HomeMy WebLinkAbout _ 4.11(e)--Award Bid Negotiation No. 5494 Redding City Hall Occupied Office Carpet Replacement Project � � �' � � �
� � � ' � �' � � ' � ` CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: September 17,2024 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(e) Director
***APPROVED BY***
�
�c a� � �bEi� 'c�r�Cs I7�reetcsr �f2?t2t}`?� r5�' �p�i��,C�i �r� �, �,fl(l�'2{�?
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(e)--Award Bid Negotiation No. 5494 (Job No. 9248) Redding City Hall
Occu ied Office Ca et Re lacement Pro'ect
Recommendation
Authorize the following actions relative to Bid Negotiation No. 5494 (Job No. 9248), Redding
City Hall Occupied Office Carpet Replacement Project:
(1) Award to Continental Flooring Company, in the amount of$283,444 for the Base Bid, an
additional $92,222 for Additive Alternate 1, an additional $200,460 for Additive
Alternate 2, and an additional $30,535 for Additive Alternative 3;
(2} Approve $65,000 to cover the cost of administration and inspection fees;
(3) Approve $14,000 for project development costs;
(4) Approve $30,500 to provide construction contingency funding; and
(5) Find that the project is categorically exempt from review under the California
Environmental Quality Act Guidelines,pursuant to Section 15301 —Existing Facilities.
Fiscal Impact
The Redding City Hall Occupied Office Carpet Replacement Project (Project) will be funded by
the Building Maintenance Division and Risk Management Division.
Cost SummaNy
Item Estimated
Pro'ect Develo ment Costs $14,000
Construction Contract+Contin enc $637,161
Contract Administration,Ins ection,Testin $65,000
Total Pro'ect Costs $716,161
Project Bud et $716,161
Project cast components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget. Public Works has determined that this is a low risk project
and has reduced the contingency rate to five percent (the standard contingency rate is 10%).
Report to Redding City Council September 20, 2024
Re: 4.12(e)--Award Bid Negotiation No. 5494 Redding City Ha110ccupied Office Carpet
Replacement Project Page 2
Therefore, should any unexpected expenses or costs arise, it may be necessary to return to City
Council (Council) to budget additional funds.
Al�er�native Action
The Council may choose not to award the project and provide alternate direction. If the project
does not move forward, the carpet wi11 continue to deteriorate and require ongoing repairs and
maintenance.
Background/Analysis
As approved by Council on May 7, 2024, the project includes the removal of existing carpet
throughout City Ha11 staff occupied spaces and installing Mannington Tile Carpeting. In
addition, the existing wall base will be removed and replaced with new material, and transition
strips wi11 be installed in locations where carpet tiles are placed against dissimilar flooring.
Attached is a tabulation of the bids opened on July 16, 2024. The low bid in the amount of
$283,444 was received from Continental Flooring Company, of Scottsdale, Arizona. The
engineer's estimate was $238,095. Due to the limited budget for this project, staff designed it
with a base bid and two additive alternates. While DFS Flooring's overall project estimate is
lower than Continental Flooring, pursuant to Public Contract code 20103.8, they are not being
recommended the contact award. This section of the Public Contract Code allows for several
options to award a project that includes additive alternates; however, staff elected, and
subsequently included in the project contract documents, language stating that the lowest bid
shall be the lowest base bid without consideration of the additive alternative bids.
Total project development costs for this project are estimated to be $14,000. Project development
costs include engineering, environmental, and consultant services (design support).
Environmental Review
Staff has deter�nined that the project is categorically exempt from environmental review under
the California Environmental Quality Act Guidelines, pursuant to Section 15301. Class 1
exemptions include the operation, repair, maintenance, or minor alteration of existing facilities,
structures, or equipment involving negligible or no expansion of use. The project is a regular
maintenance activity and does not involve expansion of use. The project has no potential to have
a significant effect on the environment.
Council P�^io�ity/City ManageN Goals
• This agenda item is a routine operational item.
Attachments
^Location Map
^Bid Tabulation
^Notice of Exemption
- '�-'� ` � � ' ' � ! '���� ; �� �� �
�-"�' i �' � �_% ��
--� ' � ',�' ��----� � =_�
-: �
%;
;
� ;;� �,�
� �,
� ' i
, ' ,��,� �� � ; � � -
.
; � � ' �
� ,
%
, „
� , , , ��
�� i � � ; / �
- �� � ; ; i � � l �� �
— �„ , � ; � --
� �
� "�� / �� ��� '� � � � -
�, i
/ ��/ f� � ���% `�,� / � � Q i� j �� � NT9 ��
�
'� , ��� � � ��/ z t �� i
���, �. �y' � � %'r `-' I; C/� i
, ,
� �,,
� �a
- �� � �
y
� _ � /
_ :
� ��r�A��� � � �� � L � _
�� �� � � � � �
� � - _ ,
� --
� � �- � \� � � �� ; �`-t � -
� � i � \��' v � �
�� o���l ci�%i�' ,ricER� � ;
�` 1 1��, � 4F/ECD� %c� � � � �.
, , ���K -� � �� , -- --
��� � � ,
t r� � � � ��,� , ,
� r� ✓l �,,� �v � o �> �� j l'�/ � __—
�
�. i !Q � o / \,
,
,
o �
,
�
�� i�: �Q // �'�,� r,. 0 � �j_ j� �j �-�
/ � � � � � / Z
. � � �
, � oo �.
� � ,
� — --
� - - o� R y � �� � DDING � � � �� � �r �
Q �
; �� � �v ����� YHALL �,� cy.a ; � 1 � �
� � � � �,� �Fss � � � �
�, , �_� �� �- �' -91�F �/ tr
1 � � � p,�R ��, --� �o� ,�til�� � �
� � � ' �V � r� Z � , i
�'4 F i�' �F�j, ��,�Q , p-� _�� � ,
�
S ��/ / �i i��F�_ �_ ;,%/�?��J��� '��� ��"� __ �\
� � i i � ( � � �, � � I�`' � \ __ _ —�
/ '
� ///, ���/ �// ��, ��� � �� ,� I� _ -------
�- � '/ , �� � �� /� � � � �
��-
BID TABU�ATION FOR:
Redding City Hall Occupied Office Carpet Replacement Project
Bid Schedule No.: 5494
Continental Floorinq
ENGINEER'S EST Com an DFS Floorin AVERAGES
7/16/2024 UNIT UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTA� PRICE
1 Furnish and Install Carpet �S 1 $238,095.00 $238,095.00 $283,444.00 $283,444.00 $283,550.00 $283,550.00 $283,497.00
TOTAL BASE BID $283,444.00 $283,444.00 $283,550.00 $283,550.00
ADDITIVE ALTERNATES
Additive Alternate 1
1 Furnish and Install Carpet �S 1 $76,005.00 $76,005.00 $92,222.00 $92,222.00 $92,640.00 $92,640.00 $92,431.00
Additive Alternate 2
1 Furnish and Install Carpet �S 1 $163,035.00 $163,035.00 $200,460.00 $200,460.00 $189,050.00 $189,050.00 $194,755.00
Additive Alternate 3
1 Furnish and Install Carpet �S 1 $25,245.00 $25,245.00 $30,535.00 $30,535.00 $26,895.00 $26,895.00 $28,715.00
TOTAL BID
ALTERNATES 1-3 $323,217.00 $308,585.00
TOTA� BASE BID PLUS
ADDITIVE ALTERNATES $502,380.00 $606,661.00 $592,135.00 $599,398.00
The lowest bid shall be the lowest bid price on the base bid without consideration of the prices on the additive alternate items.
Page 1 of 1
I�OTICE OF E�EMPTI�}N
Tct; � Of�ce Qf Planning and Research FIt�rM. Cily of Reddrng
1440 Tenth Street,Room 121 Public Works Department
Sacramento, CA 95814 777 Cypress Avenue
Redding, CA 9bf}01
� Shasta County Clerk
County af�l�asta
P.O.Box 990880j 1643 Ivlarket Street
Redding, CA 96099-0880
Pro�ect Title; Citv Hal1 Carpet Renlacement Proiect-J0#924$-14
Project Location—Specifc: Citv Hall, 777 Cvpress Avenue
Project Lacation—City:Reddin� Pro�ect Loeation—County; Shasta
Descriptian of Pro,�ect: The eity of Reddin�(Gitt��p�ses to removs and replace appraximatelv 53 SQO square feet af
carpetin�: In addition the ex�sCin�wall base shall b�removed and r�placed witih naw material and transition strips shall
be rnstalled�n desr�nated locations
Name of Public Agency Approving Projects Ci1v of Reddin�
Name r�f Person or Agency Carrying 4�ut Project;Corri Vandiver,PE-Pro'ec� t En�ineer
Exempt Status: (check one)
❑ Ministerial [S�ction 21080(b}(1); 152b8]
❑ Declarad Emergency [Section 21080{b){3); 15269(a)]
❑ Emergency Project[Section 21080{b)(4); 152b9(b)]
❑ Statutory Exemptions. State eode number:
❑ Comznt�n Sense Exempt`ton(This praject does ncat fall within an exempt ciass,but it can be seen with certainty that there is
no possibility that the activity may have a significant effect on the environment(14 CCR 15601[b][3]).
� Categorical Exeinption: State type and sectiQn number: Sec. 15301,Existin�Facilities
� No exceptic�ns apply that u�auld bar t1�e use of a categoricaI exemptior►(PRD 210$4 and 14 CGR 1530(}.2).
Reasons why project �s exernpt; Class 1 exemptions incl�tde the operation re�air maintenance or rninor alteratic�n af
existin�facilities structures ar equipment involvin�ne�Ii�ible or no expansion of use The project includes removing�and
repiacln� approximatelv 53 500 square feet of carpet In addition the existin�; wa11 base shall be re�noved and replaced
with new material,and transit�on strios shaii be instatled in locations where carpettiles are�laced a�ainst dissimitar floorin„�
Oid carpet and debris will be removed offsite for p�er disposal The pra�ect is a regular maintenance item and does not
involve clzan�e af or expansion of use Therefore the project has na potent�al to have a si�nificant effect on the environment
and further environmental review is nc�t required
Lead Agency Contact Persan:Amber Ke11ev Telephone: 530.225.4046
If Filed by Applicantt
l. Attach certifed document afexe�npfion findrng.
2. Has a notice of exemption been filed by the public agency approving the praject?o Yes o Nt�
�.,�.�°
Signature. C.,�'�.�.,g.��....�.�� � ����'1 Date: �`�e:� ���'
Title. Environtnental Compliance Mana�
��igned by Lead Agency Date receivad for filing at QI'R°
❑ Signed bY Appticant