� � �- ' � ° � � i � CITY OF REDDING
��
REPORT TO THE CITY COUNCIL
MEETING DATE: May 19, 2026 FROM: Michael Webb, Assistant City
ITEM NO. 4.11(� Manager/Public Works
Director
***APPROVED BY***
�� � 3,�� �.nu„
����
� ��� � � ,,��
� 5� � �� �� �� �,��,�
� � � =µ
1" irel'We, .. v: aty Vf� a�et Rubliu\ c*rA�.;�Uectetcrr 5��s�?U2G �}F������'�1'�3(JX �,�ti"�'��.��23a3�TG"I �,. `Yf'������.7
mwebb@cityofredding.org wtarbox@cityofredding.gov
SUBJECT: 4.11(�--Project Acceptance, Bid Negotiation No. 5508, Construction on State
Highway in Redding on Route 273 from Yuba Street to Tehama Street and on California Street
from Tehama Street to Eureka Wa
Recommendation
Accept Bid Negotiation No. 5508, Construction on State Highway in Redding on Route 273
from Yuba Street to Tehama Street and on California Street from Tehama Street to Eureka Way,
awarded to S.T. Rhoades Inc., as satisfactorily complete, with a final cost of$4,095,796.90.
Fiscal Impact
There is no negative �sca1 impact, General Fund or otherwise, associated with the recommended
actions. Funding for this project was provided by the California Department of Transportation
(Caltrans) State Highway Operation Protection Program (SHOPP) construction capital funds;
Redding Downtown Loop and Affordable Housing (RDLAH) Projects' Affordable Housing and
Sustainable Community(AHSC)Program grant award; and the City's Streets Division.
The following table provides a summary of the project funding sources and project costs.
Funding Source Budgetedi Expendedl Balancel,2
Caltrans SHOPP $2,870 $2,281 $589
RDLAH $1,289 $1,289 $0
Cit Streets $1,000 $526 $474
Total $5,159 $4,096 $1,063
1. Amounts shown are in$1,OOOs.
2. Project balance funds are estimated,may be adjusted within the total budgeted amount based on final project closeout
activities and with funding partners.
Alternative Action
The City Council (Council) may choose not to accept the project as satisfactorily complete and
advise staff on how to proceed.
Report to Redding City Council May 8,2026
Re: 4.11(f)--ProjectAcceptance, Bid Negotiation No.5508, CA Street Bikeway Project Page 2
Background/Analysis
S.T. Rhoades Inc. has completed all itelns of work on the California Street Bikeway Project as of
August 26, 2025, which was within the contract time frame. The project warranty period expires
one year froln the completion date of August 26, 2025.
At its meeting of September 3, 2024, the Council awarded a construction contract to S.T.
Rhoades Inc. of Redding, for $2,954,838.50 and approved a $300,000 construction contingency
fund. Also authorized was $400,000 for contract administration and construction inspection fees
and $750,000 for project development costs, and the City Manager was authorized to approve
additional increases in either the construction management or construction contingency amounts
up to a total of $50,000, for a total authorized amount of $4,454,838.50. Project development
costs include engineering, environmental, and consultant services. During construction, there
were eight change orders in the amount of$34,004.92, leaving a balance of$265,955.08 in the
contingency fund. The final project cost is $4,095,796.90.
Cost Summary
Awarded Amounts Actual Cost
Project Development Costs $750,000 $750,000
Construction Contract
+
3 254 838.50
Contin enc
$
, ,
Construction Contract + � �..
Contract Chan e Orders
•� $2,988,843.42
Contract Administration & ��,00,000 $356,953.48
Ins ection
Additional City Manager �50,000 $0
Authorit
Total $4,454,838.50 $4,095,796.90
The project involved constructing a separated two-way bikeway, also referred to as a cycle track,
curbs, curb ramps, asphalt concrete paving, intersection signal installations, storm drainage
improvements,pavement markings, and other miscellaneous items of work.
Envir�onmental Review
This action, project acceptance, is not a project as de�ned by the California Environmental
Quality Act. On September 3, 2024, the Council determined that the project is Categorically
Exempt from review under th� California Environmental Quality Act Guidelines, per Section
15301 — Existing Facilities and Seetion 15302 — Replacement or Reconstruction. No further
action is required.
Council Priority/City Manager� Goals
This agenda item is a routine operational it�m.
Report to Redding City Council May 8,2026
Re: 4.11(f)--ProjectAcceptance, Bid Negotiation No.5508, CA Street Bikeway Project Page 3
Attachments
California Street Bikeway Location Map
Previous Staff Report - September 3, 2024, item no. 4.11(e)--Award Bid Negotiation No. 5508
CA St Bikeway Award
PROJECT LIMITS
�'�� �� �
�
�
0
�z
v
N�
�UR�KP�pY
�
�A
�
oN�s`°N S� �
��m
�m�
�N�
SNPgS P s'!
c
v
2
m
a
MPS�
�CENP
�
e����S
�
m
�
c-� 2
O� N�
a
N�
OV���S� ��gPg'C
YV�PS�
n
�'
T
�S
v �2 P�"Pc�
v
��o N� -c
�a �
�� ���
�
m N�
Z�
� � N �
�
�o� ��oo,� ciTY oF RE��iN� CALIFORNIA STREET
�? ;,, � PUBLIC WORKS BIKEWAY PROJECT
�.���F��e,�P DEPARTMENT LOCATION MAP
GI �" Y C� F
� � �- ' � ° � � i � CITY OF REDDING
��
REPORT TO THE CITY COUNCIL
MEETING DATE: September 3,2024 FROM: Michael Webb, Public Works
ITEM NO. 4.11(e} Director
***APPROVED BY***
„, �. .A,��,�
ie ael � iiEali� oaks L)arector �(?'�J2424 i�}�in,Ci an � 8127(2424
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(e)--Award Bid Negotiation No. 5508 Construction on State Highway in
Redding on Route 273 From Yuba Street to Tehama Street and on California Street from
Tehama Street to Eureka Wa
Recommendation
Authorize the following actions relative to Bid Negotiation No. 5508, Construction on State
Highway in Redding on Route 273 from Yuba Street to Tehama Street and on California Street
from Tehama Street to Eureka Way:
(1) Award to S.T. Rhoades Inc., in the amount of$2,954,838.50;
(2) Approve $400,000 to cover the cost of administration and inspection fees;
(3) Approve $750,000 for project development costs;
(4) Approve $300,000 to provide construction contingency funding;
(5) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amount up to a total of$50,000; and
(6) Find that the Project is categorically exempt from the California Environmental Quality
Act, pursuant to Section 15301 — Existing Facilities and Section 15302 —Replacement or
Reconstruction.
Fiscal Impact
The City of Redding (City) and the California Department of Transportation (Caltrans) will share
the costs of the California Street Bikeway Project (Project) advertised as Construction on State
Highway in Redding on Route 273 from Yuba Street to Tehama Street and on California Street
and on California Street from Tehama Street to Division Street. Caltrans will contribute State
Highway Operation Protection Program construction capital funds in the amount of$2,870,000.
In addition, a portion of project funding from the Redding Downtown Loop and Affordable
Housing (RDLAH) Projects' Affordable Housing and Sustainable Community (AHSC) Program
grant award in the amount of $1,289,000 and the City's Streets Division in the amount of
$1,000,000. Total project budgeted funds are $5,159,000.
Report to Redding City Council August28,2024
Re: 4.11(e)--Award Bid Negotiation No. 5508 CA St Bikeway Award Page 2
Due to various delays in this project related to design complexities and previous funding gaps,
the balance of AHSC Program funds, approximately $400,000, will need to be invoiced to the
state for reimbursement by December 2024. If a11 of the AHSC Program funds are not eligible or
able to be invoiced by that date, Street funds will be used to backfill the funding. There are
adequate Street funds budgeted to backf'il1 the funding, if necessary.
Cost Summar
ftem Estimated
Pro�ect Develo ment Costs $750,000
Construction Contract+Contin ency $3,254,838.50
Contract Administration, Ins ection,Testin $400,000
Additional Cit Mana er Authorit � $50,000
Total Pro'ect Costs $4,454,838.50
Pro'ect Bud et $5,159,000
Project cost components are estimates and some shifting between project funding sources,
project development, construction management, and construction contingency funds may be
necessary to balance the project within the approved budget.
Alternative Action
The City Council may choose not to award the project and provide alternate direction. If the
project does not move forward, the City would jeopardize and potentially be required to pay back
AHSC grant funding previously spent for the Redding Downtown Loop and Affordable Housing.
In addition, it would jeopardize the City's partnership with Caltrans and state funding allocated
to this project and lose val�uable grant funding.
Background/Analysis
Attached is a tabulation of bids received and opened on August 21, 2024, for the project. The
low bid in the amount of $2,954,838.50 was received from S.T. Rhoades Construction, Inc of
Redding, California. The engineer`s estimate was $3,514,000. Total project development costs
for this project are estimated to be $750,000. Project development costs include engineering,
surveying, right-of-way, environmental, consultant services, Caltrans coordination and permit
fees.
In October of 2016, Housing and Community Development awarded the City and K2
Development Company, Inc., AHSC Program funding in the amount of $20 million for the
RDLA�I Project located at 1551 Market Street. The RDLAI� Project included construction of a
four-story, mixed-use building and a subterranean parking facility. In addition, the RDLAH
Project included reestablishment of the formerly abandoned street rights-of-way and
reconstruction of pedestrian and bicycle-friendly streets along portions of Market, Yuba, and
Butte Streets known as the Downtown Streets Circulation (DSC) Project; as well as constructing
a separated, two-way bikeway on California Street known as the California Street Bikeway
Project. The RDLAH and DSC Projects were completed in February 2021.
The Bikeway Project proposes to construct a separated two-way bikeway, also referred to as a
eycletraek, on California Street from Yuba St�eet to Division Street. The Bikeway Project work
includes constructing curbs, curb ramps, asphalt concrete paving, intersection signal installations,
storm drainage improvements,pavement markings, and other miscellaneous items of work.
Report to Redding City Council August28,2024
Re: 4.11(e)--Award Bid Negotiation No. 5508 CA St Bikeway Award Page 3
Environmental Review
Staff has determined that the project is categorically exempt from environmental review pursuant
to the California Environmental Quality Act Guidelines Section 15301 — Existing Facilities and
Section 15302 - Replacement or Reconstruction. Class 1 exemptions include the operation, repair
and alteration of existing structures and facilities including the installation of bicycle lanes. C1ass
2 exemptions consist of replacement or reconstruction where the new structure will be located on
the same site and wi11 have substantially the same purpose and capacity. The project wi11 add
bicycle facilities within the existing right of way. The facility will have the same purpose and
capacity and will result in negligible expansion of use, as new vehicle lanes are not proposed.
The project has been reviewed for sensitive resources such as threatened or endangered species
or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources. The
project has no potential to have a significant effect on the environment.
Council Priority/City Manager Goals
• Public Safety—"Work to improve all aspects of public safety to help people feel secure
and safe where they live, work and play in the City of Redding."
Attachments
^Location Map
^Bid Tabulation
^Notice of Exemption