HomeMy WebLinkAbout _ 4.11(c)--Increase to Project Budget for Water Main 2024 Improvement Project GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: October 21, 2025 FROM: Michael Webb, Public Works ITEM NO. 4.11(c) Director ***APPROVED BY*** ie ael � iiEali� oaks L)arector ld(141242� t�s�a a �, t�t � 1[dll4l202� mwebb@cityofredding.org sbade@cityofredding.org SUBJECT: 4.11(c)--Approve Increase to Project Budget for the Water Main 2024 Im rovements Pro'ect Recommendation Authorize and approve the following actions relative to Bid Negotiation No. 5523, Water Main 2024 Improvement Project, as outlinedbelow: (1) Increase of $38,000 to the construction management budget, bringing the construction management total to $418,000; and (2) Increase of $362,000 to the construction contingency budget bringing the construction contingency total to $700,000. Fiscal Impact The Water Main 2024 Improvement Project (Project) is funded by the Public Works' Water Utility Division. Public Works' Water Utility has adequate funding within the current Water Main Replacement Account as previously appropriated by City Council (Council) as part of the Fiscal Year 2025-26 budget to adeguately cover the $400,000 increase. Once approved, staff will process an appropriation transfer to document the transfer of funds from the Water Main Replacement Account to the project. The project cost, including the proposed increase, will be $5,067,521. Cost Summa 1 Item Authorized Amount IncNease Amount Revised Amount Pro'ect Develo ment Costs $521 $0 $521 Contract Administration, $380 $38 $418 Ins ection, Testin Construction Contract $3,378 $0 $3,378 Construction Contin enc $338 $362 $700 Additional City Manager $50 $0 $50 Authorit Total Pro'ect Costs $4,66� $400 $5,06� Total Pro'ect Bud et $4,700 -- $5,100 Report to Redding City Council October 14,2025 Re: 4.11(c)--Increase to Project Budget for Water Main 20241mprovement Project Page 2 Notes: iAll amounts are rounded to the nearest$1,000. �Additional City Manager Authority, $50,000,was transferred to Construction Contingency on September 25, 2025. Alternative Action Council may choose not to approve the request and provide alternative direction to staff. Without additional funding, the project scope will have to be reduced, leading to a greater potential �or increased maintenance costs for the unfinished portions of the distribution system, decreased reliability of the distribution system, and increased risk of water main breaks creating significant issues for the City of Redding (City) and its customers. Background/Analysis The City's water system includes approximately 2.98 million feet (565 miles) of conveyance and distribution pipeline consisting of various materials and sizes ranging from 1-inch to 48- inch diameter. Assessments of the City's water distribution system indicate the older steel, asbestos and cast-iron pipelines have had the highest rates of failure in recent years as they have reached the end of their service life. In an effort to reduce pipeline failures, associated maintenance costs, and improve reliability to its customers, the Water Utility has focused on replacing the older piping in areas where the breaks have occurred. This project will replace over 11,000 feet of the aging water mains, 85 water service connections, 18 fire hydrants and acquire any necessary easements. The new pipeline material is a polyvinyl chloride and ductile iron piping which is expected to reduce future maintenance and provide reliable service for the foreseeable future. On November 5, 2024, the Council awarded the construction contract for the project to Cox & Cox Construction, Inc. The notice to proceed was issued February 28, 2025, but due to concerns with the weather, the project was suspended until later in the spring when rainy weather would be more unlikely to affect construction progress. Prior to construction beginning, a change order was issued to cover an increase in costs to accommodate a request from Caltrans regarding as-built information. The Caltrans as-built requirements were specified in their initial encroachment permit, however, after the project bid, Caltrans significantly revised the permit, changing the as-built requirements. In addition to this unexpected cost increase, when construction began in May 2025, the contractor immediately encountered conditions along South Market Street that were considerably different than what was anticipated when bidding the project. The existing asphalt in some places was up to 12- inches thick with a 10-inch thick concrete slab beneath the asphalt and other locations consisting of asphalt up to 22-inches thick. These noted conditions required the use of different means and methods for the project installation and the two subsequent ehange orders depleted about 60 percent of the original contingency budget. As construction proceeded, excavation through rocky conditions was also eneountered and not previously identified on the project plans, leading to additional and necessary changes. Report to Redding City Council October 14,2025 Re: 4.11(c)--Increase to Project Budget for Water Main 20241mprovement Project Page 3 The remaining areas of work on the project are near the locations where rocky conditions were previously encountered and an estimate for completing work at these locations is included in the requested increase. Other unexpected costs for this project include repairs to the surface of Wildwood Road in an effort to match the existing condition of the road prior to installation of the water Inain; and additional exploratory excavation to locate the existing water main along Highway 299 which appears to be at least 14-feet deep rather than the 6-feet deep shown on the plans. The additional work attributed to the existing conditions will cause the project budget to exceed the awarded amount. An additional $400,000 is requested to cover anticipated increases to the construction contingency ($362,000) and construction management ($38,000) project components. EnviNonmental Review This action, budget modification, is not a project as defined by the California Environmental Quality Act (CEQA), and no further action is required. On November 5, 2025, Council determined that the Water Main 2024 Improvement Project is categorically exempt from review under CEQA, pursuant to Section 15301 - Existing Facilities, 15302 - Replacement or Reconstruction, and 15305 - Minor Alterations in Land Use Limitations. Council Pr�iority/City Manager Goals • This agenda item is a routine operational item. Attachments ^092525 Transfer of Project funds Previous Staff Report 110524-411f-Award BN 5523 C 1 T Y C7 F i��-- -��� t tern�t ca unic�tia�ra � �� � c � � r � c� �z r� t;:' ,�=:�� z,� DATE: September 25; 2425 TO: Barry Tippin,City Ivlanager FROM: Michael Webb,Directar of Public VtT�rks SU�JECT: Request for Transfer of Project�'unds Water M�in 2024 Project Bid Negotiation No. 5523,Job No.2681 In accordance with the Council Approved Award of Bid Negatiation No. 5523;a transfer c�f City Manager Funds (Job No. 2681}'to Project Continge�icy Funds($50;000) is rec�uested. Adclitional contingency funds are required in order to provide adeqt�ate resources for unanticipated quantity lncreases (rock exeavation and watei• service reconnections) as well as unanticipated discoveries during constructian such as buried cancrete(1i?-incl� thick concrete slab), leaking water mains (requiring repair) a�ld pavement repairs (chip seal). A transfer of$50;000 frorn the available rernaining Gity Manager budget is necessary to partially fund these cllange arders. Staff will bring forth to Council a project increase sc�on for remaining funds. Ori inal Authorized Re uested Increase Newl Authorized Contract $3,37�,220.50 $0 $3;378,220.50 Contingency $33 5,000 $5�,000 $3 88,000 ConsYructic�n $380,000 $0 $380,000 Management Gity Manager Funds $50,000 (�5�,C9f�Cl) $0 Total �4,146,220.5 �0.00 $4,146,2�0.50 There is eurrently a balance of$30,O�fl available in Project Cantingeney Funds. The transfer is needed to caver the knawn forthcaming change orders in order to progress with the work an tlie project. Please feel free to contact Nck Viscanti at 225-4582 if you ha�e any question need additionai information. � ���: �_� � �� Ass irecta f ublic Warks Date �,� '` Director af Public Works Date Nd � fr � ..j.n�-Pomuy�.", ���. p a�� ...�� !: ..... 1 City Mana r � Date GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: November 5, 2024 FROM: Michael Webb, Public Works ITEM NO. 4.11(� Director ***APPROVED BY*** „, �. .A,��,� ie ael � iiEali� oaks L)arector ld(?9/2424 i�}�in,Ci an � ltll2�/2424 mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(�--Award Bid Negotiation No. 5523 (Job Order No. 2681) Water Main 2024 Im rovement Pro'ect Recommendation Authorize and approve the following actions relative to Bid Negotiation No. 5523 (Job Order No. 2681), Water Main 2024 Improvement Project: (1) Award to Cox & Cox Construction, Inc., in the amount of$3,378,220.50; (2) Approve an additional $380,000 to cover the cost of administration and inspection fees; (3) Approve $521,300 for project development costs; (4) Approve $338,000 to provide construction contingency funding; (5) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of$50,000; and (6) Find that the Project is categorically exempt from review under the California Environmental Quality Act, pursuant to Section 15301 - Existing Facilities, 15302- Replacement or Reconstruction, and 15305 —Minor Alterations in Land Use Limitations. Fiscal Impact The Water Main 2024 Improvement Project (Project) is being funded by Public Works' Water Utility Division. This project was included in the Water Utility Master Capital Plan and budget accordingly—funding this project will not impact other activities or projects. Cost Summar� Item Estimated Pro'ect Develo ment Costs $521,300 Construction Contract-�- Contin enc $3,716,221 Contract Administration, Tns ection, Testin $380,000 Additional City Manager Authority $50,000 Total Pro'ect Costs $4,66�,521 Total Pro'ect Bud et $4,700,000 Report to Redding City Council October 31,2024 Re: 4.11(f)--Award Water Main 20241mprovement Project Page 2 Project cost components are estimates and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget. Alternative Action City Council may choose not to award the bid for the project and provide staff with alternate direction. Without this project, there is greater potential for increased maintenance costs, a decrease in reliability and an increased risk of water main breaks for the City of Redding (City) customers. Background/Analysis The City's water system includes approximately 2.98 million feet (565 miles) of conveyance and distribution pipelines o� various pipe materials and sizes ranging from 1-inch to 48-inch. Assessments of the City's water distribution system indicate that the older steel, asbestos and cast-iron pipelines have had the highest rates of failure in recent years. To reduce pipeline failures and maintenance costs and to improve reliability to its customers, the Water Utility has focused on replacing older steel, cast-iron and asbestos piping in areas where breaks have occurred. This project will replace over 11,000 feet of aging steel, asbestos and cast-iron water mains, 85 water services, 18 fire hydrants and acquire any necessary easements. These mains have reached the end of their service life and have had several breaks in recent years that the Water Utility has repaired. This project will replace the old piping with new polyvinyl chloride (PVC) and ductile iron piping to red�uce fut�ure maintenance and provide reliable service in these areas for the foreseeable future. Attached is a tabulation of bids received and opened on October 17, 2024, for construction of the project. The low bid in the amount of $3,378,220.50 was received from Cox & Cox Construction, Inc., of Redding, California. The engineer's estimate was $3,114,025. Tota1 project development costs for this project are estimated to be $521,300. Project development costs include engineering, surveying, right-of-way, environmental, and consultant services for the proj ect. Environmental Review Staff has determined that the project is categorically exempt from environmental review under California Environmental Quality Act Guidelines, pursuant to Sections 15301 - Existing Facilities, 15302 —Replacement or Reconstruction, and 15305 — Minor Alterations in Land Use Limitations. Class 1 exemptions include the minar alteration of existing public structures and facilities. Class 2 exemptions consists of replacement or reconstruction where the new structure will be located on the same site and wi11 have substantially the same purpose and capacity. Class 5 exemptions consist of minor alterations in land use limitations, which do not result in any changes in land use or density. Th� existing utilities wi11 be replaced to provide reliable service that meets public health and safety standards. The project will be located in the right-of way and will result in a negligible expansion of use. The action area does not have significant values for wildlife habitat or other environmental resources and the project has no potential to have a significant effect on the environment. Council Priority/City Manager Goals � This agenda item is a routine operational item. Report to Redding City Council October 31,2024 Re: 4.11(f)--Award Water Main 20241mprovement Project Page 3 Attachments ^Location Map ^Notice of Exemption ^Bid Tab � � � � J , , _ � , � � ( ... i�-- ,; � — � � i �_ _ r _ � �, a ` , , � ----- 1��., � � �-- i ; _ �,�..�— � V , , , � ( � � � �_._.� , ���� '', � I �.. J �, r �,�-� � � � � � �-- —� ��_ �L _�_ ��� � , / , , ___ ( � � � �� � � - r '�_. 1 /__/ ��I J``I ___ _�— � .i i1 i __ � 1�— I /'��'� � �� �� 1— I � — � — — — j � ( `' r � � _ ����' � � � , �� � C � � � �' I �- I � �- '� -� i �-� i� �� 1� �I , � ��'� _ �� , ___ - -- --_ i _ , J _ Q ,� � _ :. , 1 . � 1 �� � -�_ i��� � _ -� �- r . _ - '� — � (_ '— � � „� ' i �� , � � 1 , � - �_ , � OLD OASI. ; _ .�_�_ � - ( � �- -�_ � __ g R � � �� , __� r � __ __� '�l �__ � I ,�� � ^-� �`� =�- -�-� =-- � w. --- -, . - _ ..,�' � c-_ _ � � { o _ � � ~ w � � � ��� oR , � w �-; , -� � �,' =,�-1' e . f Y, , -- _ � __ ._.. , , � � ,, � � �I � � �� '� 1 ; `_ � . �) � �� , � r Q ) � � � � � ' ,._ ,� � i i � ' �,t � � � jj �� � .. b� � t i 1� 1 - ��--"� ��` � � � ....._ — . 1 �� - -- .a � � — —f 1 ( �� 1 � � ' i r, � ';�'� ;l. � _''— �_~��� � � / ,, �� _� � �_ ,� � �� — � � � �. , i =r _;'t.�r-,.. , � �C ji � � ��.r � "`���, � t�� � ��l � � �� ,�i� ,I . �. � � , - . i �—�" �-- � �, � �- �" ;� ,r' r� ��\� 1 ���i � f, ,< �.. � , y���� � �.�.. �� , � � a � ��� _ � J /, � � � � i �. \� �� '' ,,,� "r� f� � �1__, � . ( --, � � � ,r 7 ��� \ —, t_. �—� �� r ,,��'��/ � `,r ��..��� ;��� � ; ( � � � � �� � � � _ i �.��, � �r'� r � �a�\,;�,r�� _�� � � � 1 � �.,....�- � 1 r�(r�� � , � _� �� — �� � � � � , � E J`, J ` � � �� � �� � � _� , 1 �—, _, �� —� � �� � . .�_. _ � ' ;_ � ' _�, � a � � _= i _�� i ,.��r , , � . G , w. -- � �-� , � ; ,`�� - ��� � ,� � �� -- � - . � , ,, , � �__ C I� ��� -- ��f ,, , , _ , , , , — � , � � , — � , �M_���� �� � �� � ��r � � � — , , ,� , � � i , �, i�� ��- ,� �...� � �__ � �___, i ` 1 �.����� , f . r�, , �� 1 � .., � ���� '� �. i �� ; i � �� `J ��., ,. _ � I ,p� �� �� � ''Z � '_—�. � � �_� I i Wi�� � � j`�1Z � � � �` ��� � � _� _�� —� � �� � �� t i,— }— � � .._— �� �, �'° �, , , -- — � , I ��h E.. I O , , �� 1 1 � i i 'S' �' i� � r . � `rl ��I EN.. � ' � ' � _,_. , � ������. I i _� ��`� � � l �1�;� II, W i / J ` — , i � — , � � — -- � � _ ' 1 ~ ���! r ' I'��' \�'\ ' "� �� �.._ ' I Y � „.., , .,. .. � ..._ y �'' � / _ i . . r_ I , ' // •.--' � i .- ' �i !� � \\ _' �\ � - " ` �j �� � . ������ ,� ~, � .. ,� � �, , � ��_ '� --`, ,�„�� � ��'�� ,r 1 ��_ �,�. -�" ' � V 1�1� � �. .. _�, a � ��—�—i `���'�� �.� � � � ��r�, , � � .� _ � � �P � � �� � , � � �� - _ , �_ �, G. � � �� �' � , � � -� � L ��� ��� _, - � .� �.. �t, _ , � , � y a �� a R � � _ �� ., E -- ��,. � t � ,�- ; _ k � , , y I � � V.._ �� � ��� r � , � � � ..__ � �, _ -.. . � ,_.� , ' �._ � ,_ _r � _ �_ � ,�� � t__ -` — �-- _ __ .,. � ,, f � � � � ,� .� _ � � ;J ,._ T y �- — � r� � � �, ELLIS S — — �� I � � 1 � � i�,� • .�_ —r—�— \. � �_� � ��� � � _ � � ' 1 "!' , �- 4 r ; j ,_ ` `� , '� ���I � — � '% 1 , s � ,, i � i , � �, 7 , i , �ar , � � -- -- �` _. � — ; . , r.� � � � 1= i ; t ' 1 ( _� �� , �� �� ,� � ___ i ,_____ �___ � � — / , A � SU_TTER ST, _ i i � i� ,. ', � � { � �i i i i _ �-- i , �- - , r _ __ ; - i � � � r � � '' ` � � i � �� � - --� ����I , � � � - , - — "" '� � GEARY ST -- � � w , � j}c�' �� m�. . � i ; �?� �oF RFoo CITY OF REDDING EXHIBIT A '� — 2 WATER MAIN IMPROVEMENT � - � PUBLIC WORKS t� �� �� DEPARTMENT PROJECT 2024 ��,�oa� LOCATION MAP NaTICE oF E MP�To�v TO: � Office of Planning and Research FROM. City of Redding 140Q Tenth Street,Raam 121 Public Works Department Sacramento,CA�S$14 777 Cypress Avenue Redding,CA 96001 O Shasta County Clerk County of Shasta P.C7.Bax 990880, 1643 Market Street Redding,CA 96p99-0880 Project Title. Water Main Impravement Project 2024 Froject Location—Specific: Old Oasis Road,Theresa Lane;Thelma Lane Daut Road Qasis Raad Alee Lane Eureka WayISR299, Wildwood Lane, Sauth Market StreetlSR2'l3 Project Lacation—Ciiy: Reddin�Praject Location—Caunty: Shasta Descriptian af Project, The Citv of Reddin�(Citv)will construct a water improvement prc�ject in various lacatians The proiect includes the installation of approximately 11 50Q linear feet of new water line and a�proximatelv 55 new valves Fire hydrants will be replaced or rehabilitated water meters will be relocated and water service will be reconnected The existzn�water lines and valves will be abandaned in�lace. Construction and mair�tenance access requires the acquisition of twelve new t�ublic service easements. Work will be canducted within the ri h� t af way and within existing and new1X acQuired public service easement areas. The public will be noti�ed af anv traf�c restrictions Name of Public Agency Approving Project:City of Reddin� Name af Person or Agency Carrying QutProjectm Wally Daniels,Pra,�eet En�ineer Exempt Status: (check one) ❑ Ministeriat [Sectron Zi08Q(b)(l); 15268] ❑ I}eclared Emergency [Section 21080(b)(3); 15269(a}] ❑ Emergency Project[Sectian 21080(b)(4), 15269(b)] ❑ Statutory Exemptions. State code number� ❑ Common Sense Exemption('This project does not fall within an exempt class,but it can be seen with certainty xhat there is na possibilitiy that the activity rnay have a signific�nt effect on the envirananent(14 GCR 15Q61[b][3]): � Categorical Exemption.State type and section nurnber: Section 15301, Existin�;Facilities, 15302.Replacement ar Recanstruction, and 15305.Minor Alterations in Land Use Limitations � No exceptions apply that would bar the use of a categorical exemption(PRD 21084 and 14 GCR 1530Q.2). Reasans why pro,�ect is exempt; Class l exemptions include the minor altaration of existin�public structures and facilities: Class 2 exemptions consists of replacement or recan�truction where the new structure will he located on the same site and will have substantiallv the same purpose and capacity Class 5 exemptions consist of minor alterations rn land use limitations, which da not result in any chan�es in land use or densiiv The existin� utilitias wrll be replaced ta provide reliable service that meets public health and safetv standards The proieet will be located in the rr�ht of way and within public service easements.The project will not create chan�es in land use ar density and the pra�ect w111 result in a ne�li�ible expansion of use. The action area does not have si�nificant values for wildlife habitat or other environmental resources and the proiect has no potential ta have a si�nificant effeet c�n the environment- Lead Agency Contact Personm Amber Kelley Telephone. 5�0.225.4046 If Fil�d by Applicantz l. Attach certified document of exemption finding. 2. Has a natice of exemption been filed by the public agency approving the project?o Yes o Nc� Signature; +�...�� '� Date: ,� " -,�t''�� Ti#le; Environmental Cornpliance ana�er �Signed by Lead Agency Date received for filing at OPR; ❑ Signed by Applicant � �, BID TABULATION FOR: WATER MAIN 2024 IMPROVEMENT PROJECT Bid Schedule No.: 5523 ENGINEER'S EST Cox& Cox Construction, Inc Allen Gill Construction, Inc. 10/17/2024 UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Prepare Storm Water Pollution Prevention �S 1 $5,000.00 $5,000.00 $2,596.00 $2,596.00 $9,186.00 $9,186.00 2 Implement Storm Water Pollution LS 1 $18,000.00 $18,000.00 $25,959.00 $25,959.00 $33,482.00 $33,482.00 3 Construction Area Signs EA 28 $250.00 $7,000.00 $347.50 $9,730.00 $491.00 $13,748.00 4 Traffic Control LS 1 $100,000.00 $100,000.00 $203,337.00 $203,337.00 $216,401.00 $216,401.00 5 Trench Sheeting and Shoring �S 1 $20,000.00 $20,000.00 $97,613.00 $97,613.00 $88,083.00 $88,083.00 6 Water Main (6" PVC) LF 331 $145.00 $47,995.00 $314.00 $103,934.00 $448.00 $148,288.00 7 Water Main (8" PVC) LF 4010 $150.00 $601,500.00 $147.50 $591,475.00 $155.00 $621,550.00 8 Water Main (8" DIP) LF 3307 $160.00 $529,120.00 $164.50 $544,001.50 $136.00 $449,752.00 9 Water Main (8" DIP, Rock Excavation) LF 1343 $270.00 $362,610.00 $198.50 $266,585.50 $187.00 $251,141.00 10 Water Main (12" DIP) LF 2300 $280.00 $644,000.00 $316.50 $727,950.00 $324.00 $745,200.00 11 Valve (2" Gate) EA 3 $2,000.00 $6,000.00 $1,670.00 $5,010.00 $1,413.00 $4,239.00 12 Valve (4" Gate) EA 1 $2,300.00 $2,300.00 $2,903.00 $2,903.00 $2,031.00 $2,031.00 13 Valve (6" Gate) EA 7 $2,500.00 $17,500.00 $3,212.00 $22,484.00 $2,019.00 $14,133.00 14 Valve (8" Gate) EA 26 $3,000.00 $78,000.00 $3,731.75 $97,025.50 $2,680.00 $69,680.00 15 Valve (12" ButterFly) EA 11 $6,000.00 $66,000.00 $4,751.00 $52,261.00 $3,806.00 $41,866.00 16 Vaive (2" Blowoff) EA 1 $3,500.00 $3,500.00 $3,200.00 $3,200.00 $6,779.00 $6,779.00 17 Fire HydrantAssembly EA 15 $14,000.00 $210,000.00 $12,242.00 $183,630.00 $15,462.00 $231,930.00 18 Fire Hydrant Assembly(Rock Excavation) EA 3 $16,000.00 $48,000.00 $15,140.00 $45,420.00" $15,693.00 $47,079.00 19 Reconnect Water Service (1") EA 75 $3,500.00 $262,500.00 $2,978.00 $223,350.00 $5,893.00 $441,975.00 20 Reconnect Water Service (1", Rock EA 8 $5,000.00 $40,000.00 $5,718.00 $45,744.00 $6,322.00 $50,576.00 21 Reconnect Water Service (2") EA 2 $5,000.00 $10,000.00 $10,252.00 $20,504.00 $13,677.00 $27,354.00 22 Relocate Water Meter EA 8 $1,000.00 $8,000.00 $3,468.00 $27,744.00 $5,110.00 $40,880.00 23 Abandon Valve EA 20 $550.00 $11,000.00 $1,387.00 $27,740.00 $665.00 $13,300.00 24 Remove Valve EA 16 $750.00 $12,000.00 $1,934.00 $30,944.00 $479.00 $7,664.00 25 Remove Fire Hydrant EA 5 $800.00 $4,000.00 $3,416.00 $17,080.00 $1,534.00 $7,670.00 TOTAL-CONTRACT ITEMS $3,114,025.00 ;$3,378;220.50` $3,583,987.00 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 3 � �, BID TABULATION FOR: WATER MAIN 2024 IMPROVEMENT PROJECT Bid Schedule No.: 5523 Eddie Axner Construction, Site Work Solutions Inc. SnL Group, Inc. 10/17/2024 UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL 1 Prepare Storm Water Pollution Prevention �S 1 $2,440.36 $2,440.36 $4,000.00 $4,000.00 $15,000.00 $15,000.00 2 Implement Storm Water Pollution LS 1 $5,161.59 $5,161.59 $21,415.07 $21,415.07 $5,000.00 $5,000.00 3 Construction Area Signs EA 28 $415.58 $11,636.24 $330.00 $9,240.00 $335.00 $9,380.00 4 Traffic Control LS 1 $154,180.37 $154,180.37 $196,325.09 $196,325.09 $85,000.00 $85,000.00 5 Trench Sheeting and Shoring �S 1 $6,296.57 $6,296.57 $29,000.00 $29,000.00 $5,000.00 $5,000.00 6 Water Main (6" PVC) LF 331 $221.58 $73,342.98 $496.41 $164,311.71 $185.00 $61,235.00 7 Water Main (8" PVC) LF 4010 $160.86 $645,048.60 $130.04 $521,460.40 $170.00 $681,700.00 8 Water Main (8" DIP) LF 3307 $177.88 $588,249.16 $151.34 $500,481.38 $175.00 $578,725.00 9 Water Main (8" DIP, Rock Excavation) LF 1343 $207.16 $278,215.88 $301.99 $405,572.57 $190.00 $255,170.00 10 Water Main (12" DIP) LF 2300 $393.02 $903,946.00 $285.92 $657,616.00 $325.00 $747,500.00 11 Valve (2" Gate) EA 3 $1,207.84 $3,623.52 $1,972.50 $5,917.50 $3,000.00 $9,000.00 12 Valve (4" Gate) EA 1 $2,162.08 $2,162.08 $2,021.10 $2,021.10 $3,400.00 $3,400.00 13 Valve (6" Gate) EA 7 $3,307.47 $23,152.29 $2,795.96 $19,571.72 $3,900.00 $27,300.00 14 Valve (8" Gate) EA 26 $4,083.68 $106,175.68 $2,907.40 $75,592.40 $4,400.00 $114,400.00 15 Valve (12" ButterFly) EA 11 $5,617.96 $61,797.56 $4,372.76 $48,100.36 $5,783.00 $63,613.00 16 Vaive (2" Blowoff) EA 1 $4,246.52 $4,246.52 $2,441.71 $2,441.71 $10,000.00 $10,000.00 17 Fire HydrantAssembly EA 15 $14,099.46 $211,491.90 $14,070.89 $211,063.35 $14,400.00 $216,000.00 18 Fire Hydrant Assembly(Rock Excavation) EA 3 $15,818.11 $47,454.33 $21,974.00 $65,922.00 $20,000.00 $60,000.00 19 Reconnect Water Service (1") EA 75 $5,865.10 $439,882.50 $8,123.00 $609,225.00 $6,885.00 $516,375.00 20 Reconnect Water Service (1", Rock EA 8 $5,725.19 $45,801.52 $8,640.43 $69,123.44 $12,000.00 $96,000.00 21 Reconnect Water Service (2") EA 2 $9,943.59 $19,887.18 $16,781.70 $33,563.40 $15,000.00 $30,000.00 22 Relocate Water Meter EA 8 $2,532.20 $20,257.60 $5,289.08 $42,312.64 $9,800.00 $78,400.00 23 Abandon Valve EA 20 $814.55 $16,291.00 $1,343.00 $26,860.00 $1,250.00 $25,000.00 24 Remove Valve EA 16 $926.94 $14,831.04 $1,256.03 $20,096.48 $2,300.00 $36,800.00 25 Remove Fire Hydrant EA 5 $1,607.44 $8,037.20 $1,335.10 $6,675.50 $5,000.00 $25,000.00 TOTAL-CONTRACT ITEMS $3,693,609.67 $3,747,908.82 $3,754,998.00 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 3 � �, BID TABULATION FOR: WATER MAIN 2024 IMPROVEMENT PROJECT Bid Schedule No.: 5523 Stimpel-Wiebelhaus Associated, Inc AWEFL4GE ' 10/17/2024 UNIT BID ITEM DESCRIPTION UNIT QTY PRICE TOTAL TOTAL 1 Prepare Storm Water Pollution Prevention �S 1 $2,500.00 $2,500.00 $5,953.73 2 Implement Storm Water Pollution LS 1 $20,000.00 $20,000.00 $18,502.94 3 Construction Area Signs EA 28 $415.00 $11,620.00 $389.01 4 Traffic Control LS 1 $400,000.00 $400,000.00 $209,207.24 ' 5 Trench Sheeting and Shoring �S 1 $20,000.00 $20,000.00 $4�,998.76 ' 6 Water Main (6° PVC) LF 331 $330.00 $109,230.00 $332.50 7 Water Main (8" PVC) LF 4010 $170.00 $681,700.00 $155.57 8 Water Main (8° DIP) LF 3307 $185.00 $611,795.00 $164.95 ' 9 Water Main (8" DIP, Rock Excavation) LF 1343 $265.00 $355,895.00 $224.94 10 Water Main (12" DIP) LF 2300 $240.00 $552,000.00 $314.07 ' 11 Valve (2" Gate) EA 3 $3,335.00 $10,005.00 $2,099.72 12 Valve (4" Gate) EA 1 $3,710.00 $3,710.00 $2,704.53 ' 13 Valve (6" Gate) EA 7 $3,980.00 $27,860.00 $3,202.41 14 Valve (8" Gate) EA 26 $5,075.00 $131,950.00 ; $3,8'12.g7 ' 15 Valve (12" ButterFly) EA 11 $5,700.00 $62,700.00 $5,005.12 ' 16 Vaive (2" Blowoff) EA 1 $4,330.00 $4,330.00 $5,16G.21 17 Fire Hydrant Assembly EA 15 $20,500.00 $307,500.00 $15,129.06 ' 18 Fire Hydrant Assembly(Rock Excavation) EA 3 $23,500.00 $70,500.00 $�8,68�.52 19 Reconnect Water Service (1") EA 75 $3,700.00 $277,500.00 $5,574.�2 20 Reconnect Water Service (1", Rock EA 8 $4,500.00 $36,000.00 $7,150.94 21 Reconnect Water Service (2") EA 2 $7,075.00 $14,150.00 ; $12,'121.55 22 Relocate Water Meter EA 8 $4,000.00 $32,000.00 $5,033.21 23 Abandon Valve EA 20 $325.00 $6,500.00 $964.09 24 Remove Valve EA 16 $645.00 $10,320.00 $1,256.$3 25 Remove Fire Hydrant EA 5 $1,300.00 $6,500.00 $2,365.42 AVERAGE BID TOTAL-CONTRACT ITEMS $3,766,265.00 $3,654,164.$3 Shaded areas indicate corrections made in accordance with the Special Provisions. Page 3 of 3