b�sed an#h��anditican observed in the site investigation and the findings of the geotechnical
invest9gaticrn.
1,6 PREI.ItV11MARY SIU�tFACE+GRAC�ING D�SIGt�
The�GtNSIJLT�PlT will d�sign grading cs#the p�ved and unp�ved surfaces b�s�d on cc�rnpli�nce
with F,AA AC 15Ci/5300-13B.This woric wiil consist of the following sub-tasks:
a. The CUNSULTANT will create�l�igital Terrain 11Aadei (QTM}using AutoCAD Civil 3D;
b. The CQNSULTAN�'will design faxilan�artd aprc�n grades that meet th�gradi'ng requiremen#s
cafi�AA AG '9 50/53C10-138:
c. 7h�CUNSULTANT wi11 cre�te standard cross sections indicating grades fae pavement.
d. Tie-in locations may nok cc�nfcarm ta curren#:standards or u9timate design. Therefiare,
transition zanes m�y be r�quired. The�C�NStJLTANT will design a finish-grad� surFace far
each transi#ion area up tcr the adjoining pavement.The transition areas wilf m�et FAA AC
150/530Q-13B wher�pc�ssible while consid�ring constructability:
e. The CC?�SULTANT will d�sign'unpaved infield�reas t€�drain �nd tie into exis#ing starm drair�
infrastructure.
'�.7 PRIELl1411NARY 57't�RM D tt�Q�SIGN
The GQNSULT°1��JT wili subcc�ntra�k with Sharrah Dunlap�awyet�; Inc. (SG1S}ts�cc�nduct design
imprcavemenfs-ta the storm drain sys#em in accc�rdance w�th standard engineering practic�s,local
�iTY"requirements, Drainag��llasfer�'lan{dat�d September 2��2), and FA1�AC 15Q/S32a-5D,
Airprart Crrairrage desagn.`�his work�vill ccrnsist�f the fallor�ing sub-tasks:
a: C3esign storm drain pipes to cQnnect the neuv network of pipes to capture r+�noff and�xtend to
the existing catch basin. l�esia�n the diameter;slcape,and material ta me�t the design fic�w per
Ffi�1 A� 150/532C1-5�.
b. Perform pip�sizing calculati4ns, inlet c�pacity c��cul�ations, and s�aread an�lysis 6etween
structures.
� Page 10 caf 27
BenPan Field�irp�rt
EasP 7"kangar Taxitanes Pavement Reeonstruction and Drainage Imprav�ments
Engine�eing Design Scope af Senrrees
�etiruatv 26 2C�25
c, Design the staern water de#ention system p�r City c�f Redding pc�licy; using the curcent City of
Redding H�C-1 mod�ls. l"he analysis wili determine the required vofume and c�u#1et
cc�nflguration to limit runc�ff during the 1 U,25,and 1{�0-year 24-hcaur starm events to pre-
devel�ped flows:TMe analysis wiil include detention faciliiy design and ve�lume calculations,
stage-sts�rage-diseh�rg�caBeulatians,and preparation of d�tentic�n pPans and details to be
included in the plans list�d herein.
d, Prc�uid��I�-4 Lc�w Im�act Developm��s#�MP dssign and constructi�n de#ails in �ccordance
r�ith Ciiy o#F2�dding Starmw�t�r Nl�nagemeni Program and the MS-4 Permit requirements.
e. Incorporate the required Low Impact Qevelc�pment BMPs t�a mitigate for the prc�posed
imperviaus area and comply with Gity af Redding pc�st constructian st�arrr�water standards,
f. Prepar�MS-4 Permet cc�mpli�nce caiculat2ons, CEty t��"Redding regulated prc�ject summary
and City of Redding post cc�nstructic�n Op�rations and Maintenance plan.
g. "Ch� Pr€�ject is not anticipated to reault in a signifecant increase af impervic�us area.
1.8 PRELI�WIINARY PAV�MENT'MARKING DESIGN
a. The Ct?NSULT�tNT will design pavem�nt m�rkings per FA�AC 150/5340-1 f�, Standards for
Airpcart Markin�s.
1.9 RREPAE'�E PRELINItN�RY�Lp►NS
T#�e G{JNSULI A(V7 will prepare ps-eliminary plan sheets depicting the prc�pased improvements.
The fioflowing is a preliminary list o#drawin�s.
. .
,. ., � . , * ..
G-Ct09 Cover Sheet 1
G-(�02 Sheet Index, Legend, and l�bbrev�ations 1
G-tI2� Prcajec#Layout Plan 1
G-Q80 Pt�asing F'lan 1
c-�a� o�m�i�tNa�,�i��� �
G-4C11 G�rading and Drainage Plans 2
C-441 Rrainage Cm�rov�m�nt F"lans 2
G-6C?1 Pav�ment 11�arking Piar�s 2
« ,• .
9.1� PR�PARE PRELIMINARY�tdGINE�R'S C?�S1�R1 R�t'QRl"
The COIVSULTAIVT'will prepare a Preliminary Engineee°s Qesign Repr�rt{E(�F2)tc,document the
basis and findings of the preliminary deslgn.The report wili cont�in alternative de�ign concepts
that were investigated and evaluated.The cc�st estienate wilf be based on a calculation of
estirnated quantities and uniti pcice estimates,including appr��riate ccsntingencies.
Elements c�f the El��t typically includ�the fr�llowing;
� Intraduction/Scc�pe
• Histary s�f the Existing System
�
Page 11 of 27
Benton Fie1d Airporf
E'ast T-N�ngar Taxitanes Pavement Reconstruction and Dralnage impravem�nts
Engineering Ltesign Scope of Senrices
Feknaary 26,2tJ25
• Site Inv�stig�tion(Including P'hotagraphs)
• Tc�pographic Surv€�y
• Gec�technicallnvestiga#ion
• Design Standards
• F'�vement C►esign(including Fi�et Mix and F FI�LD Mad�ls)
� SurFace Grading C�esign
• Starm Drain Design
+ Pavem�nt ivlarking [�esign
• lmpacts tc�F�A-Owned Facili#ies
• Enviranmental Consitleraticans(Including Environmental Dcacumentation}
• Availability of qualified and capable cantractor�tc� perform the�unrk
• Deiineatior�af AIP EBigible and lneiigible Wark Items
• DBE Participatian
• G€�nstruction Safety and Phasing Plan/Consideratic�ns for Airport t�p�rational Safety
• F'roject Schedule
� �ngin��r's Estimate Probabie Consk�uction Cost
• Clesign R�view M�etir�g Minufies
�.11 Pt�EPA(R�F'R�L.4t�tNAFtY�CtJS7 E�TI�l1A'PE
1,11.'I Preliminarv Earthwork Analvsis
Due to the extent af grading improvements, a detailed analysis of site volumes will b�
required tc�determine excavation,�lla �nd c�tf-haul quantities.The CUNSULT�4NT will
det�rmine cut and`fi11 vt�lumes using AutaC�C�. CfJN�Ut:TANT wil9 cQnsider existing
�nd praposed pavement sections and unusable vegetated surface I�y�r unsuitable fcar
subgrade fill material#o deteemine effective volumes_
1.11.2 Galculate Estimat�d Preliminarv Quantikies
The GC?NSUL'TANT will calcuBate nece�sary quantities for the various v�ark items.
Quantitfes will be consistent e�ith the specificaticsns and��cep#able quan#ity calcul�ti�n
practices.
1.11.3 Prepar�Pt�elirriinary Cc�st Estimake
The Cf}NSULTA�lT will prc�vide a c�nstructicrn cos#estimate based an record cc�st data and similar work
using the catculated pr�lirninary quarrtities: In additian to construction cost,the CURlSULTANT wili
�stimate total eligibRe Project costs including�WPJER administr�tit�n, constn,rction administration; resident
engineer services.and materials testiing.These additictnal ccrsts�+ill be pravided tio support the�Wi�ER
in the grant planning process.
Page 12:of 27
6entorr Fie(d Airport
East T-N�nyer T`ax!l�nes PavementReconstructFon and Dr,�ln�ge lmprc>vemenPs
Engineering Design Scope of Services
Februarv 26 2025
1,12 P PA�I�PR�LI 1PI�RY SUBR�iITT°�lL
9.12.� Cnternal QA Review
Th�QA staff assigned by the PM,typically a#least a Senior Project Engineer,as part caf
the quality cor�troi prc�gram wii!perform an int�rnai revi�w of the deliverables listed
below.The r�view will b�:perfr�rmed using Bluebeam soitware.The PM wifl review the
QA markups, determine the carrectiv�acEfan,and dir�ctthe changes. The QR reviewer
will backcheck resofutian c�F c€�mments before re6eas�of deliverables.
1.12.2 Submit Pr�lim�narv Delivecable$to C?WNER
The CC)�15ULTANT w'sil�nalize assembl}�af the d�iiverables listed bel�w and submit fia
the C}WNER fcar review.7he deliverables will be submitted elecirc�nically using
Newfocma file transfer s�ftw�re.
TASK 1 L}�LIVE �LES
'I) Kickof�Me�ting Agenda and f�inutes—Elsctrc�nic submittal
2) Design Review Meeting Agenda and Minutes—Electronic submittal
3) Preliminary P9ans—Elec#ronic stabmitt�l
4) Preliminary EaF2(including cc�st estim�Ee)—Electronic submittal
"iA;SK 2 60%o ANC19+�Q1�CfESlGN
2.1 PRQJ�CT�t9,4NA.GEM�N1 At�[3�t?C1F�D1NA71t3N
Prr�ject management tasks during�'ask 2 wilB c�nsist af the feallc�wing:
2.1;'9 U�date PMP
The PN9P craated during Task 1 wifB b�upd�ted to incorporate the 1a�est Project
pr�t�cols.
2.1:2 tJt�date Schedule
Tfie schedule cr�ated during 7ask 1 wil[be updated throughout design base�i c�n review
tirnes by the C7WRIER and F1�A:
2:1.3 Ct�carclin�te Intem�f Desiqn T�am
The PM will continue to caardinate and mcanitor internal work pr€�gress during Task 2.
2.1.4 Coardinate Subcansultants
Tt�� P�rl will cc�r�tinue to c�ordinate and rr�tcanitc�r sut�eorasultant wcark pr'Qgress during
Task 2.
2;1,5 Quaiitv Gs�ntrcal�rc�c�r�rn
The PM t�vill cc�ntinu�to review the QC checklisfi,and the design team wid9 cont'rnue tic�
update th�design ics�durin�Tas�2.
The PI�and assigned QG team members vuill regui�rly r�vie+�v w�ric perFc�rmed by khe
desi�n team. Prior to finalizing tW�e 6tf°./fl and 9CJ°l�submitkals,the assigned Qf�team
members wil(review the documents to be submitt�d.
� 1�� ��g�������
Benfon Field Airporf
East 7°-Hengar Texilene�s Pavement Recanstructian and�rainag�lmprovements
Engineering Design Scope af Services
F'ebruaay 2S,2iJ25
2,1.6 Proi�ct Contrc�ls
The Piv9 wili continue to maintain the Praject budget;spreacisheet,track casts, and
prepare invc�ices as defined in Task 1. It is anticipated that fnur(4)invoices will be
pre�pared during T�sk 2.
2.2 Pt�(?J�CT{ti�EETiNGS APJa CC)1�4�1JNICATI�N
The Ct�t�SULTAN7 wiil participate in me�tings and ca11s during Task 2. ivleetings and
cammunicativn items will be�s faallows:
2.2.� �ii-Weeklv Ir�ternal F�rac�ress Meetinqs
�he PM will conriuct bi-weekly meetings with the internal design team to discuss 1he
Prt�ject schedule and work progr�ss. Up ta five(5}members from CaNSULTANT team
(anti�ip�ted to ccansist of PM, Sen9or Prc�jeck Engiraeer, Engineer(li, Lngineer!;
Technici�n 1V�wiBl attend each meeting. Up to eight{8)meetings are anticipated dueing
`i`ask�:
2.2,2 ManthlY Practress t�eetincLs witi�C3VVN�R
The CUNSULTANT will canciuct month[y meetings wi#h the OWNER to discuss the
Pro�ect sche�uJ�,wark pragr�ss,and ccrordinatian items: Up to tw�{2j members fr�m
Ct7N�UL1'ANT team wi(I attend each mee#ing (�nticipated to cansist c��PM, Seniar
Prc�ject Errgine�r).Up ta four{4)meetings are anticipated during Task 2.The meetings
will be��held virtua�ly.
2.2.3 Mcanthlv Pcoqress M�etinqs with QWNER and F,�,
The Ct"�NSULTANT wiH attend monthty meetinc�s with the C7WNER and the F+4A t�r
discuss the-over�ll Airpork program, including but nc�#limited ta schedule, progress,and
c��rdinatic�n items. Up t�two(2)rnembers from CC►NSULTAN'TTeam will attend eaeh
meeting(ant�cipated ta c�nsist ofi PiUI and Senic�r l�roject Engin�ee). Up to fcaur{4)
meetings are anticip�ated during Task 2.The meetings are anticipated tc�b� held
virtually�rsd be conducted by the FA�4,
2,2.4 Present 60Im Submittai to UWIU�R
The CC7NSULTANT will prepare for and c�nduct,a meeting wi#h the QWNER to present
khe 6Q°lo design submittal. Up to thr�e(3) rnembers frc�m Ct�NSUL.TANT team will
attend(ant'scip�ted ta ccar�s�st c�f PM,Senior,a;ssoci�te. and Er�gineer t4B}.The fi0°lo
me�ting is anticipated t�z be held virtually:The GQ�ISULTANT witl prep�sre an agenda,
exhibits, and minutes tca support the meeting.
2.2.5 Present�(}°!�Submittal fio(?WNER and sife Visit
The CUNSUL7'ANT will prepare#or�nd concfuct�meeting with the C�WNER fo pres�:rst
the 90°lo design submittal.l�p tc� #hree(�}members from CC�NSULTANT team wiil
att�rrd in-person(anticipated tcs consist€�f PM, Senior Associat�, and Engineer III).The
90°la m��ting is anticipated ta be held at the Airport.7he Cf��1SULTANT'wflf pr�pare an
agenda,exhibits,and minutes tcz support th�meeting. During the same trip,the
CQNSULT�N7 will investigate the site to document exisfing conditions based c�n
sp+�ci�c items iden#i�ed thrcrughr�u#the 6tl°lo and 3�%design.
�" P�ge 14 af 27
BenPon Fiedd Airporf
E�st T'-liangar Taxilanes Pavern�nt R�construcdion and G}rainag�dmprove+nents
Engineenng Desagn Scope caf Services
�:bruarY 26 2025
2.�,6 Genera(Ca�mmunicatian with UWN�R
7'he COIVSIJL7A,Nl`will cc�mmunicate with th�QWNER thraughau#Task 2 via phon�
�alls or�mail in additian to khe meetings listed herein.
2.3 B�°fo AP�D 90°!o PAVEf�ENT CI�SIGIV
The CtJN�lJL7ANT wpll update the pavement design based an�WNER's and FAA's review of
the Prefiminary and 6tI°lo d�sign de�cum�nts.
2,4 6Q%AA9G�90°ls Sl1RFACE � DlN��I�Sl+GN
Th�C(7NSt1LTANT will re�ne the sutfiace grading design based an OWNER's and FAA's review
af fhe Prelimdnary and 5Q°!e�design dc�cuments, The GC?NSULTANT will generate�h�surfaces tic�
th���cur�cy r�quired fc�r cc�nstruct��n.The design wi{{consist of the fcailowtng elements-and
cansiderations:
a. The Ct7NSULTANT wip update the DTN#f€�r#he finish ground surface using AutoCAD Civil
3D.
b. The CC7RISULTANT witl-update the taxilane and apron gr�des.
c. The COi�SULTANT will ereate d�taided cross sectie�ns indicatir�g grad�s f�r pavement and
unpaved areas using Givi1 3D ca�rridors and assemblies.The cross-s�ction slop�s wilf be
design�d tca meet the transvecse grading requirements of AC 150J530C1-13B.
d. The Ct�NSULTANI'wili upd�ts the finish grade surface for pav�ment transition areas.
2.5 60°Io AP�C}9tt°fo �`s°�C�E2�9 D lid D�SlGN
The CCIN�ULTA[V7 will subccrntract with 5harrah Dunlap Sawyer; lr�c.(SC]S)ta updat�the stcarm
dr�in design b�s�d on �WN�R review of the preliminary and 60°lo documents. 7he
C�NSULTANT will upd�te#he plans to the accuracy requi�ed far construction."�he design will
cc�nsist of the following elem�nts and ccsnsideratis�ns:
a, The GC7NSULTAfVT will upd�te the s#orm dr�in pipe design based on updates.
b. The GONSIJi.TAi�T wrill model the pr�pased starm drain infrastrucfure using AufoCAD Civif
3D pipe n�tworks and c�enerate plans and pr�files for each starrn drain.
c. The CC7N�UI�TANT wi1{update stormwater detentitrn syst�m design and MS-4 c�mpliance
elements based on 60°!p and 90°fa design updates.
2.6 E�RE6�ARE 60°la ANb 90°l�P P1S
Based on OWiVER ar�d FAA r�u�ew af the prelimin�ry and 60% submittais,the GUNSULTANT
wip upd�te the�9ans#or ihe 60°lo and 9U%submittafs.The CQNSlJLTANT will prepar�pl�n
sheefs depicting the propcased impr�vements.The following is a general'Cist taf drawir►gs typical
for this proj�ct type:
� Page 15�af 27
Benfon Ffeld Airport
East T-Nengar 7axilarrss Pauement Rec4nstruction a�d t�rarnage Improvements
Enyineenng Dasign Scope af Senrices
February 26,2025
e •
r 1�. �; ,r;
�-Q01 +�over Sh�;et 1
G-Qfl2 Sheet lndex 1
G-f}fl3 Legend&AEatareviations 1
G-fld4 �ener�l i�ote� 1
G-U21 ProJect Layout Plan 1
G_Q4'i Sunrey Control Plan 1
G-Q81 Consfieuctian Safety and Phasin� Plans 2
G-Q91 Cca�struction Safefiy and Phasisag Ctetails 1
8-Q51 Plan and Log of Sc�il Bordngs 3
G_t�21 Erosicsn Cc�ntral Pl�ns 2
C-031 Erosfon�an#r�l L7etails 9
C-Q51 t7em+�fiti�r�Pfans 4
G-�61 Demo}itic�n Details 'I
C-t}91 Existing Canditions 4
G-101 Grading and Dr�inaye P1an 4
C-301 l'ypical Se�lians 1
G-311 Paving Details 1
G-441 Storm Dr�in Pl�n and Profiles �It►
C-451 S#orm t�rain IJetaifs 1
G-461 �7etentic�n Basin lmprav�m�nts 1
C-651 Marking Plan 4
C-671 Marking Details 1
. .x .
2.7 PF2EPARE 6t1°lo At�D 90qIo S�'�CIFtGAT14NS
The G(.7NSl!l�TANT wll!assembBe the specificatiaans as stat�ci belaw fcsr the t�WN�R to us�in
c�btainrng competitive b�ds for the work. The dacuments wi11 m�et current FAA Standards for AIP-
funded prc�Jects and incorpt�rate GWNER-spec3fic�pecific�tionslprovisions when r-equir�d p�r
FAA instructian.
2.7.1 Biddin anct Cs�ntract�ocurnents
The FAA requires the foll€�wing secti�ns be inc6uded in the bidd'sng dacum�rsts��ar�zIC
Federally fur�ded pr€�jects.�fJRlSt1LTANT will assist the t)WNEF2 with preparing fhe
rlc�cuments bas�d e�n tbe+QWNER templat�supplem�nted with F standards.Wher�
th�UWNER has additiona(ar esverlapping requirements,CONSULTANT will review the
bidding and contr�ct docum�nts provided by the OWNEF2 and notifyth�C7WNER of
conflicts. GOtVSt1LTANT'wiil enclude appBicable OWNER r�quiremenis in the bidding
and c�ntr�ct doeuments:The dc�cuments must include the fcallcawing s�etions:
• PVr�tice to Bidders(Advertisemen#fcar Bids)
• FAA Lnstruc#ic�ns ta�idders
� Page 16 of 27
Benfon F1eld A1rpaR
East'T Narrgar Taxilanes Pavemenl Recvnstructfon and Drainag�improvements
Engineering f7esign Scape�of 5ervices
Februa 26 2025
s Prespc�sal Farms
• Statement of Quali�catiQns
. Bid Sche�iule
« Sarnpl�r�greement
• Insur�nce Requirements
• BQnds and Guarantees
2,7.2 UW�IER Gener�i Prc�visi�ans
The CC}NSllt,TANT vuiil caordinate with th� OWNER to incfude the OWNER-specific
�ener�l Pr�svisiaans in the sp�cificatic�n package.The CONSULTAPI'C wil( perfnrm a
review#c�identify areas in the t�WNER-sp�cific General Provisec�ns that may cc�nfiict
with �equired�edeeai Contract Prc�visior�s ar�d t�te�AA Gener�l Cantract P�`ovisicans
and prQvide comrn�nts�tr�th�C}1NNER for their c€�nsid�ratian and actian.
2.7,3 Reauired Federal Confiract F'rovi�ions
Federai laws and regulations r�quire that speci�c cantr��t presvisians be included in
federaiiy funded contracts as established within the gra�rt assurances:The
C�N�tJL"fANT'wiii prep�re the Rsquir�d Federal Con#ract 1'rc�visions:Th�s�
requirements caver the following:
s Affirmative Action Requirernent
• Buy Amerlcan Preference
• Givil Rights
� [3avis-B�con Act f2equirements
+ Disadvant�ged Business Enterprise
• Equai Emptoyment�pportunity
» Federal Fair Labc�r Standards,4ct(Minimum Wage)
� L�bbying and Influencing Fedec�l Employees
• F�rohibi#ian of Segregat�d Facilities
• f7ccupatic�naJ Safety and l�ealth Act
2��7.4 Prc�ject-S�ecific Sr�ecial Provisie�ns for�irc�ott Ctanstru�t�can
The CC}NSULTANT wiN;prepare Special Prauisitsns to�ddress or expand carr cdnditions
specific to cc�nstruetican an airparts. Special Pravisians typieally inceude the f�s(Ic�wing
items:
« General Safety Requirements, Airfield Safety and'fraffic Control
• Gonstructi�n Sch�du{e Requirements
• Time Limitatians
d Work Heaur Lirnit�aticsns
• Liquidated bamages
a ProJect Sequencing�nti Pcatential Delays
• Barricades and Runway Clr�sure Markers
• Radio�ommunicakion
« Acc�ss and Security
� Required Training
• General Site Infc�rmatian and Requirements
�
Page 77 of 27
Benton Fi�ld Airport
Eas#T-Nangar T�xi�anes Pauement Reconslruction and i?rainage lmpmvements
Engineering Design Sc�,ae of Senrices
FebruarY 26,2Q25
* Constructican Staking and Survey Layaut
• Submittal Proc�dures
• ,Schedule c�f Values
• Miscellaneesus Material Specificatic�ns
• Recard T}rawings
• Certified�"ayecall FZequirements
• F"roject Pay Ftequest l�equir�rnents
• Contractdrs Constructic�n Superintendent Requirements
a �adging Requirements
• Gat� Guard Requirements
• Gfty c�f Redding Standards{as permitted by the �AAj
+ atormwater c�uality�nd Infiltratic�n Device�
• Asphalt Goncrete(fcar t?WNER-only eligible pavements)
2.7.5 FAA Standard 5�ectfications for Gonstructic�n of�irc��r#s
The C4NSUL1`ANT will prepare FAJ�General Gontract Provisicans,general canstruction
items, and technica!specifrcations per FAA AC 15015370-1 flH, Standard SpecFffcati�ns
for Constru�tidn oiAirpc�rts.The foilowing FRA Standard Sp�ci#icatic�ns are expected in
this:F'rc�ject:
a. Park 1�-General Cc�ntract Provisian
i. Section 1�De�nition c�fTerms
ii. S�ection 2Q Prop�sal Requirement�and Ganditi�ns
iii. Section 30 Award and Execution crfi�ontr�ct
iv. 5ectian 40 Sc�pe of W�rk
u. Sectian 5Q Cc�ntrol c�f Work
vi. Sectic�n 60 Control crf Materials
vii. �ectic�n 7t�Legal F2�gul�tions�nd R�spc�nsibility tc�Public
viii. Scction 80 �xecution and Prcagress
ix. Sect�an 90 Measue�ement and Payment
b. Part 2—Gen�ral Construc#ian Items
i. Item C-�Ut7, �antractar Quality Contral Program(CQGP)
ii, ltetn C-'102,Temps�r�ry Air and Wat�r Pc�llution, Sail Erosion,and Siltation
Con4rol
iii. It�m C-1�5; Mc�bilizat�on
iv. Item C-°I10, Methad of Estimating PWL
c: Part 3_Sitework
i. Item �-�Gi1, Preparatic�nlRem��al aaf�xisting Pav�ments
ii. Item P-151', Clearing and Grubbing
iii_ Item P-152, Excavatian, Subgrade,ar►d Embankment
iv. Item P-153,Cor�treslled Law-Streng#h Material (GLSM)
lfiem P-154, Subb�se Ccrurse
d. Part 4—Base Ccsurses
i. It�m R-2a8,Aggregate Base Course
� Page 18 of 27
Bentan F1eld.Airpdrt
East 7-Hangar TaxilanesP�avemer�t Reconstrucfion and Qrainage tmprovemenfs
Engineering C3esign Scope df Sen+ic�s
Februerv 26,2025
e, Part 6—Flexihle Pavements
i. It�m P-401,Asphalt Mix P�vement
f. V'ar€9—Miscellan�ous
L ltem P-603, Emulsified Asphalt 1'ack Caat
ii. Item P-6'I�, Concret�for(t�isc�llan�ous Struetur�s
iii. Item P-62�, Runway and Taxivvay Marking
g. Part 11—Drainage
i. I#�m D-701, Pipe for Storm Drains and Culverts
ii. Item C�-751, Manholes,Catch �asins, Inlets and Inspecti�an Holes
'sii. ltem G-752, Cancret�Cuiv�rts, 4�eadwalys,�nd Misce4}aneous CJrainage
Structures
iv. ltem C}-754, Concrete Gutters, t7itches,and Flumes
2.8 PF�E�,�,RE 6ll%A�#T}�0°to �NG1f���R°5 ���1GN`REPC?RT
Based e�n C?WNER-and FAA review of fhe pr�;liminary and 6Q°10 submit�afs,the CC}NSULTANT
will update th� En�ineer°s aesign F2eport(EDR)."fhe�i(l%and 9fl% EC►R vvill furkher define
Prc�ject design consid�ratic�ns�nd track decisir�r�s rnade during tMe d�sign pra�cess.
2.9 SUB�AIT F FORR�74+60-1
COhlSULTANT wiil,generate t�ne{1�7460-1 submiss�on for the proposed fin�l Pro�ect
c�anstruction,fihis submission will inelude exhibits{s)identifyir�g�perati�rnal cl�arances of raads,
aircraft mavernent are�s,and structures. The exhi�its wiil require latitude and It�ngitude
coordinat�s for ali prt�posed n�w work.
CON,SULTAN7 wili submit the 746Q-1s and related exhibits electrc�nic�lly theaugh the abstruction
Evaluatican/,�irport Aarspace Analysis(f3E/" }pc�rta!for�AA review.
2.1t1 PREPAFtE 60�10 APlt)90%'� Ct��T ESTIIi�A7E
2.10:1 6(?°�O and 9a°10 Earthwark Analysis
The CQNSLJLTANT wili upda#e the earthwork anafysfs based+�n the 60°lo and 9(?°l0
design.
�.10.2 Cal�ulate �stimated 60°Z�and 90%�Quanfi#ies
Thte CC�NSIlLT�tNT wtll u�date#�e quantfties based an the 6{l°!�and 9tl°lo desigrr.
2.1Q:3 Pret��are 6a% and 90°l� Ccsst Estimate
7he CONSt1L7ANT will update the cos#estimat� hased+�n the 6{7°la and 90°fo design.
2.19 PREAARL GC3h1STRUCI'lQN SAFE"fY AND PHASlNG PLRN
2.1'1.1 The CC3N5lJLTANI"wi(1 prepare a Ce�nstructic�n Safety and Phasing F�lan(C�PR}
d�a�ument in conformance with F�,A St�ndards and FAA AC '15t3/5370-2G, t�p�rafional
Safety c�n Airports C7uring Consfruction. 1'he fina9 CSPP will be included in th�bid
documents pack�ge and generaliy includes the fakiowing informaticrn:
a, tJverview and Purpose
b. Ce�nskructian Safety Responsibility of�ach P�rty
c. Construction Phasing, including:
� P�ge 19 af 27
�
Benton Frefd,4irpcart
E'ast T-Nangar Taxidanes F'avement ReconsYruction and�rain�ge tmprovements
Engineering Design SCope of Services
Febn,atY2&;2025
• Tasking and time limitatiions:Ta es#ablish a fair ccsnstructican duratian, the
CfJNSUL7A9J�'will prepare an estimated critie�l-path construction schedule,
The sch�dule wiil be based on productivity rat�s c�bs�rued in simiiar projects.
This scheduBe will nat reiie�e t}�e contrac#car af th�ir responsibility t�prepare a
detaiied schedul�c�f work n�r allaw th�m ta modify the perfarm�nce durati�ns
of the e�ntract.
• Areas and taper�tions af�ected�y canstru�tion:
• Wildlif�rnanagement.
• Nazardaus materials managemer�t;
• Inspection requirements.
• M�rking and signs fior access routes:
• Prcatectiean of runway and taxiway criticaf areas.
' Safety plan cc�mpliance document.
d. Construction Safety and Phasing Plan Sheet(s)
2.11.2 After OWNER revie�v and acc�ptanc�,the CSPP will be uploadeti t�the UEAJ�A�nline
port�(fc�r FAJ�review�nd apprcaval. CONSULTANY will generate�n�{1)7460-1
submissian for the paoposed Cc�nstruction Safety and Phasing F'Ian (CSPP).
Submissic�n will follow g�aidance provid�d in FAA's Stand�rd Qperating Prescedure
(S�P) �.00—FAA EvaBuatwon c�f Sponsor's Const�uction S�fety and Phasing I�I�ns,
These submissions will include exhibits identifiying poia�ts-c�f-inter�st in latitude and
langitude coc�rdinates, includir�g wc�rk site area,stagingf�tr�ckpiBe locatinns, construction
equipment heigh�s, and haul routes:
2.92 PREPAR�60°la A1VC3 90°la StJ�MITTAI�
2.12.1 Int�rn�l G2A Review
The C2A stai��ssigned taythe�'�i as part of#h�quality c�ntrol pror�ram will perform an
internal review fcsr the 6C}°I��nd 9D°la subrnitt�!deliverables listed below. The review will
be perforrned using�luekaeaen sofkr�+are.The PM will revie�the�!A markups; d�termine
the cc�rrective action, and dir�ct th�chang�s. The QA r�viewer wili backche�k
resolutic�n af comments bef�re release af deliver�bl�s.
2.12:2 Submit 6�°Ia and 9t7°l� betiveraka(es tc�C�WNER
The Ct7NSU�TAN7 will finalize assembly af the 60%o and 90%a del�verables listed below
�nd submit;to the t�WNER for review.The delive�ables will be submitted electronic�ily
using Newforma file transfer software.
T,RSK 2 DELIVE' BLES
1} Design Revie�Meeting l�genda and Minutes—Electronic submittal
2} 6C1%and 9t}°lo Plans—Eiec#rrsrrcc submittal
3) 6t�°fo and 9t7°la Specificatic�ns—Electrnr�ic submittai
4} �U°I�and 9�°l� Et�R(including C4st Estimate}—Eleckronic submitital
5) CSPP—E9e�tronic submitt�l
� �� Page Zp af'27
9snlon Fietd AirparP
East T-Hangar Taxilanes PavemanP Reconstrucfion and Drainac�e lmprovemenis
E�agin�ering Oesign Sc+ape o{S�rvices
February 2& 2025
T�9�� ����►�.��w�r'�`a
3.1 PRC?J�CT MA► GEfl��i�T AAtti�C�ORDINATICCIN
Project m�nagement t�sks durin�Task 3 will cansist of the#allowing:
3.1.'I U�da#e Pt�P
The Piv1P cre�ted during Task 9 will be updated to incorpcsrate the latest Project
prc�tacols.
3.1.2 Update S�hedule
The schedule created during Task 1 will be updated thraughcaut d�sign based on review
tirnes by the OWN��:and FA�.
3,1,3 C�c�rdinate Internaf[�esiqn T�am
The PM will conlinue to coordinate and monitor internal wcrrk pragress during Task 3.
3:1:4 Caordinate Subconsultants
Subconsultant w�rk wi1{be compteted by Fina1 t�esign and cont9nued cc�ordinatiern is not
required.
3:1:5 Qualiiv�ontrca! Prc�ar�m
The �'Rfl will camplete the review afthe QC checklist�nd the design team will finalize
the design i€�g during Task 3.
The PM and assign�d QC tearn memb�rs will regularly e�view wark performed by th�
design team. f�rior ta issuance of#he f�nal design, the assigned QA team members will
reviewo the ctocuments ta be submitt�d.
3.1.6 Prca�ect Conteols
The P�l will continue tt�maintain the Prc�ject budget spreadsh�et and, track costs and
prepare invoices as defined in Task 1. lt is ant%cipated th�t one(1)inveaice will be
peepared dur�ng Task 3.
3.2 PROJECT RlIEEI"INGS,AN[3 CQ UtdICATIOPI
The GONSULTANT�ill participate in meefings and calls during Task 3. Meetings and
communicatic�n iterres will be as foll�avus:
3,2:1 �i-Weekiv Internal P�c�aress Me�finas
The P�tl wiCl ccanduct bi-weekly meekings with ti�e internal design te�m fo discuss the
Prc�jeck schedule and wa�k prc�gress. Up tc�five(2)members fram CQNSUL7ANfi team
will attend each me�ting (ankicipated ta ca�nsist of PM,S�enior F'roject�ngineer,
Engineer Ill, �ngineer t,Techn�cian IV), Up to two(2)rneetings are anticip�ted during
Task 3.
3.2,2 Monfihlv Prr�qress Meetinc�s with OWP�ER
The CCI�lSULT,4NT wil!conduct m�nthly meeting(sj with the C?Vl{NER to d�scuss the
P�ojeck schedule, w+ork pr�gress, and ccac�rdinatifln it�ms_ t1p to twcs(2)members feom
GC7NSULTANT te�m will attend�ach meeting(anticipated#c�consist e�f PM and Seniar
Project Engineer}. C7ne(�}m�eting is anticipated during T�sk�.�'he meeting will be
h�ld virku�lly.
1
Page 21 of"27
8enfan Field Airport
East T-Hangar 7`�xilanes Pauement Raeonstructlon�nd Orainage(mprouements
Engfneering Design Scope oF 5ervices
FedrvarY 26,2�25
3,2.3 i�onthly F'roqress Meeti�g_s with C?WNER and F
The CC1NSlJLT�,NT w�ill attend mtanthly meetings with the aWNER and the FRA fo
discuss 1he ov�rall Air�a�rt prc�gram,including but not limited to schedule; progr�ss,and
cac�rdinati�n items: Up t�a twa(2}member�s from GONSULTANT Team will�ttend��ch
m�eting (anticipat�d#e�cc�nsist of P{�1 and S�niar F'r�ject Engine�r). Up tcs cane(1)
meeting are anticipated during Task 3.7`he meetings are anticipated to be held virtually
and be ccrnducted by the FM.
3,2.4 General Communication with t3WNER .
The CC?NSU�.TANT wifl communica#e with the C3WNER throughau#Task 3 v�a ph�ne
calls or emaiC in additic�n to the meetings listed herein.
3.3 P�EPARE-FIAl1�L C� NS
Based can C�WPIER and �RP,revi�w of the 90°l�submittal,the GQNSULTANT will update the
pians.
3.A� PR�P�R��IfdAL SP'ECIFI�ATIOMS
Based c�n�WN�R and FAA r�view c�f the 90°la submittal„the�dNSUL�'�NT will update the
specificatit�ns.
3.5 PFi��1�RE IFIN.AL EhiGItdEEFt'S�7iESiGf� F�EPt?R1'
Based on QtlVPJER review t�f the 9�°fo submittal, the CO�ISULTP�RIT'will update the EDR:
3:B PREPAR�FIFlAL GL?ST ESTI�flJ�TE
3.6.1 Calculate Estimated Finai Quantities
The�t7NSU�TRNT wiA'update the quantities based on the fin�l d�sign.
3.6,2 Pre�aare�in�l Ct�sk Estimate
The C(aNSt�LTANT wi[I update the cost estimate based csn the final design:
3:7 PfZEPAF2E FIW,4L GqNSTRl1C'Ttt]PJ SAFETY�NC)PHASIPIG F' M
Based an OWNER and F review of th�9�°/a submittal,the�{�f�SUL7ANT wiCl update the
GSPP.
3;8 PR�P14FtE F1Pt�L SU�IiAIT1't1G
3.8.9 IntePn�I QG Revi��
The PiVI and Q�staff assrgned by the Ptvi as part of the quality ccan#rol program will
perform an in#ernal review caf the fnal updated deliverables listed belcaw.The review will
be perFcarmed using Bluebeam sc�ftware;fih�Pfvi will re�riew the QA rn�rkups,determine
the�orrective actiran, and direct th�ch�nges, The QA reviewer will backcfi�ck
res�lutic�n af comments before release of deliverables,
� Page 22 flf 27
Benton Field Airport
East r:Hangar Taxi/anes Pavement Reeonstruction and Drainage Improvements
�t?g11188I1C1g L}951g'!7 SCppb°Of S811i%G23
FBbsaJe/y 2& 2025
3.8.2 Submit Final [7�liverables tca 4WNER
The CC7iV�ltLTANT will camplet�assembly�f the final deliverables(isted belcaw and
subrni#to the QWiVER.The deliverables wili be submitted electronicaUy using
N�wforma file transfer sc�ftware.
1'ASK 3 DELIV� BL�S
1) Final Rlans—Efec#r4nic submittal
2) Fina(Spe�ifications—Electronic submittal
3) Fire�l EDR(inc�ud�ng Cost Estimate)�-Electronic submi#tal
4} Final CSPP—Electronic submittal
T�S1C 4 Bl�AD [N1ST Tl0
4.9 PRGIJECT Rt1AN,+�GEIh�EhIT AMD��tJRDIRi,�TIbN
Project manag�ment tasks during Task 4 wifl consist at the following:
4,1.1 Undate Schedule
The schedul�creat�d during Task 1 will be updated to sh�aw bid administratian
milestones.
4.1.2 Prepare lr��oices
The F'M will continue tc�fr�ck costs weekly�nd prepare invoices as d��ned in i'ask 1,It
is anticipated that t�ne(1)i'nvc�ice wi11 be prepared during 7ask 4:
4.2 PRt7dECT E�TIPiGS AI�[�CCIMA�UNIG�TIOW
The Ct?NSULTARtT will parti�ipate;in meetings and calls during Task 4.Meetings and
cammunication items will be as folCows:
4.2.1 Monthlv Progress M�etinas with CIWNER
7he GCJNSUL`fAl�7 will canduct monthly meetings with the OWNER tc�discuss the
PrQject schedule and coordination items. lJp to two(2)members frc�m GQNSl1LT�h1T
team will att�nd each me�ting (anti�ipated t�c�ansist af PM �nd Senior Preaject
�ngineer). Up ta ryne{1)meeting are�nt�cipated during l"ask 4.The meetings will be
h�ld virtually.
4.2.2 Pre-Bici G�nferen�e
T`he Gt3NSl1LTANT will prepare for and�ondu�t a pre-6id conference with potential
cantr�cEors and�he C7WC�ER to review the Prc�ject and answer questions. Up to twer(2)
members fram Gt�NSULTANT team will att�nd in-person(anticipated tc�cc�nsist of PM
and �ngineer 111�,'the conference will b�conducted at the,8,irport and inclu€ie a site
visit. `fhe(�V4�NER will presvide escc�rt tc�th�prsaspective bidciers ta view fihe Prsaject
site�: �C}NSTl1L'PAiVT will prepare a mee#ing agenda and minutes f�r d'istribution by the
OWNER.l'he CQNSI�LTANT will prepare half-size graphic te�illus#rate the Praject ta
patential contractors,
�
�age 23 c�f 27
Bentan�iefd�lrp4rt
Easf T-Ffang�r Taxilenes P�vement R�constructian and t7rainage Jmproverrrents
Engineering D�sign Scape of Sen�ices
�ebruar,y 26.�'0�5
4:2.3 Gen�ra!C�mmunica#ioe�with QWRIER
The Ct�NSULTANT will comrrtunicate�ith#he flWNEFt throughout Task 4 via phone
calls or�mail in�ddition#o the mee#ings listed herein.
4.3 RESP�ND T�BICI�IERS'QUE57`IC�tWS`
During the bitlding pracess,the CONSUI.TANT wiil cBarify the bidding ciacuments and answ�r
questicans ircam prospecfiive bidders. CC?NSULTANT will receive bidder questi�ns and issue
responses in a fc�rmal addendum.Bidders may seek cl�rificatic+n eaf the bidding documen#s up tc�
Qne(1)week befoce the bid is due.
4.4 BID A[�DENQA
The CQNSUL7�iNT will assist the t)WNEFI t�prepare bid addenda to interpret, clarify,�r change
the bidding documenCs dur�n�the bid pracess. The C)WNER wiil be re�pc�nsible for�issuing#he
addenda to the plan hoiders. Up to twc� (2)addenda are anticipated.
W�.� Qtl.�igtiGY'�YY�y.�Il.f 9d"'A63&+RL$"1�:1�VBYi:MIYI.AiriJ�s?Tl.l"�tl'V4MIYt'11r1a71w7
The UWNER will perform the initial bid reviewr for ce�mpliance with Instruetia�ns to E3idders and
determine if each bid is respcansive.
The CQNStJ'L7,�IVT will review all re�sp�ansive bids fcrr adherence ta the c��uirements ofi the
bidding documents:The CONSUL7ANT will prepare a spreadsheet c�f b��Js and bid�kems for each
bidder.The�C7NSUL7ANT wilf input the as-bid unit prices into the spreadsheet and c�nfiirm
mathematical comput�tions tzf the bids. Gt7NSULTANT will evaluaf�unit cnsts te�ch�ck for
unbalanced bids. The CON�IILTANT will provide the OWNER with the narne of the Apparent
Low Bidder.
4.� PFtEPARE t2EGtJ�IUI�t�[3AtlUIV QF A1W,AF2G1
The CONSULTANT wi(f prep�re a Recammencl��ic�n af,4ward far th�CsWNER te�accept�r rej�ct
the submitted bids. lfthe recommendaticsn is#o aw�ard,Ct�PiSULTAi�I'wili prepare a fcarmal letter
recommending acceptance by the QWNEt2. I#the recommend�;tian is tca re�ect�l1 bids,the
Gt�NSUI.TANT wil!suppiy an explana4ian for#he recc�mmendation�nd p�ssible altemative
actic�ns that th�C}WhIER might be able tca pursue t�a ceamplete the Proj�ct.
TASK���L1VER,�BLES
1) Pre-�id G�anferen�e Minutes--Erecfranic suk�mittal
2j Advertisem�:nt for Bids=Eleetronic submittal
3) Bid C}ocuments—Elect�onic submittal
4) Bid Revie�+, Bid Tabulation,�nd CostlP�ice Analysis—Electrcanic submittal
5} R�camm�ntlati�n of�ward--�lectronic submitt�i
�� VIC�S T E P �V`IDEt� Y THE fl E
The C�WN�R and CUNSULT�4NT agree that the following items will be prcavid�d by th� UWNER. 1f these
car any additionai items are added ta#h�CU�15tJL1",ANT's secape of servis�s,they will be ct�nsidered extra
services and require a negcstk�ted fee and an amendment tt�the�ontract.
� Page 24 c�f 27
eenron Fierd A;rporf
East T-fiangar Taxilanes Pavement RecansPruction and G)rairrage ImprovemenBs
Engine��in,g pesign Scope af S�rvices
February�6 2Q25
1) Payment af fees,easements, and permit fees from city,state, ccaunty,utilities, and others.
2) Outreach t�tenants and other sh�rehald�rs to cc�nVey the Project goals and toming,
3) Required p�rmits will be managed and�drninistered by�71NNER car cather parties unless specifically
identified in G�?i�SULTANT sc�pe af serrices.These perrnits may include,but are not lirnit�cf ta,
Feder�l[and St�te]environment�l clearances (ex: �9ean Water Act 4d4 permi#, NEPA, NF'DES;
C�ean Air A�t}; pubiic utility cc�nnection permifs and revi�w fe�s; canstruction/contractor permits{ex:
hauling,erc�sion cs�ntrol, stc�rm wa#er, air quality�fugitive dust).
4) Ga+nduct airField safefiy training for su�consultants.
5) Access(and�irFeld escorts if required)to#he site ft�r Gt�NSULT,4N'i`and subccansuktants.Airfi�ld
esco�ts�re anticip�ted for surv�y work in proximi#y c�fTaxiway B and tying into runway e�d
monuments:
6} Access to the site for prospmctive bidd�rs during the bid advertisement.
7) Transmissian aaf data t� CG►NSIJLT�,Nl'such as reports,"as-built"draw{ngs, �nd other informatic�n
related fia�he Prc�ject.
8) Review�f draft documents from Gt7NSULTANT within a reasonable amount of trme,including revdew
comments pr�vided in writing. OW�IER review comm�nts from various individuals and departm�nts
shall be,provided in writing and shall be returned tc�th�CC�NSUL7ANT as a singie package
eepresenting UW�NER's review comments,
9) Prat�ction�f digital inf�rmatian or�ata suppfied by C(�NSI�LTA�iT fr�m eontamination, rrtisuse,c�r
changes.
SEI�VI�ES Tt� E EXGM�UClEL�
The 4WPVER and CdNSULTANT agree that the fc�lic�wing items wili be excluded fram this scope. If thes�
car any acidifional items are added Bc�the�C�NSULTR�IT's sccape of services,they wiil 6e ct�ns'sdered�x#ra
s�ruiees and require a ne�otiated fee and an amendment ta the contract.
1) Expert witness testimc�ny.
2) Modificatian to itandards(MCJSj is�xcluded.
3) Grant applicatian assistance:
4) Federal grant claseout�ssis#ance.
5) Prep�re issued for c�nstruction dacum�nts.
6) �0.ssist in adv�rtis�rnent fcrr bids.
7) ,4ssist in bid ds�curnents distributican:
8) Rssi�t in the bid opening.
9) Any environmental�r�alyses.
10) Sform Water Pcalluti�n �sev�nt4an Pian preparation.
1'1}R�productian and distributit�n crf Bid Uocuments to int�rested ca�ntractors.
�
Page 25 of 2Z
Banton Field Airp�rtt
East T-Nangar Taxilanes Pav�ment Reconstruction end l3rainage imprr�vemenis
Engineering L7esign Scope of Services
Februery 2G,2t?2S
�2) Environmental permitting for Federal(NEPA)and Stste e�f Califomia.All required environmental
sfudies and documentati�an tea be p�rformed under separate cc�ntract.
13) Constructis�n Adminiskr�kion and support s�:rvices.
SC E ULE {7►F �C} PLETN�
A tentatiue d�sign�nd bidding schedule is included as A+ttachmenf 4. The scheduie assumes that the
OWNER wiii i�sue a design iVotice to Presce�d(iVTP)by July'�, 2025. Sased an the current FAA grant
schectule,the constructicrrr of"this ProjeGt is programme�d for a FY 2U27 AIP grant.Therefc�re, opening af
bids is expected tn c�ccur April 2C�26 to align with#he grant applic�tion timeline.The tentative schedule
includ�s design�nd review periods and t�W�IER milestcanes for advertis�m�nt and award. Estimated
duraRions for each applicable tiask is sha�rn belcaw:
7�0►5 9
1) The es#imated duratian tc�camplete the preliminary submittal is eane hundred and forty(140)ws�rking
days after r�ceipt af NTP fresm the C?WNER.
TASK 2
'!) The estimated duration to complete the 6t�°t� submittal is sixty{60)w�rking days after rec�ipt c+f
QWNER and FRA camments c�n the preliminary'submittal.
2) The estimated duration to complete the 90°/n suiamitkal is eighty{�0}we�rking days after receipt of
f�WNE�t comrnents on th�60°!o submittaB.
TAsK9
1) The es#imated durat3on to comp4ete the#inal submittal is within#�venty�20}wc�rking days aft�r receipt
c�ft��NNER�nd FAA cr�mments on the��°lo submittal.
T�SF{4
1� The estimated+�uratic�n of bidding is thirty(3Q}wc�rking days after issuance e�f final submitt�l.
2) The CtJNSIJLTANT witl c€�ordinat� bid administratic�n mileston�s with the UWNEF2�and FAA based on
t'�WNER standard prc�cesses�nd F�1A grant timelines.
3) The Ct�NSULTAh17 will submit th� Ftecomm�ndation of�ward within five(5}wcsrkin�days after
eeceipt c�f the bid preaposa!documents from th�:(�WNEFt.
aesign dur�ti�ns dca not include tJ�hIER and Ft1A revi�w periods unless stated.tJnce the design NTP is
reeeived from the t�WNER,the CQNSUI.TANT wil9 prepar�and maint�ir�a Project schedule th�t includes
estimated C3WRtER�nd FAA review periods,
j Page 26 af 27
8entcsn Field AirporP
East T-N�angar Taxilanss Pavernent Recvnstrucdian and Drainage lmpravements
Engine+�rrng Design Scop�of S�rvices
Febnearv 26 202�
C� PE 5�TI4 F SERVICES
Payment for all w�rk c�utlined in scope af services:Tasks 1,2,3,�nd�#shall b�a 4ump sum af Three
Nundred S�venty-Six Thc�usand, C?n� Hundred Sixty-Two($37�,962.L1t�j doifars. This fee includes iabor,
rnaterials, expenses,and incident�is necessary ta complete the wnrk as describ�d herein. 1"h�design
engineering fee is includ�d as At#achment 5 tcs this scr�pe af servfces. Payments will�e made morrthly
based on the percentage of work camplete.
Payment far any additional services requested by th�CITI'will be perfarm�d on�time-and-expense
basis in canfe�rmance with the Mead&Hunt, lnc. Californi�Standard Billfng F2aCe Schedute{2025)
included as Attachment 6. The Ct)NSllLTANT will estabtish the budget far additional senrices prior ta the
start of work and may not exceed the budget withauk written aufharization from the C1TY. Any additianal
services must be authari�ed in writing by fih�C1�"Y`:
Billing fc�r these tasks will be brok�n dc�wn on CC3NSULTAN7�"s invoices as foll�ws:
Task 1: F'reliminary Design{$195,440.00)
Task 2t 60°lo and 90%o Design ($131,738.i�0)
Task 3; Fina]I�esfgn($26,492.00}
`fask 4: Bid Administrafion($22,492.OQ}
�ND O�SGCiPE
Respectfuily submitted,
��AC?8� HIJNT,1NC.
7eddy C�. Ramil, P.E.
Praject Manag�r
Attachments
Affaehment 9—Project Graphic
Atfachment 2—Topagr�phic;Sunrey-4lmits
Aft�c:hmenf 3—APPraximat�Borrng Locaticans
Attachment 4—7'entative L7esign ana+BfddEng Sche�'ule
�4tfachmen#5—L7esign Engineering Fee
Affachmenf 6—Mead&Hunt; Inc: �a/ifornia Standard Bit/ing Fafe Schedule, 2�25
� F'age 2�of 27
Attachment 1 - Proj�ct Graphic
a
N
Q
ma�
�S,. �`�� ;° '"l; � �§��,4 � �� h
r,� `*�. � ' W
`� t +;� �°''�k', . .w
� � t �� i
� .� �� � r v"v�Nt" r� .. -u
��
� ��� ;�� � ',; � 5 �wLt
...�'"'� a � t � 1 ; ' :. .
p z�� ` S, �l'�C,i �� � �,..y�'j2*.
� ���;� � � ��� � .,�n>;.
�:a l i
�, � ;.
}� j
� , . .g. u �' 'L..
� v
�� � i � � �
� f �` � �
,�"'ar t^r �'�'�.� � ;
� ���' "���'� � �
; ? t
� �� � �.� 4 �
;�'������ � � ,�� ti"
����� � ��� � �� � � �,�� �
z � � ti� � r �� w
� � � ,� ;
�� � « �.� � f �, �
3 � r� +� ` t
�;.; $•���` � a
�w�.t ���� s`—
w
t7
��� ��� �
�'��� ��° �
. � �> ` � o
a p
t �
¢ ; ?
Y� �
� �
Z W rtJ
�� �X � � �
� } �
W
�,, � . � 4��7 � Z.
ti
� � � � �
, ,,...��C �
f � � ��a+ a ' �' �� �
ti
��\ � � fi �
y �� ����. Y S � ��
L � ��y G1 $U`"
: ��� � tIr ��
� � j ° �. ������ � � d.
� j
xr.�
� �4 vy� e�� �' � ��. ~.
W W
ti L�E� , � �. ..a cr�
� �� ��
c�. � �i } �. � � t � �. i—
�,` t,.. ��
. ;, ,,.
F`%° ��
tr: y��
�� ��' �� ;
�� z � �
������s r � �
, � t�i��;� � �'�.
,�4ar ' ,� t�i�.. �' ti f�a '
s � � A f �� ��,
��: `�� ��"�Y ` �`�' Z'. "�: �.
� � '� {Ys�.'c" L�`�i`�''�` � tF'���k �'y"�5;�4�`•�3`���.i ��3, � �. f�n� ��.
�
Y �� �Q
� ��'�'�,kk�k4����� a�'`s .' '�� ��;.'��;c�.,��ba�..,'y��'��;.``,`e e rtl`�`��}����£�� �.�t� � ,
¢� !
� ������4 F � �� ����� �� � }� �
�. ��. k �\ �� �' � m
��� �� .��,����. �,
�Sk `«,"� `��,,.,.; d� ? � � �.
��� .��"s�' � ✓ 91 � �i�
$� � � ;�r '" �a��`a\�:tl\S��; � � '�. 1'., �� �...... .,
z tr �� .
� ��
� ��� `� �� �y j ����, ����i pz�
�. :;����,��,al��T ,�f"'.1� ,M.�.x� ztlt'�°:ti. 'Ug'a k.
� ie�
�� 2 � v`i � �C�`
,� � �4�!.�� �.� d�. o.
"�, ,, Ci t�� n
w� �
�� j�t t����'� i� �n,l���,� .}�a,�:r� � � ���'Y�4h�i ��$.,.� ��. �
t
�' j� L1� �� �� �C�!
N
� � a t �?t'.. �y,'� �� ip T
��� '�' �, i��i�l:y, n+.� L3 CLl m�
��' ,,w��� ;�����
���,� �� ���°� h
�� � �,. �&�.w � � ��:
�_ �" � ��t ����� �� ���'� f J
�N� � ���itin� `j)C�W�. W
�p�*
�S' `� �F � �
� W
q �ti .Yt �� �,�'
t�, � � � �,,,��,�z�.. �� � �r,. � �.�.
� : �#�`���`: ?�„
. °"""a,� � .,.�.A ..�„�.t ... �. . ....� ....,W a�. '� �
� "��r�.�� ��a�w�: "� a�.. ��,�
� � �i x � `�
; u.
t �� s �� � �u o
} �r; r� � iv
F ���� S, � �$�� � �
� �`�`�`Sli�°a3���� X Li/
2
.+aa �,���V�69 N �.
ly U�Y��{" A��
WG6 � �.
v )
��i ��, � � �"�� �
`4 �, ' N�'���� �E.�tl
� �� ,
a,
�� �� �8" Y
�" mw �
1�11 d" v �
����' (
d � � . $ � � ���... .
"��� � �.� �� � �� �
� 3.,��a��n �� �.' ' �"
� � � � �a �
� � ��,.. ��
� � ` �t��
<-,��°�a�� � �' �,��, � ���:,� , � � �a�
� �n:
� �
� ����, �..� . ��
G fi � �w
��> ������,���1� � '� �d�+n
r�� ���� * �az
��`� ��s����t����� � '� � ���
��� �� ��� � �" ��; z��c"�y�
� ��� H ` �
� w
�:�� � �� ��' ���
f :� �� ���
I � . � p�a
�> � ��, � ��
4�, � �' ��� }—��C?
`�"�'" �tus p,`v'", � ��Q. .
� ���� W d cn. i
�
��`s . �+ 4 �¢{ r
., g.. ����i44��..i �qf�k���"������e�����,��, � `� �
� � � �.� �,< IqNIWW�'WIXN4Y�"G� ,
�' ,� � ��;a� rc� �,� . ; I
:`t� � q t
� '�' ; !
tl ��� � �
� �
Y
� �� � �� ,�
� ` ;}s �� ° � k;
� ��`'�� � � ���� �
� �'� ���� „� � ,
, ;t,,,� �,� a�� �� � �
� � � � �. w�� � �� ��;,� � t
��
� �. �� �� � � ���'�� � �� a *� �:
� � � ��>�, ;
� � �� �� � � ` � � �
� t �� ���� k�� �
� ,..� �r a�' ����' '. o �
� �" � �ik�`a',� �i. � �. �.`i�� �.:.
�.. ' } �a�` w�'�� ��� F���, . �
� t�,
� �� ` �';�i�� <a�v������w'�fi�� d
�' ' � " � � � �� �
� � �ae nc � � � �� �������� �'���� �� �"" 1
�i� �-� � y�� �,��,�� �� a�
� � �c.s �� ��x�i��� ���> �A C���-'
�r" , �' ', t�� ���a��� ��a� v��w 2��" �
� � o� :�,��s � �iy�."; a�,�� "��, 3 a a, m. �'� .
�++ k,�; � � � a s � �. i �� o
c�� � g� i� � � �� ` t�� ty,i� rn
� " ' ����"���i��1�c���� ��t �� G�:d �
+ . �V
�4 �" � d�.�'�`�".aS'`���`�'*�'"�Y.k� ...� �. r�� },j_�.,' u]
,A�' . �� "'ka� ,� ' Sc �t1 'p"�� �� � �g��.
� � � �� ���e������b� �'`��'1,,.'� E Q �*.� �� �.� rt3�
'� �. n. Oe� �W �t
� i �"� � v �, � � } ` z �t— � t?lYS m �
q�� `�` �� ��, � ' � �`� j ��
`a�,��\ k'� ; , h A+ i
bu.. � i � � sa"Y' � �� � � �" a�,��� ��� � tL"� F� t
� � �
�� .�`e, � �� � �+`� � w 1� '(y,J i— t—n�. � ��
» �b� ..�..�� � �.,„ "'� ��4��� ��.��'�� w �..�; 4' J:� �[��Y O w t� �.
I � ��` .� ,�tc'� 3���`4�������" 's����������� s � r
k „ *����g ��,�a��"N�4�i � �.� t �i.
� �y���� ��E � v��., f
'�a .ss� t ��. c�� _��'�� �c,. � � . i
,���',�` rt� a� � ��
..
� _�f
, �
L--._... ._.__�_..� _�.. ��....�� . a..._. ...._-.. . �_"_ ._......�...:._.,_J.
Attachment 2 - Tap�graphic Sunrey Limits
�
f a ��
*aM�' � 3 � � � ~ �
� 3 � W
1 1rr c-.; }S � ��"i"E tu
�,. �a�� &� "" 1�, t an M ; '� 2
;� ,. ' 4W �� �
t� . *.` }' �, a C`��.. � ,� , � N a:,ir .�� � �f�� �.
�� ��
,��'*' ej} .:�.,�Y 4� ,� � � �� 1"° � �
� �
�
� � � � �i�
� �r'����t � � � �` � �
��..4.ti, `�,; sa :a �,��? t h... � � ,7 t,�cs;
_; �4 � a ° t�� i` `�i`.
�. �.�� w ��,,
7 � � � °
� �
��� � @ �
�,� �`��'J j�,v���� � � µ� �1 ~ �,
�s� � co
� ����4��� � '� �p��` � y �" �° {��. W
��� ' � ,�`����� � } � �
��%, y� ,��;� � �. � ,�� �
� S 4
�i, �
� ? t , ,, a
,� � ;� . t� � z
��` ' �'�r a
�,„� �
� , � '� �
�. � � � �� � U
4��� � �
.,. � � ,r �
�
a � ��
� �� �� ; � � W v
; � � � � �
fi � � o
i
� � � � � �
d�t,� a � O —a �
� ���, �i`� �t�,\ � � � }. �.
�u � � � �� �� �
� �.. �,� ��� z ,�� � t ��
5�#i�.`�,�,�ti a�r; �w cd��',=..�.�.� ... �: �
`,� �'"�';��i� . 4i'�' .e
W�'' r `, t� t ts'.a�.`,y� C�I , C7
� � 4��� � � �
t �� � � m ,, � ' u.+
�� � c� �' r=
" �.,4x� '`'� LLl � �.
�9S
� �� ,� � ���.���Pr '� a?. � J. .�
9
:�' 1 e . � .t, �.
��,�'��' '� v�f�"id? a � r�Gt�"��� '��.., .s��.
;i i' �qa ;�m W
� B6
��� t �'X. ��
} ^f���i���� �8�G t� _
� � ,� ��� i�y � �{J:
���°t� � � ��� ��, a r��
a' r''=� U y�@.
� q �...`�2� � ?� ��� Q� WS
s� `���� �` � � ���
d ;'� ��� � �. l �''�' '���' ;
� `�y(�v�i�`Z. 1 � �`,�.0' '� `� \ ��.. . � :.
sr., .�P �,�.�W,,.;e��t ��1 .;� �, �, ,�`.�3zt4.�`� ���r�'���t..`*, � �h� 4�'.� r �.�
� , ��
� . .. Zq � �& ��� ;
� . ``�.*.. .� �..� 'i, �:'� � �
h i7
� i,
t t � v S
� ' '��� �tiH �i�``4y'l�n� aiti��'��� � j��
� � , �, �
��
�� � .< ..� �, � �� ���� ,,,,`. ��,���, "�t� � � ��
,� � ���� a,«;E �i ���
m.'b �; ,��
� a�` ��� CJ `�:
R. Y. �� ti''s,�l�,t' �a,� ��LS.
� : `�s�.��`�. �` � W� �
� �l � ��", p„°d M
� � � �, �y'. u-�'�^ �
�- �o � " �
,`�'�, �y � O� p �
�Z ar �
a �' . ��"<i\4 � �.s,��- ��� �W � �.�
� ���§�*�g� � � & ��� ��
`� y� �t i ��`y
�� � �,ti*a�,. � � 3Y � z�q��� ���,�iyx!��!i�l � ;��
� �� � �t
�,,
� " ���� ���
����. � x;�'.�ti >r
r, ��" ����3 w��� a � ,r� u�i
�� �y� n.�.... ���.� �o�� d�
4 . � �m�,� �� k�{'r
�
f� �, �� .��"�.
��' �� � ��ng:
� � l � � � ��p '��.
. . � . ..... � • :�.
,... :#w�"� . 4 ..�.. �7�f�2 R'�`",lrn.'�S.. . ��. . ... �51�"tS�� ..,.. i�
�
Attachrnent 3 - Approximate Boring Lc�cations
�
� i � �
���� �� � �
w k
. 1y�yo��v^
; Q �� w� ��,'.ti .
�.. ' ��ti 5, '�,.
�, x� �,� i"�,,r, s' �1
�� •� �'��`�� �:,
., y��.� � � �: ��, ����.
t 5 1,4
\ l � %� \
�� � a;� ��5� ��� � � �.
t
n'a� ��„' '. *, S S
+`4�'ei.,,, :� � y� .
��`. •• t� � iL �
��5� �� ��� Ty� ��. � Yti� �.
`�b`��a �4'�" � , w
�� �,, � s �+� � F w
K '� [�' `�? O
� � �
�ss ,�. `� � �
R �,t"� �, x�,' �� ��, � �� �
�� ' � z
t�' ��
�' "a, i. �
0
�'.:, �,, � C�,� O z
��1� �;.. � <
�..,'� ,.�. ; � 2
>, k. � O
s t
<i�, t,'' "� CµS
t, t > �
�
'l � � W h g
Y , � �� m � � �O
� ' Oh
" ,, , �; . ;� :r' � �. ..� � W�¢
# : �t ' � �� W t�6
� a � wJ
�
,�.,:<. : ' � �` � w vhi > �1(z
� „3 �� O
� `t�lr ��� Ki�� k , �: 3�'tt�'* e�� � �
�. �u��
, ` i � . i�� "�R�Cs��,.4 t �.,�5���� ��, � *.�? m
�rm ct����� � '�t:�.l�'i",� i � � � � CL
� .a3�,'��tt,>a.�.., a �� d�
�k �� � � �3t\7�, USdS 4;'.��'�3 �.. � � �� .
�.« .� � �'�5�� �„ W �.W
t� .�\ „, � �. h�
+:Y '�. �� '� � � w�
y� i ��p. +J L7 X
�-�:- �
t �� Q
,,.� J� ,, i� ,.,.,, �t�.
� � � �� N[L
,�, ..; �� ,.� � � �.`�} i „' l�t �
.. y
;i� � � ' ' . �`�' m
�� y
�Si�,, j
� r,' �}�•,� �.
�
�h. �
� S .. 6 4 � �� 2 . �� 'l}: �. ^"L.'x
? ���4� `�¢��;�, `�����'���' �� ° ��
� �
x
� � �*��� � ,.. ��� �a`� '�S�
:�
� '
b� �„ g,
� � ������k�� t �� � `�. � �
�
��� �� � � � � '��� �
� ' �
w,;�x � c �e
r`�t 'iJ � �;,i�,.;�.� �� , � �. � . �`�� y���iY <:
� � �� �� ,� �� ��
� �
� . ,� 4` a�`e `^��,�,' z �, �ti�'`�. �3�. .
g 7 � �
y� � t �
Y '�S�
� x � �� � a� ��srk���`� � � � ����
� 7 , ^+i�'��7��de�'1��y4�\i�,�,�,4 t��.��4.�,e.� �t\ fW��
Y � ��� ��
� �� ��� � x ,� z�a
Y Q� �
CL' „d
.n " �x ���`��, w d M
� � � '� �y� �
7i (.(.�L
v � 4
� ��. V� � N
� � ,' �
� � ��
� ',� i�, `��,'hHf�� ��" C�LYI M�O
�� 1
�� $ `"�" � � j� �' 'i�s
�� ��� � •-�r ,��
�� � �� �$ ����'
�
� ����1 3 i�N`�t �}4� 1 C 3
�i'; !te6 '�'e � � �,3'
... � ;
�, � � ���
x� . ty � �
ti' � t{ i`t
�"" 4;�� " �a �1� ��� �
_.�. a,.�
Attachment 4 — Tentative Design and Bidding Schedule
� � i
Pr�liminaev Protaos�d f�r�iect Schedule
�enton Fie1d A,irport{Q85}
R��onstru�t Eastside'T-H�ngar 7"axilan�s and Drainage Impcc�vemenik�(design}
The tenta#ive deslgn and bidding schedule is as fo#ivws;
1} Contract and IUTP July 2i�25
2) Project C�esign Kickoff July ZQ25
3} Gec�technical Field Work August 2(�25
4) Topographic Survey Field Wark Augu�t 2�25
5) Preliminary;�esign Submittal Nov�mber202�
6) 6�°do[?esign Submittal (and draft CSPP) January 2Q26
7) 95°la Design 5ubmi#tal February 2026
8} Final t�esign March 2�26
9) Bid Advertisement March 2026
1t�) Final Grant Submission Apri1 2026
Att�chment 5 - Desing Engir�eering Fee
�
� � ��..... 8 S�& & 8 �°$j8�.� $ 8�8�'8 8 8 8:I8� $i8 8 8'$�$ $ 8i-� 8 8 �� $ $! ��8 8 8� I8'� $�.. 8� �
w u �i3�� � � �; !�� � �f�'�$�� d �I�� ���f�� � ��� ��� '� �i l�I� � �� �i� � ��I� �' a
� j_� _ � i � �� � � �_ � w „ I i .. �� ' � ���
� ��� ��� ���, �� �;�� fw yiK�w, ��, ��w a� Niu
� �,� i" ����� I I i , a � � ss i � ` � '�, ,;, � ,� ,; �� ' �i� �
�� $ � � f ( � ��� ' I I i � � a � + � i � � �
; � .... ' __. � � I I I �
f «.
,
�� � e � � � .� � � � �: �� � w« � � � �� �
� � � � i i � �� i �
7•. _w�
�,� _ _� I a ..
�� —"� � i i � � :��, � �(��"� -�--.. _�^ ��
�
� ea�aa�us � S�. I � � i � T � � � i �p � . i � � I :. � ! I� ( ��.
. i (
'�� � � � � I t _ � � ( �� '�. �--- ��
� . ��;_ �_,_'
� � �
� �
, ,�,��, ` , i ,. , � i I � r...} i �. � _ -�
.���,���� � � ; � G
f . � f I h I ' �
��w� a I
�_______ _ _4,__ ....x , i. 1__. , __ � � ,,. - -
, t�a�„r� , ( �"�` ,�;i tl � I � �� � j- '-+ � �> � � _ ,
: �.� � I � i- ( � �'°�� �_�_ � � ��� � � I 1 �� �.�_"_
�t�� d���i� ���i i ��� ���f �.�_ � �»,�i i ! —,__,_-�--� _� � � �
�� . . _ , _-
_ �� ,� � � -�� —, , ��, � � , , ( , , �� � r , r
��� � i i f _ �� ,I � �� ,� i � �s. �ai ���.i i ,� , i � ,I ' �� �� � �.
f � '� � � ; � i ; '�: � � ;= I � a ; �
�: ��� f � � I � � ;�`; ��) ;�� i � �� � �� � ' ��
�
� I � � ' I , � � ) I
i � � s� i '
{ i ' I
� � _ ,._� ;� �, �w � i�f"'� � � ,- "�+:—'! ��-�` �i � � � P�.��.� _�__: _ � , { a �� _�
�__
"� Ua�f
.� I I � � � � .�I I I . � �
-
� ��� � �. I i 'I� � �� � � I �� � � I l I �.
«+ [ � � 1 i ' � � L I � I i I ..
_ .��._..___._ : �_ L..__ __ . I � --
�
�. -. - ;- - _-�--
_,� �_ i r_-�..g , s �� � � ,--�
f
�� '� ; � i i , i � { �� � i ��� ,�:�, I � i ; � �,�
, � I i �
s ��: t '
� +�w a w.umys. i�" � � � � � � � � ��=� � � � r n� � � � � i x
�
i
� �
�� ; '..�w i I � :� � I . ! I ����+'
;� � 1 i�� � I .� � f .I«�i
���Isa� s���8 s���s; s �is,�� s a��,�� s:, � �; �s � , � s a s�s� ��s�4 si �s�� � �
��:� �� 3 �, � � ���i�r �in'��� � e �;�i ��:��� �� �I ���` � �� �i � �'��i��� �I� � � ��
� _�= �� i ! .. �^*��r� i � ��� _� w� «� �mIN � � -� «I" ��
a� �� � i. I i �i ��a , t � � I I 4�� � � � I � i
�� � � � � � � � i f
s w �, �. �;.i „ � i ;�, � �: � «,��.� � i � 1 M .
:_ . __ :_. .�.. ..� _, t� __, �:"'�� � (( : . t -
�nwa � 1..� � �.. ' � I j . � f � I ( '� I { .. � �
w.r.�v s t . I . ,�,"' i I i � I � I ` i 1 I i i. _� w � �
�
i _ i I i
•+11rN NNµ+P4� . [�.�R� �I�� I .. ' I - . � I I n
� 'i �m � � 4 ..:j ... �-':� �y.
. . i � " r I � ... 4 -G
� N 1 1 Wol �..� �� ' � � � I � i � _.:. i ..' i I ..:� p �. -
� , �._—`` - -- - �-----+ - ---r--i- � � .;�r..� � - ;-_.--.�-"�---.,�P _�_.._.: .._.-- - I�;..
.- � � � _1�.�_
� ' �„ '� �� + i 1_���. I�{� �_y I ; 1 �_ ' _�
q �� —� —� T_ i- � , , � � �, �--;--- r--- , r---� —� ; —i—�
�_...Nn<++�6W : �I � � �ra
L°, i....- .;._.. �.:�--- .:_.:�--� � ;:.s -'_.� '� x--' f - ' a--- �... _L_,.,_ �.��-a. � r� i
! � ! i �� � I I � I i ( �� _
� ' Ii7+eaW�3: � � � .
I ry� } {
y , .� .. . ��� I I p �. �� l��im�i� " � �C I I .3 � j
._�_... ....,e� . .
I i_.. _� ,t. _ �. � � ��� I � i i� �t .i L . �. I
v L'
� ,sm,t�nasps�� � � � I �� ' � � 7 I � t � � � 3 � i f 7 1
_._.__
I
' j � _4�
� � ! �
; _ � . � F � � , fi f �- ; _ _r_ �� � � ,��� ,_� �� G F�. � � _
���ti��.�� ; ( ' 1 �� � < <' _;_I � � � �� � � ( � i '
.�_ _ ._�_. _.. �_ _ .�.��� � � �_I � _
+ 3
r
,�� s`s �_ r r_ � _� �_ �
��,,.��� � ,� , 1 � a �(� � p � � � 1 � m
,
iI i
_._ _ _ ._ _
i �
:�. � ,�«�,mH�a �� �� �. �,I ��j� n �b�� �:le� . i � � .: � - t � i +��.
�. , _�I ._..�_� � � � A.. __-�_ � _ �-_I� � _—'— —_ � _�_.�_ _
'°°'�"� `� �,��� '� rl�,�m� �}-_ --�.� E __�-.� � -r._ , -i� �-�-�—r��� �
- � ,� M � �, � � M '
.: ,��,a�,�� - _ � a
� � I
� " --j-� _�___ C:..� _��_. f__..� . _ �.�i.. I �,. ` i--- �-_. ..l_� � � { �
� i
,::,a�.��� � � l � � �1 �� �_�_��_�l _ �. �_� i� c � � �-��';_ _
� � � � � i � � �� , � � � ; I , � t , , ; � �
� � � � I �, � �� � I � � i � � I � � 1 � �.
I P �' I � � i I ; E�� � � li i i I � I
i i p �
� � '� �� i � I j � ; ( ���� i � ( �
� f I i ' � ; � � � � � I �� � � � p ; i �
� � � { � � I ' � !�� ��� i ; � � � I i �
, � I i � i i � � ' � I 9 � i fi
Y i � � y j 1 � 1 �.� � ���� � ` , � I i ( , � � 1
, ( � � i � � �i� � ; � ! �_ �7 I � � � �
� � ' �
,
� �� I ' � �� � i� � �j�' � � � �;� � I i �f � '���� �� j ,� �
�
'� � ��� � I ! i �p ,'S I�'� �,s � � °'� �I� a r� �� � � �I t ��I '-9� � �
� �� �� i �e� � � ��n 1�� �,. � rc .g � I�: i���.�`� pI $$ � �
� ���� � .����i � ��� �� �� �� � ����� � j�i� �� � ����� ���� � � �:�� � � �. �a'iG��` �8 .�I
I $• �� .i�� ( $f i o,� u� I
� �j� ���I� �` �� � �i ;' !�,��� �I�'� �I�;� � ���� � .�'.n �i� � k ����i�� �I� � � �
� � � � � ials �e � ��1 ai�,� �'� � ����� e� � 1� 3 a � w
� �r� �id� �j �1��� {�j'�� � � ' � ,��I ��;:�I� �,. �;� �`a s� � i'��� " ��� � ' ��
�j� ��� �������� � �,� � �;��;mt���� ��� �i��l� � ����'�����`��� ���(��� � �:��: �I��� � � � � � ���� �
. w. �_i
� � �� I t �* I ' ~I ..� ;.��' �-d S i � a a. � �� _.� " _
___ ,_ ,_.. ..' ..
� {I I� ��'!�� ;r;� K;���,�!�+� � �;��w ' .;�� .I�C.�- �;- —.IR;P ���,� � �I
— � �
P r _ .
�.. . . .. .. . . r . �. .. . �". k
� � I$�S � 8 $I $ 8 $�8 S'8 � �.��$I � EI��� $��.I �'$ $ $`��$ �I�i $'8 B��E �'� � 818�5 , $ 8't.
� I^�� �(� � ���� 'I�Ity � � � I� � � rvI a �4� s � a �I����� ��� � ���i�l � al �
� �� I ' N N7� ��ft o .� I N�� ���,I Nt:IN�N�ie v �:` N` Mi ��N r I ir# s .
� � ^C :w��i ln'wi'� ..w ��n� I I I t I. I � � f i ~ I � �I �.
I t �
� ����� wi � i��w3 � I p� �i �� � � i������,w wf ( �I� ni» �» �a��l�i
� � � �i i � �� i � i � � � �� ; � i � � �� � �
� ������ �f ( �I ,� ,� ( � ,i � �� � �,� ,
; �� � � f � �� � � I C i � 4 � � , i �
ia t ��.I�^ �^i_ "'"' "�~�"G" ' j~ "�"'" f � ` � ' I ' II N
i � i.»� 7»;L� �^,
i ausnu�...._-+=I - I =I � n-I--'-'�=' i-la + ;�'1--r-��'I- =I- �-i-r"`- �=-= -�=� ,- � -
_ »
( � � i � I
i��t�p�� I +. � � �i � i I i � �. � � (. I i '
,�' I '_' 4 � � I �..._:_.�, � I ��__ .�;_..� I I � i .�:... I i � �.
I--� , � ' i
�� ����, �� � ; ��# �- i � � ' �_ i �_, � ; i �._ _ _' �_���W �
�����.,. a� �� � � �� � � � � ��.-.' �� �' �_ - � � �
,9�����a ; ' I ' � _,l_ � � i � �_.. . R
� t�� � ��—i I ' 1 { I p �1�1 I � � �
�— -�°'" �� �-�- — � _�_� � � �_�_— ;— � �- � 1 �� �� � i � �__ _I � �I_ i I
�w , �
r— _��,_ �. _ i ._,.'. I � �1 � i � � + .�
��da�+�ai�+w I i i R � . � .�� I � I � � �� � �� � I � . d � �
� ,�. .. � I i ���. !^.� .I' i .,� � I � i i�. i. ! �.. i . � � i � .
� � ' �� i �! j �� ! �� � ���I 1 ,E ,I � ' •s�.� ,� .I� � i��� � �� f � .�
� � � � i � I ; � ' � �� - i � ; ; ' � , 'j � ' � i I �
; � �
; * � I ( I ! i " , � , i
�
� , � � I I� I i
� w i i i I , � I.
t i �
,� � . w �M�w _°"� ! � '"') _�"' ��- � —�,"�'" - - � ( ""� «+ ib �w.k
1 � w � —�—~ "�� wf��
� ' �
«�� �Iw, ; ���(� ��1� �,� � � � �i ��� � � �, I , �
: , ,
'�""°s , , ; 1 I�� , � � � ; � i� � i �� ' �
� ������ I � i � , �
� _. � ,__� _� _ , i ,—�--1-- -� -- ,—; ��:,� _+ � '_� i r_..$ —(� .�_-�--i—�
� � � II � i � � )
I � � i :g' � I :
i
� ���: i � � i-- � i :� � ( � � �� �: ( ( ;, � � � "� i � ! 7 �
�riwM�M�4s 1 i � � � � i I � f� f � i 1 �� i ( ' � 1
i � � � � 3 C 1 � 1 � � I 3 � 1 � � � �� t � �
� g� � (8 ���� 8 8� ��.IB#$ � � 8 � �:'� 8 8��8i�I8 ::,$�$I8�8: $ � 8... 18�$�9 � ��� �� �I$rS18I � $I �.
� s� � � �� �� � �����I� � ' �� � � �i�) ��:����� � �I I�i�,�l�� ��� � (�� I� ' �I�I
� w -� �iN �,��wi,n � .� � a ai � �,. �r ai i 1`� � i
�� ; � � � ' ' t ; ' I� ! � ; ' �
i � ` � � � � i �� 1 � � ( .. f I
�
, , ,
i i ( I
� w � N t.. � ��, � �:N,�� � ....�a� � i � �� .�.� w��_) '"_,�� _i�.�� (�� '"I
'----....._� . M �, ' �
, , __ � - I —i � � - - ; �
� leal/ap I:� ..� .�
� L�, w .� �,. _�_
i� ��� . � � �. ��.. � � � � � �� � � . _ � �� � � �
.._ _�� ;� � �_ _"_
� :' ;-� � � , � ' i � � ; ' , - �.i� � _) �� �.�� � �.���.��
, ��.� , � _ �
��— ' �� ��
�.�,�.��, � ` _J � �—�—t_.� ' � �_�) � �� -- I_ �_� � �,� �I
� _. , __ _ �
� �ni���w+l ��,�i i I i—��-�-���� ` j �.�:�� � �3 �I=I ��I����� a 1_� j •�+p � �� �. � f � �� _�._� $�
�+ ��- ,�,w,�a ��'I_ j ��,, 1 �� � ^ � ; � i ' � � � � �� ' f 1 � ' i
m a
,� ^ � � --
{-� i_..�"_��_f_i !.J I__�!J� � ��_L._ i � " � i_
, , j
��..._",�«,�a ���i � _._.�__ I t _t���� � � � �_! �� � � �� � � � i � W�`_" ��
�.�w�+� '�i i � �� ,.i�{ �I������� ," ,,, � � �(�� ; I �
� _ � N �' � � i � � ,w� , �N <� � ;
r _ _ ,
_ , , ,
�.._ � � � � � � � I 1 � i ��� � l � � � � _ � ,
--- �
� .**w�uw� s�� � � � � ( ��--.�� � �� _ � � � � � �j� -��i ��
� � � �
f---� , �--—� � I �� � �L � ' 4_
� � � , _{ �
,—L--- �
� � � � � � � ' , �.� �� � ��<i > � i
- ����m a�a�r .��' :, _� C` � � .._..�_� ___�� � � � .—
� __ __i_S. I, � � � � . ° E �—_ � _.�� I
I a ' ' I � � e i
i� 9i � � � I � � � � I � � (
"°W`�� . _�__. I i J l I � � � _M �� �I � I_
`�
.. �,��„�,���� � m� �_..��,�r�m���« �i ;" " � � ' � �� i �� "� � !�i��"� _�_ a I< � f
��; �.__ - _. -��--� _,__ _ _� _
'°°"in`� a f..� �,�e i��r I��i n l � i'� � -j� �'°� �� ���) �` �
�� , �ti��� ��� _�i�� �I__� � .�I a � �I I__ � -� � �I _I _��.��" I_— �--�— i_.���. � I I— �_
I I I ; I� 1 i t y��» �
�.�„�..,,..��$i�l � l� ! �� �� �-1� � � �� I�� ' 1 I � � �� I E � ' �� �
� � , i � � � � � � � � ; � ! � I ` a � � �
, � � ; � �� � � �� � : � I � � ' � , � � , �
� � f � � i ' � ' � � C ;� E � I � � ii ' Ei i � � ' � � �
� ; � 1 � i " f , � � f � � I � f � � ' , j li � �
I � i � � , , �� f f � ; � rir � � � ; f
' ' i i � f i ! i � F ' f 's i ( � � , j i ( � �
� � ; a � � ; � �� � � � � � � i ' � � k �
r " � ' ' ��� ��� � � ��` � � ` 1�� � � ' ' � ' ' �� � '� �
� , � , � � � � ,
� I
x � I �i �y� I ; � ��i I i I� s � � � � �� I� � } �
� � � I ���� ��I i ; � �� ������ ; � �� � � t�`�'�� +� ' �' � � � �
� _
�, �
� � �� ��� � � � � � � � _��i�; �` I�� � ;'� �'�i�;�� i �2 � ' �C ;� ��
:
� � � � '� �!� � � � ��� � F'� � � i�� � ��� � � � j��� �1�;��� ; ! '� � �
,
��� � I �� ������ r� ��� �, � �����+����I���" ��� � _���I� �d�F� � ����� ��,�; '�
,� � � 1� � �,a . ��o � � � � `� �I E� g I� �� � ����� � � � � 8 � ai�,�:� � �
, �� � �;� � ��� � �1� � � � � A >;� ��� �;��$ �'� � �'� � ��;��� ��� � � ��� �;����� � �
;� �'� �.I�: > �i��€ ��� � y�z � � � �����l� �,�;� �;��� �i � �!�'t�i� ��� � ��� �;� ,��� �'i�' �
..i _. (�, ry� ��-- � � 3 $ �� f "L�� i I i S u�� I �KI � �__� iI i L l�
Id N��hiI�IN •cS.1NiN1ry�Nn:l� inin w w�I iT iN:IN Nt '� "a IJIe�YI.rl7.ai�.N{`Ol�ti�e��l � ..:t:m�nl! 'i.'n ���� �..
� , `^. I ,n:'n' P
. y ;�r i
� � , : . . . . . . . . �:
� �. 18 8 $ �@��i8i�:j �i����.k � 8 S SA�) 8 �� S 8�8���� � ��.
� ��� � � �IaIN{ ��@��f �ry 5 � �;� �m'��� � ��£ �
-ja �
� ' ' � ' ' I ! T� � � �'
i , ; � r � i
� iw! �ki„, �»' '�i i� wi�i �.i�,1� .,I'» �►
� �� � ' ';, ��� ' 'i � '�g� '� 'i� � ����
� �� I � F �
� g � �- «I_ � k--;_a.--F '-� �-"_ �{;_ ,.� _ -_-��!_.-� "�
._.._ � _ _
;__ ( { I I � IrtI ' , IIV �; � i
o��� � � , r
��. ��.� � , �
a_._ �� w � _
�
f.���; ;� � _�- --�--� ; � �-��..�. - ' ; I p�- �--�
�*+�u arr�a�: a � "'
�'�iro�w�r�a � � 1_ _ � _�
�._.C� �-1"'� �
j txa0lt•�uil��w�._ �� � � �i � � . � � i,_ �...�
..
�._+��� ���_..t i � � ' � � �: '._�� m
;� ._�,...._._..,�'�_ I T _`��–�'T - ' .i
�tawy�oa)oe.eiaiv i� E F
; � �� f �� � � � � ; f !�� � f �
' ; ' � � ,I ,{! ! i ' ° ,I ,
��� ,I ' ,� � '� I � i I � ;
� � � i ; � , i ; F j � 1 ' � � �
�
' ��I� � a � r �i� '��� :
� � �� ; (�I j�� � �
,�-- �--.� . i _ _ �_� � .���
1 �'�' '' I I_...I ' I '_
� ,�� i
���w�+ ,,ws � � �
� i_�.. � .�...i_t . � 1 i
_..y. ...i.
' �sosr „� � .�.__ � � ( , � _ LLf_V� _ M �
� ; ( I � i � i w�.�
s �
�wnn a.�vs i � i I ' ' ; � I ' � ' i
; �
i i I i i l � � � .. ; � � � «
(8 Q 8 S S�8,R1 �� 8'8i �8 � � �S�3j � S & � 8I8'� � �
i �� �� � � �I�{ �i I�I� �; � � � g�;�� �� ��� � � ��a � �
i i � a �` ` _ � F�' ' «���
I �� +l � f ' � � 1 i i �'
� � ' } � ' � � ' ! � � � � ��,� �
,$ ul 1 r_°" I"° 1'" C'"" ( ° y�,.:.s _ °��.
lm,�ci� �.._� � 1�� � �
1�W�v � y � . I . i n � � 4..' I , _ �._ �.
�anX} ia't�W+6Y 't �� I { (� � N� �. �
..�._ , ._�__ ( 7-- ,...� ;.,. j{ _ � . ^
, ( ��.. � , s
.� hi wi WV�a � r � �� I ��� I "°I i�'°��� —� }._ �' w I� .
i�_ � � � : � ' I �–4 �.---_•
. _ � ..:.> > i
� ' � � i � 4
; m , <
* x s
� � , � � __ � __ � � _.�� � � i
I �»�� i_i � . { m � , e
! _ �
I � � ,
� � Ildmou�lu3 Y�I � ' �:a� E � rn 4 �, '��� �����`� � � f
�
a �i � I: +�_�a��_�.I___._. _ __ v1,� � �`�� i_:I:.:__
� �_..w{�u�o��s^ [ . � ' :! � 1 . _ _
I s .
�� ._ ( � -I--- r
��--„�,��, �� fi�-- � �--� ; �-{-- �_� � � � j � a
i "�
�„�,� � � _ 1 � s� _�._ � � �
�
_..___ � � --�-[ _ �- � �—j-I
�
_. _
a..�r�� ;s� I � � � � o l i , �
�i��� �
z , r j � � Y � �� I a_i �
- ' .�,�.r�..,�� � l��"a � I �" �= `� � � ���� � � `� �
' N
'�..� � {.�. a _ __.. ���
�.+�ta�3 1 � � t 7 1
f —_ � I !
� w�'�dmw's ��i _.1. f:� � � _ � ^�^� � � �
_ , ,__._. ._._ .., _ � � �
� _ �
� — -, I-.;-- � �_ �._.
;��,�..ti��� �� � I � ` a l � � � °' � 1� � i ��� �_ _
. ' y
� � � � � i i l � �� �
� � �
I ` � I �
� � � � I ; � � i i € � � ; �
I i ! � 1 � � �. � " � � 1 M�
( � � . � 1 I � � � �
� �
j� f� f ia� � � � I + � �
� ! I '�� � I � ��� � I i f � f �.
� �i , ,�= j } I � � I ��� �
� � �i� � � i�� I � ��� � } ' �� � (
s � �'� � �'I � I ,�" �� � I ' �` '$ ' '� �
� � �i��� � � � ,� �� � � ,� � ��
a � �_ �; • , �
(��� � ����� �i��� � � ;� � �f �. � � �
( � � 4
I� � �IrI �WI� ���i��I�I� � � � �� ��� ��:�i� ' f� ��,. ,y�
��� � �j� �r� �� � �� .. � � � �I � t � ���� a,' �
'�i� � � ���`���,�������4� � � � � �,��� �;� � �;�;�f,� � � �
� .. .. � �
�� C__. �.� �� si�I �,�j�s �. r �
� !
'� � �I^ {"I"riWl'I�j"j^�m ^� '� =I'� fa�< : Q� I" w
i �i 2
u
� � �' � � �
� � � ' � �' � � ' � ` CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: June 17,2025 FROM: Steve Bade, Assistant City
ITElVI NO. 4.2(a) Manager
***APPROVED BY***
}
, �� v ��r���,xA
� =,�tr,,,��
n
�
� ��r..� � �
t���� ,� �� h �r�� ,i �r`l`����"?� �rS' �p�z��,C`i �� �� b,f�?,�'�p?�,;�
�s �� � �
sbade(u;cityofredd�� ub`rg ' '' btippinna,cityofredding.org
SUBJECT: ���(a)--Budget Resolu����and Ratification of Grant Application
�?. x
i
`�S
Recommendatiot� ,� � � }
t
ati� ;,
Authorize and approve the follo�����:����
(1) Ratify the Federal Avia����i Admimstrat���;�(FAA) Airport Improvement Program (AIP)
grant application subinl��d by the Alr���s Divis�on in the amount of $425,765 for the
Benton Eastside Taxi-lar���d Drair����;�ro�ec�r���enton Field;
(2) Autho�ze the City Manag��� ��������ee, t������'�����bmit a grant application to the
California Department of Transportation����rans) Aer���utics Division State Matching
Grant Program in the alnount of$8,S l,� �����the Benton���tside Taxi-lane and Drainage
project at Benton Field; � � ��s�' ,<<,
(3) Authorize the City Manager, or �����n��� to acce�� �����exec�,��`a grant agreement for
either, or both, the FAA AIP a���altran� ��,��������ng G�^�����for the Benton Eastside
Taxi-lane and Drainage Proj ect,��and author��'������fe�City l��ger to appropriate grant
funds to the proj ect; and �, �
(4) Adopt Resolution approving and adopting the 80th to Ci���ud������!���tion N�o. 2023-
060 appropriating $448,173 for project costs. � f ' '
,;: � , ,�.
�
Fiscallmpact �� �
�, �
,,Nr r}��
City of Redding (City) Airports Division staff submitted applieations to the Federal Aviation
Administration (FAA) Airport Improvement Program (AIP) and Airport Infrastructure Grant
(AIG) program grants for the Reconstruct Eastside T-Hangar Taxilanes and Drainage
Improvements (Design) Project at Benton Field. The total project budget submitted is $448,173
with requested federal funding of$425,765. City Staff also anticipates applying for up to $8,515
in State Matching Grant funds from California Department of Transportation (Caltrans) for this
project - maximum eligibility local match would be $13,893.
Report to Redding City Council June 12,2025
Re: 4.2(a)--BudgetResolution and Ratification of GrantApplication Page 2
FAA-funded grant projects often require pre-award expenditure to prepare required project
documentarion and certain environmental reparts which is why staff is requesting this budget
amendment in advance of receiving a grant. So-far pre-award expense, at-risk in case of no
award, are $32,000.
Alternative Action
City Council may choose not to authorize staff to submit the applications and to not adopt the
budget resoluti�n. Or, may choose to provide alternate direction to staff. If the grant application
is not ratified, staff would withdraw the applications thereby funding would not be available for
this project. Certain elements of the pre-award expenditure may not be reusable depending on
elapsed time between now and any future consideration of grant funding for this project,
effectively forfeiting the e�i��b�llty of the current at-risk pre-award expenses.
,
i , �
Background/Ana����� ���
;�z s � ,
This project f����es on addressing tl��avelnent condition of the taxi-lanes located on the east
side of Ben����' Field which are ��riorating due to drainage conditions and defe�ed
maintenance �``��ically, an FAA proj��will only consider a narrow seginent of pavement from
the centerlme ��`;��ie taxi-lane as eligible for federal funding in a capital grant, however, because
this project ad���s an over�ll dralna�e�roblem on the east side of Benton Field, the Airports
Division may be c�,���,� � ��eiv� ������_�`�� a full reconstruction of the taxi-lanes. At this
application phase, the cu�r�ent��gra�����ortuniti���re for the design of the project.
t ;,
�
The Airports Division is able ��-��minimize sta����erall costs for this capital improvemen� by
combining a number of entitle����t and dis��`��+�nary ��dmg sources from federal and state
government agencies. AIG is a �����am �����valla�k�,���'��� the Infrastructure Investment and
Jobs Act (2021) which is also co������.x��'�erre� ������t����������tlon industry as the Bipartisan
Infrastructure Law (or `BIL") whereas AIP Is t����gularly av����,ble federal funding source for
airport infrastructure projects. Certain pre a,v��� �xpenditures ���e already been made in order
to complete the application submittal pacl�'������ich include�����t co��for development of the
CATEX documentation for the desi��s����e�� � $26,0���,�� we�� y���� the Independent Fee
Estimate required for the application su���`ittal($�j���� , `
� ' ��,
Envi�onmental Review � � �
, �. > °�`
As part of the grant application process for FAA fu�,ding th������,��"�edding ha� requested
determination of a categorieal exclusion for pro����� ���������'��or a categorical exclusion
(CATEX) that have greater potential for extraordinary�����inlstances or that otherwise require
additional documentation, as described in the FAA Order 1050.1 (current version) and FAA
Order 5050.4B (collectively, FAA Environmental Orders). The City has requested a
determination of categorical exclusion based on paragraphs 5-6.4 (e) and (o) — Categorical
Exclusions for Facility Siting, Construction, and Maintenance. The CATEX documentation is
currently being reviewed by the FAA under a request for a CATEX determination on this
project.
Council Prio�ity/City Manage� Goals
• Budget and Financial Management — "Achieve balanced and stable 10-year Financial
Plans for all funds."
Report to Redding City Council June 12,2025
Re: 4.2(a)--BudgetResolution and Ratification of GrantApplication Page 3
Attachments
^Resolution
t
st
I . t
� ,
s �,
i�
;1 � �;
�� }
i
} �'
}y
7 j;
� s i:
� �? � i r
,,,;d ti>
,,,,+,,.. t ; 3,' r
�,t
t ,
4 �' s,
� � 3
�
�
. .»,. ( 'j.�a ,,,,�
y t
� t �
s s f
� s �
/j 1 �
tt ;
ll� S S.
n
�' S
J
a>> ... ,f�;
J" �
� l
1 1}4.
t
i 1 1