REPORT TO THE CITY COUNCIL
MEETING DATE: June 3,2025 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(b) Director
***APPROVED BY***
�c a� � �bEi� 'c�r�Cs I7�reetcsr 5f2Ii2t}`?:� te�r� , ;� � �:r ��`?7r'?C3�w,
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(b)--Accept Bid Negotiation No. 5474 Replace AC Surfacing 2024 Project
Recommendation
Accept Bid Negotiation No. 5474 (Job No. 2712), Replace Asphalt Concrete (AC) Surfacing
2024 Project, awarded to 1�.F. Shea Construction, Inc., as satisfactorily complete, with a final cost
of$2,115,664.48.
Fiscal Impact
Streets Division funding in the amount of$1,901,850 and Solid Waste Division funding in the
amount of $416,000 totaling $2,317,850 were approved for this Replace AC Surfacing 2024
Project (Project). The total project cost, including surveying, design, bidding, construction, field
engineering, inspection, and contract administration is $2,ll5,664.48.
Alternative Action
The City Council (Council) may choose noti to accept the project as satisfactorily complete and
provide staff alternative direction.
Background
As of December 16, 2024, J.F. Shea Construction, Inc. has completed all work items of the
project which was within the adjusted contract time frame following weather delays and
additional work. Subsequently, the Public Works Department filed a notice of completion with
Shasta County. The project warranty period expires one year from the completion date.
On June 4, 2024, the Council awarded a construction contract to J.F. Shea Construction, Inc. for
$1,'773,377 and approved a $180,000 construction contingency fund. Also authorized was
$199,400 for contract administration and construction inspeetion fees and $122,000 for project
development costs. The City Manager was authorized to approve additional increases in either
the construction management or construction contingency amounts up to a total of$25,000. The
Report to Redding City Council May 23,Z025
Re: 4.12(b)--Accept Bid Negotiation No. 5474 Replace AC Surfacing 2024 Project Page 2
total authorized amount for the project was $2,299,777. Project development costs include
engineering, environmental, and consultant services. During construction, there were three
change orders in the amount of$125,787.48 leaving a balance of$54,212.52 in the contingency
fund. The final project cost was $2,ll5,664.48.
The project involved removing and replacing approximately 110,000 cubic feet of asphalt
concrete in worn and deteriorated sections of Airport Road, Oasis Road, Quartz Hill Road, Twin
View Boulevard and the So1id Waste Transfer Station as we11 as appropriate traffic control,
striping, and pavement markings as required.
Cost Summary
Awarded Amounts Actual Cost
Project Development Costs $122,000.00 $122,000.00
Construction Contraet + �1,953,377.00 ��� � ����� � � �
Contin enc
Construction Contract + �=������ � � � ���� ����� �
Contract Chan e Orders � $1,899,164.48
Contract Administration & �199,400.00 ��� � $94,500.00
Ins ection
Additional City Manager $25,000.00 $0.00
Authorit
Total $2,299,777.00 $2,115,664.48
Environmental Review
This action is not a project as defined by the California Environmental Quality Act, and no
further action is required. On June 4, 2024, the Council determined that the project is
categorically exempt from review under the California Environmental Quality Act Guidelines,
per Section 15301 (Existing Facilities).
Council Prior�ity/City Manage� Goals
This agenda item is a routine operational item.
Attachments
^Replace AC Surfacing 2024-Location Map
Previous Staff Report
TWIN VIEW BLVD
OASIS RD
OASIS RD
QUARTZ
HILL RD �o
5�s
op'
��PrA RD
� ��y�\G �
�9kF e`�o SR2ggE �
O
� TRANSFER STATION
�
Pe-'�� y<<�'p,o y
SqCRqMENTO RNER � �
� ---_ �
--�--�=—�� _�ti^ OLD ALTURA
��
SR299W
d
P�'�ER VIKING
cypRes S�,QQ
/ q� E. CYPRES
�G
Ftiy� HARTNEL� r
F�TG,p9 � cY� 3 z __---
W W r�
= z j Q
U
W
�
N m = �
c� U � Q I—
C1TY OF ' � N �
REDD/NG go��"�" j� > RANCHO ¢ G��i`G�� AIRPORT ROAD
N
S� D(J � —
Y �
W �
� W �
�
U
�J �
R� v �
���p,R �RK s,� � KNIGHTON M�D DC I A L
AIRPORT
e-° ���`� s
o� �.� �ST
���� } s�OF �.�c
W �J
Q DERSCH RD
>
�Peey �`�---�' ``
oF R�o CITY OF REDDING
� �O� REPLACE AC SURFACING
� PUB�IC WORKS PROJECT 2024
c� __ = �
� - ��: .P DEPARTMENT
�t,F�ar' �OCATION MAP
c � �` � � �
� � � ' � �' � �' ' � CITY OF REDDING
_�,
REPORT TO THE CITY COUNCIL
MEETING DATE: June 4,2024 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(b) Director
***APPROVED BY***
�c a� � �bEi� 'c�r�Cs I7�reetcsr 5f2?t2t}`?� te�r� , ;� � �:r ��`?SI�CI�
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(b)--Award Bid Negotiation No. 5474 (Job No. 2712) Replace Asphalt
Concrete Surfacin 2024 Pro'ect
Recommendation
Authorize the following actions relative to Bid Negotiation No. 5474 (Job No. 2712), Replace
Asphalt Concrete Surfacing 2024:
(1) Award to J.F. Shea Construction, Inc, in the amount of$1,773,377;
(2) Approve $199,400 to cover the cost of administration and inspection fees;
(3) Approve $122,000 for project development costs;
(4) Approve $180,000 to provide construction contingency funding;
(5) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of$25,000;
(6) Approve the project design plans, specifications, and special provisions; and
(7) Find that the project is categorically exempt from review under the California
Environmental Quality Act Guidelines, pursuant to Section 15301(c) — Existing
Facilities.
Fiscal Impact
The Replace Asphalt Concrete Surfacing 2024 Project is funded by the Streets Division
($1,901,850) and the Solid Waste Division ($416,000). Project cost components are estimated,
and some shifting of the funds may be necessary to balance the project within the approved
budget.
Cost Summary
Item Estimated
Pro'ect Develo ment Costs $ 122,000.00
Construction Contract-I-Contin enc $ 1,953,377.00
Contract Administration, Ins ection, Testin $ 199,400.00
Additional City Mana er Authority $25,000.00
Total Pro'ect Costs $2,299,777.00
Pro'ect Bud et $2,317,850.00
Report to Redding City Council May Z3,2024
Re: 4.12(b)--Award Bid Negotiation No. 5474 Replace Asphatt Concrete Surfacing 2024
Project Page 2
Alternative Action
The City Council may choose not to award the project or provide alternate direction to staff. If
the project does not move forward, the streets will continue to deteriorate and may require
roadway reconstruction.
Background/Analysis
This project involves removing and replacing approximately 110,000 cubic feet of asphalt
concrete pavement in worn and deteriorated sections of Oasis Road, Twin View Boulevard,
Quartz Hill Road and Airport Road. The project includes other associated work items that
include: pavement delineation, pavement markings, pavement markers, and other miscellaneous
items. The project also includes removal and replacement of worn asphalt concrete pavement at
the City of Redding's Transfer Station as a result of the daily heavy truck traffic.
Attached is a tabulation of the three bids opened on May 15, 2024. The low bid in the amount of
$1,773,377 was received from J.F. Shea Construction, Inc., of Redding. The engineer's estimate
was $1,777,86'7. Total project development costs far this project are estimated to be $122,000.
Project development costs include engineering, environmental, and consultant services (design
support).
Environmental Review
Staff has determined that the project is categorically exempt from environmental review under
the California Environmental Quality Act Guidelines, per Section 15301 (c). Class 1 exemptions
include the operation, repair, maintenance, or minor alteration of existing facilities, structures, or
equipment involving negligible or no expansion of use. The project will extend the life of the
existing pavement, but will not create additional vehicle capacity or result in expansion of use.
The project has been reviewed for sensitive resources such as threatened or endangered species
or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources. The
project has no potential to have a significant effect on the environment.
Council P�io�ity/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Location Map
^NOE
^Bid Tab
TWIN VIEW BLVD
OASIS RD
OASIS RD
QUARTZ
HILL RD �o
5�s
op'
��PrA RD
� ��y�\G �
�9kF e`�o SR2ggE �
O
� TRANSFER STATION
�
Pe-'�� y<<�'p,o y
SqCRqMENTO RNER � �
� ---_ �
--�--�=—�� _�ti^ OLD ALTURA
��
SR299W
d
P�'�ER VIKING
cypRes S�,QQ
/ q� E. CYPRES
�G
Ftiy� HARTNEL� r
F�TG,p9 � cY� 3 z __---
W W r�
= z j Q
U
W
�
N m = �
c� U � Q I—
C1TY OF ' � N �
REDD/NG go��"�" j� > RANCHO ¢ G��i`G�� AIRPORT ROAD
N
S� D(J � —
Y �
W �
� W �
�
U
�J �
R� v �
���p,R �RK s,� � KNIGHTON M�D DC I A L
AIRPORT
e-° ���`� s
o� �.� �ST
���� } s�OF �.�c
W �J
Q DERSCH RD
>
�Peey �`�---�' ``
oF R�o CITY OF REDDING
� �O� REPLACE AC SURFACING
� PUB�IC WORKS PROJECT 2024
c� __ = �
�' f ��: .P DEPARTMENT
�t,F�ar' �OCATION MAP
IVC}TICE +DF E�EMFTI+ON
TO: 0 (Jf�ice of Planning and Research F1toMa C�ty of Redding
1400 fienth Street,Rt�om 12l Public Wc�rks Department
Sacramento,CA 95814 777 Cypress Avenue
Redding,CA 96001
� Shasta County Clerk
C�unty of Shasta
P.Q:Box 990$80, 1643 Market Street
Redding,CA 96d99-08$Gt
Project Title: Replace AC Surfacin�;2Q24 Project J.O. #2712-10
Praject Lacatian—Spec�fic:Airprrt Road,Oasis Road, Twin View B1vd and Quartz Hill Road:
Praject Lacation—City:Redding Project Locatian—Caunty: �hasta
Descr�ption of Project: The Citv of Reddin�proposes tc� remove and replace 2.5" of asphalt concrete on the existi�
deteriorated sections af Airport Road Qasis Road Twin View B1vd and Quartz Hill Road Work gncludes rindin and
replacin� or sealin� t�pavement� addin� new stripin�• and ad�usting� manholes as needed Qne-way traffic control or
temporary street closures ma b�required.The public wiit be natified of the project
Name of Public Agency Approving Project: City of Reddin�
Name afPerson or Agency Carrying�ut Pro�ect. Tom Semb,Project En�ineer
Exemp�Status. (check ane)
❑ Ministerial [Section 21080{b)(1}; 1526&]
❑ Deciared Emergency [Section 21080tbj(�}; 15269(a}]
❑ Emergency Pra�ect CSection 21080{b)(4); 15269(b}]
❑ Statutory Exemptions. State code number:
Q Cc�mmon Sense Exemptian(This project does not fall within an exempt ciass;but it can be seen with certainty that there is
no possibility that the activity rnay have a'signlficant effect on the environment{14 C�R I560I[b�[3]}.
0 Cafegorical Exempti�n: State type and section num6er; Sec. 15301(c ,Existin�Facilities
0 No excepti�ns apply that would bar the use of a categarical exemptron(PRD 21084 and I4 CCR 15300:2);
Reasons why project is exemgt: Class 1 exernptions include the operatian, re�air ma�ntenance or minor�lteratian of
existin� facilities, structurea, or equipment invo[vin�ne�li�ible or no expansion of use The existin� asphalt wi�l be
maintained and the .�roject daes not invalve expansion of use. The proiect has been revr�wed for sensitive resources such
as threatened �rr andangered species or their habitats sensitive vegetation communities tribal lands or tribal cu[tural
resources.The proiect hasno potentiai to have a si�nificant effect on the enviranment.
Lead Ag�ncy Contact Person: Amber ISeliev Telephane. 530.225:4046
If Filed by Applicant.
1. Attach certified document of exemption�nding,
2; Has a notice of exemptron been filed by the public�agency approving the pro,�ect"?❑Yes o No
Si n�tures (`�� r c�.-�i'� Dat�: �' —�ca,�.�
� .�..� � <�`'��.�
Title: Environmentai Com liance Man r
0 Signed by Lead Agency Z}ate received far filing at OPR:
❑ 5igned by Applicant
BID TABULATION FOR:
REPLACE AC SURFACING 2024
Bid Schedule No.: 5474
ENGINEER'S EST J.F. Shea Construction Inc Darren Ta lor Construction Inc
4/12/2024 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTAL PRICE TOTAL
1 Water Pollution Control LS 1 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $10,000.00 $10,000.00
2 Traffic Control LS 1 $130,000.00 $130,000.00 $163,800.00 $163,800.00 $100,717.60 $100,717.60
3 Replace Asphalt Concrete Surfacing (3/4" CF 9�720 $9.50 $928,340.00 $9.70 $947,884.00 $12.84 $1,254,724.80
4 Asphalt Concrete Overlay(3/4" PG 64-10) TON 1150 $90.00 $103,500.00 $115.00 $132,250.00 $155.20 $178,480.00
5 Replace Asphalt Concrete Surfacing (3/4" CF 21730 $14.50 $315,085.00 $11.50 $249,895.00 $15.66 $340,291.80
6 Shoulder Backing LF 1700 $4.00 $6,800.00 $7.00 $11,900.00 $10.77 $18,309.00
7 Digouts (3/4" PG 64-10) CF 4600 $14.80 $68,080.00 $13.00 $59,800.00 $11.81 $54,326.00
8 Thermoplastic Traffic Stripe (6") LF 73656 $1.75 $128,898.00 $1.75 $128,898.00 $1.50 $110,484.00
9 Thermoplastic Traffic Stripe (8") LF 756 $2.50 $1,890.00 $2.50 $1,890.00 $4.50 $3,402.00
10 Thermoplastic Pavement Markings SF 637 $16.00 $10,192.00 $16.00 $10,192.00 $18.00 $11,466.00
11 Pavement Markers EA 1561 $12.00 $18,732.00 $10.00 $15,610.00 $7.00 $10,927.00
12 Adjust Water Valve EA 35 $850.00 $29,750.00 $650.00 $22,750.00 $750.00 $26,250.00
13 Adjust Manhole EA 14 $1,200.00 $16,800.00 $917.00 $12,838.00 $1,000.00 $14,000.00
14 Adjust Monument EA 14 $1,200.00 $16,800.00 $905.00 $12,670.00 $1,200.00 $16,800.00
TOTAL-CONTRACT ITEMS $1,777,867.00 $1,773,377.00 $2,150,178.20
Stimpel-Wiebelhaus
Associates Inc AUERAGES
UNIT UNI7
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE
1 Water Pollution Control LS 1 $6,500.00 $6,500.00 $6,5t10.00
2 Traffic Control LS 1 $200,000.00 $200,000.00 $154,839.20 "
Replace Asphalt Concrete Surfacing (3/4"
3 PG 64-10) CF 9��20 $15.35 $1,500,002.00 $12.63
4 Asphalt Concrete Overlay(3/4" PG 64-10) TON 1150 $165.00 $189,750.00 $1'45.07
Replace Asphalt Concrete Surfacing (3/4"
5 PG 70-10) CF 21�30 $18.50 $402,005.00 $15.22
6 Shoulder Backing LF 1700 $53.00 $90,100.00 $23.59
7 Digouts (3l4° PG 64-10) CF 4600 $22.00 $101,200.00 $15.60
8 Thermoplastic Traffic Stripe (6") LF 73656 $1.50 $110,484.00 $1.5� '
9 Thermoplastic Traffic Stripe (8") LF 756 $4.50 $3,402.00 $3.$�
10 Thermoplastic Pavement Markings SF 637 $18.00 $11,466.00 $17.33
11 Pavement Markers EA 1561 $7.00 $10,927.00 ;$8.00 ';
12 Adjust Water Valve EA 35 $550.00 $19,250.00 $650.00
13 Adjust Manhole EA 14 $1,100.00 $15,400.00 $'1,005.67
14 Adjust Monument EA 14 $1,100.00 $15,400.00 $1,t?68.33
TOTA�-CONTRACT ITEMS $2,675,886.00 $2,199,$13.73 -