HomeMy WebLinkAbout _ 4.11(d)--Approve Increase to Project Budget for Churn Creek Lift Station Rehabilitation Project � � �' � � � � � � ' � �' � � ' � ` CITY OF REDDING REPORT TO THE CITY COUNCIL MEETING DATE: March 18,2025 FROM: Michael Webb, Public Works ITEIVI NO. 4.11(d) Director ***APPROVED BY*** � �c a� � �bEi� 'c�r�Cs I7�reetcsr 3r�tC�12t}`?� r5�' �p�i��,C�i �r� �, ��'1'?��'2{�?. mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(d)--Approve Increase to Project Budget for Churn Creek Lift Station Rehabilitation Pro'ect Recommendation Approve an increase to the Churn Creek Lift Sta�ion Rehabilitation Project's (Bid Negotiation No. 5452) construction contingency budget in the amount of $65,000, bringing the construction contingency total to $262,000 for the project. Fiscal Impact The Churn Creek Lift Stiatian Rehabilitation Project (Project) is being funded by Public Works' Wastewater Utility Division funds, as will the proposed $65,000 contingency increase. The total project cost, including the proposed increase, is expected to be $929,600. Alte�native Action The City Council (Council) may ehoose not �o approve the reques� and provide alternative direction to staff. Backgrou n d/f1 n alysis This project includes the rehabilitation of the Churn Creek lift station to address the issues and deficiencies listed below, including coating/lining the wet well interior with epoxy, replacing the influent slide gates, rehabilitating and securing the pump guide rail systems, installing combination air valves on the two force mains, installing drain outlets and piping from the vaults, and replacing the force main discharge structure with a new polymer concrete corrosion resistant structure. The station is in decent condition overall and it is expected to have adequate capacity for the foreseeable future, but there are several issues and deficiencies at that station that are being addressed to extend the service life of the station and meet operation and maintenance needs, including: Report to Redding City Council March 12, ZOZ5 Re: 4.12(d)--Approve Increase to Project Budget for Churn Creek Lift Station Rehabilitation Project Page 2 • The existing wet well liner is failing and exposing concrete to corrosive gasses; • Two influent slide gates have exceeded their service lives and are difficult to operate; • Pump guide rails separate and make pump removal and installation difficult; • Air valves on the force mains have failed, exposing the station to potential surge damage; • Service vaults at the station do not have drains and regularly fill with rain water; and • The station's force main discharge structure is severely corroded. On April 2, 2024, the Council awarded the construction contract for the project to SnL Construction, Inc. The notice to proceed was issued May 10, 2024, and due to material delays, the project was suspended and construction did not begin until September 9, 2024. During the course of construction, it was found that the existing 12-inch sewer main entering the wet well had a major failure that necessitated immediate replacement of the pipe. On November 6, 2024, Public Works engineering staff initiated a transfer of project funding from City Manager available funds to construction contingency funding in the amount of$50,000. On November 19, 2024, Council approved an increase to the project contingency funds in the amount of$90,000 to cover the additional costs of the 12-inch sewer replacement. During the last stages of the project, it was also found that the existing 20-inch sewer force main that crosses Goodwater Avenue and discharges into a newly installed sewer manhole, as per plan, was severely corroded to the point of failure for about 40 linear feet. Due to the magnitude of this failure, it is necessary to replace this failed section of pipe as it is the main discharge of the newly upgraded lift station. Due to this unforeseen condition, the project requires an increase of funding as the contingency funds previously approved for the projects budget are not adequate to cover the additional required work. A $65,000 increase to the construction contingency is required to cover the costs of this additional work. The below table summarizes the total project budget to date including the requested increase to contingency. COST SUMMARY Item Authorized Amountl Increase Requested Projected Amount Project Development $25,000 $0 $25,000 Construction Contract $562,600 $0 $562,600 Contract Administration, $80,000 $0 $80,000 Ins ection, Testin Construction Contin enc $197,000 $65,000 $262,000 City Manager Funds $0 $0 $0 Totals $864,600 $65,000 $929,600 Notes: llncludes previous budget transfers (City Manager Funds) and Council approved budget inereases. Report to Redding City Council March 12, ZOZ5 Re: 4.12(d)--Approve Increase to Project Budget for Churn Creek Lift Station Rehabilitation Project Page 3 Environmental Review This action is not a project as defined by the California Environmental Quality Act (CEQA), and no further action is required. On April 2, 2024, the Council determined that the project is categorically exempt from environmental review under CEQA, pursuant to Sections 15301 — Existing Facilities, 15302 — Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. Council P�^iority/City ManageN Goals This agenda item is a routine operational item. Attachments ^Location Map Previous Staff Report 111924 Transfer of Project Funds 110624 Previous Staff Report 040224 , ; , � ...�',r� I,1.,.��_ ,�`-�� _R,/ � ��r����� �,�'�� �---� � ... --- _.. . , - � r r, , M � ._�.�..��� ,/ �~�,, <'�,,MM � � �- � --,f � -- ' _, � ,�, �, 1 �''~ \`� ,' , ��' Y 0 .� - ___.. � ,. � �,~`' �, �`�,��'�� ,� ' �'�J9�'�RM� �� -< --_� �- _._� ~� �`�'� �,�r �,� � � � � �c ,�o -�,_ �___��_�� ; -- -- r T�RMf�C RD �.� �,,� � � � , ry_ p, _� _ — — � � ,~i7 - .�* l,r �� � _ {! rf a�cc _,___ � ,�� ST�qT �� ,7 �,� � /r��; _t- �,����� c� ' ,,tl l � ` � � �"� 7 .._ . _ ; �, � ( F � � � � ~ TM ` -t 1, 7 4,:,� � �`� � '� ��� �� �� {����' ) � ����,`�� �i �; � � �,�� �' � �,1,.�_,�: 1,W��� ��, , �;�� ��_�_�_�._._�`"`��__--� � � . ��L_ �NI � �.'� _.. w_..._;' 1 .:,�' � , ..�.___ �-- -------- � ,� � _ ?�- , � ��� •,, ��A �U; ; A �.. �� S �!��, �I/q �- �-- �� ��f'11 _ ,.{� , Q �1 �..�___� I �- � �� '*. . ,�.. _________ _'_, *M� 'titi .�,.�.__,�....._ ..� , .,t � �i f J 'm _.,_, „,^ .,� ��........-.� +L,.��:+ 7 Ij ,'I __.._......_.__�� _�,_ ""_,_,., _,__ * __ , �"__,."" , ,r ___,._..—, , �a , , � , ,� � , , - __ __ ",� � , . � l ~~,� � ' , ��.�� PROJECT�; ;` ;1 ------._ .__ �EC;�V Y. \,,� ,�" �1�, LOCATION',, � ' — — � , __. ; `t ,.—._,-------- ..1 t t �l `t � � 1 1 t',, � 't �,� '� l 'i _________ � _ �'�..� �`�� l t1,....,1____- �� 1 E � ,, , � � � � , �--__- -------- , , — ,. � ,. � --��� �- �� �� � 1 _.�.. �,l �,� ��—_-__��L_1 � � `.___fr'�,..�, ST'�T �____.J...__ TAF2MA _. _ � ....... . ,_. __ �__.—-- __. ` _ ' �f G'�TER�� E , ,_ _ __ 1 (� � ���' - _� 4� .� y�j=�'�����,� � - � --- 1 - � �-----T � � ��. _- a , �� ,�__ �'�, . � �� i / � �� �,� w* �i __ � �,, , ��----- ------- r- �-�] - - I��---- -----�- �� , j _-_ '� --__ "�, �,,, l � � ( --�`^�, �� __ _ �9�'F� � � . ^ ,„, _ _ ----_. ,, � ��_,. � ., t _.., — i�� �,<g�� -' cn � ;r �.,�1 � �'r ��_ __ _���. .,, ,�f �w--- ��r _� __ .� �.. ,,.�'", m._�� �j � '/� ... — -- ,, �/. � �_t_, ; I i _..,r C ``y,� -� t � r�. ,,•" `�,,' __ ___ � �r "" f �-- „ '�-""- _____�? ___ F - ,r S �, �.,,�( _� � __ � � F, ----� U ,f , �,r „• '^ �_ . - '^'� ,„ ` } _. � � ~,� , � , �' E ����� ", � , � 1 }LC --- - �.'�L�.Pd f��'£�{- '---- ' '� i � _ -� �� _ �� � _ � _-� � � � ,,,,--' � �, , r � �.� � �J� , �'__" _ , r�' �, ; r � ......__ --�-_...� .. � �.. w.� _j�_? � m.. ...._ _ _... �.______ .....�� r� f ,,�,� � � '� � __. . __. � ��- � � - � I � i_-��� _.____._-(' � --- , �� 4� l4 1 � � ___�' ��;��,�_ � -- ��� �� � F , w� ,1 "� ���� �� � �___.�. - --- --- ___ '�......� ---�'`'..-�`____ '�f���_._ �m ..�_. � :�-_�-�-� � .. ... �`� ��'�_�f�''F_ � _�__� � _�. .. � 1 _ r �..> . � ___ , r� � .... ........ ._.. � I ___ �..� �. ._�� .._ ._.......... ....�, f ��� � � _._ f � ��,���. �—�—� I;_.. .... ..... I .� � � � I_ � � � .— _ _ —------ .. —__ ___� � �_ r � �... ,-�-- , � �_�� � ����� [ _ ._��I--�—������������ � _ _____�______�. ��L��� �� �� � t_��� _N� — , � . ._ _ _ _ _—-- __�f�'t'��� � ��I = __- __ _��=-=���... z_ ...._� :�....�..._�_��� �� ,_�j _ �, �_ <,_._.___. ... � _____� �.. __ >_ ��v'� �v�"' ..._ �_ _____ . — — r — j �-� Q — � -- --- � _—" 1— , r__� � �._ 1.aaa ._— _� —�_ _ �� � --� �-- aaa __. .... _� ._ — --- — 1 � — ......z --; �T�, � ��,.,- --i—i�-�°ttr�_-�, r ..3—,.."— ��I ��--�-- --- ------ _�..___.. ---��� ��F RFo� CITY OF REDDING CHURN CREEK LIFT STATION � , �� REHABILITATION PROJECT PUBLIC WORKS �' - ��-� .�' DEPARTMENT �OCATION MAP �4�,F�ac� c � �` � � � � � � ' � �' � �' ' � CITY OF REDDING _�, REPORT TO THE CITY COUNCIL MEETING DATE: November 19, 2024 FROM: Michael Webb, Public Works ITEIVI NO. 4.11(c) Director ***APPROVED BY*** � �c a� � �bEi� 'c�r�Cs I7�reetcsr t 1.37t'2t}`?� r�' �p�si��,C�i �r� �° 11,f1 1,{'2{�? mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(c)--Approve Increase to Project Budget for Churn Creek Lift Station Rehabilitation Pro'ect Recommendation Approve an increase to the project construction contingency budget in the amount of $90,000, bringing the construction contingency total to $233,0'70, for the completion of Bid Negotiation No. 5452, Churn Creek Lift Station Rehabilitation Project. Fiscal Impact The Churn Creek Lift Station Rehabilitation Project (Project) is being funded by Public Works' Wastewater Utility Division funds, as will the proposed $90,000 contingency increase. The total project cost, including the proposed increase, is expected to be just over $864,600. Alte�native Action The City Council (Council) may ehoose not �o approve the reques� and provide alternative direction to staff. Backgrou n d/f1 n alysis This project includes the rehabilitation of the Churn Creek lift station to address the issues and deficiencies listed below, including coating/lining the wet well interior with epoxy, replacing the influent slide gates, rehabilitating and securing the pump guide rail systems, installing combination air valves on the two force mains, installing drain outlets and piping from the vaults, and replacing the force main discharge structure with a new polymer concrete corrosion resistant structure. The station is in decent condition overall and it is expected to have adequate capacity for the foreseeable future, but there are several issues and deficiencies at that station that are being addressed to extend the service life of the station and meet operation and maintenance needs, including: Report to Redding City Council November 8,2024 Re: 4.12(c)--Approve Increase to Project Budget for Churn Creek Lift Station Rehabilitation Project Page 2 • The existing wet we111iner is failing and exposing concrete to corrosive gasses; • Two influent slide gates have exceeded their service lives and are difficult to operate; • Pump guide rails separate and make pump removal and installation difficult; • Air valves on the force mains have failed, exposing the station to potential surge damage; • Service vaults at the station do not have drains and regularly fill with rain water; and • The station's force main discharge structure is severely corroded. On April 2, 2024, the Council awarded the construction contract for the project to SnL Construction, Inc. The notice to proceed was issued May 10, 2024, and due to material delays, the project was suspended and construction did not begin until September 9, 2024. During the course of construction, it was found that the existing 12-inch sewer main entering the wet well has a major failure to the sewer main causing a significant amount of Inflow & Infiltration (I&I) to the Wastewater Utility's system requiring the existing 12-inch sewer main to be replaced. Due to the magnitude of this failure, the project requires additional funding as the contingency funds originally awarded for the project is not adequate to cover the additional required work. On November 6, 2024, staff transferred City Manager approved funds to the project contingency funds in the amount of $50,000 and an additional $90,000 increase to the construction contingency is requested to cover the costs of the additional required work. COST SUMMARY Item Awarded Amount Trans e�Amount Increase P�ojected A�nount Contract Administration, $80,000 $0 $0 $80,000 Ins ection, Testin Construction Contingency $57,000 $50,000 $90,000 $197,000 Additional Cit Mana e $50,000 (-$50,000 $0 $0 Totals $187,000 $0 $90,000 $277,000 Environmental Review This action is not a project as defined by the California Environmental Quality Act (CEQA), and no further action is required. On April 2, 2024, the Council determined that the project is categorically exempt from environmental review under CEQA, pursuant to Sections 15301 — Existing Facilities, 15302 — Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. Council Prio�ity/City Manager^ Goals This agenda item is a routine operational item. Attachments ^Location Map Previous Staff Report . , � � � r^ �� � � ,��� � { �-.,,... ,� �.P��,� �..w� �„_�,w,� � -i �,M��--� �'� � �' �' ... ���� �� � -__P � ._z.. , �.w �� F ''� w ' , � �,'� �' - , ,��, � �, �����,� j`� `~,� � <'`�'� �� �� �� -- /, �. � ���' �, ��,��, ,�� � ��R �� 1^�� , � _. _�i TARMAC R � r �,�' M � ; � r`,, '`v/ �-,- _1 � R� --- -_ 1 � `� � � t - , D �, _ . _ � � � �.,� � �� `�,�_�� y .� �� .�,�- �cc --r� � ~� � �� S-q,.�.,�'��- � ,��;✓ �� y��. "� _t� .!���,��17 .��� �� 1 �'�� � __ � v �' ��� ��'�. y � , , �� �ti ���7''`,� _������ �_�f j ������ ;' �-__� y ; '�` � �j� � �l ����1�,`���C ` ` � � i!� ---,� ��n,_..._.w, 7 � �, `• �� �, _� �,-.� �� _, �r�v�,� � i -------- �� �� � ��� �- - � � q "' - ��..�____� —� Q � _� ` T a �. � ��____��.. � � r --------- _ ; � �,. �� �__�,, �,w� 1 j _, ; ;r� - ~�,. � 1 _ � �� I '� � �`,.�� ; �__�.._.__�t' ,1. - __..�__ �,._..—, __ C___ , f �,� � , , � - - -__ __ .� � ,, . � . �,; ,� � �.�. ���.�� PROJ ECT�-� jj' 1,' __� _ ����� Y. � �t LOCATION'tt, ' ' - � i t •- ____.,....a lt 1 t {" ,.. ______'__.. 1` t 1 t�, l � 1 1 , � � , '.,, `, i ,, - - ; l __ I `�, �' - � � ��. �_..............................................I �� � � �- - ------ , , _ � �, -- � �. ,,- ---�-��:��� �� �, 1 .m�.. �, �� � .____��... T �____. ��___�� �__ � __ _,. _ � ; �. � -�T� -� �TA�MA ....... _ ���E � ,_ __ � - _��. - , � � � . � � . � �_ �._���r ^ �� w., . h'l�i -- j _ � -----,� �- � ��' ___ � i� I ,,_�,a �� - `'�,�J,,_,. �, G �,�, i / ��. _�w . „ .__ ���/ ,,. �_ ----� jT � �'!� T .. / l "-Q "_ '_ _ �.._'_ '__ 1 � "' / � '_ . .—.,_� ..._,._�/�_, �/(�� � ,,..—,( �"�.., t r, ...... �-_ ' ..._. . , � ��_., ., t _ # �� t"��� _ , .� �, �,�f �j r ��_ __ _ ��,. .,�1 i � f C..-- �. Y _� �, _ .. _,._� _ -—— /� � .� . . .-`r " t� � .� �,/. , �_t�; � i �r y, -� t F ._. .___ . .,,' � __ __��� ..., � �„..�'' �..,�(�, _._ �-- -- r - �- � � r �t - _. ,y ���£ L� m r i � ,� � - �'` ,/�- " '� �✓','` `,r��_ _.� .. _._..... �� .�C - - I �j,,- '- -- `�`' `_�. rr ti , � _� �" � ' �,� r'r r',, � �� � (J � f}'' -----��C -- f/ w , .�^'" . ����, ,��'. � ._� � -�-_...� .. � �.. _.� _ i ---- �� � �_ ��. ��� , � .__ m _. _ - � �� ,,.,, �� ,, _ � _ t_... w__ �f ._.f,' ���',;�°��_ � � ��� �� � � F � , "� ���� �� � �___� � ._ f -- �` , _� - , .._ --- - � ,, ,, _ --- ----- ___ ___ � ...... �' .._____- '� ���_. �_ -_ �-�-�-�-, .. ... �:.���� _�_� __.. �--�-� �__ _�. .. , � -- 1 � - r � ;�� �, �_��� � � = __ __ _ _� .-- �.:� ���__��- � __. ... �, _._ ��- -I--�-�,� .. ............ .I...� �-� �- I---_� � _� � _�...I.. -� � �_ r ,} �... ,'f , � �_�� � ����� [ _ _ � ���I--�-���� � ������ �...��� � _____________�._ ��L��� �� �� � t_��� _N.� __ - ,_ � __�f�'t'r��� [ � I = -- __ _��_��� z_ .� � _���� �� ,_�j _ �, �_ � � � . _ ��"� `�v�'',,..._ �_.m�._m��. �__ . .. - - - r - ...._ _ , �-� Q -�._ _--�---- --- , _ . -_=._1- � � �...... �_� - �- - - --- --j � - � ly} i ... . .... _ ._ .__ .... � I T��� "'_""i `..,c"�_'_���r� .__I_t (.........3_""t...,�f , ........,��I , � _" " . .."_____ _._.......I """"�__� ��F RFoo CITY OF REDDING CHURN CREEK LIFT STATION � , �� REHABILITATION PROJECT PUBLIC WORKS � - ��-� .�' DEPARTMENT �OCATION MAP �4�,F�ac� c � �` � � � � � � ' � �' � �' ' � CITY OF REDDING _�, REPORT TO THE CITY COUNCIL MEETING DATE: Apri12,2024 FROM: Michael Webb, Public Works ITEIVI NO. 4.11(d) Director ***APPROVED BY*** � �c a� � �bEi� 'c�r�Cs I7�reetcsr 3f2Ii2t}`?� r�' �p�si��,C�i �r� �° �,f26,{'2{�? mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(d)--Award Bid Negotiation No. 5452 (Job Order No. 2663) Churn Creek Lift Station Rehabilitation Pro'ect Recommendation Authorize the following actions relative to Bid Schedule No. 5452 (Job No. 2663), City of Redding Churn Creek Lift Station Rehabilitation Project: (1) Award to SnL Group, Inc., in the amount of$562,600; (2) Approve an additional $80,000 to cover the cost of administration and inspection fees; (3) Approve $25,000 for project development costs; (4) Approve $57,000 to provide construction contingency funding; (5) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of$50,000; and (6) Find that the Project is categorically exempt from review under the California Environmental Quality Act, pursuant to Section 15301 - Existing Facilities, 15302- Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. Fiscal Impact The Churn Creek Lift Station Rehabilitation Project (Project) is being funded by the Wastewater Utility. The Wastewater Utility has sufficient budget for this project and its funding wi11 not impact other activities or projects. Cost Sumina Item Estzmated Pro'ect Develo ment Costs $25,000 Construction Contract+ Contin enc $619,600 Contract Administration, Ins ection, Testin $80,000 Additional Cit Mana er Authorit $50,000 Total Pro'ect Costs $774,600 Report to Redding City Council March 26,2024 Re: 4.12(d)--Award BN No. 5452 Churn Creek Lift Station Rehabilitation Page 2 Project cost components are estimates and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget. Alterna2ive Action City Council may choose not to award the bid for the project and provide staff with alternate direction. If the project is not awarded, then the service life of the City of Redding's (City) Churn Creek Lift Station could be reduced, decreasing reliability for City customers and increasing potential risk of sanitary sewer overflows into Churn Creek. Background/Analysis The City currently owns and operates 18 lift stations within its wastewater collection system, including the Churn Creek Lift Station (Station). The station is located on the southwest side of Shasta View Drive and the Highway 44 overpass, between Highway 44 and Churn Creek Road, as shown in the attached location map. The station has capacity for 14.4 million gallons per day (MGD) and includes five submersible pumps located in a concrete wet well, dual force mains (20" and 16" diameter), vaults for force main maintenance and valves, an emergency standby generator, and a control building. The station is in decent condition overall and it is expected to have adequate capacity for the foreseeable future, but there are several issues and deficiencies at that station that need to be addressed to extend the service life of the station and meet operation and maintenance needs, including: • The existing wet well liner is failing and exposing concrete to corrosive gasses; • Two influent slide gates have exceeded their service lives and are difficult to operate; • Pump guide rails separate and make pump removal and installation difficult; • Air valves on the force mains have failed, exposing the station to potential surge damage; • Service vaults at the station do not have drains and regularly fill with rain water; and • The station's force main discharge structure is severely corroded. This project will include rehabilitation of the station to address the issues and de�ciencies listed above, including coating/lining the wet well interior with epoxy, replacing the influent slide gates, rehabilitating and securing the pump guide rail systems, installing combination air valves on the two force mains, installing drain outlets and piping from the vaults, and replacing the force main discharge structure with a new polymer concrete corrosion resistant structure. Attached is a tabulation of bids received and opened on March 12, 2024, for construction of the project. The low bid in the amount of$562,600 was received from SnL Group, Inc., of Redding, California. The engineer's estimate was $457,347. Total project development costs for this project are estimated to be $25,000. Project development costs include engineering and environmental for the project. Report to Redding City Council March 26,2024 Re: 4.12(d)--Award BN No. 5452 Churn Creek Lift Station Rehabilitation Page 3 Environmental Review Staff has determined that the project is categorically exempt from environmental review under California Environmental Quality Act Guidelines, pursuant to Sections 15301 - Existing Facilities, 15302 — Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. Class 1 exemptions include the minor alteration of existing public structures and facilities. Class 2 exemptions consists of replacement or reconstruction where the new structure will be located on the same site and will have substantially the same purpose and capacity. Class 3 exemptions consist of construction and location of new small facilities and equipment, or conversion of existing structures. The existing wastewater facility will be rehabilitated in order to provide reliable service that meets public health and safety standards. The project will be located on City property and wi11 result in no expansion of use. The action area does not have significant values for wildlife habitat or other environmental resources and the project has no potential to have a significant effect on the environment. Council Prior�ity/City Manage� Goals This agenda item is a routine operational item. Attachments ^Location Map ^Bid Tabulation ^Notice of Exemption C� I T Y C3 F ,�--- - _ µ " f� Int�rr��� cc� ur�i���ic�►r� . - � � � � � � c� �z `t� �:'�-� �,� �irr DATE: November 6; 2��4 TCI; Barry Tippin;City Manager FROM: Michael Webb,I)irector c�f Public Warks SUBJECT: Request fc�r Transfer of Project Funds Churn Creek Lift 5t�tion Rehabilit�tian Praject Bid Negatiation 5452, Job Nc�. 2�b3 In accordance with the�ouncil approved Aurard of Bid Negotiation 1`�da. 5452,a transfer af City Manager Funds(3ob Na, 2663}to Canstruction Management Funds{$50,000}is requested. Additianal construction managernent funds are necessary to help cover tl�e additian�l casts tc�repair an existing 12-inch sevver main that was faund to h�ve a significant failure causing an un-�estimated amc�unt of Inflc�w& Tn�ltrati4n (IBr,i} into the WastewaterUtility's syst�m requiring the 12-inch sewer�nain to tae replaced.I)tte tc�the magnitude �f this failure, staff will alsa be requesting an additional contingency fund increase from Councit for $90,000 t�n Navember 19, 2024,to help cover the costs+�fthe required work. Current Requested lYewly Expended Balance Authorized Increase Authorized Pro`ected} Pro'ected Project $25,000 �:00 �2S;Q00 $25,00f3 $0 Develo ment Contract $562,60t} Q.00 $Sb2,600 5562,600 $0 Contingency $57,000 �50,d00 $10'7,OOfl $107,000 $0 Canstruction $80,OQ4 $0 $80,000 $8d;040 $0 Management City Manager g50,000 Eunds ($50,000) $Ci $4 $4 Totat �'7'74,600 �O.OtI $774,Gt10 �7?4,G00 $0 There is currently a balance o� $5'7,000 available in Project; Ccantingency Funds, leaving $57,OOd in construction contingency funds to camplete this project: Please c�l me af 225-4582 if you have any questians or need additional information: � �/ �� City Engineer Date �.�� � City Man r Date nvlmk c: Construction Manager Resident Engineer Finance c � �` � � � � � � ' � �' � �' ' � CITY OF REDDING _�, REPORT TO THE CITY COUNCIL MEETING DATE: Apri12,2024 FROM: Michael Webb, Public Works ITEIVI NO. 4.11(d) Director ***APPROVED BY*** � �c a� � �bEi� 'c�r�Cs I7�reetcsr 3f2Ii2t}`?� r�' �p�si��,C�i �r� �° �,f26,{'2{�? mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(d)--Award Bid Negotiation No. 5452 (Job Order No. 2663) Churn Creek Lift Station Rehabilitation Pro'ect Recommendation Authorize the following actions relative to Bid Schedule No. 5452 (Job No. 2663), City of Redding Churn Creek Lift Station Rehabilitation Project: (1) Award to SnL Group, Inc., in the amount of$562,600; (2) Approve an additional $80,000 to cover the cost of administration and inspection fees; (3) Approve $25,000 for project development costs; (4) Approve $57,000 to provide construction contingency funding; (5) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of$50,000; and (6) Find that the Project is categorically exempt from review under the California Environmental Quality Act, pursuant to Section 15301 - Existing Facilities, 15302- Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. Fiscal Impact The Churn Creek Lift Station Rehabilitation Project (Project) is being funded by the Wastewater Utility. The Wastewater Utility has sufficient budget for this project and its funding will not impact other activities or projects. Cost Sumina Item Estzmated Pro'ect Develo ment Costs $25,000 Construction Contract+ Contin enc $619,600 Contract Administration, Ins ection, Testin $80,000 Additional Cit Mana er Authorit $50,000 Total Pro'ect Costs $774,600 Report to Redding City Council March Z6,2024 Re: 4.12(d)--Award BN No. 5452 Churn Creek Lift Station Rehabilitation Page 2 Project cost components are estimates and some shifting of the project development, construction management, and construction contingency funds may be necessary to balance the project within the approved budget. Alterna2ive Action City Council may choose not to award the bid for the project and provide staff with alternate direction. If the project is not awarded, then the service life of the City of Redding's (City) Churn Creek Lift Station could be reduced, decreasing reliability for City customers and increasing potential risk of sanitary sewer overflows into Churn Creek. Background/Analysis The City currently owns and operates 18 lift stations within its wastewater collection system, including the Churn Creek Lift Station (Station). The station is located on the southwest side of Shasta View Drive and the Highway 44 overpass, between Highway 44 and Churn Creek Road, as shown in the attached location map. The station has capacity for 14.4 million gallons per day (MGD) and includes five submersible pumps located in a concrete wet well, dual force mains (20" and 16" diameter), vaults for force main maintenance and valves, an emergency standby generator, and a control building. The station is in decent condition overall and it is expected to have adequate capacity for the foreseeable future, but there are several issues and deficiencies at that station that need to be addressed to extend the service life of the station and meet operation and maintenance needs, including: • The existing wet well liner is failing and exposing concrete to corrosive gasses; • Two influent slide gates have exceeded their service lives and are difficult to operate; • Pump guide rails separate and make pump removal and installation difficult; • Air valves on the force mains have failed, exposing the station to potential surge damage; • Service vaults at the station do not have drains and regularly fill with rain water; and • The station's force main discharge structure is severely corroded. This project will include rehabilitation of the station to address the issues and de�ciencies listed above, including coating/lining the wet well interior with epoxy, replacing the influent slide gates, rehabilitating and securing the pump guide rail systems, installing combination air valves on the two force mains, installing drain outlets and piping from the vaults, and replacing the force main discharge structure with a new polymer concrete corrosion resistant structure. Attached is a tabulation of bids received and opened on March 12, 2024, for construction of the project. The low bid in the amount of$562,600 was received from SnL Group, Inc., of Redding, California. The engineer's estimate was $457,347. Total project development costs for this project are estimated to be $25,000. Project development costs include engineering and environmental for the project. Report to Redding City Council March Z6,2024 Re: 4.12(d)--Award BN No. 5452 Churn Creek Lift Station Rehabilitation Page 3 Environmental Review Staff has determined that the project is categorically exempt from environmental review under California Environmental Quality Act Guidelines, pursuant to Sections 15301 - Existing Facilities, 15302 — Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small Structures. Class 1 exemptions include the minor alteration of existing public structures and facilities. Class 2 exemptions consists of replacement or reconstruction where the new structure will be located on the same site and will have substantially the same purpose and capacity. Class 3 exemptions consist of construction and location of new small facilities and equipment, or conversion of existing structures. The existing wastewater facility will be rehabilitated in order to provide reliable service that meets public health and safety standards. The project will be located on City property and wi11 result in no expansion of use. The action area does not have significant values for wildlife habitat or other environmental resources and the project has no potential to have a significant effect on the environment. Council Prior�ity/City Manage� Goals This agenda item is a routine operational item. Attachments ^Location Map ^Bid Tabulation ^Notice of Exemption . , � � � r^ �� � � ,��� � { �-.,,... ,� �.P��,� �..w� �„_�,w,� � -i �,M��--� �'� � �' �' ... ���� �� � -__P � ._z.. , �.w �� F ''� w ' , � �,'� �' - , ,��, � �, �����,� j`� `~,� � <'`�'� �� �� �� -- /, �. � ���' �, ��,��, ,�� � ��R �� 1^�� , � _. _�i TARMAC R � r �,�' M � ; � r`,, '`v/ �-,- _1 � R� --- -_ 1 � `� � � t - , D �, _ . _ � � � �.,� � �� `�,�_�� y .� �� .�,�- �cc --r� � ~� � �� S-q,.�.,�'��- � ,��;✓ �� y��. "� _t� .!���,��17 .��� �� 1 �'�� � __ � v �' ��� ��'�. y � , , �� �ti ���7''`,� _������ �_�f j ������ ;' �-__� y ; '�` � �j� � �l ����1�,`���C ` ` � � i!� ---,� ��n,_..._.w, 7 � �, `• �� �, _� �,-.� �� _, �r�v�,� � i -------- �� �� � ��� �- - � � q "' - ��..�____� —� Q � _� ` T a �. � ��____��.. � � r --------- _ ; � �,. �� �__�,, �,w� 1 j _, ; ;r� - ~�,. � 1 _ � �� I '� � �`,.�� ; �__�.._.__�t' ,1. - __..�__ �,._..—, __ C___ , f �,� � , , � - - -__ __ .� � ,, . � . �,; ,� � �.�. ���.�� PROJ ECT�-� jj' 1,' __� _ ����� Y. � �t LOCATION'tt, ' ' - � i t •- ____.,....a lt 1 t {" ,.. ______'__.. 1` t 1 t�, l � 1 1 , � � , '.,, `, i ,, - - ; l __ I `�, �' - � � ��. �_..............................................I �� � � �- - ------ , , _ � �, -- � �. ,,- ---�-��:��� �� �, 1 .m�.. �, �� � .____��... T �____. ��___�� �__ � __ _,. _ � ; �. � -�T� -� �TA�MA ....... _ ���E � ,_ __ � - _��. - , � � � . � � . � �_ �._���r ^ �� w., . h'l�i -- j _ � -----,� �- � ��' ___ � i� I ,,_�,a �� - `'�,�J,,_,. �, G �,�, i / ��. _�w . „ .__ ���/ ,,. �_ ----� jT � �'!� T .. / l "-Q "_ '_ _ �.._'_ '__ 1 � "' / � '_ . .—.,_� ..._,._�/�_, �/(�� � ,,..—,( �"�.., t r, ...... �-_ ' ..._. . , � ��_., ., t _ # �� t"��� _ , .� �, �,�f �j r ��_ __ _ ��,. .,�1 i � f C..-- �. Y _� �, _ .. _,._� _ -—— /� � .� . . .-`r " t� � .� �,/. , �_t�; � i �r y, -� t F ._. .___ . .,,' � __ __��� ..., � �„..�'' �..,�(�, _._ �-- -- r - �- � � r �t - _. ,y ���£ L� m r i � ,� � - �'` ,/�- " '� �✓','` `,r��_ _.� .. _._..... �� .�C - - I �j,,- '- -- `�`' `_�. rr ti , � _� �" � ' �,� r'r r',, � �� � (J � f}'' -----��C -- f/ w , .�^'" . ����, ,��'. � ._� � -�-_...� .. � �.. _.� _ i ---- �� � �_ ��. ��� , � .__ m _. _ - � �� ,,.,, �� ,, _ � _ t_... w__ �f ._.f,' ���',;�°��_ � � ��� �� � � F � , "� ���� �� � �___� � ._ f -- �` , _� - , .._ --- - � ,, ,, _ --- ----- ___ ___ � ...... �' .._____- '� ���_. �_ -_ �-�-�-�-, .. ... �:.���� _�_� __.. �--�-� �__ _�. .. , � -- 1 � - r � ;�� �, �_��� � � = __ __ _ _� .-- �.:� ���__��- � __. ... �, _._ ��- -I--�-�,� .. ............ .I...� �-� �- I---_� � _� � _�...I.. -� � �_ r ,} �... ,'f , � �_�� � ����� [ _ _ � ���I--�-���� � ������ �...��� � _____________�._ ��L��� �� �� � t_��� _N.� __ - ,_ � __�f�'t'r��� [ � I = -- __ _��_��� z_ .� � _���� �� ,_�j _ �, �_ � � � . _ ��"� `�v�'',,..._ �_.m�._m��. �__ . .. - - - r - ...._ _ , �-� Q -�._ _--�---- --- , _ . -_=._1- � � �...... �_� - �- - - --- --j � - � ly} i ... . .... _ ._ .__ .... � I T��� "'_""i `..,c"�_'_���r� .__I_t (.........3_""t...,�f , ........,��I , � _" " . .."_____ _._.......I """"�__� ��F RFoo CITY OF REDDING CHURN CREEK LIFT STATION � , �� REHABILITATION PROJECT PUBLIC WORKS � - ��-� .�' DEPARTMENT �OCATION MAP �4�,F�ac� BID TABULATION FOR: Churn Creek Lift Station Rehabilitation Bid Schedule No.: 5452 ENGINEER'S EST SnL Grou Inc RTA Construction Inc AVERAGES 3/12/2024 UNIT UNIT UNIT UN17 ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTA� PRICE TOTA� PRICE 1 Water Pollution Control LS 1 $5,000.00 $5,000.00 $600.00 $600.00 $4,000.00 $4,000.00 $2;300.00 2 Trench Sheeting &Shoring LS 1 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $5,000.00 $5,000.00 " $5;50�.(�0 3 Lift Station Rehabilitation LS 1 $447,347.00 $447,347.00 $556,000.00 $556,000.00 $670,000.00 $670,000.00 $613rQ0(?.DO Average Bid TOTAL -CONTRACT ITEMS $457,347.00 $562,600.00 $679,000.00 ' $620,800.00 '' Page 1 of 1 I�TOTICE �F EXEMPTIUN To: � {)ffice af Planning and Research FR4M: Gity ofRedding 140d Tenth Street,Roc�m 12'1 Public Works I)epartment Sacrarnenta, CA 95814 777 Cypress Avenue Reddrng,CA 96001 � Shasta County Clerlc County of Shasta P.C}:Box 99088�, 1643 Market Street Redd'rng,C�.96{}99-0880 Project Title: Churn Creek Lift Station Reliabilitation Project Project Location—Specifc: 2340 Goodwater Aver�ue Project Location—City.Redding Fro;�ect Locati�n—Caunty: Slaasta Descriptian of Pro,�ect: The Citv of Reddin� (City} wiIl rel�abilitate the Churn Creek Wastewater Lift Statian The prrriect includes eoatin�tlie existin�wet well interic�r with epox� re lacin�;siide �ates and o�erators rehabilitating�u� �uide raiI svstems instal�in�* combination air valves on the existrng liiFt station force mains impraving drainage from existzn�vaults;and installin�wet well �ight fixtures The project will also include reinoval and replacement of stat°ron's existin� cancrete force main outlet stire�cture with a;new t�olymer concrete structure All work wil� take place within tlle existin�wastewater facility. Name of Public Agency Approving Project: Citv of Reddin� Name af Person ar Agency Carrying Uut Project:K�rt Maire.Proiect En�ineer Exernpt Status: (check one) ❑ Ministe�ial [Secti�n 21080(b}(1); 15268] ❑ Declared Emergency [Sectiora 21080(la)(3); 15269(a}] ❑ Emergency Project [S�ctian 21080(b){4); 15269(b)] ❑ Statutory Exemptions, State code number: ❑ Common Sense Exemption(This project daes not fail withiaa an sxempt class,but it can be seen with certainty that there is no possibility thatthe activity may h�ve a significant effect on the enviranment(14 CCR 15061[b][3]}. 0` Categorical Exempticsn.State type and section number: 5ection 15301.ExistingFaciliti�s, �5302.Reptacement or Reconstruction, and 15303,New Construction or Conversion af Existin�Structures 0 No e�ceptians apply that would bar the use of a categorical exemption(PRD 21484 and 14 CCR 15�00.2). Reasons why �roject is e�empt: Class 1 ��emptians include the minor alteratic�n c�f existang�public structures and facilities. Class 2 exemi�tions consists of replacement or reconstruction where tl�e new structure will be located on the same site and wili have substantially the sarne purpose and capacitv Glass 3 exemtations consfst of construction and locatit�n af new smalt facilities and ec�uiprnerit r�r conversion of existin� structures The existin�wastewater facilitv w`tl� be rehabilitated in order to �rovide reiiable-service that meets public health and safety standards The proiect wilt be located on Citv propertv and wili resuit in a no expansian of use fihe action area does not have significant values for wildlife habitat �r other environmental resourees and the proj_ect has no potential to have a si�nificant effect on the environment. Lead Agency Cantact Ferson: Amber Kelley Te�ephone: 530.�25.4046 If Filed by Applicant; �. Attach certi�ed dacument of exemption�nding. 2. Has a notice of exemption beeri filed by the pubtic agencY approving the project? ❑�es d I�o Signature: °�, I}ate° r�',�1"�`' ,'� Tifile: Environmental Com lianee ana er �Signed by Lead Agency Date received fc�r filing at C1F'R: ❑ �igned by Applicant �C'I�E}�1 M1J{�}I� r��'� (, -r���