HomeMy WebLinkAbout _ 4.11(a)--Update for Emergency Repair to South Street Water Main ER Project GI �" Y C� F
� � �- ' � ° � � i � CITY OF REDDING
��
REPORT TO THE CITY COUNCIL
MEETING DATE: August 5, 2025 FROM: Michael Webb, Public Works
ITEM NO. 4.ll(a) Director
***APPROVED BY***
„, �. .A,��,�
ie ael � iiEali� oaks L)arector 7/?$1242� i�}�in,Ci an � 71?�/242�
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(a)--Update for the Emergency Work for the South Street Water Main at
Railroad Emergenc Re lacement Pro'ect.
Recommendation
Authorize and approve the following relative to the South Street Water Main at Railroad
Emergency Replacement Project(Project):
(1) Accept update regarding the Project; and
(2) Pursuant to Public Contract Code Section 22050(c)(1), make a determination by a four-
fifths vote that there is a need to continue the emergency work.
Fiscal Impact
The South Street Water Main at Railroad Emergency Replacement Project (Project) will be
funded by the City of Redding's Water Utility. The current total estimated project cost is
$1,380,000. The Water Utility Division's Fiscal Year 2024-25 Budget has sufficient funds
appropriated to complete the project.
AZteNnative Action
The City Council (Council) may choose not to accept the project status report and provide
alternate direction to staff.
Background/Analysis
On February 4, 2025, Council adopted an emergency resolution for the project and authorized
the negotiation of emergency contracts. The project proposes to replace and relocate the failed
section of 12-inch, east-iron water main and corrugated steel pipe casing in South Street that is
beneath the Union Pacific Railroad (�UPRR) �racks by jack and boring a new steel pipe casing
and installing a 16-inch, ductile iron pipe. Work also ineludes water main tie-in fittings, isolation
valves, asphalt concrete pavement, curb, gutter, sidewalk and other miscellaneous items.
Report to Redding City Council July 30, 2025
Re: 4.11(a)--Update for Emergency Repair to South Street Water Main ER Project Page 2
Staff has contracted with RTA Construction, Inc. (RTA) for the construction of the project based
on their technical knowledge of utility construction and previous performance on projects of
similar size and scope. Construction activities started on April 8, 2025, and are expected to be
completed by August 15, 2025.
The contractor is currently installing the new 30-inch, steel casing, and will be placing and
testing the new 16-inch, ductile iron pipe water main by the first week of August, 2025. UPRR
has flaggers and observers on site for the work and is currently scheduled for a11 remaining work
within the UPRR right-of-way until the project's completion.
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA) and
no further action is required. On February 4, 2025, the Council determined that the project is
statutorily exempt from environmental review under the CEQA Guidelines, per Section
15269(b)-Emergency Projects.
Council Priority/City Manager Goals
• Public Safety — "Work to improve all aspects of public safety to help people feel secure
and safe where they live, work, and play in the City of Redding"
Attachments
Previous Staff Report February 4, 2025
GI �" Y C� F
� � �- ' � ° � � i � CITY OF REDDING
��
REPORT TO THE CITY COUNCIL
MEETING DATE: February 4, 2025 FROM: Michael Webb, Public Works
ITEM NO. 9.11(g} Director
***APPROVED BY***
„, �. .A,��,�
ie ael � iiEali� oaks L)arector 1(?�(242� i�}�in,Ci an � L,'2�/242�
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 9.11(g)--Consider declaring an emergency for the South Street Water Main at
Railroad Emergenc Re lacement Project.
Recommendation
Authorize the following actions relative to the South Street Water Main at Railroad Emergency
Replacement Project (Project):
(1) Adopt Resolution, by not less than four-fifths affirmative vote, authorizing the City
Manager to negotiate and award an emergency public works contract for the project in an
amount not to exceed $630,000;
(2) Autharize the City Manager, or designee, to approve construction contingency amounts
up to a total of$180,000;
(3) Approve $95,000 to cover costs for project development costs;
(4) Approve $135,000 to cover costs for construction management and inspection fees; and
(5) Find that the Project is exempt from review under the California Environmental Quality
Act Guidelines,pursuant to Section 15269(b)—Emergency Projects.
Fiscal Impact
The South Street Water Main at Railroad Emergency Replacement Project (Project) is being
funded by the City of Redding's (City) Water Utility. The Water Utility's Fiscal Year 2024-2025
budget has sufficient funds appropriated to complete the project. The following table provides a
summary of estimated costs for the project:
Cost Summar
Item Estimated Cost
Pro'ect Develo ment Costs $95,000
Construction Contract+ Contin enc $810,000
Contract Administration, Ins ection, Testin $135,000
Total Pro'ect Costs $1,040,000
Report to Redding City Council January 29,2025
Re: 9.11(g)--Declare Emergency for the South Street Water Main ER Project Page 2
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Alternative Action
The City Council (Council) may choose not to authorize the award of an emergency contract,
and instead have staff prepare plans and specifications to award a contract to the low bidder in
accordance with state and local contracting procedures. This would result in the broken water
main remaining out of service through the suinmer of 2025 and during peak water demands
which could significantly reduce reliability of the water system for City customers and fire flows
in the area. Or, the Council could provide alterative direction to staff.
Background/Analysis
On December 9, 2024, a 12-inch, cast-iron, water main in South Street broke beneath the Union
Pacific Railroad (UPRR) tracks. The corrugated steel casing under the UPRR tracks that
surrounds the water main also broke, resulting in erosion and voids beneath the railroad tracks.
City crews quickly made temporary repairs to close water valves and isolate the broken section
of water main. They also backfilled voids in the soil caused by the break and coordinated with
UPRR for repair of the railroad tracks in the area. The railroad tracks were quickly restored to
normal operation, but because the pipeline break was beneath the tracks and the steel casing
failed, City crews were unable to repair the water main and this segment of piping remains out of
service.
Since both the water main and the casing failed beneath the railroad tracks, simply pulling a new
pipe through the existing casing is not feasible. To adequately repair this main, staff intends to
design for a jack and bore installation of a new steel casing and ductile iron water main, sized to
convey peak flows in accordance with the City's design standards, across the UPRR right-of-way
for connection to the existing main piping on both sides.
Computer modeling of the City's water system indicates that there should not be issues with the
South Street water main remaining out of service through the winter and early spring, when
water demands are relatively low. However, during the summer months and peak water
demands, this main conveys significant flows eastward and its outage would have substantial
impacts. If it remains out of service through the summer then peak flows would need to be
conveyed through alternate routes and water mains, which will increase flow velocities, stress,
and potential for surges and damage to other aging water mains in the downtown area.
If the South Street main remains out of service through the summer months, then there are
several areas where increased flow velocities and potential for fur�her pipeline damage are a
concern. One, in particular, is another ]2-inch water main crossing the UPRR tracks along
Shasta Street, approximately one-half-mile north of' the South Street water main break. The
Shasta Street water main was installed in 1958 and is a cast iron pipe, similar to the South Street
main that broke. The City has plans to replace the Shasta Street main with a separate capital
improvement project in the near future because of concerns with its reliability. Recently, on June
19, 2024, it also had a break,just three blocks west of its railroad crossing. With the South Street
water main out of service, flows through the Shasta Street main would increase to velocities
above the maximum allowed by many agencies and recommended maximum in the City's Water
Master Plan. The increased flow velocities would lead to additional stress and potential for
surges in the Shasta Street main that will increase the risk of additional failures.
Report to Redding City Council January 29,2025
Re: 9.11(g)--Declare Emergency for the South Street Water Main ER Project Page 3
The South Street water main provides critical redundancy for the Shasta Street main and other
water mains in the area. While the South Street main remains out of service, this critical
redundancy is not available. The lack of redundancy, combined with the increased velocities and
stress to other aging mains where there are already concerns of reliability, including in Shasta
Street, put the City at a much higher risk for additional water main failures that would have
major impacts on the water system.
To provide necessary redundancy in the water system and mitigate the risks of additional
pipeline breaks, disruptions in service, potential damage to infrastructure and property, and a loss
of available storage and fire flow, staff recommends that the South Street Main be repaired as
soon as possible and before the high water demands in the summer of 2025. Staff has considered
proceeding with typical design and bid process for a capital improvement project; however, this
process would likely require a minimum of seven months in order to prepare the bid package,
obtain UPRR permits, advertise for bids, and award a contract far construction. At that point, the
contractor would still need to order and procure materials, which would result in the construction
work not starting until late 2025. This timeline is substandard and the repairs would not be
completed prior to the high impact and risk period during the summer.
The broken water main presents potential impacts to public health, property and safety.
Therefore, staff proposes an emergency contract to repair and replace the broken water main in
South Street beneath the UPRR crossing. If approved, staff estimates the construction will be
complete in May 2025, before the high water demands in the summer and greatest risks occur.
It is noted that the Public Contract Code (PCC) (Section 20168) provides that the local
government's legislative body may pass a resolution by a four-fifths vote of its members
declaring that the public interest and necessity demand the immediate expendiYure of public
money to safeguard 1ife, health and property. Further, the PCC (Section 22050)provides that "in
case of emergency, a public agency, pursuant to a four-fifths vote of its governing body, may
repair or replace a public facility, take any directly related and immediate action required by that
emergency, and procure the necessary eguipment, services, and supplies for those purposes
without giving notice for bids to 1et contracts."
It is in the public's interest and necessity to repair the broken water main in South Street to
ensure reliability of the water system, protection of property and the public's health and safety.
The attached Resolution has been approved as to form by the City Attorney.
Envir�onmental Review
Staff has determined that the project is exempt from review under the California Environmental
Quality Act Guidelines, pursuant to Section 15269(b) — Emergency Projects. Section 15269(b)
includes emergency repairs to publicly and privately-owned service facilities necessary to
maintain service essential to the public health, safety, or welfare. The emergency repair and
replacement will occur in areas of previous disturbance, and the repairs are necessary to maintain
service essential to public health.
Council Priority/City Manager Goals
• Public Safety — "Work to improve all aspects of public safety to help people feel secure
and safe where they live, wark, and play in the City of Redding."
Report to Redding City Council January 29,2025
Re: 9.11(g)--Declare Emergency for the South Street Water Main ER Project Page 4
Attachments
^Resolution
^Location Map
^Notice of Exemption
RESOLUTION NO. 2025-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
REDDING TO DECLARE AN EMERGNCY AND AUTHORIZE THE
CITY MANAGER TO AWARD EMERGENCY CONTRACTS FOR THE
SOUTH STREET WATER MAIN AT RAILROAD EMERGENCY
REPLACEMENT PROJECT
WHEREAS, Public Contract Code section 22050 and Redding Municipal Code 4.22.120(A)
provide that, in the case of emergency, a public agency inay repair or replace a public facility,take
any directly related and immediate action required by that emergency, and procure the necessary
equipment, services, and supplies for those purposes without giving notice for bids to let contracts;
and
WHEREAS, on December 9,2024, a 12-inch water main in South Street broke beneath the Union
Pacific Railroad(UPRR) tracks; and
WHEREAS, City crews isolated the broken segment of piping but are unable to repair it, due to
its location under the UPRR tracks, and the pipe remains out of service; and
WHEREAS, proper water infrastructure is critical for public health, safety, and fire protection;
and
WHEREAS, if not repaired before high water demands during the summer months, there will be
a lack of redundancy in the water system that wi11 result in higher flow velocities, stress, and
potential for surges in other water mains, increasing potential for additional pipeline failures; and
WHEREAS, additional pipeline failures would result in disruptions in service, potential damage
to associated public and adjacent private infrastructure, and a significant decrease in available
water storage and fire flows; and
WHEREAS, a competitive solicitation for bids is anticipated to require at least seven (7)months
to design, advertise for bids, and award a contract for construction, after which construction would
not occur until the autumn of 2025, failing to complete the necessary repairs until after the summer
and highest risk period for additional pipeline damage or failures, water pressure losses, and
de�cient fire flows; and
WHEREAS, continued outage of the water main will significantly reduce the reliability of water
systems to provide adeguate pressures and fire flows, which threatens the safety of the public and
properties in the downtown area; and
WHEREAS, the continued isolation and outage of the broken water main in South Street to
aeeommodate the delay neeessary for the competitive bidding process would not mitigate or
eliminate the threat to persons and property;
NOW, THEREFORE, BE IT RESOLVED THAT:
L The City Council of the City of Redding finds that the recitals set forth above are true and
correct and are hereby adopted as findings of fact.
2. The public interest and necessity require the immediate expenditure of public money to
restore the water conveyance system to full capacity, protect the public health, safety and
welfare, and prevent further damage to the water system.
3. The City Council of the City of Redding therefore declares an emergency and authorizes
the City Manager to award emergency contracts to repair the broken water main in South
Street at the UPRR crossing.
4. The action authorized herein shall be reviewed by the City Council at all regular meetings
of the Council until such time as the City Council determines that the emergency is abated.
I HEREBY CERTIFY that the foregoing resolution was introduced and adopted at a regular
meeting of the City Council of the City of Redding on the 4th day of February, 2025, by the
following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
JACK MUNNS, Mayor
ATTEST: FORM APPROVED:
SHARLENE TIPTON, City Clerk CHRISTIAN M. CURTIS, City Attorney
� �,
\�� �� ���Est �..�� ; ',� �� \� l ,� � „� �r�-� �.-_ ,� 1 ..---�""�\
� _
�.- __ . ,
- e� � � s l�"" ' 1
� �
�� _-- \, `, —" \ � _�---� _-, ' ,
.--.�- '�� ,, `l.__- � _ � \ .�-- l �
_ � � -'
Y �- 1
�
,..- �l a � � ����_..�% ��� �" .. '�-:pST--', � `; l�x- � � ,,� -'
� 1 4 � � .. B -\ �� ..-
� `..-- i �,,.-- � �1 -s_ y�l,��--_- �`c, i � � -~� � � _
\ " � �.-
� �
J J �.
` ` 1�,��,�.---~''� �� ,� � --''" �o ^�" f ��T � �.---'' \
- ..-c
� � �
, � \
..-- -
� �,.-'�~ \ `` �1 ' : - �. - '� ,� �O� 1 �� \ ` �
"� ' ',
�
� � �` ����5� i � ��� ..--�� � .,._.. ������ � � _, �S�( -,--;� �.-
� i ��,�, '`�� � t � � � � CE � �
--r v . ..-
�-„
�-
s i�-�� ugP ...�,. � � \Ar �-�~'-~' ` V PLP \ 1�""
` V . _ \ � �O`� i \ �` ` -J . - �, \'° `
� J �
, C"�=-
J' Ct � � 1 = �.--'"�- �� �
_- = "�-� �;==� ~( � ���,:� 1 la� � � " � %' � , �
_ - ` � l 1 l.._-- \ � �l�� �f--- �� �~ " ``` �\ � , ��-�- l`\ `\
�
�-- � l \ �
--� � � ��- .-��.----�� -' v
_ � �_- \ � l �� � �_ _- ���-- ���� � �l
�� �
l ti -� � `� �..--
'' �--'\ � _-" ' 1 "-~� � � ��"-� `���,� ��----�"� �.� �� _�
--- --- _ _- ~ _
� � ���
�
�..-- 1 � � r -~' `� (� �--\
` .�- �
� l � \
._-- ---' �f f_., . ,1 �..�--~'".- t,\� --'.
� l _� � � �, �- _ � � - ��---� l
_.� �. _ - \�,�, 1 ��:� � i S
� � � \ _. _ � "�� ���� .- ,
.
� ,��_�=- � .,��7 �\ � �`�- _.�- � �..
..�_. .
"� _��`��,�\� � �� � � � Q.�
__- -- ��` J ~ H�f
_��_ �_-�
;- __ _�- -
�-;= "� ���� t' 1 ��-- �\oA --'" � �� _ --"�'
_ - � �,
Y �
�- ` �.-_ `2� ,�'-- .--
_ _� c-�=f.��u4T
� \ _ `
�.- '�` �� �f ,_.,-'" l �Na\ „�i,��-,. . \� .,�,--'"�l �� �1 ,� ,.-- .�-
_ _ �� , \ �� `� `� _- _� -� ,r �� � -�-���
�_
�_ __ _w_ �
_ _
�
, \ � � \\ ���= �- l � ` 1� �� l
`�, � � '' _ ` `. -- �9�� i
_.
-_-1� \\ __��=.� � x� " .�
� �� � ��-.�. �- �, � yJ �-� � � f--t
��_--- � �� \ � � � _�
.,�� __ _.�, ("
� �� . _ ��
�,,,..--' ,--.'- ,,- ,--' � ..,- -'--' ..,.-��� ��� �N�1 -
_-�„ '"
\ - - \ �-- -s'' 11 --'-
- „-- _ -.- � , `�\ \
l 1 __-' . -�� l �� � -��,.�-- �� \ �„� �
` —
�� �EN�p S� �\� �� � �� � � l l� ��� �� ;-�"". \ �
�.
\ ,-�" ,.. � � i . -
i -' P�Rp ;� ` �: l � _�- � ��.-1 �
r�
y y Y f �"
5 �.7� � � --~ l � �='r) - \ �� .---'"" �` � l �� _-
� � .. � .
�
� ` �l
� ff �.= ~ ._ ' \r;� ��
.� � � -� � � ,
��l � l l �� -�� � _ �" �� �� `�� ` "���`; } �~'-�' �_
� — -�
_--
� i l � l , � � �,� �� _�---'" ,
_ ._ - l� � �-�--_
_ ._ � �
� � � l_--� � � l ����.�.� ..��--������ ll _ �
�., , l � � f. � �a` � "�o�- s `� i
z� o
., �\�L 1\ � i ,-i,f,-�,-j S'C. .,-... �„..--� � ll � �i� `�... l� 1 �i
� t y a-„'- C�Q� �.�,-.-'i ,..-,.' � ,-'t � ll �„,-,- � �� ��.., �.��-'��i �� 1
v�
.� .. � t .w . ..
\ - � \
.�1 \...-"-. �.....-
.,.-^"� " .''�-r^-."�� C� ,-1' � } „,,,� .. \i1��4_...%.- � ,--'""` .--` \� � 1 �i 1"i,.-
N ,--�""---�.,- p� ,. � „- ,..- .,--�
„ � � ,
� '". 1 � �' G�� -'"---'l �l�..--''"� _, \� . -�f�---."t � `\ "-' `l\\ \
j � _ � �
-- (t �� � l �---~ -+ .�_ l �-- � �
_ �
�_-
l i � 1 1 � a -~� � __ ��� � �\T� ` �
.--�'" � �---- -''"� � `
1.�- �w.� _ , 1 .�--- 0 1''"��� \
.- \ l ��. 1 �- �� ' _.�
�.� ` , t � � � _-:--� \E T�'" a
� - __ \ __.�
w
� �.
� l � t JrJ D�� ` �� � �
_
- ` N ��
l �.�
-' Y
,.--,'" `� � ."
l ; � l l �l i G�� �- \ 1,.--- \ ; � (i
� "� `a
"C i l t � l ,=-'� � � \ � �� G�`Ns� ~�\
l �
� l � � �� � � . . �.- � 1 � --" �At� - t
� �).,�� - t i 1 �'� -
�� �
� �.� (
l� - -'-' �.. 1 ll t --,--' l f f�,..� \ � �
1 � ""�
-��-' ���� .1 �... � � � �.�.�- ��l ,- �--�.--"
-- �
� �.
.
�.-�" � � i
� � , J- ��'
� - \ � � �� � � �\ � � \� �
� ` N�' �" \ „- � �„ \
` � t 1 � ,�--' � �..-.--f.--' '" �. _ --"'
� --
�-
� -- 1 � 1 � �\� �\ ,�- "-� .- �T" � � ���- �� �.- `
,
� �
� 1
� �„� � �„
� l � 1 \ 1 ., � rv„ ,..--~`� ' -- \1 -�
�, �-�'"i
t ��� o � �..�-�
, l \ "
�
��� �� �- '"��(� -�==���� �� ��� i� .--�z � ` �1�' �,..,.
� l �
. ..
�� �
��
--
@ i -' � � � '-� � ��-"""� c.---'"-`�-
� ��-
.
� � � � ��� ��-� 7� � ���- � � ���
- �
; .,�.. �
�, --'"� ' i �l =--"- � ' --" 1 ---' � ..- ��
. "
�'� `, � �-� ' i � \�"- t �-- � � � \l
- � ---' � � � ---1 l _ il:�
�-
- �- � � _ "
� \�` �._-~" \ � � \l l�� `i �tl_�--- �_._-- _ __ - t __ �\ ��-H���s� _
-" 1
. l \ .----"� i i � -{\ ��..-'-''".-- ''"- _ w,_ _... f(.
....
.-�"
� ��
_ � -- ,w
_, i ' `--'�~ -' � i \ - ___... �.. __
_____ �.. m� �.�\ \ _ -_ �
w--- `\ l�. � � � \� � �
� �
� w.... � �,`�, _�_�
� � --�"� \ .---~""�~1"`� --- i �1 ; Z ,
� a \ " __
� - \, A�� � l �� -�� m C �
, -- _
��-.�.., \\ � _- v� �..-� � w.�-'" - � _.
_ . - _
__,_._.-- 1 -�=�'� �,�""-� �� `"- \ i o _ �.. - �
�.
�_�- _- � _
_w_ � _`� � __ Z __
l ,.-- ,.- N.� ,„„„,j\ � � _....__ _.�._I
-- - r
_ .w_ _
� __ � , __
� N _. _. t��..
_._.
_._
� _._
\` l��f�� \ �� 1 `l� ,.- �} . ,.� ..._ ; .._.., ..1,�
___._,_
i ,,..--�"""� C ..�--'""-'"�i �il-'""-'' l,„„..--"",- , ._..._...-�_� � .__.._ ___ y ......� .
�t�F �Foo CITY OF REDDING EXHIBIT A
'` � 2 SOUTH ST WATER MAIN AT RAILROAD
� ` � PUB�IC WORKS
a ° � � ���� ° EMERGENCY REP�ACEMENT PRt�JECT
t,,� - -:�a.�' DEPARTMENT LOCATION MAP
LIF pPd
i CD'I'I�E (�F �XEMPTI4N
To: � Office of Planning and Research FROM. City of Redding
1400 Tenth;Street, Room 121 Public Works Department
Sacramento,CA 95$14 7'17 Cypress Avenue
Redding,CA 96001
� Shasta County Clerk
County af Shasta
P.O.Box 990880; 1643 Market Street
Kedding, CA 96099-0880
Project Title: South Street Water Main Repair
Project Locatidn—Specific. South STreet at the Union Pacific Rail�•aad crossin�; east of Caurt Street
Project Location—City: Reddin�Project Location—County: Shasta
Description of Pr�ject. The City_of Reddin� (Cit�� will conduct an emergency water main replacement and repair
praject in the downtown area. Wor�k will include the jack and boi•e installation of a steel casing a�roximately 24-inches
in diameter and 12n-feefi lan�; installation of a lb-inch water main within the steel casin�;� arid installation of additional
water mai�i an eacll sida the railroad crossin usin t� he apen trench rnetllod. The existin�water rnain and casin will be
abandoned in place. Work will ocour ii�bot11 the Gitv and Union Pacific Railroad riaht of wa .� The public will be nfltified
aftraffc restrictions.
Name of Public Agency Approving Project: City c�f Redding
Name of Person ar Agency Carrying Clut Project; Kurt Maire,Project Engineer
E�cemgt Status: (check�ne)
❑ Ministerial [Section 21080(b){l); 152b8]'
❑ Declared Ernergency [Section 21Q80{b){3)� 152b9(a)]
� Emergency Project[Secticsn�:10$fl(b){4); 15269{b)]
� Statutary Exempti�ns. State code number;
� Common Sense Exemption('This project does not fall within an exempt class,buti it can be seen with certainty that there is
no possibility that the activity may have a,significant effect an the environment(l�CGR 15Q61[b][3]}.
0 C�teg�srical Exernption.State type and section number:
❑ No exceptions apply that would bar the use of a categorical exemption(PRI7 210$4 antl 14 CCR 15300.2);
Reasons why praject is exempt: Sectian 15269 fb) includes emer�enc�repairs to publicl ay nd��rivately owned service
facilities neeessary #o rnaintain service essential to the public health safety or welfare The emer�ency repair and
r�lacement will occur in areas of previaus disturbancew and the repairs are necessarv to rnaintain service essential to
public health.
Lea�d Agency Contact Persan: Amber Kellev Telephone: 530.225:4446
If l�"iled by Applicant:
1. Attach certi�ed document of exempti�n finding.
2. Has a natiice of exemptian been filed by the public agency approving the project? ❑Yes ❑No
�
Signaturew � Date: ,�'�'e.'s� ;��
Title: Environmental Campliance�an'��er
0 Signed by Lead Agency Date received far filing at flPR.
❑ Signed by Applicant
CG��N{?�:a-ev. G'��??