HomeMy WebLinkAbout _ 4.11(c)--Approve Increase to Budget for City Hall Fire Alarm Replacement Project GI �" Y C� F � � �- ' � ° � � i � CITY OF REDDING �� REPORT TO THE CITY COUNCIL MEETING DATE: August 4, 2025 FROM: Michael Webb, Public Works ITEM NO. 4.ll(c) Director ***APPROVED BY*** „, �. .A,��,� ie ael � iiEali� oaks L)arector 7/3Q/242� i�}�in,Ci an � 7131(242� mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(c)--Adopt Resol�ution and Approve Increase to Project Budget for City Hall Fire Alarm Replacement Pro'ect Recommendation Authorize and approve the following actions to approve increases to the project budget in the amount of $220,000 for the completion of Bid Schedule No. 5357, City Hall Fire Alarm Replacement Project, as outlined below for additional project costs: (1) Adopt Resolution approving and adopting the 4�h Amendment to City Budget Resolution No. 2025-049 appropriating an additional $220,000; (2) Increase of $83,000 to the construction management budget, bringing the construction management total to $112,000; and (3) Increase of $137,000 to the construction contingency budget, bringing the construction contingency budget to $152,000. Fiscal Impact The City Hall Fire Alarm Replacement Project (Project) cost is being increased by $220,000 over the original project budget of$235,333 bringing the total project costs to $455,333. During Fiscal Year 2024-25 Building Maintenance had savings in excess of the additional amount requested, the savings wi11 be an increase to the Building Maintenance Reserves. Therefore, this increase will be funded by the City of Redding's (City) Building Maintenance available Fund Reserves. Report to Redding City Council July 31, 2025 Re: 4.11(c)--Approve Increase to Budget for City Hall Fire Alarm Replacement Project Page 2 Current Authorized Requested Increase New Authorized Project Development $34,000 $0 $34,000 Construction Contract $142,333 $0 $142,333 Construction Contingency $15,000 $137,000 $152,000 Construction Management $44,000 $83,000 $127,000 Total $235,333 $220,000 $455,333 Alternative Action The City Council (Council) may choose not to approve the request and provide alternative direction to staff. Background/Analysis On April 18, 2023, the City Manager awarded the construction contract for the project to Conti, LLC, in the amount of$142,333. This project was awarded in accordance with Ordinance No. 2625 - the City's criteria for informal award. The project consists of the replacement of the City Hall fire alarm system which incl�udes, but is not limited to, removal and disposal of existing equipment, and installation of control panels, power supplies, detectors, notification appliances, including installation of conduits and conductors, and all other system devices. During the course of construction, unforeseen conditions warranted changes to meet the project's intent. These unanticipated changes require additional contingency funds to cover contract change order(CCO) costs for the following: • Modifications to the new fire alarm control panel to retain full notification, sprinkler system function and monitoring throughout City Ha11 as a temparary system. It was originally assumed the existing system could be taken off-line one floor at a time, modified, and connected to the new control panel. However, the existing system was installed such that circuits served multiple floors rather than a single floor. The existing system also had about 70 error codes that could not be cleared because the control panel was no longer functioning and needed replacement. Without a temporary system in place, City Hall would not have a functional fire alarm system until the project was complete; • Several duct detectors were moved from their existing locations to make installation, future maintenance and testing, and replacement more convenient. This is done because of existing obstructions or interferences with other commodities or supports. The holes remaining after the existing detectors are removed, need to be patched so they do not affect performance of the buildings HVAC system; Report to Redding City Council July 31, 2025 Re: 4.11(c)--Approve Increase to Budget for City Hall Fire Alarm Replacement Project Page 3 • Various modifications have been made within the City Ha11 structure since it was built. Access to several existing detectors are no longer available due to interior wall construction, lack of access panels, or installation o�other building system components. This required additional time for the contractor to locate, create access, and install the new detectors; • Procuring and installing additional equipment and devices necessary for complete system �unctionality which had not been identified or anticipated during design; and • Additional construction management and inspection budget is necessary to cover the extended timeline and increased workload for the project resulting from these CCOs. While the new fire panel is currently operating in a temporary state, there are insufficient funds available in the existing project budget to complete the CCOs identified above and bring the fire panel to complete system function. Although some change orders are expected with building projects of similar scope, due to numerous undocumented changes over the lifespan of City Hall, the amount of differing site conditions discovered on this project are above average. This can be attributed to original building as-built drawing inaccuracies, changes to floor layout to suit the needs of departments not captured in as-built drawing revisions, and limited resources during project design to fully capt�ure existing conditions. It is very unlikely these existing conditions would have been able to be identified until a contractor actually opened portions of the building to complete the work. Due to these contributing factors, the funding increase to the project is imperative in order to complete the work to have a fully functional fire alarm system at City Hall. Currently, the project is temporarily suspended due to the lack of funds needed to complete the effort. However, prior to the temporary suspension, the contractor incurred Liquidated Damages (LDs) for not completing available contract work within the contract time allowed. Although, some of the LDs will be nullified due to increases in contract days associated with the CCOs, staff anticipates that the contractor may still be assessed LDs at the end of the project. These potential LDs may result in a credit back to the projecYs overall budget. Envit�onmental Review This action, a budget increase, is not a project as defined by the California Environmental Quality Act (CEQA). On November 10, 2022, the City's Environmental Team determined that the project is categorically exempt from review under the CEQA, pursuant to Section 15301(a)— Existing Facilities. No further action is required. Council Pr�ioNity/City Manager Goals • This agenda item is a routine operation item. Attachments ^Budget Resolution Award Letter 042623 Resolution No. 2025 - A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTING THE 4th AMENDMENT TO CITY BUDGET RESOLUTION NO. 2025-049 APPROPRIATING $220,000 FOR THE CITY HALL FIRE ALARM REPLACEMENT PROJECT FOR FISCAL YEAR 2025-26. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDDING THAT Budget Resolution No. 2025-049 be and is hereby amended as follows: FUND DNISION DESCRIPTION 1NCREASE DECREASE 335 3351 Building Maintenance $220,000 THAT account titles and numbers requiring adjustments by this Resolution are as follows: USE SOURCE OF FUNDS OF FUNDS Increase(Decrease)Revenue 335-0000-2910000-00000 Fund Balance $ 220,000 Increase Expenditures 335-3351-7300004-00000 Building Improvements $ 220,000 Total $ 220,000 $ 220,000 THAT the purpose is to appropriate $220,000 for the City Hall Fire A1arm Replacement Project for fiscal year 2025-26. I HEREBY CERTIFY that the foregoing Resolution was introduced at a regular meeting of the City Council of the City of Redding on the 4th day of August, 2025 and was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: JACK MUNNS, Mayor ATTEST: FORM APPROVAL: SHARLENE TIPTON, City Clerk CHRISTIAN M. CURTIS, City Attorney c � -r Y o F ,.�j INTERNAI� � � ��� ����:��f CC3MMUI�IICATION ca � i � o � rv � �% DATE: Rpril 18, 2023 CODE: BS 5357 TO: Barry Tippin, City Manager FRC�M: Chuck Aukland, City Engineer SUBJEGT: Recommendation of Contract Award City Hall Fire Alarm Replacement Bid Schedule No. 5357 Pursuant to Public Contract Code Sections 22000-22045 bids were requested for City Hall Fire Alarm Replacement. In accordance with Ordinance No. 2625, the City Manager has been delegated the authority to award this project. Attached is a tabulation of bids received and opened on March 30, 2023, for this project. The low bid in the amount of$142,333. was received from Canti, LLC, of West Sacramento, Galifornia. The engineer's estimate was $165,000. Recommendation It is recommended that the City Manager: 1. Award this project to Conti, LLC, in the amount of$142,333; 2. Approve an additional $15,000 ta cover the cost of contract change orders; 3. Approve an additional $44,000 for construction management, for a total of$201,333; and 4. Find the praject is Categorically Exempt from the California Environmental Quality Act per Section 15301(a) — Existing Facilities The City Hall Fire Alarm Replacement is funded by the Building Maintenance Funds. Cost Summary Item Estimated Pro'ect Development Cost $34,000.00 Construction Contract + Contin enc $157,333.00 Contract Administration, Inspection, Testin $44,OOOAO To#al Project Cost $235,333.00 Background This prc►ject will replac� the fire alarm system at the City Hall building. Attachmerafs Bid Tab Notice of Exemption c: Finance Environm�ntal Campliance Manager r.,� ;.--``�� ,--�''�f l! �/'�-� City Engineer Date APPROVED. ..--�__–._-_._-_...—.--�. _ , � �� City Mana er Date nW n � � � o m � o � � = D � � = A —� �, vw oo � � � -nvw � � oo � m� � o ar �t- O ro� mw fl; rr D D n tv tn -n A D D n n� tn �t D �' � � w � rn0 � �' � w � rnC> O �n =i c r�'- -n n � -i N fl. D Z z � Z � DO Z � � � � O � � O � � -� @ Z z � � 3 � � o � � � � w '�v � vn � ~ n � rn m c cn c c�n � z c�i� � Z � � � p � p �, m � z � � �; �r c� rn ={ om =� m o � o � m cn � � � � � O Urn,� c�i, O r�- o o �' 0 o r 0 0 0 0 n 0 � %� � .% � cr rn =i i,� m =+ n w w 0 0 � � � � O N N (� r W W r W W O O � � b9 � C � � 'U rn =� wm =+ y � rn o � o � o -, � d 3 � � � � � O � � O r � � � a o 0 0 0 0 Nc�°rzc� oF Ex� �rit�� T4: ❑ (��ce of Planning and Res�arcl� FRt�M: City uf Redding 1400 Tenth Stre�t,Room I21 Public Wc�rks I3eparhnent Sacramento,CA 95�14 777 Cypress Avea��ue Redding,CA 96(}tl1 a Shasta Caunty Clerk Covniy af Shasta P,O.Box 9908$0, 1643 Market Street Redding,CA 96099-088� Project Title;City Hall�ire A1arm Renlacement Proiect,J O#9248-�45 Pra,�ect Location—Speci�ic: '177 CYpress Avenue Proj�ct Loca#ion—City. Reddln�Pro�ect Location—County: Shasta a�scription of Project. The Citv of R:eddin�will replace the existin�fire ala svstem at City Hal1 �VU�rk wi�l require the remc�val and renlacament of the fire �tarm epu�pmen# and cablir�� �1�:ctric�i modifications an�i replacement or reccsnnection of assoelated e ur ment.All work wrll be conducted can Ci ro e . Nar�ne�f Public.Agency Approving Project:Citv c�f R.edd�n� Name of Fersort c�r Agency Carrying(}u�Pro,�ect:I�:urt Maire,Proiect En�;ineer Exempt 5tatus:(check one) ❑ Ministerial [Sectic�n 21080(b)(1); 15268], Cl i)ecl�red Emergency c�ect�an 21080�6)(3); 15269{a)] � Emergency Prc�ject[Sectifln 2i(}8�(b)(4); 1���9{b)] L7 Statutory Exernptions: State code number: ❑ Comtnon Sense Exemptitsn�This project does nat�ail vsrithin an exempt ciass,but it can be seen witla ce�ta�inty t�at t�ere is. no possibility that#lae actrvity may have�signifcant effect an t�te enviro emt{lA CCR 15t�61 jb3j3�). � Categorical Exemption. State iype and section n�mb�r: Sectian 153flifa� �xistrn���cilities a No exceptions-apply thhat wt�uld bar'the use�f a categoracal exemp�tio�{P 21{}�4 d 1��CCR 153Qfl,��: Reasous svhy pra�ect is exeuipf: �lass 1 �xem�tivns inctu�e t�e t�nerat�c�n repair iraten ce �r ��sr a1#er�ti�n c�f ex�stin� �ublic struafures and fac���t�es. Tl�e exlst�n� �re al' svste�n wi11 be r��placed tc� meet ar��sde�a safe� a�d effic�ency standards The a�rotect w�ll not result�n ex�ans�c�n c�f use as t�e prc��ec�da�s riot incla�de t�e cc�ns cticar��� new fac�l�ties. The actian area does�ot hav�s� �ficant values for�vildlife ha��t�at or ssther ene�iro �a�t��resourees and the�roject has no notenti�l to has�e a si�i�i t effect�an the enviro ent Lead Agency Gon�a�t Fersonz ber]Kel�ev Telep�c�s�e:53U.225.4045 If�'iled by Applican#. 1. Atka�h certified docurnent of exemptian finding. 2. Ha��notace+�f�xemption been filed by the pubiic ager�cy apprcavui�the projec#?�Y�s��a� Signature. �� �- -� � ���._l���-��� Title: Environmen#al Compli ce 1Vf �er �Sig�aed b��ad A�enc�+ ��te s�eceived for fili�g�t t�Pit: Ci 5igned by Ap�sli t