MEETING DATE: July 15, 2025 FROM: Michael Webb, Public Works
ITEM NO. 4.ll(b) Director
***APPROVED BY***
ie ael � iiEali� oaksL)arector 7;'9/242� t�s�a a �, ss � eF 7f10/202�
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(b)--Approve Budget Resolution and Award Bid Schedule No. 5603 REU
Eastside Road Valve Yard Fence Replacement
Recommendation
Authorize and approve the following:
(1) Award Bid Schedule No. 5603 for Redding Electric Utility Eastside Road Valve Yard
Fence Replacement Project to Ray Excavating in the amount of$204,090;
(2) Adopt Resolution approving and adopting the 2"d Amendment to City Budget Resolution
No. 2025-049 appropriating an additional $137,�00;
(3) Approve $70,000 to cover the cost of administration and inspection fees;
(4) Approve $81,000 for project development costs;
(5) Approve $30,610 to provide construction contingency funding;
(6) Authorize the City Manager, or designee, to approve additional increases in either the
construction management or construction contingency amounts up to a total of$25,000;
and
(7) Find that the project is categorically exempt from review under the California
Environmental Quality Act Guidelines, pursuant to Section 15301(c) — Existing
Facilities.
Fiscal Impact
The Eastside Road Valve-Yard Fence Replacement Project is fully funded by Redding Electric
Utility (REU). The total estimated project costs, including contingency, are shown in the
accompanying table. Project cost components are estimates, and adjustments may be necessary
to reallocate funds and ensure the project remains within the approved budget.
Report to Redding City Council July 10, 2025
Re: 4.11(b)--Approve Budget Resolution and Award Bid Schedule No. 5603 REU Eastside Rd
Valve Yard Fence Page 2
DESCRIPTION ESTIMATED
COST
Pro�ect Develo ment Costs $ 81,000
Construction Contract ($204,090) + 15% Contingency $ 234,700
$30,610
Contract Administration, Ins ection, Testin $ '70,000
Additional Cit Mana er Authorit $ 25,000
TOTAL PROJECT COST $ 410,700
Bud et A �oved b Council $273,000
Additional Funds Re uested $137,700
On March 19,2024, the City Council (Council) adopted a budget resolution of $210,000
authorizing the replacement of the security fencing around the REU/Paci�c Gas&Electric gas
intertie. Subsequent design review identified the need for higher-grade, security-rated materials.
To cover this upgrade, staff requested an additional$63,000 during the Fiscal Year 2025
mid-year budget review. With all adjustments, the project requires an additional$137,700. REU
has sufficient reserves to cover the additional $137,700 needed to support the fencing project.
Alternative Action
The Council may choose not to award the bid for the project and provide staff with alternate
direction. If the project is not awarded, the location will remain as-is and there will be a safety
and security risk.
Background/Analysis
Attached is a tabulation of bids opened on June 18, 2025. The low bid in the amount of$204,090
was received from Ray Excavating and Grading, Inc., of Shasta, California. The engineer's
estimate was $173,500. Total project development costs for this project are estimated to be
$80,992. Project development costs include engineering, environmental, and consultant services
(design support).
The purpose of this project is to provide increased security and safety by replacing the chain link
fencing with expanded metal fencing and installing traffic rated bollards to protect the facility
from vehicular traf�c of the adjacent roadways.
Environmental Review
Staff has determined that the project quali�es as categorically exempt from environmental
review under California Environmental Quality Act Guidelines Section 15301(c). Class 1.
exemptions include the operation, repair, maintenanee, or minor alteration of existing public
facilities. The project wi11 involve the replacement of existing fencing materials only, will serve
the same purpose as the previous fencing, and will result in no expansion of use. The project has
been reviewed for sensitive resources and will not have a significant effect on biological or
eultural resourees such as threatened or endangered species or their habitats, sensitive vegetation
communities, tribal lands, or tribal cultural resources. The project has no potential to have a
significant effeet on the environment.
Report to Redding City Council July 10, 2025
Re: 4.11(b)--Approve Budget Resolution and Award Bid Schedule No. 5603 REU Eastside Rd
Valve Yard Fence Page 3
Council PNio�^ity/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Budget Resolution
^Location Map
^Notice of Exemption
^Bid Tabs
RESOLUTION NO. 2025 -
A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTiNG THE
2ND AMENDMENT TO CITY BUDGET RESOLUTION NO. 2025-049 APPROPRIATING
$137,700 FOR THE REDDING ELECTRIC UTILITY EASTSIDE ROAD VALVE YARD
FENCE REPLACEMENT PROJECT FOR FISCAL YEAR 2025-26.
BE IT RESOL VED B Y THE CITY CO UNCIL OF THE CITY OF REDDING
THAT Budget Resolution No. 2025-049 be and is hereby amended as follows:
FUND DNISION DESCRIPTION 1NCREASE DECREASE
211 8091 REU—Capital $ 137,700
THAT account titles and numbers requiring adjustments by this Resolution are as follows:
USE SOURCE
OF FUNDS OF FUNDS
Increase(Decrease)Revenue
211-8091-2910000-00000 Fund Balance $ 137,700
Increase Expenditures
211-8091-7200006-00000 Fencing, Signage,Etc. $ 137,700
Total $ 137,700 $ 137,700
THAT the purpose is to appropriate $137,700 for the Redding Electric Utility road valve yard fence
replacement project for�iscal year 2025-26.
I HEREBY CERTIFY that the foregoing Resolution was introduced at a regular meeting of the
City Council of the City of Redding on the 15th day of Ju1y, 2025, and was duly adopted at said
meeting by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
JACK MUNNS, Mayor
ATTEST: FORIYI APPROVAL:
SHARLENE TIPTON, City Clerk CHRISTIAN M. CURTIS, City Attorney
1 1 ��� ...._�_>>...._....._>>>>>...._........... ,
�� � >>.._...._.>>>>>>..._ �
� y ......_.. �._...._>>>>>>..._...._>>>
%
' /
F
� � '� � .....__. �
..._._j—_� % � \
�
�
i
"_"_"_'�-'___'_." i .
i �
%
i /� �
' ...'¢.. ' i
___'_
, .'_'_'__', � � F
, � .._-..,._- � ,,
— �
�, , .._...,.� i �/
�, '� __._...,._.--" i
— � f
___ �
._�.-__ i F.
_""' ti,
i /
i �,
i '._"___" ' / � /
""„1 _'" Y� /� ���,/
i
1 �
i i
/ � �
."_ " _" � / /�� �;
v, ;�� F;
;' FF ,� ��
- J�Q-; � ,� ,FF ,,,
i;� ; �F ,�'
y ,
;
,, FFF ,,
, ; F ,
, , ;, ; F ,
, FF ,
---�- , , F ,
, , , ; ,F ,,
, , ,
FF` ��'
' ' f� ROJ,�CT
_ , ;
-_ , ;
,
, , �
, __.
' ' ' L ��TTO N
_ ,
_ - ,;
, ,
, ,,
, ,
� ; �
, _-- ,
� - � , ;
,
, , ,
,, ,
_ J ,
/ � _ - ,;
,
,
�
,l
; , ___.�____________
� __.
r' I
_ _... __--
� ,
-
� ,
.� , ,
,
; --i
-
;
�
�
_ _ _ , _._..�
-
;' - _. i
_._-
_.._._._
,___._
---" l �
�-- "
__
; __ _._._.
_L�Q'� - _._._._._.____.
,
a Q __._._____-__
�
`� , _._._._
- � ,
� � _.___
o �
0
,�
� � ,
� f L� Ll1
,
� GQ;� M , - p __._____
� _� ,__ _
0
� Q. ; ti � N � _ � _
., _�
, P N �
m - ___
_
_
_._..
___ _
_. � � _.
� � ; J � ,_ �_ � - -�,
Q � �
m �, ;
� , N
, . _ Q .
; �c�
a C� ; ..... , , ._._.. .._..., �-._., 1
� � ,
, LL1 '
� , � ___.
J ,�; , _. ,_ , __ �
t'
� _..
m ,
,
� ,, ;
,
� ; ,
o ,
,
� ; , , � �,
_ , -
, _ ._
� —
a ; � , �.
� ; ,
, _ ,
m , , �
_ , __ ___
� , _�_ �_
� , �-
o ; ,
0
m , , , ,
N ,
�
N - ,
, - �- __
� ,
, ,
E _.__"- ... ... f
� ' , , ...... ...... ........ ... . `
�...,.. - _'._.._. �_,_.._.___ `
mi �� _'_'_"_I_ _ .._.._... _..
a 1 �..�i�
� a i
�, � .._.----
i
� t,�...,.. ���� ' ..� _�._-... ...... 1
�
y
_ - � - - r_ ,,
� ; __ _
� �oF RFOo CITY OF REDDING EXHIBIT A
>
— 2 2361 EASTSIDE RD VALVE
� � f�f � PUBLIC WORKS Y A R D F E N C E R E P�A C E M E N T
� C� -� �Q DEPARTMENT LOCATION MAP
, ���Foa�
X
I'�t�TICE QF EXEMPTICI►N
To: � Office of Planning and Research FROM; City c�f Redding
1400 Tenth Street,Room 12l Public Warks Department
Sacramento, CA 9S$14 777 Cypress Avenue
Redding,CA 96001
� Shasta Cflunty�lerk
County of Shasta
P.O. Box 99�880, 1643 Market Street
Redding, CA 9b�99-0880
Prc�ject Title: Redding Electric Utiliiy Eastside�alue Yard Fence Re�laeement
Pro,�ect Locatian—Specific: 6841 Eastside Rd,
Project 1Locat�on�City: Reddin� Project Lacati€�n—County: Shasta
Description of Projectt Reddin�Electric Utilitv�REUZpraposes to remove approximatelv 217 linear feet of existin�
link fence and it�stall new securitv fenein� with expanded metal panels and cancertina wire, install crash rated bollards
c�emt�lish and repiace curb and�utter,and replace 3/d"dect�rock alon�fence line and around post foundations. Wark includes
removing and disposing of all existing;cllain link fencing, installin� new fencing with metal panels and concertina wire
pouring;concrete,reinstallin e� xistin�s�igna�e,reconnectin�the existin��round wire, and rakin�crushed reack.
Name af Public Agency Approving Pro,�ect:Citv of Reddin�
Name of Person or Agency Carrying{�ut Projeet. Wally Daniels,Pro'eca t En�ineer
Exempt Status: (check one)
❑ Ministerial [S�ction 2108�(b)(1}; i52b8j
❑ l7eclared Emergency [Saction 210$0(b){3); 15�b9(a)]
❑ Emergency Prc�ject [Section�1080(b}{4); 15269{b)]
Cl Statutory Exernptions. State c�ade number:
❑ Common Sense Exemption(T'his project does not fall within an exempt class,but it can be seen with certainty that there is
no possibility that the activity may have a signlficant effect on the envirorunent(14 CGR 15601[b][3]).
0 Categarical Exernptian. State t�pe and section number: Sec. 15301(c), Existing Facilities
Cl Na exceptians apply that would bar the use of a categarical exemption(PRD 21084 and 14 CCR 15300.2).
Reasons why project is exempt. Class 1 exemptions include the a�eratic�n, repair, maintenance, ar minar alteration of
exist'rn�public facilities. The project will involve the re,placernent of existing fencing materia�s anly will serve the same
purpose as the previous fencin�,and will result in r�o expansian of use.The praject has been xeviewed for sensitive resources
and v✓ill nat have a si�nificant effect on biolo�ical or cultural resources such as threatened or endangered st�ecies or their
habitats, sensitive ve�;etation communities, tribal lands, or tribal cultural resaurces. The pro�ect has n�potential to have a
signifieanti effect an the environment.
Lead Agency Cantact Person;Mieke Sheffield Telephone: 530.225.4889
If Filed by Applicant:
1. Attach certified docurnent of exemptian finding.
2. Has a notice o£`exe,�p�ian been,f�l'ed by the p�tblic agency appxoving the project?X'Yes ❑No
� $ � f r �
�
f � �S ,�
u wx
r�
„ ,� _
.
.
i =' a. ... .�,
���yI18�llI'F.': ��'` � � � M..,i_ �'�� i ���`.� ', ��"� �`d�G= � � ,'t - ,�° ."°.`
t� , g
Title: Associate Environrnental Planner
�°`
�Signed by Lead Ageney Date received for filing at QPR:
❑ Signed by Applicant
BID TABULATION FOR:
REU Eastside Road Valve Yard Fence Replacement
Bid Schedule No.: 5603
Hiqhwav Specialty
ENGINEER'S EST Rav Excavatinq Auner Excavatinci Inc Companv, Inc.
6/12/2025 UNIT UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 Water Pollution Control LS 1 $1,760.00 $1,760.00 $7,500.00 $7,500.00 $4,508.50 $4,508.50 $4,000.00 $4,000.00
2 Fence (Temporary) LF 280 $16.50 $4,620.00 $12.50 $3,500.00 $21.00 $5,880.00 $8.95 $2,506.00
3 Fence (Remove) LF 210 $27.50 $5,775.00 $10.00 $2,100.00 $24.00 $5,040.00 $27.00 $5,670.00
4 Fence (Frame) LF 200 $110.00 $22,000.00 $111.00 $22,200.00 $101.00 $20,200.00 $210.00 $42,000.00
5 Expanded Metal Panel (4'x 8') EA 60 $440.00 $26,400.00 $529.00 $31;74U.�0 $579.00 $34,740.00 $750.00 $45,000.00
6 Barbed Wire LF 435 $16.50 $7,177.50 $10.00 $4,350.00 $4.50 $1,957.50 $5.00 $2,175.00
7 Concertina Razor Wire LF 220 $11.00 $2,420.00 $16.50 $3,630.00 $12.75 $2,805.00 $21.00 $4,620.00
8 Bollard (M-50 Crash Rated) EA 11 $7,700.00 $84,700.00 $8,910.00 $98,010.00 $9,411.00 $103,521.00 $9,950.00 $109,450.00
9 Bollard (Standard) EA 4 $1,100.00 $4,400.00 $1,875.00 $7,500.00 $1,483.00 $5,932.00 $1,600.00 $6,400.00
10 Gate (Driveway 18') EA 1 $4,400.00 $4,400.00 $2,500.00 $2,500.00 $2,257.00 $2,257.00 $4,750.00 $4,750.00
11 Gate (Pedestrian 4') EA 1 $1,650.00 $1,650.00 $2,300.00 $2,300.00 $1,702.00 $1,702.00 $4,000.00 $4,000.00
12 Curb & Gutter(6") LF 70 $115.50 $8,085.00 $268.00 $18,760.00 $275.00 $19,250.00 $235.00 $16,450.00
TOTAL -CONTRACT ITEMS $173,387.50 $2�4;{�9Q.tJ0 $207,793.00 $247,021.00
CR Fence Com an ' Avera e '
UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE
1 Water Pollution Control LS 1 $1,500.00 $1,500.00 $4,377.�3
2 Fence (Temporary) LF 280 $5.50 $1,540.00 $11.99'I
3 Fence (Remove) LF 210 $30.00 $6,300.00 $22.75
4 Fence (Frame) LF 200 $150.00 $30,000.00 ' $143.00
5 Expanded Metal Panel (4'x 8') EA 60 $980.00 $58,800.00 $709.50
6 Barbed Wire LF 435 $7.50 $3,262.50 i $6.75 '
7 Concertina Razor Wire LF 220 $33.00 $7,260.00 ' $20.8� '
8 Bollard (M-50 Crash Rated) EA 11 $12,500.00 $137,500.00 ' $10,192.75
9 Bollard (Standard) EA 4 $1,100.00 $4,400.00 $1,514.50
10 Gate (Driveway 18') EA 1 $10,000.00 $10,000.00 i $4,876.75 '
11 Gate (Pedestrian 4') EA 1 $4,000.00 $4,000.00 $3,000.50
12 Curb & Gutter(6") LF 70 $1,223.58 $85,650.60 ' $500.40
Average bid
TOTAL -CONTRACT ITEMS $350,213.10 ' $252,2�9.28