REPORT TO THE CITY COUNCIL
MEETING DATE: November 19, 2024 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(c) Director
***APPROVED BY***
�
�c a� � �bEi� 'c�r�Cs I7�reetcsr t 1.37t'2t}`?� r�' �p�si��,C�i �r� �° 11,f1 1,{'2{�?
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(c)--Approve Increase to Project Budget for Churn Creek Lift Station
Rehabilitation Pro'ect
Recommendation
Approve an increase to the project construction contingency budget in the amount of $90,000,
bringing the construction contingency total to $233,0'70, for the completion of Bid Negotiation
No. 5452, Churn Creek Lift Station Rehabilitation Project.
Fiscal Impact
The Churn Creek Lift Station Rehabilitation Project (Project) is being funded by Public Works'
Wastewater Utility Division funds, as will the proposed $90,000 contingency increase. The total
project cost, including the proposed increase, is expected to be just over $864,600.
Alte�native Action
The City Council (Council) may ehoose not �o approve the reques� and provide alternative
direction to staff.
Backgrou n d/f1 n alysis
This project includes the rehabilitation of the Churn Creek lift station to address the issues and
deficiencies listed below, including coating/lining the wet well interior with epoxy, replacing the
influent slide gates, rehabilitating and securing the pump guide rail systems, installing
combination air valves on the two force mains, installing drain outlets and piping from the
vaults, and replacing the force main discharge structure with a new polymer concrete corrosion
resistant structure.
The station is in decent condition overall and it is expected to have adequate capacity for the
foreseeable future, but there are several issues and deficiencies at that station that are being
addressed to extend the service life of the station and meet operation and maintenance needs,
including:
Report to Redding City Council November 8,2024
Re: 4.12(c)--Approve Increase to Project Budget for Churn Creek Lift Station Rehabilitation
Project Page 2
• The existing wet well liner is failing and exposing concrete to corrosive gasses;
• Two influent slide gates have exceeded their service lives and are difficult to operate;
• Pump guide rails separate and make pump removal and installation difficult;
• Air valves on the force mains have failed, exposing the station to potential surge damage;
• Service vaults at the station do not have drains and regularly fill with rain water; and
• The station's force main discharge structure is severely corroded.
On April 2, 2024, the Council awarded the construction contract for the project to SnL
Construction, Inc. The notice to proceed was issued May 10, 2024, and due to material delays,
the project was suspended and construction did not begin until September 9, 2024. During the
course of construction, it was found that the existing 12-inch sewer main entering the wet well
has a major failure to the sewer main causing a significant amount of Inflow & Infiltration (I&I)
to the Wastewater Utility's system requiring the existing 12-inch sewer main to be replaced. Due
to the magnitude of this failure, the project requires additional funding as the contingency funds
originally awarded for the project is not adequate to cover the additional required work.
On November 6, 2024, staff transferred City Manager approved funds to the project contingency
funds in the amount of $50,000 and an additional $90,000 increase to the construction
contingency is requested to cover the costs of the additional required work.
COST SUMMARY
Item Awarded Amount Trans e�Amount Increase P�ojected A�nount
Contract Administration, $80,000 $0 $0 $80,000
Ins ection, Testin
Construction Contingency $57,000 $50,000 $90,000 $197,000
Additional Cit Mana e $50,000 (-$50,000 $0 $0
Totals $187,000 $0 $90,000 $277,000
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA), and
no further action is required. On April 2, 2024, the Council determined that the project is
categorically exempt from environmental review under CEQA, pursuant to Sections 15301 —
Existing Facilities, 15302 — Replacement or Reconstruction, and 15303 - New Construction or
Conversion of Small Structures.
Council Prio�ity/City Manager^ Goals
This agenda item is a routine operational item.
Attachments
^Location Map
Previous Staff Report
, ; ,
� ...�',r� I,1.,.��_ ,�`-�� _R,/ � ��r����� �,�'�� �---� � ... ---
_.. . , -
� r r, , M �
._�.�..��� ,/ �~�,, <'�,,MM � � �- � --,f � --
' _, � ,�, �, 1 �''~ \`� ,' , ��' Y 0 .� - ___..
� ,.
� �,~`' �, �`�,��'�� ,� ' �'�J9�'�RM� �� -< --_� �- _._�
~� �`�'� �,�r �,� � � � � �c ,�o -�,_ �___��_�� ; -- --
r
T�RMf�C RD
�.� �,,� � � � , ry_ p, _� _ — —
� �
,~i7 - .�* l,r �� � _ {! rf a�cc _,___ �
,�� ST�qT �� ,7 �,� � /r��; _t- �,����� c� ' ,,tl l
� ` �
� �"� 7 .._ . _
; �, �
(
F � � � �
~ TM ` -t 1,
7
4,:,� �
�`� � '� ��� �� �� {����' ) � ����,`�� �i �;
� � �,�� �' � �,1,.�_,�: 1,W��� ��, , �;�� ��_�_�_�._._�`"`��__--� �
� . ��L_ �NI � �.'� _.. w_..._;' 1 .:,�' � , ..�.___ �-- --------
� ,� � _ ?�- , �
���
•,, ��A �U;
; A �.. �� S �!��, �I/q �-
�-- �� ��f'11 _ ,.{�
,
Q �1
�..�___� I �- �
��
'*. . ,�.. _________ _'_,
*M� 'titi .�,.�.__,�....._ ..� , .,t � �i f J 'm
_.,_,
„,^ .,� ��........-.� +L,.��:+ 7 Ij ,'I
__.._......_.__��
_�,_ ""_,_,., _,__ * __ , �"__,."" , ,r
___,._..—,
, �a ,
, � ,
,� � , , - __ __
",� � ,
. �
l ~~,� � ' ,
��.�� PROJECT�; ;` ;1
------._ .__ �EC;�V Y.
\,,�
,�"
�1�, LOCATION',, � ' — —
� , __.
; `t ,.—._,-------- ..1
t
t �l `t
� � 1 1
t',, � 't
�,� '� l 'i _________
� _
�'�..� �`�� l t1,....,1____-
�� 1
E �
,, ,
� � � �
, �--__-
--------
, , —
,.
� ,.
� --���
�- �� ��
� 1 _.�.. �,l
�,� ��—_-__��L_1 � � `.___fr'�,..�, ST'�T �____.J...__ TAF2MA
_. _ � .......
. ,_. __ �__.—-- __. `
_ ' �f G'�TER�� E , ,_
_ __ 1 (� � ���' - _� 4� .� y�j=�'�����,�
� - �
--- 1 - � �-----T � � ��.
_- a , �� ,�__ �'�,
.
� �� i / � �� �,�
w* �i __ � �,, ,
��----- ------- r- �-�] - - I��---- -----�- �� ,
j _-_ '� --__ "�,
�,,, l � � ( --�`^�, �� __ _ �9�'F�
� �
.
^ ,„, _ _
----_.
,, � ��_,. � ., t _.., — i�� �,<g��
-' cn �
;r �.,�1 � �'r ��_ __ _���. .,, ,�f �w---
��r
_�
__ .�
�..
,,.�'", m._�� �j � '/�
... — --
,, �/. � �_t_, ; I i _..,r C ``y,� -� t �
r�. ,,•" `�,,' __ ___
� �r
"" f �--
„ '�-""- _____�? ___ F - ,r S
�, �.,,�( _� � __ � � F, ----� U ,f , �,r
„• '^ �_ . - '^'�
,„ ` } _. � � ~,�
, �
,
�' E ����� ",
� , � 1 }LC --- - �.'�L�.Pd f��'£�{- '---- ' '� i
� _ -� �� _ �� � _ � _-� � �
� ,,,,--' � �, , r � �.� � �J� , �'__" _ , r�'
�, ; r � ......__ --�-_...� .. � �.. w.� _j�_? � m.. ...._ _ _... �.______ .....�� r� f
,,�,� � � '�
� __. . __.
� ��- � � - � I � i_-��� _.____._-(' � --- ,
�� 4� l4
1 � �
___�' ��;��,�_ � -- ��� �� � F , w� ,1 "� ���� �� � �___.�.
- ---
--- ___
'�......� ---�'`'..-�`____ '�f���_._ �m ..�_. � :�-_�-�-� � .. ... �`� ��'�_�f�''F_ � _�__� � _�. ..
� 1
_
r �..> . � ___ , r� �
.... ........ ._.. � I ___ �..� �. ._�� .._ ._.......... ....�, f
��� � �
_._ f � ��,���. �—�—� I;_.. .... ..... I .� � � � I_ � � � .— _ _ —------ .. —__ ___� � �_ r � �...
,-�-- , � �_�� � ����� [ _ ._��I--�—������������ � _
_____�______�. ��L��� �� �� � t_��� _N�
— , � . ._ _ _ _ _—--
__�f�'t'��� � ��I = __- __ _��=-=���... z_ ...._� :�....�..._�_��� �� ,_�j _ �, �_
<,_._.___. ... � _____� �.. __ >_ ��v'� �v�"' ..._
�_ _____ . — — r — j �-� Q — � -- --- � _—" 1—
, r__� � �._ 1.aaa ._— _� —�_ _
�� � --� �-- aaa __. .... _� ._ — --- — 1 � — ......z
--; �T�, � ��,.,- --i—i�-�°ttr�_-�, r ..3—,.."— ��I ��--�-- --- ------ _�..___.. ---���
��F RFo� CITY OF REDDING CHURN CREEK LIFT STATION
� , �� REHABILITATION PROJECT
PUBLIC WORKS
�' - ��-� .�' DEPARTMENT �OCATION MAP
�4�,F�ac�
� � �' � � �
� � � ' � �' � � ' � ` CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: Apri12,2024 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(d) Director
***APPROVED BY***
�
�c a� � �bEi� 'c�r�Cs I7�reetcsr 3f2Ii2t}`?� r�' �p�si��,C�i �r� �° �,f26,{'2{�?
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(d)--Award Bid Negotiation No. 5452 (Job Order No. 2663) Churn Creek
Lift Station Rehabilitation Pro'ect
Recommendation
Authorize the following actions relative to Bid Schedule No. 5452 (Job No. 2663), City of
Redding Churn Creek Lift Station Rehabilitation Project:
(1) Award to SnL Group, Inc., in the amount of$562,600;
(2) Approve an additional $80,000 to cover the cost of administration and inspection fees;
(3) Approve $25,000 for project development costs;
(4) Approve $57,000 to provide construction contingency funding;
(5) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of$50,000; and
(6) Find that the Project is categorically exempt from review under the California
Environmental Quality Act, pursuant to Section 15301 - Existing Facilities, 15302-
Replacement or Reconstruction, and 15303 - New Construction or Conversion of Small
Structures.
Fiscal Impact
The Churn Creek Lift Station Rehabilitation Project (Project) is being funded by the Wastewater
Utility. The Wastewater Utility has sufficient budget for this project and its funding wi11 not
impact other activities or projects.
Cost Sumina
Item Estzmated
Pro'ect Develo ment Costs $25,000
Construction Contract+ Contin enc $619,600
Contract Administration, Ins ection, Testin $80,000
Additional Cit Mana er Authorit $50,000
Total Pro'ect Costs $774,600
Report to Redding City Council March 26,ZOZ4
Re: 4.12(d)--Award BN No. 5452 Churn Creek Lift Station Rehabilitation Page 2
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Alterna2ive Action
City Council may choose not to award the bid for the project and provide staff with alternate
direction. If the project is not awarded, then the service life of the City of Redding's (City)
Churn Creek Lift Station could be reduced, decreasing reliability for City customers and
increasing potential risk of sanitary sewer overflows into Churn Creek.
Background/Analysis
The City currently owns and operates 18 lift stations within its wastewater collection system,
including the Churn Creek Lift Station (Station). The station is located on the southwest side of
Shasta View Drive and the Highway 44 overpass, between Highway 44 and Churn Creek Road,
as shown in the attached location map. The station has capacity for 14.4 million gallons per day
(MGD) and includes five submersible pumps located in a concrete wet well, dual force mains
(20" and 16" diameter), vaults for force main maintenance and valves, an emergency standby
generator, and a control building.
The station is in decent condition overall and it is expected to have adequate capacity for the
foreseeable future, but there are several issues and deficiencies at that station that need to be
addressed to extend the service life of the station and meet operation and maintenance needs,
including:
• The existing wet well liner is failing and exposing concrete to corrosive gasses;
• Two influent slide gates have exceeded their service lives and are difficult to operate;
• Pump guide rails separate and make pump removal and installation difficult;
• Air valves on the force mains have failed, exposing the station to potential surge
damage;
• Service vaults at the station do not have drains and regularly fill with rain water; and
• The station's force main discharge structure is severely corroded.
This project will include rehabilitation of the station to address the issues and de�ciencies listed
above, including coating/lining the wet well interior with epoxy, replacing the influent slide
gates, rehabilitating and securing the pump guide rail systems, installing combination air valves
on the two force mains, installing drain outlets and piping from the vaults, and replacing the
force main discharge structure with a new polymer concrete corrosion resistant structure.
Attached is a tabulation of bids received and opened on March 12, 2024, for construction of the
project. The low bid in the amount of$562,600 was received from SnL Group, Inc., of Redding,
California. The engineer's estimate was $457,347. Total project development costs for this
project are estimated to be $25,000. Project development costs include engineering and
environmental for the project.
Report to Redding City Council March 26,ZOZ4
Re: 4.12(d)--Award BN No. 5452 Churn Creek Lift Station Rehabilitation Page 3
Environmental Review
Staff has determined that the project is categorically exempt from environmental review under
California Environmental Quality Act Guidelines, pursuant to Sections 15301 - Existing
Facilities, 15302 — Replacement or Reconstruction, and 15303 - New Construction or
Conversion of Small Structures. Class 1 exemptions include the minor alteration of existing
public structures and facilities. Class 2 exemptions consists of replacement or reconstruction
where the new structure will be located on the same site and will have substantially the same
purpose and capacity. Class 3 exemptions consist of construction and location of new small
facilities and equipment, or conversion of existing structures. The existing wastewater facility
will be rehabilitated in order to provide reliable service that meets public health and safety
standards. The project will be located on City property and wi11 result in no expansion of use.
The action area does not have significant values for wildlife habitat or other environmental
resources and the project has no potential to have a significant effect on the environment.
Council Prior�ity/City Manage� Goals
This agenda item is a routine operational item.
Attachments
^Location Map
^Bid Tabulation
^Notice of Exemption