REPORT TO THE CITY COUNCIL
MEETING DATE: February 3, 2026 FROM: Michael Webb, Public Works
ITEM NO. 4.11(c) Director/Interim Asst. City
Mana�er
***APPROVED BY***
�`
�
1' �rel'We, .��u -�;I?ai etort��azrrn�.evt.Ci2y�NRairs�,er 1r..3�?02G ��,i'� lC[,.nieti[TIC`it�j�v'1��7�t�,4iCF'�ls�.�� �bi��'4tt7i 11�'7i202
mwebb@cityofredding.org kkibler@cityofredding.gov
SUBJECT: 4.11(c)--Award BS No. 5651 Burney Library Roof Replacement, Solar &
Generator Addition
Recommendation
Authorize and approve the following actions relative to Bid Schedule No. 5651, Burney Library
Roof Replacement, Solar and Generator Addition Project (Project):
(1) Award to Addy Electric, Inc. in the amount of $225,271.14 for the Base Bid, an
additional $15,240 for Additive Alternate 1, and an additional $3,175 for Additive
Alternate 3;
(2) Approve $94,000 to cover the cost of administration and inspection fees;
(3) Approve $75,000 for project development costs;
(4) Approve $25,000 to provide construction contingency funding; and
(5) Find that the project is categorically exempt from review under the California
Environmental Quality Act,pursuant to Section 15301 —Existing Facilities.
Fiscal Impact
The Burney Library Roof Replacement, So1ar and Generator Addition Project (Project) is being
fully-funded by a Building Forward Grant from the California State Library. There is no match
required for this program and no impact to the General Fund.
Cost Summar
Item Estimated
Pro'ect Develo ment Costs $ 75,000.00
Construction Contract+ Contin enc $268,686.14
Contract Administration, Ins ection, Testin $ 94,000.00
Total Pr�o'ect Costs $43�,686.14
Pro'ect Bud et $453,109.00
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Report to Redding City Council January 28,2026
Re: 4.11(c)--Award BS No. 5651 Burney Library Roof Replacement, Solar& Generator
Addition Page 2
Alternative Action
The City Council (Council) may choose not to award the bid for the project and provide staff
with alternative direction. If this project is not approved, the Burney Library will miss the
opportunity to replace the aging roof material and install solar infrastructure, which would help
offset utility expenses. Additionally, the library will not have a generator installed, which is
necessary for it to remain open during power outages. In addition, the City of Redding (City)
risks not receiving reimbursement for funds that have already been spent and not yet invoiced,
and any remaining grant funds may be forfeited.
Background/Analysis
Staff applied for a California Building Forward grant after obtaining the Council's approval on
Apri15, 2022. Three separate grant applications requested funding across the entire Shasta Public
Library system, which the City administers. For the Burney Library, funds were requested to
install a generator, enhance HVAC filtration, replace roofing, and install a solar system for utility
savings.
The Building Forward Grant was awarded in the amount of$453,109 for these projects and on
October 18, 2022, Council accepted the grant. Since then, the project required a few revisions
and some value engineering, which lengthened the timeline. The project is still in compliance
with the March 31, 2026 deadline. However, staff has applied for an extension to the grant term
as the expiration date nears and more information is available.
Attached is a tabulation of bids opened on December 4, 2025. The low bid in the amount of
$225,27114 was received from Addy Electric, Inc. of Redding, California. The engineer's
estimate was $265,100.00. Total project development costs for this project are estimated to be
$75,000.00. Project development costs include engineering, surveying, right-of-way,
environmental, and consultant services.
The project will install a standby generator along with the associated infrastruct�ure. In addition, a
portion of the library roof will be replaced with a composite shingle material, and a photovoltaic
system will be constructed.
Environmental Review
Staff has reviewed the project and determined that it is categorically exempt from review under
the California Environmental Quality Act Guidelines, pursuant to Section 15301 - Existing
Facilities. Class 1 exemptions include the minor alteration of existing public and private
facilities, equipment, and topographical features involving negligible or no expansion of use. The
roof at the Burney Library will be replaced and a new generator and photovoltaic system will be
installed. The project is a minar alteration of the existing library facility to improve services
during a power outage and will not result in expansion of use. The action area does not have
significant values for wildlife habitat or other environmental resources and the project has no
potential to have a significant effect on the environment.
Report to Redding City Council January 28,2026
Re: 4.11(c)--Award BS No. 5651 Burney Library Roof Replacement, Solar& Generator
Addition Page 3
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Location Map
^Bid Tab
Notice of Exemption
�•
y
O�
�O�
F
w
TRINITY STREET �
F
�m �
� �
��� �' _
�„ ti J
� a
�� ��
J
m
UPERIOR AVENUE
PROJECT
LOCATION
EN STRE
STATE HWY 299 E MA�____N_STREET
� �
� �
�n Q
� �
Q �
a
��F �Foo CITY OF REDDING EXHIBIT A
'� � 2 BURNEY LIBRARY ROOF REPLACEMENT,
� � PUB�IC WORKS
t,,� ,���� .Q DEPARTMENT SOLAR, & GENERATORADDITON
�,F���' LOCATION MAP
BID TABULATION FOR:
BURNEY LIBRARY ROOF REPLACEMENT SOLAR& GENERATOR ADDITION
Bid Schedule No.: 5651
ENGINEER'S EST Addv Electric, Inc. Sustainable Livinq Builders
12/4/2025 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 WATER POLLUTION CONTRO� P�AN �S 1 $2,500.00 $2,500.00 $3,750.00 $3,750.00 $14,000.00 $14,000.00
EXCAVATE GENERATOR FOUNDATION
2 AND INSTA�� ENGINEERED FI�� �S 1 $10,000.00 $10,000.00 $4,800.00 $4,800.00 $8,000.00 $8,000.00
3 REINFORCED CONCRETE SLAB LS 1 $15,000.00 $15,000.00 $8,618.00 $8,618.00 $12,000.00 $12,000.00
4 ROOF WOOD FRAMWG AND SHEATHING SF 774 $30.00 $23,220.00 $23.26 $18,003.24 $38.76 $30,�0�.24 '
5 COMPOSITE SHINGLE ROOF SF 4070 $14.00 $56,980.00 $12.07 $49,124.90 $27.03 $'11't�,012.10
6 PV ARRAY RACKWG �S 1 $17,500.00 $17,500.00 $6,516.00 $6,516.00 $26,000.00 $26,000.00
7 GENERATOR LS 1 $58,000.00 $58,000.00 $66,900.00 $66,900.00 $45,000.00 $45,000.00
8 AUTOMATIC TRANSFER SWITCH �S 1 $10,500.00 $10,500.00 $15,731.00 $15,731.00 $8,000.00 $8,000.00
9 PANELBOARD LS 1 $15,000.00 $15,000.00 $8,100.00 $8,100.00 $14,000.00 $14,000.00
10 CONDUIT AND CONDUCTORS �S 1 $30,000.00 $30,000.00 $27,750.00 $27,750.00 $12,000.00 $12,000.00
11 PHOTOVOLTAIC INVERTER LS 1 $9,500.00 $9,500.00 $6,150.00 $6,150.00 $8,000.00 $8,000.00
12 PHOTOVO�TAIC PANE� EA 26 $650.00 $16,900.00 $378.00 $9,828.00 $242.31 $6,3��.06 '
TOTAL BASE BID $265,100.00 $225,271.14 $293,31�.40
ADDITIVE ALTERNATE 1
1 METAL TRIM LS 1 $15,000.00 $15,000.00 $15,240.00 $15,240.00 $4,200.00 $4,200.00
ADDITIVE ALTERNATE 2
1 ROOF HEAT TAPE LF 730 $20.00 $14,600.00 $15.87 $11,585.10 $5.55 $4,051.50
ADDITIVE ALTERNATE 3
1 CONTINUOUS ROOFING RIDGE VENT LS 1 $5,000.00 $5,000.00 $3,175.00 $3,175.00 $2,250.00 $2,250.00
TOTAL -BASE BID PLUS ADDITIVE ALTERNATE 1,2,3 $299,700.00 $255,271.24 i $3�3,$1�.9�
*Corrected Bid Item 12 total based on submitted unit price.
**Submitted two P1 Pages therefore determined non-responsive
Shaded areas indicate corrections made in accordance with the special provisions Page 1 of 3
BID TABULATION FOR:
BURNEY LIBRARY ROOF REPLACEMENT SOLAR& GENERATI
Bid Schedule No.: 5651
Snl Grou Inc SCC Electric Inc Cal Electro Inc
12/4/2025 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 WATER POLLUTION CONTRO� P�AN �S 1 $500.00 $500.00 $1,000.00 $1,000.00 $2,500.00 $2,500.00
EXCAVATE GENERATOR FOUNDATION
2 AND INSTA�� ENGINEERED FI�� �S 1 $6,500.00 $6,500.00 $20,000.00 $20,000.00 $5,000.00 $5,000.00
3 REINFORCED CONCRETE SLAB LS 1 $16,000.00 $16,000.00 $25,000.00 $25,000.00 $15,000.00 $15,000.00
4 ROOF WOOD FRAMING AND SHEATHING SF 774 $62.00 $47,988.00 $55.00 $42,570.00 $49.76 $38,514.24
5 COMPOSITE SHINGLE ROOF SF 4070 $9.00 $36,630.00 $7.00 $28,490.00 $6.47 $26,332.90
6 PV ARRAY RACKING �S 1 $32,000.00 $32,000.00 $30,000.00 $30,000.00 $23,327.00 $23,327.00
7 GENERATOR LS 1 $82,000.00 $82,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00
8 AUTOMATIC TRANSFER SWITCH �S 1 $13,000.00 $13,000.00 $25,000.00 $25,000.00 $30,000.00 $30,000.00
9 PANELBOARD LS 1 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $30,000.00 $30,000.00
10 CONDUIT AND CONDUCTORS �S 1 $70,000.00 $70,000.00 $75,000.00 $75,000.00 $75,000.00 $75,000.00
11 PHOTOVOLTAIC INVERTER LS 1 $32,000.00 $32,000.00 $4,000.00 $4,000.00 $23,268.00 $23,268.00
12 PHOTOVO�TAIC PANE� EA 26 $1,050.00 $27,300.00 $700.00 $18,200.00 $772.00 $20,072.00
TOTAL BASE BID $378,918.00 $384,260.00 $389,014.14
ADDITIVE ALTERNATE 1
1 METAL TRIM LS 1 $25,000.00 $25,000.00 $35,000.00 $35,000.00 $20,973.00 $20,973.00
ADDITIVE ALTERNATE 2
1 ROOF HEAT TAPE LF 730 $70.00 $51,100.00 $70.00 $51,100.00 $58.00 $42,340.00
ADDITIVE ALTERNATE 3
1 CONTINUOUS ROOFING RIDGE VENT LS 1 $3,000.00 $3,000.00 $2,500.00 $2,500.00 $1,525.00 $1,525.00
TOTAL -BASE BID PLUS ADDITIVE ALTERNATE 1,2,3 $458,018.00 $472,860.00 $453,852.14
*Corrected Bid Item 12 total based on submitted unit price.
**Submitted two P1 Pages therefore determined non-responsive
Shaded areas indicate corrections made in accordance with the special provisions Page 2 of 3
BID TABULATION FOR:
BURNEY LIBRARY ROOF REPLACEMENT SOLAR& GENERATI
Bid Schedule No.: 5651
ic ae o erts
Hooked on Solar* Construction** AVERAGE
12/4/2025 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL 'PRICE
1 WATER POLLUTION CONTRO� P�AN �S 1 $1,050.72 $1,050.72 $0.00 $0.00 $3,257:25
EXCAVATE GENERATOR FOUNDATION
2 AND INSTA�� ENGINEERED FI�� �S 1 $1,576.08 $1,576.08 $0.00 $0.00 $6,553�73
3 REINFORCED CONCRETE SLAB LS 1 $2,626.80 $2,626.80 $0.00 $0.00 $11,320:69 i
4 ROOF WOOD FRAMWG AND SHEATHING SF 774 $5.70 $4,411.80 $0.00 $0.00 i $33.�b
5 COMPOSITE SHINGLE ROOF SF 4070 $19.04 $77,492.80 $0.00 $0.00 $11:52
6 PV ARRAY RACKWG �S 1 $6,829.68 $6,829.68 $0.00 $0.00 $17,810'38
7 GENERATOR LS 1 $64,320.00 $64,320.00 $0.00 $0.00 $65,460.00 `
8 AUTOMATIC TRANSFER SWITCH �S 1 $16,080.00 $16,080.00 $0.00 $0.00 $15,4d1.57
9 PANELBOARD LS 1 $2,626.80 $2,626.80 $0.00 $0.00 $12,103:$3
10 CONDUIT AND CONDUCTORS �S 1 $6.30 $6.30 $0.00 $0.00 $37,108:d4
11 PHOTOVOLTAIC INVERTER LS 1 $15,760.80 $15,760.80 $0.00 $0.00 $12,739.$3
12 PHOTOVO�TAIC PANE� EA 26 $15,760.68 $409,777.6$ ' $0.00 $0.00 $2,700:43
TOTAL BASE BID $602,559.46 ' $0.00 $324,762.16
ADDITIVE ALTERNATE 1
1 METAL TRIM LS 1 $13,307.00 $�3,307.U0 $0.00 $0.00 $16,245:71
ADDITIVE ALTERNATE 2
1 ROOF HEAT TAPE LF 730 $20.14 $14,702.20 $0.00 $0.00 $34:22
ADDITIVE ALTERNATE 3
1 CONTINUOUS ROOFING RIDGE VENT LS 1 $5,608.00 $5,608.00 $0.00 $0.00 $2,579:71
TOTAL -BASE BID PLUS ADDITIVE ALTERNATE 1,2,3 $636,176.66 $0.00 $368,570:28
*Corrected Bid Item 12 total based on submitted unit price.
**Submitted two P1 Pages therefore determined non-responsive
Shaded areas indicate corrections made in accordance with the special provisions Page 3 of 3
OTICE f�F EXEMFTION
To. � Office of Planning and Research FROM: City af I2eddrng
1400 Tenth Street, Room 121 Public Works I?epartment
S�crainentc�, CA 95814 777 Cyp��ess Avenue
Reddin�, CA 96001
� Shasta Cc�unty Clerk
County of Shasta
�'.(�.�ox 990880, 1643 Market Street
Redding, CA 960�}-d880
Project Titie: Burne L�y Roof Replaceinent Shcar and Generator Proiect
Prt�ject Lacation—Specific: 3�116 Main Street, BurneY CA 96013
Froject Locatian—City. Burnev Project Location—County: Shasta _
Desca�iption of Project:The Citv ofReddin�will install new standby�enerator with assaciated mechanical equipment and
infrastructure; a �round mount photovoltaic system; and a new roaf at the Burney Librar-y. Work will include radin .
excavatin�;; installing en�i��eered fill, pc�urin�concrete and ct�nstructian of acl enclosure for the ec�uipment.
Name of Public Agency Approving Praject: City of Reddin�
Name ofperson or Agency Carryin�Ont i'rc�ject;Corri�landiver, Proiect En�ine�r
Exempt Status; (check o�ae)
❑ Ministerial [Section�,1080{b}{1); 15268]
❑ I)eclared Emergency jSection 21080{b){3); 152b9{a)]
� Emergency Prt�ject [Sectifln 21080(b){4); 15269(bj]
❑ Statutc�ry Exernptions. State code number:
❑ Cnrnmon Sense Exetnption(`t"his project does not fall within an exempt class, but it can be seen with certainty that there is
no possibility that the activity may have a si�ni�cant effect on the environment(14 CCR 15Qb1[b][3]).
0 Categarical Exemption. State type and section number: Section 15301.Existing Facilities
C�J No exceptians�pply that would bar the use of a categorical exemptian{PRD 21Q84 and 14 CCR 15300.2).
Reasons wh;y pro;�ect is exempt� Class 1 exemptions include tl7e minor alteration of existin�public and private facilities
equipmenf,�nd tapo�raphical features involvin�ne�li�*ible or nc�expansit�n of use. The rocsf at the Burne L�rv wrll be
replaced and a new generator and �hotaValtaic system will be installed. The prt�iect is a rninor alteratian of the existing
library facilitv to i�nprove services durin�a power outaQe and will not result in expansic�n of use. The actic�n area does not
have si�nificant values for wildlife habitat or other enviranmental resources and the project has no potential to I�ave a
si�nificar�t effect on tlze environment.
Lead Agency Contact Person: Amber Kelley Telephane: 530.225.4046
If Filed by Applic�nt:
1. Attach certified document c�f exernption finding.
2. Has a nc�tice af exemption been�led by the public agency approving the project? o Yes ❑No
� > ,� r �r,��
Signatuee: � T1ate. ,��°�����c��
Title: Environmental Compliance Iv�a�a�er
�
�Signed by Lead Agency I�ate received for filing at QPR:
❑ Si�ned t�y Applicant
��,��,:�1 i iC}����,. 6'?'v�`'?