HomeMy WebLinkAbout _ 4.5(b)--Redding Power Plant VFD Cooling System Installation � � �' � � �
� � � ' � �' � � ' � ` CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: December 3, 2024 FROM: Nick Zettel, Director of
ITEIVI NO. 4.5(b) Redding Electric I7tility
***APPROVED BY***
� ��. ; � _ �
v ��
��„ ����
�:k ct c. ����yrectc� �it e in�� lric�ttti}ity 1 tf19='?f�24 � � �p�zt�,C`i ��� ��t t�� � 1lr'26,''2{}� �
nzettel@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.5(b)--Redding Power P1ant Variable Frequency Drive Cooling System
Installation
Recommendation
Authorize and approve the following actions regarding Bid Schedule No. 5520 for the
installation of the Redding Power Plant Variable Frequency Drive (VFD) cooling systems:
(1) Authorize an amount not to exceed $300,000 for the installation of the VFD cooling
systems;
(2) Award Bid to Timberline Heating & Air Conditioning, in an amount not to exceed
$300,000 including contingency($235,380 for installation and$64,620 for contingency);
(3) Authorize the City Manager, or designee, to execute change orders up to the total amount
of the project contingency to address unforeseen work items discovered during the
installation process; and
(4} Find that the project is categorically exempt from review under the California
Environmental Quality Act, pursuant to Sections 15301 (Existing Facilities) and 15302
(Replacement or Reconstruction).
Fiscal Impact
The total cost for City of Redding Power Plant Variable Frequency Drive (VFD) Cooling System
installation, including contingency, is outlined below:
Descri tion Amount
HVAC Installation, Bid Schedule 5520 $235,380
Contin enc $64,620
TOTAL $300,000
Al�hough increased project costs and unexpected maintenance needs have depleted the Major
Maintenance Fund, sufficient funding, including contingency, remains available for this
unplanned project.
Report to Redding City Council November 26,2024
Re: 4.5(b)--Redding Power Plant VFD Cooling System Installation Page 2
Alternative Actions
The City Council (Council) could choose not to award the bid to Timberline Heating & Air
Conditioning and provide alternative direction to staff.
Background/f1 nalysis
The City of Redding (City} owns and operates a 183 MW natural gas fired power generation
plant with six generating units. Generating Units 5 and 6 have prefabricated buildings adjacent to
the turbine and generator enclosures containing power plant controls, the starting system variable
freguency drive, power distribution panels, and other auxiliary eguipment. The cooling systems
are integral to the operation of Generating Units 5 and 6. The existing cooling systems are
original to the construction of Generating Units 5 and 6 (2002 and 2011 respectively), and are
reaching their end-of-life.
Replacement parts are only available from vendors outside of the United States, and cooling
system contracted service personnel available to the City are unfamiliar with the cooling system
design and parts, which makes it difficult to service the equipment. Staff intend to replace the
equipment prior to failure to ensure continued generating unit reliability. In 2021, staff
contracted with Pace Engineering Inc., which designed new systems using US-made industry-
standard parts and equipment to retrofit these cooling systems.
Request for Proposals number 5520 was published to solicit proposals for the installation of
equipment specified by Pace Engineering Inc. Staff determined that Timberline Heating & Air
Conditioning's proposal was the best value for the City. The evaluation summary is attached.
Environmental Review
Staff has reviewed the project and determined that it is categorically exempt from review under
the California Environmental Quality Act, pursuant to Sections 15301 (Existing Facilities) and
15302 (Replacement or Reconstruction). Class 1 exemptions include the operation, repair,
maintenance, or minor alteration of existing public facilities. Class 2 exemptions consists of
replacement or reconstruction where the new structure will be located on the same site and will
have substantially the same purpose and capacity. The project involves the removal and
replacement of the existing cooling systems at the Power Plant. This is a maintenance aetivity
and the cooling systems will have substantially the same purpose and capacity with no proposed
expansion. The project area has no underlying value for sensitive resources and the project has
no potential to have a significant effect on the environment.
Council P�ioNity/City Nlanager Goals
• This is a routine operational item,
Attachments
RFP #5520 Evaluation Summary
NOE RPP Cooling System Replacement
1ti�lir���n�irrr Prc�pc��l '�"�c�r��c�1 : Cc�st�u����t��n::
Bicicl�� l��t�u�r�rr�ent�-Me�'? ��r�ivativr���tir�, ; S��re �`+���I��vr�::
Timberline Yes 165 108 273
Redding Heating and Air Yes 105 99 204
U°I'IaCE t)F EXEMPTIQN
To: � Office of P`lanning and Researcli FRt�M. Gity of Redding
1440 Tenth Street, Raam 121 Fublic Warks Department
�acramenfo, CA 95814 777 Cypress Aveni��
Redding;CA 9b401
� Shasta County Cierk
Caunty Qf Shasta
P.t�, Box 990�80, 1643 1Vlarket Street
Reddin;, CA 96099-0880
Praject Title: Reddin��'ower Plant Variable Frequencv I?rive C�olin�ystem
Projec#Location—�peci�c; 361 l Avtech Parkway
Project Location—City: Reddin� Praject Location—County: 5hasta
Description of Projecti The 1Zeddin� Electric Uti1i will rep�ace the existin� variable frequencv drive cooling s sv tem
far Generatin�Units 5 and 6 at the Redding Power Plant. TI�e existin c� ot�lin�;units were installed in 2002 and 2011 and
are reaching the end of the�r service life.All work will occur within the Reddin�Pawer Plant facility.
Name of Publie Agency Approving Praject: City�f Reddin�
Name of Person or Agency+Carrying Out Prc�jectt Joe ZelesnY,Power Pla�t Engineer
Exempt Status. (check one)
❑ Ministerial [Sectian Z 1080(b)(1); 152b8]
❑ Declared Emergency[Section 2108(�{b}(3); 15269(a}]
� Emergency Praject[Sectian 21O8d(b){4}; 15269{b)]
❑ Statutc�ry Exemptions. State code number`:
❑ Ct�mmon Sense Exempfion(This project does not fall within an exempt class;but it can be seen with certainty that there is
no passibility that the activity may have a signrficant effect on the environment(14 C�R 15061[b][3]).
d Categorical Exernption: State tYpe arid section number: Section 15301. Existin�Facilities arld Sectian 15302.
Replacement or Recc�nstructian
G]x" No exceptians apply thaf would bar the use of a categoric�l exemption(PRD 21084 and i4 CCR 153Q0.2);
Re�son� �why project is exempt. Class 1 exemptions include the c�peration, repair, maintenance, or minor alteration of
existin��ublic facilities. Class 2 exemptions ct�ns�sts of replacement or reconstructitrn wl�ere the new structure will be
lacated on the same site and will have substantiallv the same purpase and capacity. The praject involves the removal and
replacement of the existing cooling systerns at the Power Plant. This is a maintenance activity and the coalin�svstems
will have substantially the same purpase antl cat�acity with no propased expansion. The proiect area has na iinderl�g
value for sensitive resources and the project has no potential to have a significant effect on the environment.
Lead Agency Contact P`erson: Amber Kellev fielephone: 530.225.4046
If Filed by Appl�cant.
l. Attach certified document of exemptian finding.
2, Has a natice c�f exemption been filed by the public agency approvii�g the project? a Yes o Na
Sig�t�tare: � ��'� ��..�° Date. ��� ��
Titlet Environmental Compliance Ma�a�er
��igned by Lead Agency Date received fc�r filing at QPR:
0 Signed by Appiicant