� � � ' � �' � � ' � ` CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: November 19, 2024 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(d) Director
***APPROVED BY***
�c a� � �bEi� 'c�r�Cs I7�reetcsr t 1.37t'2t}`?� te�r� , ;� � �:r 1 I,'�!?C}?
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(d)--Award Bid Negotiation No. 5531 (Job Order No. 2700) Liberty Street
Sidewalk Im rovement Pro'ect
Recommendation
Authorize and approve the following aetions relative to Bid Negotiation No. 5531 (Job No.
2700), Liberty Street Sidewalk Tmprovement Project:
(1) Award to SnL Group, Inc. in the amount of$489,708;
(2) Approve $60,000 to cover the cost of administration and inspec�ion fees;
(3) Approve $150,000 for project development costs;
(4) Approve $50,292 to provide construction contingency funding;
(5) Authorize the City Manager, or designee, to approve additional increases in either the
construction management or construction contingency amounts up to a total of$44,575;
and
(6} Find that the project is categorically exempt from review under the California
Environmental Quality Act Guidelines,pursuant to Section 15301 —Existing Facilities.
Fiscal Impact
The Liberty Street Sidewalk Improvemen� Project (Project) is being funded by Community
Development Block Grant(CDBG) funds in the amount of$244,5�5, American Rescue Plan Act
(ARPA) funds in the amount of $500,000, and Streets Maintenance Funds in the amount
$50,000.
Cost Summa
Item Estimated
Pro'ect Develo ment Costs $150,000
Construction Contract+ Contin enc $540,000
Contract Administration, Ins ection, Testin $60,000
Additional Cit Mana er A�uthorit $44,575
Total Pro'ect Costs $794,575
Total Pro'ect Bud et $�94,5�5
Report to Redding City Council November 12,2024
Re: 4.12(d)--Bid Negotiation No. 5531 Liberty St Sidewalk Improvement Project Page 2
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Alternative Action
The City Council (Council) may choose not to award the bid for the project and provide staff
with alternate direction. Without this project, pedestrian accessible routes will continue to be
deficient, and there is a risk of losing CDBG and ARPA funding.
Background/Analysis
Attached is a tabulation of project bids received and opened on October 31, 2024. The apparent
low bid was received from Zeis Construction (Zeis). However, after staff reviewed all seven
proposals and created a bid tab it was apparent that an error had been made in Zeis' proposal.
The error made by Zeis was a mistake in the calculation for bid item 2, where they used the total
price as the unit price. Per the Instructions to Bidders in the project Special Provisions, if there is
a discrepancy between unit prices and totals, unit prices will prevail. Staff consulted with the
City Attorney and confirmed this is not a mistake that can be waived as it would be a material
change to Zeis' bid. Therefore, after staff made corrections to Zeis' bid proposal, as shown in the
attached bid tab, they were no longer the low bidder. Staff has contacted Zeis to inform them of
the mistake, that it cannot be waived, and that they were no longer the low bidder.
The low bid in the amount of $489,708 was received from SnL Group, Inc. of Redding,
California. The engineer's estimate was $484,250. Total project development costs for this
project are estimated to be $150,000. Project development costs include engineering, surveying,
right-of-way, environmental, and permit and utility connection fees.
The project consists of replacing damaged portions of sidewalk, curb, gutter and asphalt concrete
on Liberty Street, Eureka Way, East Street and Trinity Street that have been severely damaged
by tree roots. In addition, the project wi11 replace damaged and aged water meter boxes, valve
boxes, and signs, as well as remove existing problem trees, replacing with new trees that wi11 not
damage infrastructure, and install irrigation.
Envi�^onmental Review
Staff has reviewed the project and determined that it is categorically exempt from review under
the California Environmental Quality Act Guidelines, per Section 15301 — Existing Facilities.
Class 1 exemptions include the operation, repair, maintenance, or minor alteration of existing
facilities, structures, or equipment involving negligible or no expansion of use. The project will
repair damaged portions of sidewalk, as well as associated infrastructure, and replace damaged
trees. The project includes the repair or replacement of existing infrastructure in the same
location and serving the same purpose and capacity. Therefore, the project has no potential to
have a signi�cant effect on the environment and further environmental review is not required.
Council PNiority/City Manager Goals
This agenda item is a routine operational item.
Report to Redding City Council November 12,2024
Re: 4.12(d)--Bid Negotiation No. 5531 Liberty St Sidewalk Improvement Project Page 3
Attachments
^Location Map
^Bid Tab
^Notice of Exemption
-�-��, �<µ�:�- _.;, , . �; � -
's",=-'<�-..c,�",ci'� ;,,�%�,-/ /j i�� ;'% ; ,- � '"� �''/ i/'��.�- i.r" %;;,. i < ., �;;,-�:i;
--'�:< ;� ,�� 'r' ,c.�,-' .�i .;; l"� i'.�r..r % i';i:'' ; r,:r" ;r!� �''' -%f
�'==�.K/ - , .� , ,%". -' ���.% , -' ; - i '',�:
� � -�-`<<r;�. f,-:i' �/.-� e`��,,,�,-" /'Y �'- ,=�,. �! ' :% ,-' " i
......,_,___,_ ��....�."" .:''�";-' %-', / .. '4.,.�' ������� Y� ''� ,r, � ��'%�
f ' �%
��''�� i i ... �i� '"/-,-- ,%/,�� �.j� .:�i l� ;%
�" -'i:%i -'% � i �
I( � - � '-' � -' ,: ''
-- ';•i �,,,r ,'�--' -''r'"� �� r'i
( r��:� �'l;' ;' l. �..lrr"
�
� � � ��_� �.� -r.- ' NTS �� r
� ���� �,� �. .�-i �
, /t_� . . _._ � � ......�_..�,� 'K.., . ;;, i!'%-� ;�- r' ':%�.%i
....._ . ... .._.. � [ -.�..<
; - %m.,'-,Y, - �,.; --=`-°-<-__���:�; '' . ' ��"'Jii
.i � �``
� � � � �---� --.= - �.:.-�
--- � .
�----=� �: -
_ — � , ,
� � ,
; (
( ; r � r C �l _ — ——____ "-- :
_ � � �
___
,�-----�__ _ _._ � _ — i � � _._ �
c �3— � i' t � i � _l`
��� � f'�',' � � :'�� ��,. � ,„�� i �
� p �
_ !
� F 'i i.......�__ , . _ . . ... _.._... . . _.
�� �— �.�_ _� t:.� �� . . { ` ' �
C ,
�'I � I
��,��� ... ......... � . �-� ' . ... � �F� . . ... .
� � ���1 � �
, -, I
_._,
— — ;
— -- _ _—_ ,
� � 'j _)� i ( i i
rr� ,
( �
i � � � � — , ' �
� � _ — �� � � �
;
!
: �
;
t � ___...�__
( �� ..- �'� �
' '� i
�
, I; ` .::-�,. � " �
r � . .:� G:, , � � ��
�...� (��.� ( � ��.. � ���� ��� � i�.�� �� �`" � ' ���w�-::�w�� �� ��M..�u,.,.��,�� '
��� ��� �i � � �� �� � ��� �s � � ,� ��;
� dO1S -�_ .�..> ..... _.. dOS t_.....—��� .� �� i . .: �__�..._._._.......
..��. `��.;__�_�, — ._... _�I�- L���===��W��..__._..__.___ ',— ,`_ I../�:_� _t�. a W~S__u"-__��a ".I:W_� �l
,.,.
c�f� '
r,��``-' TRINITY ST � II ,
S1P ^� �� �,..>:: �, ; '`I, fl�P -Y-;�-..,..ae,��.ry.�...� I� 1 ...... ��'..�' - ������ ._.......__ t�-'���
t .
._:`c ___—�-��
� ' ,
�y � � � ��' 4 ?«�^� t,
'—""�'--,�
. �%^.r.�' �GF..,��� �9�:�.� �"��—_. �.,�".�.,. X�,�
��� � �� � � � �� ...._.._. . , ii
C � i M1 I
�` � ��„rt �� � �'�A' �� � t 1.
m. ; � �,- PL�ZA� : cn �1" � � _ �,
PINE Slf��ET � DOW <f0; N �— � T- W" ; �
sCHa I t— � � �:P�Az�.-� � I � �r f
f PLAZA , N A�ART���S� a p � . PARTA�fE��.S
�:
� ; � .. ��� �� �. � I � C._.�
_ ``__� � � N w � '�� �
¢
' � ,
, _,_ ,:;� - Q -- m ; i ,
_ , ; �
��,.�-�; W J �
� '
� ,
���__� �
� � . ,,_ �
— �� �_ ,_�r_._ . �_m _ ,...... ..�
� �x.....� � �� � � �i�. �g �� d�6 � �.���.�:�_ �
��
. __� - ti.....� �_�_:=__ �__���i—�- � _a._� � . _ - � i
� �' �
� � �i
_ _�
�{ ���= -__� � ���_— � EUREKA WAY _ � r ���
�. _-�� —�—_.. � � _ _ _�� ���.._�.
- ____. � _' �� �� � -�_� � � :t�� � r- �, �
.�� � � � � � � � �� �� � — � 1�
1 � � �.�� � �� �� � � �a 2
- � � r� -� � � ,,.
�
�
, _
�
' ( " �
� � . �� � ��-.� �; ',
' � ( � � I � �i i �����. ___. '�
j
, , '
� __.._ _E_ ���____ I� � � �I
� �
—_ _._.� ; !
, — ;
, , ._ _� �
i
,
,
„
—_ _.. � il_�
__... , �I' i
LEGEND
LIMITS OF CURB, SIDEWALK
� AND PAVEMENT REP�ACEMENT
NOVEMBER, 2024
CITY OF REDDING �c�F '�F�o LIBERTY STREET REHAB PROJECT
� s2
L� �
PUB�ic woRKs �,� � 'f��,� PROJECT LOCATION MAP
DEPARTMENT t,F�,�
BID TABULATION FOR:
Liberty Street Sidewalk Improvement Project
Bid Schedule No.: 5531
ENGINEER'S EST SnLGrou inc Axner Excavatin Inc
10/31/2024 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 TRAFFIC CONTROL LS 1 $10,000.00 $10,000.00 $18,000.00 $18,000.00 $14,196.00 $14,196.00
2 CONSTRUCTION AREA SIGNS EA 12 $250.00 $3,000.00 $250.00 $3,000.00 $300.00 $3,600.00
3 WATER PO��UTION CONTROL LS 1 $4,000.00 $4,000.00 $1,000.00 $1,000.00 $6,167.00 $6,167.00
4 PROJECT FUNDING SIGN EA 1 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,200.00 $1,200.00
5 REMOVE TREE EA 20 $2,400.00 $48,000.00 $3,500.00 $70,000.00 $3,739.00 $74,780.00
6 IRRIGATION SYSTEM LS 1 $12,500.00 $12,500.00 $22,893.00 $22,893.00 $23,400.00 $23,400.00
7 ROOT BARRIER LF 660 $20.00 $13,200.00 $18.00 $11,880.00 $18.00 $11,880.00
8 TREE (15-gallon) EA 28 $1,000.00 $28,000.00 $775.00 $21,700.00 $816.00 $22,848.00
9 REP�ACE AREA DRAIN EA 1 $4,700.00 $4,700.00 $5,000.00 $5,000.00 $2,808.00 $2,808.00
10 REP�ACE CATCH BASIN TOP EA 2 $9,500.00 $19,000.00 $2,500.00 $5,000.00 $3,733.00 $7,466.00
11 REP�ACE WATER METER BOX EA 4 $250.00 $1,000.00 $1,225.00 $4,900.00 $1,557.00 $6,228.00
12 REP�ACE WATER VALVE BOX EA 5 $250.00 $1,250.00 $1,150.00 $5,750.00 $1,152.00 $5,760.00
13 REP�ACE SIGN EA 4 $450.00 $1,800.00 $1,200.00 $4,800.00 $720.00 $2,880.00
14 CURB AND GUTTER(6") LF 930 $60.00 $55,800.00 $72.00 $66,960.00 $95.00 $88,350.00
15 SIDEWALK(4" PCC) SF 6400 $30.00 $192,000.00 $22.00 $140,800.00 $18.00 $115,200.00
16 DRIVEWAY(COMMERCIA�) SF 550 $70.00 $38,500.00 $66.00 $36,300.00 $40.00 $22,000.00
17 REP�ACE ASPHALT CONCRETE CF 3650 $8.00 $29,200.00 $15.00 $54,750.00 $16.00 $58,400.00
18 CONCRETE CURB RAMP SF 355 $60.00 $21,300.00 $45.00 $15,975.00 $65.00 $23,075.00
TOTAL-CONTRACT ITEMS $484,250.00 $489,708.00 $490,238.00
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 3
BID TABULATION FOR:
Liberty Street Sidewalk Improvement Project
Bid Schedule No.: 5531
FBD Vanquard Construction,
Inc. RTA Construction Inc Zeis Construction
10/31/2024 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 TRAFFIC CONTROL LS 1 $27,019.00 $27,019.00 $25,000.00 $25,000.00 $17,026.00 $17,026.00
2 CONSTRUCTION AREA SIGNS EA 12 $470.00 $5,640.00 $400.00 $4,800.00 ' $5,965.00 $71,5$�.00
3 WATER PO��UTION CONTROL LS 1 $4,000.00 $4,000.00 $5,000.00 $5,000.00 $9,584.00 $9,584.00
4 PROJECT FUNDING SIGN EA 1 $2,000.00 $2,000.00 $4,000.00 $4,000.00 $3,234.00 $3,234.00
5 REMOVE TREE EA 20 $3,230.00 $64,600.00 $3,000.00 $60,000.00 $1,650.70 $33,014.00
6 IRRIGATION SYSTEM LS 1 $35,000.00 $35,000.00 $42,000.00 $42,000.00 $29,520.00 $29,520.00
7 ROOT BARRIER LF 660 $17.00 $11,220.00 $20.00 $13,200.00 $18.45 $12,177.00
8 TREE (15-gallon) EA 28 $784.00 $21,952.00 $800.00 $22,400.00 $836.43 $23,4�t�.d4 '
9 REP�ACE AREA DRAIN EA 1 $6,700.00 $6,700.00 $4,500.00 $4,500.00 $4,271.00 $4,271.00
10 REP�ACE CATCH BASIN TOP EA 2 $5,900.00 $11,800.00 $3,500.00 $7,000.00 $4,911.00 $9,822.00
11 REP�ACE WATER METER BOX EA 4 $300.00 $1,200.00 $600.00 $2,400.00 $689.50 $2,758.00
12 REP�ACE WATER VALVE BOX EA 5 $300.00 $1,500.00 $500.00 $2,500.00 $461.80 $2,309.00
13 REP�ACE SIGN EA 4 $540.00 $2,160.00 $600.00 $2,400.00 $904.75 $3,619.00
14 CURB AND GUTTER(6") LF 930 $60.00 $55,800.00 $48.00 $44,640.00 $95.99 '' $$9,27U.7Q '
15 SIDEWALK(4" PCC) SF 6400 $30.00 $192,000.00 $25.00 $160,000.00 $17.59 $112,576.00
16 DRIVEWAY(COMMERCIA�) SF 550 $40.00 $22,000.00 $20.00 $11,000.00 $43.48 $23,914.t1(l
17 REP�ACE ASPHALT CONCRETE CF 3650 $12.00 $43,800.00 $28.00 $102,200.00 $20.45 $74,642.5�
18 CONCRETE CURB RAMP SF 355 $50.00 $17,750.00 $58.00 $20,590.00 $68.69 ' $24,384.55
TOTAL-CONTRACT ITEMS $526,141.00 $533,630.00 $547,122.19
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 3
BID TABULATION FOR:
Liberty Street Sidewalk Improvement Project
Bid Schedule No.: 5531
S.T. Rhoades Construction
inc Site Works Solutions A'��RAGES '
10/31/2024 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTA� PRICE
1 TRAFFIC CONTROL LS 1 $35,151.00 $35,151.00 $39,051.27 $39,051.27 $23,382.45
2 CONSTRUCTION AREA SIGNS EA 12 $250.00 $3,000.00 $498.01 $5,976.12 '! $1,31'3,$4
3 WATER PO��UTION CONTROL LS 1 $5,000.00 $5,000.00 $5,658.9� $5,658.9� ' $5,235.�0 '
4 PROJECT FUNDING SIGN EA 1 $1,000.00 $1,000.00 $2,134.32 $2,134.32 ' $2,26'1.39
5 REMOVE TREE EA 20 $917.45 $18,349.00 $3,744.09 $74,881.80 ' $3,143.97 '
6 IRRIGATION SYSTEM LS 1 $20,000.00 $20,000.00 $28,473.25 $28,473.25 '$30,214.38
7 ROOT BARRIER LF 660 $15.00 $9,900.00 $18.29 $12,071.40 $18.29
8 TREE (15-gallon) EA 28 $375.00 $10,500.00 $829.33 $23,221.24 $806.79 '
9 REP�ACE AREA DRAIN EA 1 $5,000.00 $5,000.00 $5,275.61 $5,275.61 $4,7��.'10 !
10 REP�ACE CATCH BASIN TOP EA 2 $5,000.00 $10,000.00 $3,340.31 $6,680.62 ' $3,98C�.72
11 REP�ACE WATER METER BOX EA 4 $200.00 $800.00 $997.17 $3,988.68 ' $894.78
12 REP�ACE WATER VALVE BOX EA 5 $1,250.00 $6,250.00 $444.28 $2,221.40 $668.01 ;
13 REP�ACE SIGN EA 4 $600.00 $2,400.00 $667.26 $2,669.04 $77�.04 '
14 CURB AND GUTTER(6") LF 930 $114.00 $106,020.00 $116.37 $108,224.10 $$1.23
15 SIDEWALK(4" PCC) SF 6400 $25.50 $163,200.00 $27.04 $173,056.00 $23.27
16 DRIVEWAY(COMMERCIA�) SF 550 $34.50 $18,975.00 $47.89 $26,339.50 $4�.90
17 REP�ACE ASPHALT CONCRETE CF 3650 $28.50 $104,025.00 $12.11 $44,201.50 $17.26
18 CONCRETE CURB RAMP SF 355 $107.00 $37,985.00 $57.40 $20,377.00 557.35
TOTAL-CONTRACT ITEMS $557,555.00 $584,501.82 $532,699.43
verage i otal
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 3 of 3
UTI�CE C�F �+ XE PTItJl�T
TO: � C?ffice afPlanning and Research FROM: City ofRedding
1400 Tenth Street,Raom 121 Public Works Department
Sacrarnenta, CA 95814 777 Cypress Avenue
Redding, CA 96�01
� Shasta County Cierk
County of Shasta
P.O. Bc�x 99088(1; 1643 Market Street
Redding,CA 9b099-0880
Project Title: Libertv Street Rehabilitation F'raiect
Proje�t Location—Specific; Libertv Street,Eureka Wav,East Stt-eet,Trinitv Street
Prcaject Loca#ian—City; Redding Project Location—�ounty. Shasta
Descript�on of Project. The Citv of Reddin� (Citv� proposes to re�air dama�ed partions af sidewalk, curb; �utter and
asplialt concrete;;replace dama�ed water meter boxes area drain and catch basins• remave up to 20 tr�es� plant 21 tp o 28
trees in emptytree wells• and install irri�atic�n Wark will involve fell'rn tree plantin� installing irri�atian line watering,
ex�avatiti�, trenching,�pourin�cancrete, curin�concrete, and sawcuttin�
Name of Public Agency Approving Project:Citv of Redding
Name crfPers�n or Agency�arrying dJut Project: Rvan Fraga,PE-Project En�ineer
Exempt S�atus: (check one)
C] Ministerial [Section�1080(b}{1}; 15268]
CI Declared Ernergency [>eetic�n 21080(b}(3); 15269(a}]
� Ernergency Project[Sectian 210$0(b}{4)> 152b9(b)]
❑ Statutc�ry Exemptic�ns. State cade number:
C� Common Sense Exemptifln{This project does not fall within an exempt class,but it can be seen with certainty that there is
na possibiliry th�t the activity may have a signif cant effect on the environment(14 CCR 15601[b][3]).
� Gategorical Exemption. State type and section nuinber: Sec. 15301,Existing Faciliti�s
� No exceptians apply that would bar the use of a categorical exemption(PRD 210$4 and 14 CCR 15304.2):
Reasans why project is exempt: Class 1 exernptians include the operation, repair, maintenance, or minor alteratior� af
existin� faciiities, structures, or equipment invalvin�ne�l�ible or no expansion of use. The project will repair dama�ed
poi�tians c�f sidewalk, as well as associated infrastructure, and replace darnaged trees. The praject includes the repaii ar
repiacement of existin�infrastructure in the same lc�cation and servin�the same purpose and capacity,Therefore the ��roject
has no potential to have a signific�nt effect on the environment and further envirc�nmental review is not required.
Lead Agency Canta�f Person. Amber Kelley Telephone; 530.225.4046
If Filedl by Ap�plicant:
1. Attach certified dacument of exernption finding.
2. Has a notice flf exemption been filed by the pubiic agency approving the project? ❑ Yes �No
�ign�tur�. �� '� Date. .�.,�� ����
Title: Environmental Compliance I�ztnager
�
xO Signed by Lead�gency Date received for filing at C3PR:
(3 Signed by Applic�nt