REPORT TO THE CITY COUNCIL
MEETING DATE: April l,2025 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(b) Director
***APPROVED BY***
�
�c a� � �bEi� 'c�r�Cs I7�reetcsr 3f��12t}`?� r5' �p�i��,C�i �r� �, �,f2:��'2{�?.
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(b)--Award Bid Negotiation No. 5548 (Job No. 5636) Redding Library
Floorin Re lacement Pro'ect
Recommendation
Authorize the following actions relative to Bid Negotiation No. 5548 (Job No. 5636), Redding
Library Flooring Replacement Project:
(1) Award to Northern Valley Flooring in the amount of$622,840;
(2) Approve $78,500 to cover the cost of administration and inspec�ion fees;
(3) Approve $32,000 for project development costs;
(4) Approve $63,000 to provide construction contingency funding; and
(5) Find that the project is categorically exempt from review under the California
Environmental Quality Act Guidelines,pursuant to Section 15301 —Existing Facilities.
Fiscal Impact
The Redding Library Flooring Replacement Project (Project) is completely funded by a Building
Forward Grant from the California State Library and no additional funding is required. The
project budget amount shown in the table below, $798,000, is within the overall amount of the
grant awarded to the City of Redding (City).
Cost SummaNy
Item Estimated
Pro'ect Develo ment Costs $32,000
Construction Contract+Contin enc $685,840
Contraet Administration,Ins ection,Testin $78,500
Total Pro'ect Costs $796,340
Project Bud et $798,000
Project cast components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Report to Redding City Council March 21, ZOZ5
Re: 4.12(b)--Award Bid Negotiation No. 5548 Redding Library Flooring Replacement Page 2
Alternative Action
The City Council may choose not to award the project and provide alternate direction. If the
project does not move forward, the Redding Library will not receive new flooring to replace the
existing flooring which has reached the end of its useful life. In addition, the City may not
receive reimbursement for money spent and not yet invoiced, and the remaining grant funds may
be forfeited.
Background/Analysis
Attached is a tabulation of bids opened on January 28, 2025. The low bid in the amount of
$622,840 was received from N�orthern Valley Flooring of Stockton, California. The engineer's
estimate was $635,000. Total project development costs for this project are estimated to be
$32,000. Project development costs include engineering, surveying, environmental, and
consultant services.
The project includes the removal, disposal and replacement of the majority of the existing carpet
and vinyl flooring on both levels of the library including the stairs. In addition, the existing book
shelving and furniture will be moved and relocated, or reinstalled as detailed on the plans and in
the special provisions. During construction, the library will remain open by setting up a small
temporary library in the Community Room.
Environmental Review
Staff has determined that the project is categorically exempt from environmental review under
the California Environmental Quality Act Guidelines, pursuant to Section 15301. C1ass 1
exeinptions include the operation, repair, maintenance, or minor alteration of existing facilities,
structures, or equipment involving negligible or no expansion of use. The project is to replace
flooring, replace existing wall base, install transition strips, and relocate or reinstall existing
shelving and furniture. Old flooring and debris will be removed offsite for proper disposal. The
project is a regular maintenance item and does not involve change of or expansion of use.
Therefore, the project has no potential to have a significant effect on the environment and further
environmental review is not required.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Bid Tab
^Location Map
^Notice of Exemption
BID TABULATION FOR:
REDDING �IBRARY FLOORING REPLACEMENT PROJECT
Bid Schedule No.: 5548
Continental Floorinq
ENGINEER'S EST Hanes Floor inc Northern Vallev Floorinq Companv
1/28/2025 UNIT UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL
Furnish and Install
1 Flooring LS 1 $610,000.00 $610,000.00 $1.Od i $665,727.28 $582,840.00 $582,840.00 $567,336.00 $567,336.00
Move, Relocate and
Reinstall Shelving and
2 Furniture LS 1 $25,000.00 $25,000.00 $1.00 $183,272.72 $40,000.00 $40,000.00 $66,000.00 $66,000.00
TOTAL -CONTRACT ITEMS $635,000.00 **$2.00 $622,840.00 $633,336.00
G8�S Carpet Mills, Inc Better Enterprises, Inc. DFS Floorinq, LP Pro-Ex Construction Inc
1/28/2025 UNIT UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL
Furnish and Install
1 Flooring LS 1 $496,000.00 $496,000.00 $563,975.00 $563,975.00 $565,250.00 $565,250.00 $731,000.00 $731,000.00
Move, Relocate and
Reinstall Shelving and
2 Furniture LS 1 $152,000.00 $152,000.00 $149,590.00 $149,590.00 $152,745.00 $152,745.00 $198,000.00 $198,000.00
TOTAL -CONTRACT ITEMS $648,000.00 $713,565.00 $717,995.00 $929,000.00
**Shaded areas indicate corrections made in accordance with the Special Provisions. Due to error in proposal bidder is deemed
non-responsive.
� � � �
;
;
;
,
�
� ;
} �;
�j �3
�� ��
�� � w.... ,..�`
� ��.����
�� �,w
� �'�
� �..w�
�� �, ,.�
,�_
�� Redding ` ��}
�� Library 1100 ���,
Parkview Ave
�. �
���
� �
�� ��
� ��
�.a� �
� �
�� "„,��"� �"� � ♦
♦ �
l
,,� • �
,,` ~� �
r
` � PROJECT Q�
LOCATION ��� ����~� p ��
� , � �� q�, �
:� � � ��r � t�j '`'` ���
_ ,..�, f � � � � ��
, , � ' � �VF
� �.a � , �r �,� �w.
� � *� � `� `� �,`
gtO ,,�� � `�r'�' a z;� �,r��' ,
- �� ,*•. ��.. f� � ����.{ � m, 4
� �� , ;� §..w ; �y ,�
° "� � ; J /' �r Q'� ,,.,f£k r
� �� � �t t r' �� .. r>.s
� r , I 1 * �y
� i � � � �� ,,,,;` � � ��.
�,.., �. .,, `` ��' � ,'
P ' � ? X .�m �„ �
� � � � `� ` �:' �`.,.
I � �.,y { ...r'
�' � ��
� .�` ,�' r � .
�
v r �...,,. t , w�
o � v � �
, , '� ..�
�, � � ��
a I ;, °�, ; ,
; , r „ .,
' „'t
� j_ �,� '� t� ,. / �^� �„ °° ,�� ,t j
�
� �� � CITY OF REDDING EXHIBIT A
' Z REDDING LIBRARY
v � � PUBLIC WORKS CARPET REPLACEMENT PROJECT
� � ��� /����� �+� DEPARTMENT
x '�����,�' LOCATION MAP
'I'ICE QF E�EMPTIC}N
T+�. `L�Q Office of Planning and Research �ROM: C'ity of Redding
1400 Tenth`Street,R.00m l Z 1 P�tblic Works L>epartrnent
5acramenta,CA 9�814 777 Cypress Avenue
Redding,CA 960Q1
0 Shasta C�urlty Clerk
County af Shasta
P.�`: Box 990880, 1643 Market Street
Redding,CA 9b499-0880
Project Title: Reddin L�ibrarv�'looriri�Replacement Pro�ect
Project Lacation—Specific.Reddin Lg ibra_rY, 1 l00 Parkview Ave.
Proyect Location—City: Reddir►g Projeet Location—�ounfy: Shasta
Description af Prt�ject._Tfie Citv of Reddin�(�it��p�oses tc� remove and replace a�proxirr�ately 4$ 775 square feet of
flaoring.�(coinbination af carpet tile, viny�lank, and resilient st�ir treads}. In addition the existin¢ wall base wiIl be
removed, disposed af and replaced with new material. and new metal transitic�n strips shall be installed in desi nated
locations.The project also includes moving and relocatin�;or reinstallin�all existing shelvin�and furniture.
Name of Public Agency Apprnving Project: Citv of Reddin�
Name c�f Person or Agency Carrying Out Projeet: Carri VandiWer, PE-Pro�eca t En�ineer
Exempt Statuts: (check one)
(� Ministerial [Seeticsn 21480(b}(l}; 15268]
� Declared Etnergency [Sectian 2108d{b)(3}; 15269{a}]
❑ Etnergency Prc�ject[Sectior�210$0{b}(4}; 15Z69(b)]
❑ Statutary Exemptions. State cade number:
❑ Ct�mman Sense Exemption(This project dc�es not fali within an exempt class;but it can be seen with certainty that there is
no possibility that the activity may hav�a signtficant ef#`ect on the envir4nment{l4 C�R 156i}1tb][3]):
� Gat�gorical Exemption.State type and sectic�n number: Sec. 15301,Existin�Facilities
� I"�o exceptions apply that would bar tlie use af a categorical exemption(PRD 21084 and 14 CCR 15340.2):
Reasans why pr�ject is exempt: Class 1 exemptions include the ot�eration, repair, maint�nance, or minar alteration af
existin� facilities, structures, or equipment involvinQ�ne�ligible or no expansian of use. The project is to replace floc,rin�
repla�e existin�wall base, install transition strips, and relocate or reir�stall existing shelving and fi�miture.Old flac�ring and
debris will be removed offsite far praper disposal. The project is a regular maintenance item and does not involve change
of or e�pansion af use,Therefore, the project has no potential tc� have a si�nificant effect on the environment and further
envirc�nmental review is not reql�ired.
Lead Agency Contact Person: Mieke Sheffi�ld Teiephone: 530.225.4889
If Filed by Appiicant:
l, Aitach�certified doctlment af exemption finding.
2, Has a�r�oti`�e of#exemptior�been filed by the public agency approving the project? a Yes o No
,
�, � ��� ; ���� � �,
� .�� g � �-�� n � '" ,w, �v.
Si nature: �°�� ���
��" ����
� �" � 4'�.� 1 �r��� I�at�.� -;�� �w �'��� ,�.��
�� . �
• ,. ��. ,
Title: Assaciate Envirar�'iriental Planner
�Signed by Lead Agency I�ate teceived for filing at t7PR:
❑ Signed bY ApPlicant