Loading...
HomeMy WebLinkAbout _ 4.11(a)--Award BS No. 5628 Turtle Bay to Downtown Gap Completion Project GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: November 18, 2025 FROM: Michael Webb, Public Works ITEM NO. 4.11(a) Director ***APPROVED BY*** ie ael � iiEali� oaks L)arector t�/S1242� t�s�a a �, t�t � 1 tll0/202� mwebb@cityofredding.org sbade@cityofredding.org SUBJECT: 4.11(a)--Award Bid Sched�ule No. 5628 Turtle Bay to Downtown Gap Com letion Pro�ect Recommendation Authorize and approve the following actions relative to Bid Sched�ule No. 5628, Turtle Bay to Downtown Gap Completion Project: (1) Reject the apparent low bid by Sunrise Excavating as nonresponsive, and award the project to the second lowest bidder S.T. Rhoades Construction Inc. in the amount of $1,797,056; (2) Approve an additional $230,000 to cover the cost of administration and inspection fees; (3) Approve $585,200 for project development costs; (4) Approve $179,800 to provide construction contingency funding; (5) Authorize the City Manager, or designee, to approve additional increases in either the construction management or construction contingency amounts up to a total of$75,000; and (6) Find that the project is categorically exempt from review under the California Environmental Quality Act,pursuant to Section 15301(c)—Existing Facilities. Fiscal Impact The Turtle Bay to Downtown Gap Completion Project (Project) is being funded by three sources: (1) State Transportation Improvement Program (STIP) funds in the amount of $1,270,000; (2) State of California Active Transportation Program (ATP) funds in the amount of$2,665,000; and (3) Streets funds in the amount of$100,000 for a total available of$4,035,000. The estimated cost of the project is $2,867,056. However, du� to the City's ability to complete the preliminary engineering phase significantly below the original estimated budget, the excess funds for that phase w�re returned to the State leaving a new available amount of$3,225,143. Report to Redding City Council November 11,2025 Re: 4.11(a)--Award BSNo. 5628 Turtle Bay to Downtown Gap Completion Project Page 2 Cost Summa Item Estimated Pro�ect Develo ment Costs $ 585,200 Construction Contract+ Contin enc $1,976,856 Contract Administration, Ins ection, Testin $ 230,000 Additional Cit Mana er Authorit $ 75,000 Total P�o'ect Costs $2,867,056 Pro'ect Bud et $3,225,143 Project cost components are estimates and allowable shifting of the project development, construction, construction management, and construction contingency funds may be necessary to balance the project within the approved budget. Alternative Action The City Council (Council) may choose not to award the bid for the project and provide staff with alternate direction. If the project is not awarded, connection between Turtle Bay Park and the River Trail with Downtown will not be complete. In addition, if the project is not awarded, the City of Redding (City) would be at risk of losing state funding due to grant requirements for project delivery. Background/Analysis Attached is a project tabulation of bids received and opened on September 18, 2025. The low bid in the amount of $1,734,190.51 was received from Sunrise Excavating (Sunrise) of Redding, California. After evaluating the apparent 1ow bidder's proposal, staff has deemed Sunrise's bid is nonresponsive and recommends award to the second low bidder, S.T. Rhoades Construction Inc., in the amount of$1,797,056. The engineer's estimate was $2,300,000. Total project development costs for this project are estimated to be $585,200. Project development costs include engineering, surveying, right-of-way, environmental, and consultant services. During the City's review of the apparent low bidder's proposal, a bid advisory letter was received from Norcal Construction Industry Compliance (NCIC) on October 6, 2025 alleging that the apparent low bidder's (Sunrise Excavating) proposal was nonresponsive because it did not list the percentage of work but instead the decimal format for work subcontractors would perform on each bid item. Sunrise provided clarification for how their subcontractor's portions of work were calculated. The bid proposal requires all bidders to submit a list of subcontractors and the percentage of each bid item the subcontractors will perform. Through standard staff bid review and consultation with the City Attorney's office, it was found that Sunrise's total percentages listed for subcontracted work totaled 62 percent. Per the standard specifications, Section 3 - Control of the Work, 3-2 Self Performance, th� prime must perform at least 50 percent of the work. Since Sunrise's bid did not meet the 50 percent self-performance requirement, it was determined that their bid was non.responsive. It should be noted that a nonresponsive bid is not a refleetion of the contractor's ability to perform the work nor does it reflect the quality of work or the ability to bid on future public works projects. The project will construct improvements along Sundial Bridge Drive from the intersection of Butte Street, north to the Turtle Bay Parking lot and along the Turtle Bay Parking lot to Sundial Report to Redding City Council November 11,2025 Re: 4.11(a)--Award BSNo. 5628 Turtle Bay to Downtown Gap Completion Project Page 3 Bridge Drive. Improvements include the construction of a shared-use path, a raised intersection with curb extensions, raised crosswalks, pedestrian lighting, curb ramps, striping, landscaping, and other miscellaneous items of work. It is anticipated that the project will be completed in Summer 2026. EnviNonmental Review Staff has determined that the project is categorically exempt from environmental review under Cali�ornia Environmental Quality Act Guidelines Section 15301(c) - Existing Facilities. Class 1 exemptions include minor alteration of existing public or private structures, facilities, or topographical �eatures involving negligible or no expansion of use. The project will be constructed on existing streets and facilities and involves negligible expansion of use. The project will not add new vehicle travel lanes. The project has been reviewed for sensitive resources and will not have a significant effect on biological or cultural resources such as threatened or endangered species or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources. There are no active hazardous waste sites within the project limits. The project has no potential to have significant effect on the environment. Council Priority/City Manager Goals This agenda item is a routine operational item. Attachments ^Location Map ^Bid Tab ^NOE Turtle Bay To Downtown_2025 .�� � � �y��,�o� _. c; `���<� � ��`�, �,,�oc� � � , � ` `�, � o , ��`��°,� , / . � �`���, �,, `�������F �~ ��� ���`��~�� . `� '`Y �'`� r. Y��� l � �,F ti, `�`�, ' � `� � , `�. �� �, `� ti i � ��� �. �,`�� \ �/ �, _� '� �, / � `,� � ~` �'.r ���� �~� ���'`��l1 �; _�, �, / ' � _� l ~ _--����� � ��� ��� ;/ �,1 � l r �� 1� C.) `~~�. l ;%�'%o. ..... ����. � �`�, :r� ,�'/`� ��F w� �> \ / r' '` � `�� w�� ��,"` � '�,� �. � � �` �� �,� �� ,o`�,, �.� , �.�, �, �,�� > �,� � ,� :;;,` �, ,,,, ,, � �- , \,,� � ��',,-� � `�. . ., t" �� � - ��� � ����� �;�, �� � �. ��� -�. �< � `t.' � r � PROJECT � � � � z. LOCATION � � , � �, ���, � - ��. ��� J � � � , ,, �� ~`�., �Q�� ;� .�;�/����� �r � _ ,' �` `�, P�' �,._..,1/, ._ fi,�' ��� ��� ��� ' �1 � ,,, � „� ��`�� `� 5`� � � ,/� �,_� � ; ° � ,„� �;� �� -�,� �,,t��-��. , � �, �; r f ._ ���r;r'j���r r�>�a�r���� ����'� �__ � �� � �� `�� „ , c � i � �/ .r .. �,� �/>�,.) �,/r C'yw�✓�^��..) ,,,/ „' µ � C,��j C�/*S � r�`✓j� � /� . .�__ " ,""�-- � �` A� � y.. ,,� r��„� �/ ` L� Y Y _ m_� � �"�,/`*�y��r � `�, l -- 'e,� AUDITORIUM DR �.�w.. l� � f , , �� �nr._..� �,F' � �-� _ , - � __ �` ��---_- _...� _ r , �� � ,� -- __ ___ �_��� �� � -- '"�" � ____- C ��� �=' �/r `��' ��� \ r ��. ��� ,. ��� �. �.,, ��� �� �'�P ` R 44 �".:``�: . � � .. , �- t, ��^ ttie o ., � �� � N .. . � ., ,, . .,. � � �.. .N6°-.� o � � � FF,� ~�, � � .- � s °`� W � � �.. � ,, .- � � � � ,.- �� p �. C9 � ~���� �C C] j ��__�_ 0: � _ tn , J I Q `" Z � �,r� e'(�i,,~�,'�,. � �� i �� �. F ST�� � �.-�'�fJ. ���.�. .. .�.� ��� � �����, �.. : �,�,.� ��w�� `__...__......_...._....._...._....._...._....._ ���� pARK _ ���.� MARllyq pRIVE -� �- ~-�:�� ��F `�Eo� CITY OF REDDING '= �� 2 TURT�E BAY TO DOWNTOWN C1 � PUBLIG WORKS � •° � �f _ ° GAP COMP�ETION PROJECT t�,� - -:-��P DEPARTMENT �OCATION MAP <�Foa BID TABU�ATION FOR: Turtle Bay to Downtown Gap Completion Project Bid Schedule No.: 5628 S. T. Rhoades ENGINEER'S EST Sunrise Excavatin Construction Inc ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL Prepare Storm Water Pollution 1 Prevention Plan LS 1 $5,000.00 $5,000.00 $2,625.00 $2,625.00 $2,500.00 $2,500.00 Implement Storm Water Pollution 2 Prevention Plan LS 1 $30,000.00 $30,000.00 $2,362.00 $2,362.00 $6,500.00 $6,500.00 SWPPP Action Based 3 Requirements (SWPPP ABR) LS 1 $5,000.00 $5,000.00 $1,000.00 $1,000.00 $4,000.00 $4,000.00 4 Traffic Control �S 1 $200,000.00 $200,000.00 $142,000.00 $142,000.00 $287,000.25 $287,000.25 5 Construction Area Signs EA 5 $600.00 $3,000.00 $388.00 $1,940.00 $370.00 $1,850.00 6 Project Funding Sign EA 1 $2,000.00 $2,000.00 $1,575.00 $1,575.00 $1,500.00 $1,500.00 7(F) Excavation (Unclassified) CY 695 $175.00 $121,625.00 $246.00 $170,970.00 $165.00 $114,675.00 8 Clearing and Grubbing �S 1 $80,000.00 $80,000.00 $68,000.00 $68,000.00 $20,000.00 $20,000.00 9 Biologist LS 1 $3,000.00 $3,000.00 $2,625.00 $2,625.00 $1,800.00 $1,800.00 10 Remove Asphalt Concrete SF 3150 $5.00 $15,750.00 $15.00 $47,250.00 $9.40 $29,610.00 11 Remove Concrete SF 3805 $7.50 $28,537.50 $15.00 $57,075.00 $8.00 $30,440.00 12 Curb and Gutter(6") �F 715 $75.00 $53,625.00 $90.40 $64,636.00 $130.00 $92,950.00 13 Concrete Curb (6") LF 150 $50.00 $7,500.00 $86.00 $12,900.00 $50.00 $7,500.00 14 Concrete Curb (B1-4) �F 95 $45.00 $4,275.00 $337.00 $32,015.00 $150.00 $14,250.00 15 Rolled Curb and Gutter LF 80 $55.00 $4,400.00 $90.40 $7,232.00 $130.00 $10,400.00 16 Concrete Flush Curb �F 146 $75.00 $10,950.00 $46.00 $6,716.00 $110.00 $16,060.00 17 Sidewalk (4" PCC) SF 18210 $25.00 $455,250.00 $16.50 $300,465.00 $15.00 $273,150.00 18 Sidewalk (8" PCC) SF 675 $45.00 $30,375.00 $20.75 $14,006.25 $45.00 $30,375.00 19 Concrete Curb Ramp SF 1142 $100.00 $114,200.00 $29.25 $33,403.50 $25.00 $28,550.00 20 Concrete (4" Deco) SF 1130 $45.00 $50,850.00 $23.00 $25,990.00 $27.00 $30,510.00 Detectable Warning Surface (Rust 21 Color) SF 385 $65.00 $25,025.00 $80.00 $30,800.00 $42.00 $16,170.00 22 Concrete (Roadway) SF 3185 $25.00 $79,625.00 $38.00 $121,030.00 $41.50 $132,177.50 23 Asphalt Concrete TON 229 $200.00 $45,800.00 $227.00 $51,983.00 $300.00 $68,700.00 24(F) Aggregate Base (Class 2) CY 60 $125.00 $7,500.00 $133.00 $7,980.00 $290.00 $17,400.00 25 Traffic Stripe (4"Thermoplastic) �F 177 $14.00 $2,478.00 $26.00 $4,602.00 $3.00 $531.00 26 Traffic Stripe (6"Thermoplastic) LF 5871 $5.00 $29,355.00 $2.36 $13,855.56 $2.25 $13,209.75 27 Traffic Stripe (8"Thermoplastic) �F 565 $8.00 $4,520.00 $5.51 $3,113.15 $4.50 $2,542.50 28 Pavement Marking (Thermoplastic) SF 4956 $15.00 $74,340.00 $11.55 $57,241.80 $7.50 $37,170.00 29 Pavement Markers EA 365 $15.00 $5,475.00 $15.75 $5,748.75 $6.00 $2,190.00 Remove Traffic Stripe 30 (Thermoplastic) LF 6000 $2.00 $12,000.00 $1.15 $6,900.00 $2.00 $12,000.00 BID TABU�ATION FOR: Turtle Bay to Downtown Gap Completion Project Bid Schedule No.: 5628 S. T. Rhoades ENGINEER'S EST Sunrise Excavatin Construction Inc ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL Remove Pavement Marking 31 (Thermoplastic) SF 840 $10.00 $8,400.00 $4.20 $3,528.00 $8.50 $7,140.00 32 Remove Sign EA 12 $175.00 $2,100.00 $57.00 $684.00 $51.50 $618.00 33 Install Sign EA 59 $550.00 $32,450.00 $400.00 $23,600.00 $375.00 $22,125.00 �ED Pedestrian Light(10 foot with 34 luminaire) EA 12 $10,000.00 $120,000.00 $6,300.00 $75,600.00 $6,000.00 $72,000.00 �ED Pedestrian Light(12 foot with 35 luminaire) EA 6 $10,000.00 $60,000.00 $6,300.00 $37,800.00 $6,000.00 $36,000.00 Street light(35' Standard & 36 Luminaire) EA 1 $20,000.00 $20,000.00 $8,925.00 $8,925.00 $8,500.00 $8,500.00 37 Conductor(#12) �F 625 $25.00 $15,625.00 $4.20 $2,625.00 $4.00 $2,500.00 38 Conductor(#6) LF 700 $25.00 $17,500.00 $5.25 $3,675.00 $5.00 $3,500.00 39 Conductor(4/O) �F 10 $15.00 $150.00 $105.00 $1,050.00 $100.00 $1,000.00 40 Conduit(1" PVC) LF 625 $120.00 $75,000.00 $18.90 $11,812.50 $59.00 $36,875.00 41 Conduit(2" PVC) �F 700 $120.00 $84,000.00 $26.25 $18,375.00 $82.00 $57,400.00 42 Pullbox (2E) EA 5 $2,500.00 $12,500.00 $2,100.00 $10,500.00 $2,000.00 $10,000.00 43 Pullbox (3E) EA 2 $3,500.00 $7,000.00 $2,600.00 $5,200.00 $2,500.00 $5,000.00 44 Electric Service Panel EA 1 $12,000.00 $12,000.00 $10,500.00 $10,500.00 $10,000.00 $10,000.00 45 Signal Modifications �S 1 $30,000.00 $30,000.00 $73,500.00 $73,500.00 $70,000.00 $70,000.00 46 Remove Flexible Bollard EA 7 $450.00 $3,150.00 $1,000.00 $7,000.00 $50.00 $350.00 47 �andscaping and Irrigation �S 1 $50,000.00 $50,000.00 $108,000.00 $108,000.00 $78,987.00 $78,987.00 48 Replace Catch Basin Lid EA 2 $15,000.00 $30,000.00 $2,800.00 $5,600.00 $6,500.00 $13,000.00 49 Slot Drain �F 27 $125.00 $3,375.00 $188.00 $5,076.00 $250.00 $6,750.00 50 Trench Drain LF 90 $500.00 $45,000.00 $200.00 $18,000.00 $475.00 $42,750.00 51 Replace Water Meter Box EA 3 $5,000.00 $15,000.00 $450.00 $1,350.00 $450.00 $1,350.00 52 Adjust Utility Box EA 5 $1,500.00 $7,500.00 $750.00 $3,750.00 $1,100.00 $5,500.00 TOTAL -CONTRACT ITEMS $2,162,205.50 $1,734,190.51 $1,797,056.00 BID TABU�ATION FOR: Turtle Bay to Downtown Gap Completion Project Bid Schedule No.: 5628 J. F.Shea Construction Inc A�cner Excavatin Inc. Snl Grou Inc ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL Prepare Storm Water Pollution 1 Prevention Plan LS 1 $892.00 $892.00 $3,634.40 $3,634.40 $5,500.00 $5,500.00 Implement Storm Water Pollution 2 Prevention Plan LS 1 $33,002.00 $33,002.00 $22,245.00 $22,245.00 $10,000.00 $10,000.00 SWPPP Action Based 3 Requirements (SWPPP ABR) LS 1 $10,641.00 $10,641.00 $4,840.00 $4,840.00 $25,000.00 $25,000.00 4 Traffic Control �S 1 $248,968.00 $248,968.00 $302,016.00 $302,016.00 $100,000.00 $100,000.00 5 Construction Area Signs EA 5 $370.00 $1,850.00 $363.00 $1,815.00 $530.00 $2,650.00 6 Project Funding Sign EA 1 $1,500.00 $1,500.00 $1,210.00 $1,210.00 $3,000.00 $3,000.00 7(F) Excavation (Unclassified) CY 695 $93.00 $64,635.00 $81.00 $56,295.00 $164.00 $113,980.00 8 Clearing and Grubbing �S 1 $26,288.00 $26,288.00 $31,888.00 $31,888.00 $48,500.00 $48,500.00 9 Biologist LS 1 $10,710.00 $10,710.00 $6,655.00 $6,655.00 $7,500.00 $7,500.00 10 Remove Asphalt Concrete SF 3150 $6.00 $18,900.00 $8.21 $25,861.50 $3.25 $10,237.50 11 Remove Concrete SF 3805 $13.00 $49,465.00 $7.60 $28,918.00 $13.50 $51,367.50 12 Curb and Gutter(6") �F 715 $75.00 $53,625.00 $138.00 $98,670.00 $131.00 $93,665.00 13 Concrete Curb (6") LF 150 $74.00 $11,100.00 $91.00 $13,650.00 $65.00 $9,750.00 14 Concrete Curb (B1-4) �F 95 $340.00 $32,300.00 $104.00 $9,880.00 $100.00 $9,500.00 15 Rolled Curb and Gutter LF 80 $145.00 $11,600.00 $139.00 $11,120.00 $110.00 $8,800.00 16 Concrete Flush Curb �F 146 $56.00 $8,176.00 $100.00 $14,600.00 $63.00 $9,198.00 17 Sidewalk (4" PCC) SF 18210 $18.00 $327,780.00 $18.00 $327,780.00 $28.50 $518,985.00 18 Sidewalk (8" PCC) SF 675 $59.00 $39,825.00 $55.00 $37,125.00 $35.00 $23,625.00 19 Concrete Curb Ramp SF 1142 $36.00 $41,112.00 $96.00 $109,632.00 $38.00 $43,396.00 20 Concrete (4" Deco) SF 1130 $37.00 $41,810.00 $39.00 $44,070.00 $48.00 $54,240.00 Detectable Warning Surface (Rust 21 Color) SF 385 $146.00 $56,210.00 $52.00 $20,020.00 $60.00 $23,100.00 22 Concrete (Roadway) SF 3185 $27.00 $85,995.00 $38.00 $121,030.00 $43.00 $136,955.00 23 Asphalt Concrete TON 229 $227.00 $51,983.00 $509.00 $116,561.00 $700.00 $160,300.00 24(F) Aggregate Base (Class 2) CY 60 $237.00 $14,220.00 $311.00 $18,660.00 $300.00 $18,000.00 25 Traffic Stripe (4"Thermoplastic) �F 177 $25.00 $4,425.00 $4.00 $708.00 $31.00 $5,487.00 26 Traffic Stripe (6"Thermoplastic) LF 5871 $3.00 $17,613.00 $2.72 $15,969.12 $2.75 $16,145.25 27 Traffic Stripe (8"Thermoplastic) �F 565 $6.00 $3,390.00 $5.50 $3,107.50 $7.50 $4,237.50 28 Pavement Marking (Thermoplastic) SF 4956 $11.00 $54,516.00 $9.08 $45,000.48 $13.25 $65,667.00 29 Pavement Markers EA 365 $15.00 $5,475.00 $8.00 $2,920.00 $19.50 $7,117.50 Remove Traffic Stripe 30 (Thermoplastic) LF 6000 $1.10 $6,600.00 $2.42 $14,520.00 $1.50 $9,000.00 BID TABU�ATION FOR: Turtle Bay to Downtown Gap Completion Project Bid Schedule No.: 5628 J. F.Shea Construction Inc A�cner Excavatin Inc. Snl Grou Inc ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL Remove Pavement Marking 31 (Thermoplastic) SF 840 $4.00 $3,360.00 $11.00 $9,240.00 $6.25 $5,250.00 32 Remove Sign EA 12 $51.50 $618.00 $242.00 $2,904.00 $314.00 $3,768.00 33 Install Sign EA 59 $375.00 $22,125.00 $484.00 $28,556.00 $375.00 $22,125.00 �ED Pedestrian Light(10 foot with 34 luminaire) EA 12 $8,291.00 $99,492.00 $5,414.00 $64,968.00 $7,500.00 $90,000.00 �ED Pedestrian Light(12 foot with 35 luminaire) EA 6 $10,588.00 $63,528.00 $5,350.00 $32,100.00 $7,800.00 $46,800.00 Street light(35' Standard & 36 Luminaire) EA 1 $10,593.00 $10,593.00 $6,002.00 $6,002.00 $8,500.00 $8,500.00 37 Conductor(#12) �F 625 $4.00 $2,500.00 $5.00 $3,125.00 $6.50 $4,062.50 38 Conductor(#6) LF 700 $5.00 $3,500.00 $4.00 $2,800.00 $12.00 $8,400.00 39 Conductor(4/O) �F 10 $100.00 $1,000.00 $256.00 $2,560.00 $150.00 $1,500.00 40 Conduit(1" PVC) LF 625 $48.00 $30,000.00 $74.00 $46,250.00 $60.00 $37,500.00 41 Conduit(2" PVC) �F 700 $61.00 $42,700.00 $85.00 $59,500.00 $70.00 $49,000.00 42 Pullbox (2E) EA 5 $2,400.00 $12,000.00 $2,671.00 $13,355.00 $3,250.00 $16,250.00 43 Pullbox (3E) EA 2 $2,500.00 $5,000.00 $5,331.00 $10,662.00 $11,000.00 $22,000.00 44 Electric Service Panel EA 1 $10,000.00 $10,000.00 $16,346.00 $16,346.00 $20,000.00 $20,000.00 45 Signal Modifications �S 1 $70,000.00 $70,000.00 $68,924.00 $68,924.00 $80,000.00 $80,000.00 46 Remove Flexible Bollard EA 7 $336.00 $2,352.00 $455.00 $3,185.00 $950.00 $6,650.00 47 �andscaping and Irrigation �S 1 $78,987.00 $78,987.00 $124,658.00 $124,658.00 $118,850.00 $118,850.00 48 Replace Catch Basin Lid EA 2 $4,373.00 $8,746.00 $2,396.00 $4,792.00 $4,450.00 $8,900.00 49 Slot Drain �F 27 $317.00 $8,559.00 $371.00 $10,017.00 $500.00 $13,500.00 50 Trench Drain LF 90 $295.00 $26,550.00 $603.00 $54,270.00 $350.00 $31,500.00 51 Replace Water Meter Box EA 3 $1,349.00 $4,047.00 $2,207.00 $6,621.00 $1,300.00 $3,900.00 52 Adjust Utility Box EA 5 $860.00 $4,300.00 $1,928.00 $9,640.00 $1,300.00 $6,500.00 TOTAL -CONTRACT ITEMS $1,844,563.00 $2,090,876.00 $2,199,858.75 BID TABU�ATION FOR: Turtle Bay to Downtown Gap Completion Project Bid Schedule No.: 5628 AVERAGE ; ' ITEM DESCRIPTION UNIT QTY PRICE Prepare Storm Water Pollution 1 Prevention Plan LS 1 $3;030.2$' Implement Storm Water Pollution 2 Prevention Plan LS 1 ' $14,821.8Q ' SWPPP Action Based 3 Requirements (SWPPP ABR) LS 1 $9;096.20 4 Traffic Control �S 1 $2�5,996.85' 5 Construction Area Signs EA 5 $404.2a 6 Project Funding Sign EA 1 $1,757.00 7(F) Excavation (Unclassified) CY 695 $149.8Q 8 Clearing and Grubbing �S 1 ; $38,935.20' I 9 Biologist LS 1 $5,858.00 10 Remove Asphalt Concrete SF 3150 ' $8.37 11 Remove Concrete SF 3805 $11.42 12 Curb and Gutter(6") �F 715 $112.88 ; 13 Concrete Curb (6") LF 150 '$73.20 ` 14 Concrete Curb (B1-4) �F 95 $206.20 ! 15 Rolled Curb and Gutter LF 80 $122.88 16 Concrete Flush Curb �F 146 $75.00' 17 Sidewalk (4" PCC) SF 18210 $19.20 18 Sidewalk (8" PCC) SF 675 I$42.95 19 Concrete Curb Ramp SF 1142 $44.85 20 Concrete (4" Deco) SF 1130 $34.80 Detectable Warning Surface (Rust 21 Color) SF 385 $76.00 22 Concrete (Roadway) SF 3185 '$37.50' 23 Asphalt Concrete TON 229 $392.60 24(F) Aggregate Base (Class 2) CY 60 $254.20 25 Traffic Stripe (4"Thermoplastic) �F 177 $17.80 26 Traffic Stripe (6"Thermoplastic) LF 5871 $2.62 27 Traffic Stripe (8"Thermoplastic) �F 565 $5.80 ' 28 Pavement Marking (Thermoplastic) SF 4956 $10.A�8 ' 29 Pavement Markers EA 365 $12.8�' ' Remove Traffic Stripe 30 (Thermoplastic) LF 6000 $1.63 ' BID TABU�ATION FOR: Turtle Bay to Downtown Gap Completion Project Bid Schedule No.: 5628 AVERAGE ; ' ITEM DESCRIPTION UNIT QTY PRICE Remove Pavement Marking 31 (Thermoplastic) SF 840 $6.79 32 Remove Sign EA 12 $143.20 33 Install Sign EA 59 $401.80' �ED Pedestrian Light(10 foot with 34 luminaire) EA 12 $6;701.00 �ED Pedestrian Light(12 foot with 35 luminaire) EA 6 $7;207.60 ' Street light(35' Standard & 36 Luminaire) EA 1 $8,504.00 37 Conductor(#12) �F 625 $4.74 38 Conductor(#6) LF 700 $6.25 39 Conductor(4/O) �F 10 $142.�0 40 Conduit(1" PVC) LF 625 $51.9$ 41 Conduit(2" PVC) �F 700 $64.85' 42 Pullbox (2E) EA 5 $2,484.20 43 Pullbox (3E) EA 2 $4,786.20 44 Electric Service Panel EA 1 ; $13,369.20 I 45 Signal Modifications �S 1 $72,484.80' 46 Remove Flexible Bollard EA 7 $558.20 47 �andscaping and Irrigation �S 1 i $1fl�,896.40 48 Replace Catch Basin Lid EA 2 $4;103.8Q 49 Slot Drain �F 27 $325.2� 50 Trench Drain LF 90 $384.60' 51 Replace Water Meter Box EA 3 $1;151.20 52 Adjust Utility Box EA 5 $1,187.60 ' TOTAL -CONTRACT ITEMS $1,933,308.$5 +LlTICE QF �E PTI N To: � Qffice of Planniilg and Reseai-ch FROMs City af Redding 1400 Tenth Street, Roam 121 F'ublic Works Department Sacralnenta,CA 95814 777�ypress Avet�ue Redding; CA 960D1 � Shasta County Clerk County of Shasta P.Q.Box 990880, 1643 Mar�ket Street Redding, CA 9fi499-08$0 Project Titte: Turtle Bay ta DowiYtown Ga�Cc�m_pletion Project JO# 2486-20 Pxoject Location—Specific: Sundial Bridge Dri�e;Butte Stre�t and Park Marina Drive Project Location—City. Reddin� Project Loc�tion—County: Shasta Description of Froject: The City of Aedding will construct� non-lnotorized praject ta improve non-motorized access ta the dar�ntowll area and ia existin� 11an-matoriz�d trail facilities The �roaect includes 1,900-feet of sliared use path a two-wa� cycle track, raised crosswalks, Y•aised intersection, bicycie laiies sidewalk, curb and �utter modificatians pedestrian safet�� li�hting, barricade fence, and protective ballards. Constructioii will consist of rg adin� draizla�e rnodification, ve�etation rernaval, u#ility relocation, li htil��pavin�, stripin�, and si�n rer�lacement. The project rnav include ve�etation plantin� and the installation of irrigation eQuipment. The pro�ect will be located on City streets, CitX roper and�rivate pro�ert�The public will be notified prior to construetion. Narne af Public Agency Approving Praject: City of Reddin� Narne of I'erson or Agency Carrying l'3ut 1'roject: I�risteil Rea ag n, Project Engineer Exempt Status: (check r�ne) ❑ 1Vlinisterial [Section 21080(b)(1), 1;5268] � Declared Emergency [Sectioi121080(b){3); 152b9{a)] ❑ Emergency Project[Seetion 21080(b)(4); 15269(b)] ❑ Stat�.itory Exemptions. State cade rnumbcr: ❑ Common Sense Exempfian (7'his project does nat fall within an exempt class;but it ean be seen with certainty that there is no possibiiity that the actrvity rnay have a sigmficant effect on the environment{14 CCR 15b01[b][3]): � Categorical Exemption. State type and section number: Sec. 15301{c),Existiii�Facilities CI No exceptic�ns apply that would bar tl�e use of a categorical exemptian(PRD 21Q$4 and 14 CCR 15300:2): I2easons why pro,�ect is exempt: Class 1 exemptions include minor alteration of existin� public or private structures, facilities, ar topographicat features inVoPvin�ne,�lieibie or no exparision of use. The project wiii be constructed on existing stireets and facilities arid involves ne�ib[e expansion of use: The praject will not add new vehicle travel lanes. The project has been reviewed for seiisitive resaurces and will nat have a significant effect o�l bialogical or cialtural resources such as tlireatened or endangered species or their habitats, sensitive vegetation communities tribal lands; or tribal cuitural resoui•ces. There are no active hazardous waste sites within the project limits. The pro�yect l�as no poten#ial to have a si�nificant effect on the environinent: Lead Agency Contact P'erson:Amber Kelie� Teiephone; 53Q.225:4046 If Fil�d by Applicant: 1. Attach certifiet�document of exemption finding. 2. Has a notice af exernption been filed by the pubiic agency approving the project? ❑ Yes ❑No � Sign�ture: ('�� .�,:�v��...s�_r�.!:�'f.����,it�, llate• ��"., �� Title: Enviranmental Com�liance 11�a�er c:� �Signed by Lead Agency Y�ate received for filin;at(7PR: ❑ Signed by Applicant