Loading...
HomeMy WebLinkAboutReso. 2025-057 - Approving and Authorizing the City of Redding Drought Protection Agreement SOLUTION N{). 2025-�57 A S�7►LUTION OF THE CI'TY C+DUI�ICIL +DF THE �ITY OF DI)Il�1G (1) ADt)PTIN+G SPONSIBLE AGENCY FINDINGS AND STATEMENT flF OVE DING CCINSIDE TIONS UNI?ER CE+QA FQR TT�E DR+UU+GHT PROTEC'TI(}N PRt�G M A� EMENT; ��) aPPx�►vI�G a�vn Au�rxo�zlN� TxE c�TY aF xEn�►�N� T+� E�tT�R Tx� �Rau�xT P�o�Ec�r�vN A+� E�ENT '4��IE ' AS, the Dr�ught Pratection Prugram Agreement {"proposed project" or "Agreement") is an agreement between the Sacramento River Settlement Contractc�rs Nonprofit Mutual Benefit Corpc�ratian,individual Sacramento River Settlernent Cantractc�rs(SRS�),and the U.S.Bureau of Reclamatian(Reclamation)to forego a larger percentage of their contracted supply in specified drought years. In addition, the SRSC wauld receive funding from Reclamatic�n to engage in drought-resiliency projects to address potential water loss and imprt�ve the resilience c�f the SRSC's water system and long-term water delivery capabilities; and WHE AS, the Glenn-Coiusa Irrigation District (GCID), as the leari agency under the Califarnia Environmental Quality Act (�EQA) prepared an Environmental Impact Repart (EIR} for the Project; and WHE AS, on December 30, 2424, GCID certified the final EIR for the Project, adopted findings of fact and a statement c�f overriding considerations for appraval of the 1'rc�ject, and appraved the Project; and 'WHE AS, the City of Redding (City) holds a Sacramento River Settlernent Contract and has proposed to approve and enter the Agreernent and is therefore a responsible agency under CEQA with discretionary approval authority over its obligati+�ns under the Agreement, and WH� -. AS, the City, as a responsible agency, must take feasible measures to avoid ar rnitigate the direct or indirect environrnental effects of thase parts of the project which it decides to carry out, finance, or approve (CEQA Guidelines, Section 15096(g)(1)); and WHEREAS, the City, as a respansible agency, must also make findings and adopt overriding considerations far envirnnmental impacts that wi11 result from the parts of the project that it approves �CEQA Guidelines, Section 1509b(h)); 1\Il�VYa 1. . . FlJ � 9 I]L` �11 :.�. �JIJL:VL'L� 11.1H�1.e� l. The recitals ,stated above are true, correct, and are adopted h�rein. 2. The City Council approves the Drought Protection Water Program Agreement between the Sacramento River Settlement Contractars Nonprofit Mutual Benefit Corpnration, individual Sacramento River Settlement Contractors,and the U.S.Bureau of Reclamation. 3. The City Manager or his designee is authorized to enter into the Drought Pratection Program Agreement and any related do�urnents Qn behalf of the City. 4. The �ity, as a responsible agency under CEQA,has reviewed and considered the EIR and has reached its own inde�,endent decision to approve the L?rought Protection �ater F'rogram Agreement; 5. The�ity adopts all mitigation measures identified in the EIR with respect to its obligations under the Agreement. 6. The City finds that there are no additionai feasible alternatives or feasible mitigation measures within its pc�wers that would substantially lessen or avoid any signi�'icant effect t�e project would have on the environment, 7. The City adopts the Responsible Agency Findings of Fact and Statement of Overriding Considerations for the Drought Protection Program Agreement, and the Mitigation Monit�ring and Reporting Program. I HE �Y CERTIFY that the foregoing resolutic�n was introduced at a regular rneeting of the City Council af the City of Redding on the 15t1' day of July, 2025, and was duly adopted at said meeting by the following vote: AYES: COiTNCIL MBERS: — AII�Cfi�9 1.7I1°AI�II�`a�9 LIUt`tlUy Resner, Munns NOESc CCiUNCiL ERS. - N a n e ABSENT: �ClUNCIL MEMBERS: - None ABSTAIN: C((7RRLlNCIL ME ERS; -None �"� �4..��._�� , � � � , JACK MUN�TS, yor ATTEST: Ff� APP��` D. �- � ` . �. � �.; o �. �� � r�� � � ""�SHA ENE TIPT4N, City Clerk CHI�ISTIAN M. CURTIS, City Attorney