HomeMy WebLinkAbout _ 4.11(a)--Accept BN No. 5531 Liberty Street Sidewalk Improvement Project GI �" Y C� F
� � �- ' � ° � � i � CITY OF REDDING
��
REPORT TO THE CITY COUNCIL
MEETING DATE: January 20, 2026 FROM: Michael Webb, Public Works
ITEM NO. 4.ll(a) Director/Interim Asst. City
Mana�er
***APPROVED BY***
�`
�
1' �rel'We, .��u -�;I?ai etor t��azrrn�.evt.Ci2y�NRairs�,er 7 9�?02G ��,i'� lC[,.nieti[TI C`it�j�v'1��7�t�,4iCF'�ls�.�� �bi��'4tt7i 11121202
mwebb@cityofredding.org kkibler@cityofredding.gov
SUBJECT: 4.11(a)--Accept Bid Schedule No. 5531 Liberty Street Sidewalk Improvement
Pro'ect
Recommendation
Accept Bid Schedule No. 5531 (Job No. 2700), Liberty Sidewalk Improvement Project, as
satisfactorily complete, with a final cost of$713,896.02.
Fiscal Impact
Community Development B1ock Grant (CDBG) funds in the amount of$244,575 and American
Rescue Plan Act (ARPA) funds in the amount of$500,000 as well as Streets Maintenance Funds
in the amount of$50,000 totaling $794,575 were approved November 2024 for this project. The
total project cost, including surveying, design, bidding, construction, field engineering,
inspection, and contract administration is $713,896.02.
AZteNnative Action
The City Council (Council) may choose not to accept the project as satisfactorily complete and
provide staff alternative direction.
Background
As of April 16, 2025, SnL Group, Inc. of Redding California, has completed all items of work on
the Liberty Streets Sidewalk Improvement Project which was within the adjusted contract time
frame following weather delays and additional work. Subsequently, the Public Works
Department filed a notice of completion with Shasta County. The project warranty period expires
one year from the completion date.
At its meeting on November 19, 2024, the Council awarded a construction contract to SnL
Group, Inc. for $489,'708.00 and approved a $50,292.00 construction contingency fund. Also
authorized was $60,000.00 for con�ract administration and eonstruction inspection fees and
$150,000.00 for project development costs. The City Manager was authorized to approve
Report to Redding City Council January 13,2026
Re: 4.11(a)--Accept BN No. 5531 Liberty Street Sidewalk Improvement Project Page 2
additional increases in either the construction management or construction contingency amounts
up to a total of $44,575.00. The total authorized amount for the project was $794,575.00. The
Cost Summary table for the project is included below:
Cost Summary
Increase
Item Initial Authorized Amount Final Authorized Actual Amount
Project Development�1� $ 150,000.00 $ 150,000.00 $ 144,575.07
Construction Contract $ 489,708.00 $ 489,708.00 $ 489,708.00
Construction Contingency $ 50,292.00 $ 50,292.00 $ 30,779.74�2�
Contract
Admin/Inspection/Testing $ 60,000.00 $ 60,000.00 $ 48,833.21
Add') City Manager Auth. $ 44,575.00 $ 44,575.00
TOTAL PROJECT COSTS $ 794,575.00 $ 794,575.00 $ 713,896.02
TOTAL PROJECT BUDGET $ 794,575.00 $ 794,575.00 $ 794,575.00
Notes:
�I�Project development costs include engineering, environmental, and consultant services
���During construction, there were three change orders in the amount of$30,779.74
The project involved replacing damaged portions of sidewalk, curb, gutter and asphalt concrete
on Liberty Street, Eureka Way, East Street and Trinity Street that had been severely damaged by
tree roots. In addition, the project replaced damaged and aged water meter boxes, valve boxes,
and signs, as well as removing existing problem trees and replaced with new trees with root
barriers that will not damage infrastructure, and installed irrigation.
Environmental Review
This action is not a project as defined by the California Environmental Quality Act, and no
further action is required. On November 19, 2024, the Council determined that the project is
categorically exempt from review under the California Environmental Quality Act Guidelines,
per Section 15301 (Existing Facilities).
Council Pr�iority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Liberty Street Location Map
Previous Staff Report -November 19, 2024, item 4.1 ld-Award BN5531.
-�-__..,, ,.._ _..._��,
__
��____�,�
---__ _ -~ � SACR.4�yEHTp
_,_ w.. �� � � R/VE-R
� r NTS
-__
---_
.
i�_�� , ._ ,
.� :
-� _ r.�,�u.�-�....r,_
� �.�:T_ .: � ��
[ ( '
� � � - -
� � �
� � � �
I _ - ;
i ;
I ' ;
�
i
,
�
,
'ii r
� i
I L
__�; ���_ � - __�1
�
� ,
;('� i �
I ' ( �
i
. i
I �
LEGEND
LIMITS OF CURB, SIDEWALK
� AND PAVEMENT REP�ACEMENT
EXISTING TREE
JANUARY, 2024
CITY OF REDDING LIBERTY STREET REHAB PROJECT
�
���
PUB��c woRKs ���� ''��'���r��� ��� PROJECT LOCATION MAP
DEPARTMENT
GI �" Y C� F
� � �- ' � ° � � i � CITY OF REDDING
��
REPORT TO THE CITY COUNCIL
MEETING DATE: November 19, 2024 FROM: Michael Webb, Public Works
ITEM NO. 4.11(d} Director
***APPROVED BY***
ie ael � iiEali� oaks L)arector l�i7/2424 t�s�a a �, ss � eF 11/�12024
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(d)--Award Bid Negotiation No. 5531 (Job Order No. 2'700) Liberty Street
Sidewalk Im rovement Pro'ect
Recommendation
Authorize and approve the following actions relative to Bid Negotiation No. 5531 (Job No.
2700), Liberty Street Sidewalk Improvement Project:
(1) Award to SnL Group, Inc. in the amount of$489,708;
(2) Approve $60,000 to cover the cost of administration and inspection fees;
(3) Approve $150,000 for project development costs;
(4) Approve $50,292 to provide construction contingency funding;
(5) Authorize the City Manager, or designee, to approve additional increases in either the
construction management or construction contingency amounts up to a total of$44,575;
and
(6) Find that the project is categorically exempt from review under the California
Environmental Quality Act Guidelines,pursuant to Section 15301 —Existing Facilities.
Fiscal Impact
The Liberty Street Sidewalk Improvement Project (Project) is being funded by Community
Development Block Grant (CDBG) funds in the amount of$244,575, American Rescue Plan Act
(ARPA) funds in the amount of $500,000, and Streets Maintenance Funds in the amount
$50,000.
Cost Summar
Item Estimated
Pro'ect Develo ment Costs $150,000
Construction Contract-�- Contin enc $540,000
Contract Administration, Tns ection, Testin $60,000
Additional Cit Mana er Authorit $44,575
Total Pro'ect Costs �794,575
Total Pro'ect Bud et $794,5�5
Report to Redding City Council November 11,2024
Re: 4.11(d)--Bid Negotiation No. 5531 Liberty St Sidewalk Im provement Project Page 2
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Alternative Action
The City Council (Council) may choose not to award the bid for the project and provide staff
with alternate direction. Without this project, pedestrian accessible routes will continue to be
deficient, and there is a risk of losing CDBG and ARPA funding.
Background/Analysis
Attached is a tabulation of project bids received and opened on October 31, 2024. The apparent
low bid was received from Zeis Construction (Zeis). However, after staff reviewed all seven
proposals and created a bid tab it was apparent that an error had been made in Zeis' proposal.
The error made by Zeis was a mistake in the calculation for bid item 2, where they used the total
price as the unit price. Per the Instructions to Bidders in the project Special Provisions, if there is
a discrepancy between unit prices and totals, unit prices will prevail. Staff consulted with the
City Attorney and confirmed this is not a mistake that can be waived as it would be a material
change to Zeis' bid. Therefore, after staff made corrections to Zeis' bid proposal, as shown in the
attached bid tab, they were no longer the low bidder. Staff has contacted Zeis to inform them of
the mistake, that it cannot be waived, and that they were no longer the low bidder.
The low bid in the amount of $489,708 was received from SnL Group, Inc. of Redding,
California. The engineer's estimate was $484,250. Total project development costs for this
project are estimated to be $150,000. Project development costs include engineering, surveying,
right-of-way, environmental, and permit and utility connection fees.
The project consists of replacing damaged portions of sidewalk, curb, gutter and asphalt concrete
on Liberty Street, Eureka Way, East Street and Trinity Street that have been severely damaged
by tree roots. In addition, the project will replace damaged and aged water meter boxes, valve
boxes, and signs, as well as remove existing problem trees, replacing with new trees that will not
damage infrastructure, and install irrigation.
Envir�onmental Review
Staff has reviewed the project and determined that it is categorically exempt from review under
the California Environmental Quality Act Guidelines, per Section 15301 — Existing Facilities.
Class 1 exemptions include the operation, repair, maintenance, or minor alteration of existing
facilities, structures, or equipment involving negligible or no expansion of use. The project will
repair damaged portions of sidewalk, as well as associated infrastructure, and replace damaged
trees. The project includes the repair or replaeement of existing infrastructure in the same
location and serving the same purpose and capacity. Therefore, the project has no potential to
have a significant ef�ect on the environment and further environmental review is not required.
Council Priority/City Manager Goals
This agenda item is a routine operational it�m.
Report to Redding City Council November 11,2024
Re: 4.11(d)--Bid Negotiation No. 5531 Liberty St Sidewalk Im provement Project Page 3
Attachments
^Location Map
^Bid Tab
^Notice of Exemption
`�'<�"'�.x `�"."` ,�.�: �� ��. � � � �� , ,� ; --, _
� 'r� � �
•l ��i/i ���i ��% / /.�� � i i i/ � ,G/i i� / � / �; j% ��.�;
//
r,,, /� :/ // i i i"" % / � ,
�l ji ��/ i,., �/.% i / %% �r �% j /� ,
c.`."%!�K. % / 'j ! �,� '� �!,� /: r i/i� „�.
.--� �-''����t���`(;3 /� /,�'
�� �""'� '. -� �'ftz'�`�r ;�� ,-� �;
'� � "� �.r =% r>
>
� � � �� � �
i �-, ��� � , .�� ;;, �
,
� , � �;
, �) — �
� , , �
� ��.� ' r�� ',
, �
� � ���� �,� ! �� �' TS ���
� _ �i �,I— r�=y ��� � �_ �_,� '`-��;� N=� ����
�� �����,'i � � __ _ _ ��� �� �=�
_ ; � �
� -��..�� �
; , �, � � i .
� � ,
t
, � _ _ __ i � -_- __-
_ _
,
I Y
� I i ��� -� - � ���
� � �
� �--- i �
, � � � �
, ,� � � ��-��
� ,�_, __ I I i __ ___
� i , � i� _ , � ''
j 'I ;� �
� ( �i -,_ _ � �' c�
I
� � ._ i � �� _
� __ _ ( � � � l� 1 m I I i��� I
'I �I ...— � � ;� ; _ _ I I I i I
— — — , �
� 1i ,
�
� _
i� i �
,,
�� — _ r
�
, � � � ��— I � _
, G . � �
.�..�
,i , � , �I
a _ , ,
�, �
� � �� � '� ������ � � � �� �� w. �..M � i
a
i .�� � fi � � ��,.. � � � I�� � ( ���.w,�..�.. � µ,. �,�
„
w .� � '� �� � �� � ..�.W� �. �
.� � ���.�.�� d� �,..
� ��s ;� �� "': —���s I�_� _)I �� �� a. , �I��s I ��� _ �I
— � � �
�. ��.. ___--.µ. _— � _ . �: ��_...m �.�� �; .—
w,_�� ....�..��� �........;..� —. ,.w.w_. �
r'�,-" TRINITY ST �
;
... �_� ,n�---� ,--� -
_.�
�or _ � __ �.._. � ( s� �� _ :�. �
r �_ � � ( u, ,� ,,,�r�— ,.� � ''��, I
� : y , <.,,� � 1 �.�
�'\ �
�
. � ; � Jl
�
�. � � ''I � �r �,.:, w r,`� � � �. � �,� � � — �
�: � �
� � .. � � � � _�I �, �
� � � ,�, �i�E sr ��r �;��I ' � �ow .�ra N � ��vT �v� � �
�
:
�CNO II i— � � �� �L �A�_ � N P��� x �I,'--- — �I �� �
�� PLA�,4 I N , ���A AR���N.���____..�:_ � PAR7�f�lE�S' �� i
� ��__� � �— i , �
� ii
__� c � J I— �
-..-��..M" ___
� N W
. ��..��� Q m
M �m...._��
W J
� �..�_ �, � �
i ��I'I � �._..�.� __.._ .._ �_.. .... __. �...� � ;
�,
�.. __ ,
�- ..,— �� do� ms �°� i
��i�� �..�� � . ��
— — ��� _—_�.__ � �. ',
�_ _ � � _— -
����� �� EUREKA WAY _
� �� �� �� ;
� �. � __�—�— �
_e..��_ _
. �� �� � _ = � — II �
�,,.�- , � �tr __.__ ., ,— _. ,� ��; r �. ,��, _._.
_.— �) _ s �
/ �� �ov � � � � � � 3���,.,�� ! �
��a�.� .-�,..� � � �r�� I� a �., i
I � .� � �____ i
I
' � � i i I.. �.� __ II� � ''I I
�_—
j � — _.. i
— \......
I
,
_. I I I �I i i_
�''1
LEGEND
LIMITS OF CURB, SIDEWALK
AND PAVEMENT REPLACEMENT
NOVEMBER, 2024
CITY OF REDDING ��F RFo� LIBERTY STREET REHAB PROJECT
� '2
v �
PUBLIC WORKS ° �! °
DEPARTMENT `'��,�o��'� PROJECT LOCATION MAP
� - -�
BID TABULATION FOR:
Liberty Street Sidewalk Improvement Project
Bid Schedule No.: 5531
ENGINEER'S EST SnLGroup, Inc A�cner Excavatinq Inc
10/31/2024 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 TRAFFIC CONTRO� �S 1 $10,000.00 $10,000.00 $18,000.00 $18,000.00 $14,196.00 $14,196.00
2 CONSTRUCTION AREA SIGNS EA 12 $250.00 $3,000.00 $250.00 $3,000.00 $300.00 $3,600.00
3 WATER POLLUTION CONTRO� �S 1 $4,000.00 $4,000.00 $1,000.00 $1,000.00 $6,167.00 $6,167.00
4 PROJECT FUNDING SIGN EA 1 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00
5 REMOVE TREE EA 20 $2,400.00 $48,000.00 $3,500.00 $70,000.00 $3,739.00 $74,780.00
6 IRRIGATION SYSTEM LS 1 $12,500.00 $12,500.00 $22,893.00 $22,893.00 $23,400.00 $23,400.00
7 ROOT BARRIER �F 660 $20.00 $13,200.00 $18.00 $11,880.00 $18.00 $11,880.00
8 TREE (15-gallon) EA 28 $1,000.00 $28,000.00 $775.00 $21,700.00 $816.00 $22,848.00
9 REPLACE AREA DRAIN EA 1 $4,700.00 $4,700.00 $5,000.00 $5,000.00 $2,808.00 $2,808.00
10 REPLACE CATCH BASIN TOP EA 2 $9,500.00 $19,000.00 $2,500.00 $5,000.00 $3,733.00 $7,466.00
11 REPLACE WATER METER BOX EA 4 $250.00 $1,000.00 $1,225.00 $4,900.00 $1,557.00 $6,228.00
12 REPLACE WATER VALVE BOX EA 5 $250.00 $1,250.00 $1,150.00 $5,750.00 $1,152.00 $5,760.00
13 REPLACE SIGN EA 4 $450.00 $1,800.00 $1,200.00 $4,800.00 $720.00 $2,880.00
14 CURB AND GUTTER (6") LF 930 $60.00 $55,800.00 $72.00 $66,960.00 $95.00 $88,350.00
15 SIDEWA�K(4" PCC) SF 6400 $30.00 $192,000.00 $22.00 $140,800.00 $18.00 $115,200.00
16 DRIVEWAY(COMMERCIAL) SF 550 $70.00 $38,500.00 $66.00 $36,300.00 $40.00 $22,000.00
17 REPLACE ASPHA�T CONCRETE CF 3650 $8.00 $29,200.00 $15.00 $54,750.00 $16.00 $58,400.00
18 CONCRETE CURB RAMP SF 355 $60.00 $21,300.00 $45.00 $15,975.00 $65.00 $23,075.00
TOTAL -CONTRACT ITEMS $484,250.00 $489,708.00 $490,238.00
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 3
� - -�
BID TABULATION FOR:
Liberty Street Sidewalk Improvement Project
Bid Schedule No.: 5531
FBD Vanquard Construction,
Inc. RTA Construction Inc Zeis Construction
10/31/2024 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 TRAFFIC CONTRO� �S 1 $27,019.00 $27,019.00 $25,000.00 $25,000.00 $17,026.00 $17,026.00
2 CONSTRUCTION AREA SIGNS EA 12 $470.00 $5,640.00 $400.00 $4,800.00 ' $5,9�i5.OtI $71,5$O.Ot7
3 WATER POLLUTION CONTRO� �S 1 $4,000.00 $4,000.00 $5,000.00 $5,000.00 $9,584.00 $9,584.00
4 PROJECT FUNDING SIGN EA 1 $2,000.00 $2,000.00 $4,000.00 $4,000.00 $3,234.00 $3,234.00
5 REMOVE TREE EA 20 $3,230.00 $64,600.00 $3,000.00 $60,000.00 $1,650.70 $33,014.00
6 IRRIGATION SYSTEM LS 1 $35,000.00 $35,000.00 $42,000.00 $42,000.00 $29,520.00 $29,520.00
7 ROOT BARRIER �F 660 $17.00 $11,220.00 $20.00 $13,200.00 $18.45 $12,177.00
8 TREE (15-gallon) EA 28 $784.00 $21,952.00 $800.00 $22,400.00 $836.43 �23,420.04 '
9 REPLACE AREA DRAW EA 1 $6,700.00 $6,700.00 $4,500.00 $4,500.00 $4,271.00 $4,271.00
10 REPLACE CATCH BASIN TOP EA 2 $5,900.00 $11,800.00 $3,500.00 $7,000.00 $4,911.00 $9,822.00
11 REPLACE WATER METER BOX EA 4 $300.00 $1,200.00 $600.00 $2,400.00 $689.50 $2,758.00
12 REPLACE WATER VALVE BOX EA 5 $300.00 $1,500.00 $500.00 $2,500.00 $461.80 $2,309.00
13 REPLACE SIGN EA 4 $540.00 $2,160.00 $600.00 $2,400.00 $904.75 $3,619.00
14 CURB AND GUTTER (6") LF 930 $60.00 $55,800.00 $48.00 $44,640.00 $95.99 $89,270.7t7 '
15 SIDEWA�K(4" PCC) SF 6400 $30.00 $192,000.00 $25.00 $160,000.00 $17.59 $112,576.00
16 DRIVEWAY(COMMERCIAL) SF 550 $40.00 $22,000.00 $20.00 $11,000.00 $43.48 $23,914.Ct0
17 REPLACE ASPHA�T CONCRETE CF 3650 $12.00 $43,800.00 $28.00 $102,200.00 $20.45 ! $74,642.5t�
18 CONCRETE CURB RAMP SF 355 $50.00 $17,750.00 $58.00 $20,590.00 $68.69 I $24,384.95 '
TOTAL -CONTRACT ITEMS $526,141.00 $533,630.00 $547,322."19
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 3
� - -�
BID TABULATION FOR:
Liberty Street Sidewalk Improvement Project
Bid Schedule No.: 5531
S. T. Rhoades Construction
Inc Site Works Solutions AVERAGES
10/31/2024 UNIT UNIT " UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE
1 TRAFFIC CONTRO� �S 1 $35,151.00 $35,151.00 $39,051.27 $39,051.27 $23,382.0�
2 CONSTRUCTION AREA SIGNS EA 12 $250.00 $3,000.00 $498.01 $5,976.12 ' $1,313.$4 �!
3 WATER POLLUTION CONTRO� �S 1 $5,000.00 $5,000.00 $5,658.97 $5,658.97 $5,235.fl�
4 PROJECT FUNDING SIGN EA 1 $1,000.00 $1,000.00 $2,134.32 $2,134.32 $2,261.39 '
5 REMOVE TREE EA 20 $917.45 $18,349.00 $3,744.09 $74,881.80 $3,143.97 '
6 IRRIGATION SYSTEM LS 1 $20,000.00 $20,000.00 $28,473.25 $28,473.25 $�0,214.3$
7 ROOT BARRIER �F 660 $15.00 $9,900.00 $18.29 $12,071.40 $18.29 '
8 TREE (15-gallon) EA 28 $375.00 $10,500.00 $829.33 $23,221.24 $$06.79
9 REPLACE AREA DRAW EA 1 $5,000.00 $5,000.00 $5,275.61 $5,275.61 $4,759.10
10 REPLACE CATCH BASIN TOP EA 2 $5,000.00 $10,000.00 $3,340.31 $6,680.62 $3,98�.72 i
11 REPLACE WATER METER BOX EA 4 $200.00 $800.00 $997.17 $3,988.68 ' $$94.78 '
12 REPLACE WATER VALVE BOX EA 5 $1,250.00 $6,250.00 $444.28 $2,221.40 , $66$.0"I
13 REPLACE SIGN EA 4 $600.00 $2,400.00 $667.26 $2,669.04 $772.00
14 CURB AND GUTTER (6") LF 930 $114.00 $106,020.00 $116.37 $108,224.10 $81.23
15 SIDEWA�K(4" PCC) SF 6400 $25.50 $163,200.00 $27.04 $173,056.00 $23.27
16 DRIVEWAY(COMMERCIAL) SF 550 $34.50 $18,975.00 $47.89 $26,339.50 $42.90
17 REPLACE ASPHA�T CONCRETE CF 3650 $28.50 $104,025.00 $12.11 $44,201.50 $17,26 '
18 CONCRETE CURB RAMP SF 355 $107.00 $37,985.00 $57.40 $20,377.00 $57.35 'i
TOTAL -CONTRACT ITEMS $557,555.00 $584,501.82 $532,699.43
�erage i otal
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 3 of 3
QTICE (:�F EXEMPTI�N
'Y"U: CI Of�ice of Planning and Research FI2dM. City af Reddin�
1400 Tenth Street, Room 121 Public Works Department
Sacramento, CA 95814 777 Cypress Avenue
Redding, CA 96001
� Shasta County CIerk
County of Shasta
P.O.Box 990880; 1b43 Market Street
Redciing, CA 9b099-0$S0
Praject Title: Libertv Street Rehabilitatian Project
Proj��#Location—Sp�cific> Liberty Street,Eu1•eka Way, East Stl�eet,Trinitv Street
Project Lacation—City: Redding Project Locatian—County: Shasta
�escription af"Project. The City of Redding (City) prop�ses to re�air dama�ed�ortions of sidewalk, curb, �utter and
asphalt concrete; replace dama�ed water meter boxes, area drain and catch basins• remove up to 20 trees� plant up to 28
trees in em�ty tree wells• and install irrigation Wark will involve fellin tree planting installing irri�atian line watering,
excavatizl�, trenching, pourin�concre€e, curin�concrete, and sawcutting
Name of Public Agency Approving Project, City-�f Redding
Name of Person or Agency Carrying Out Project:Ryan Fraga, PE-Proiect En�ineer
Exempt Status. {check one)
C] Ministerial [Section 21080(b)(1); 1526$]
CJ Declared Emerger�cy[Section 21fl80{b)(3j; 15269(a)]
� Emergency�roject�Section 2'l0$0(b){4); 15269(b)]
❑ Statutory Exemptions: State code number.
d Cornmon Sense Exemptifln{This project daes not fall within an exempt class;but it ean be seen with certainty that there is
no possibility that the activity may have a sigmficant effect on the envirc�nment(14 CGR 156fl1[b]�3]).
� Categorical Exemption. State type and sectian number: Sec. 15341,Existing Facilities
� Nc�exceptions apply tliat would bar the use of a categol•ical exemption{PRD 21084 and 14 CCR 15300.2).
Reas�ns why project is exempt: Class 1 exemptions include the operation; repair, maintenance, c�r minor alteration af
existing facilities, struch�res, ar equipment involving, ne�l_igible or no expansit�n of use. The project will repair dama�ed
ortions of sidewalk, as well as associated infrastructure, and replace damaged trees. The proiect includes the repaii• or
replacement of existin�infrastructure in the satne location and servin�the same purpose and capacity.Therefore the�roject
has no patential to have a si�nific�nt effect on the environment and further environmental review is not required.
Lead Ageney Cantact Persan:,Amber Kelley Telephonet 530.225.4046
If Filet� by Applicant;
1. Attach certified dc�cutnent of exernption finding.
2. Has a notice of exemption been filed by the public agency approving the project? ❑ Yes ❑No
�ignature: �"� ��. . Date; �"�� ��'���'
Titlec Environmental Ccsmplianc��;er
d Signed by Leacl Agency Date received far filing at OPRr