HomeMy WebLinkAbout_ 4.11(b)--Award Bid Negotiation No. 5474 (Job No. 2712) Replace Asphalt � � �' � � � � � � ' � �' � � ' � ` CITY OF REDDING REPORT TO THE CITY COUNCIL MEETING DATE: June 4,2024 FROM: Michael Webb, Public Works ITEIVI NO. 4.11(b) Director ***APPROVED BY*** �c a� � �bEi� 'c�r�Cs t7�reetcsr 5f2?t2t}`?� te�r� , ;� � �:r ��`?81?C}? mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(b)--Award Bid Negotiation No. 5474 (Job No. 2712) Replace Asphalt Concrete Surfacin 2024 Pro'ect Recommendation Authorize the following actions relative to Bid Negotiation No. 5474 (Job No. 2712), Replace Asphalt Concrete Surfacing 2024: (1) Award to J.F. Shea Construction, Inc, in the amount of$1,773,377; (2) Approve $199,400 to cover the cost of administration and inspection fees; (3) Approve $122,000 for project development costs; (4) Approve $180,000 to provide construction contingency funding; (5) Authorize the City Manager to approve additional increases in either the construction management or construction contingency amounts up to a total of$25,000; (6) Approve the project design plans, specifications, and special provisions; and (7) Find that the project is categorically exempt from review under the California Environmental Quality Act Guidelines, pursuant to Section 15301(c) — Existing Facilities. Fiscal Impact The Replace Asphalt Concrete Surfacing 2024 Project is funded by the Streets Division ($1,901,850) and the Solid Waste Division ($416,000). Project cost components are estimated, and some shifting of the funds may be necessary to balance the project within the approved budget. Cost Summary Item Estimated Pro'ect Develo ment Costs $ 122,000.00 Construction Contract-I-Contin enc $ 1,953,377.00 Contract Administration, Ins ection, Testin $ 199,400.00 Additional City Mana er Authority $25,000.00 Total Pro'ect Costs $2,299,777.00 Pro'ect Bud et $2,317,850.00 Report to Redding City Council May 23,Z024 Re: 4.12(b)--Award Bid Negotiation No. 5474 Replace Asphalt Concrete Surfacing 2024 Project Page 2 Alternative Action The City Council may choose not to award the project or provide alternate direction to staff. If the project does not move forward, the streets will continue to deteriorate and may require roadway reconstruction. Background/Analysis This project involves removing and replacing approximately 110,000 cubic feet of asphalt concrete pavement in worn and deteriorated sections of Oasis Road, Twin View Boulevard, Quartz Hill Road and Airport Road. The project includes other associated work items that include: pavement delineation, pavement markings, pavement markers, and other miscellaneous items. The project also includes removal and replacement of worn asphalt concrete pavement at the City of Redding's Transfer Station as a result of the daily heavy truck traffic. Attached is a tabulation of the three bids opened on May 15, 2024. The low bid in the amount of $1,773,377 was received from J.F. Shea Construction, Inc., of Redding. The engineer's estimate was $1,777,86'7. Total project development costs far this project are estimated to be $122,000. Project development costs include engineering, environmental, and consultant services (design support). Environmental Review Staff has determined that the project is categorically exempt from environmental review under the California Environmental Quality Act Guidelines, per Section 15301 (c). Class 1 exemptions include the operation, repair, maintenance, or minor alteration of existing facilities, structures, or equipment involving negligible or no expansion of use. The project will extend the life of the existing pavement, but will not create additional vehicle capacity or result in expansion of use. The project has been reviewed for sensitive resources such as threatened or endangered species or their habitats, sensitive vegetation communities, tribal lands, or tribal cultural resources. The project has no potential to have a significant effect on the environment. Council P�io�ity/City Manager Goals • This agenda item is a routine operational item. Attachments ^Location Map ^NOE ^Bid Tab TWIN VIEW BLVD OASIS RD OASIS RD QUARTZ HILL RD �o 5�s op' ��PrA RD � ��y�\G � �9kF e`�o SR2ggE � O � TRANSFER STATION � Pe-'�� y<<�'p,o y SqCRqMENTO RNER � � � ---_ � --�--�=—�� _�ti^ OLD ALTURA �� SR299W d P�'�ER VIKING cypRes S�,QQ / q� E. CYPRES �G Ftiy� HARTNEL� r F�TG,p9 � cY� 3 z __--- W W r� = z j Q U W � N m = � c� U � Q I— C1TY OF ' � N � REDD/NG go��"�" j� > RANCHO ¢ G��i`G�� AIRPORT ROAD N S� D(J � — Y � W � � W � � U �J � R� v � ���p,R �RK s,� � KNIGHTON M�D DC I A L AIRPORT e-° ���`� s o� �.� �ST ���� } s�OF �.�c W �J Q DERSCH RD > �Peey �`�---�' `` oF R�o CITY OF REDDING � �O� REPLACE AC SURFACING � PUB�IC WORKS PROJECT 2024 c� __ = � � - ��: .P DEPARTMENT �t,F�ar' �OCATION MAP 1Vc�TICE OF E�EMPTION TO, 0 {�f�ice of Planning and Research F1�oM: C�ty of Redding 1400 fier�th Street,Roc�m 121 Public Wc�rks Department Sacramento,CA 95814 777 Cypress fi,venue Redding,�A 960Q 1 � Shasta Cc�unty Clerk County of Shasta P.O.Box 990880, 1643 Market Street Redd�ng,CA 96099-0$80 Project Title: Replace AC Surfacin�;2Q24 Prcriect J:U.#2712-10 Project Location—Specific: Airport Road,Oasis Road, Twin View Blvd and Quartz Hill Road: Project Lacation—City:Redding Project Locatian—Caunty: Shasta Descr�ption of Projectm The Citv of Reddin�proposes tc� remave and rep�a�ce 2.5" of asphalt concrete on the existi� deteriorated sections af Airport Rc�ad, Qasis Road, Twin View Btvd and Quartz Hi�l Road Work gncludes rindin�d replacin� or sealin�the pavement� addin� new stripin�• and ad�usting� manholes as needed Qne-way traffic control or temparary street closures ma b�required:The public wiit be natified of the project Name of Public Agency Approving Project: City of Reddin� Name afPerson or Agency Carrying�ut Pro�ect. Tom Semb,Project En�ineer Exemp�Status. (check one) ❑ Ministerial [Section 21080{b)(1}; 1526&] ❑ Declared Emergency [Section 210$Otbj(�}; 15269(a}] ❑ Emergency Project[Section 21080{b)(4); 15269(b}] ❑ Statutory Exernptions. State code number: ❑ Cr�mman Sense Exemptian(This project does not fall within an exempt ciass;but it can be seen with certainty that there is no possibility that the activity rnay have a'signlficant effect on the environment{14 C�R I560I[b�[3]}. � Categorical Exemptic�n. State type and section num6er; Sec. 15301(c ,Existin�Facilities 0 No excepti�ns apply that would bar the use of a categarical exemptron(PRD 21084 and I4 CCR 15300:2); Reasans why project fs exerngt: Class 1 exernptions include the operatian, re�air ma�ntenance or minor�lteratian of existin� faciiit�es, structures, or equipment invo[vin�ne�li�ible or no expansion of use The existin� asphalt wi�l be maintained and the .�raject daes not invalve expansion of use. The proiect has been revr�wed for sensitive resources such as threatened crr andangered species or their habitats sensitive vegetation communities tribal lands or tribal cu[tural resources.The project hasno potentiai to have a si�nificant effect on the enviranment. Lead Ag�ncy Contact Person: Amber ISeliev Telephane. 530.225:4046 If Filed by Applicantc 1. Attach certified document of exemption�nding, 2; Has a notice of exemption been filed by the public�agency approving the pro,�ect"?❑Yes o No Si nature. � , � � C ` e�.,� Dat�: �' —�ca,�.� Title: Environmental C+�m liance Man r �Signed by Lead Agency Z}ate received far filing at OPR: ❑ Signed by Applicant BID TABULATION FOR: REP�ACE AC SURFACING 2024 Bid Schedule No.: 5474 ENGINEER'S EST J.F. Shea Construction Inc Darren Ta lor Construction Inc 4/12/2024 UNIT UNIT UNIT ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTAL PRICE TOTAL 1 Water Pollution Control LS 1 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $10,000.00 $10,000.00 2 Traffic Control LS 1 $130,000.00 $130,000.00 $163,800.00 $163,800.00 $100,717.60 $100,717.60 3 Replace Asphalt Concrete Surfacing (3/4" CF 97720 $9.50 $928,340.00 $9.70 $947,884.00 $12.84 $1,254,724.80 4 Asphalt Concrete Overlay(3/4" PG 64-10) TON 1150 $90.00 $103,500.00 $115.00 $132,250.00 $15520 $178,480.00 5 Replace Asphalt Concrete Surfacing (3/4" CF 21730 $14.50 $315,085.00 $11.50 $249,895.00 $15.66 $340,291.80 6 Shoulder Backing LF 1700 $4.00 $6,800.00 $7.00 $11,900.00 $10.77 $18,309.00 7 Digouts (3/4" PG 64-10) CF 4600 $14.80 $68,080.00 $13.00 $59,800.00 $11.81 $54,326.00 8 Thermoplastic Traffic Stripe (6") LF 73656 $1.75 $128,898.00 $1.75 $128,898.00 $1.50 $110,484.00 9 Thermoplastic Traffic Stripe (8") LF 756 $2.50 $1,890.00 $2.50 $1,890.00 $4.50 $3,402.00 10 Thermoplastic Pavement Markings SF 637 $16.00 $10,192.00 $16.00 $10,192.00 $18.00 $11,466.00 11 Pavement Markers EA 1561 $12.00 $18,732.00 $10.00 $15,610.00 $7.00 $10,927.00 12 Adjust Water Valve EA 35 $850.00 $29,750.00 $650.00 $22,750.00 $750.00 $26,250.00 13 Adjust Manhole EA 14 $1,200.00 $16,800.00 $917.00 $12,838.00 $1,000.00 $14,000.00 14 Adjust Monument EA 14 $1,200.00 $16,800.00 $905.00 $12,670.00 $1,200.00 $16,800.00 TOTAL-CONTRACT ITEMS $1,777,867.00 $1,773,377.00 $2,150,178.20 Stimpel-Wiebelhaus Associates Inc AUERAGES UNIT '�� UNl"� ITEM DESCRIPTION UNIT QTY PRICE TOTAL ' PRICE 1 Water Pollution Control LS 1 $6,500.00 $6,500.00 $6,5t�t�.0� 2 Traffic Control LS 1 $200,000.00 $200,000.00 ;$154,839.20 Replace Asphalt Concrete Surfacing (3/4" 3 PG 64-10) CF 97720 $15.35 $1,500,002.00 $12.�3 4 Asphalt Concrete Overlay(3/4" PG 64-10) TON 1150 $165.00 $189,750.00 $14�.07 Replace Asphalt Concrete Surfacing (3/4" 5 PG 70-10) CF 21730 $18.50 $402,005.00 $15.22 6 Shoulder Backing LF 1700 $53.00 $90,100.00 $23.59 7 Digouts (3/4° PG 64-10) CF 4600 $22.00 $101,200.00 $�5.60 8 Thermoplastic Traffic Stripe (6") LF 73656 $1.50 $110,484.00 $1.58 9 Thermoplastic Traffic Stripe (8") LF 756 $4.50 $3,402.00 $3.$3 ' 10 Thermoplastic Pavement Markings SF 637 $18.00 $11,466.00 $17.33 11 Pavement Markers EA 1561 $7.00 $10,927.00 ;$8.00 12 Adjust Water Valve EA 35 $550.00 $19,250.00 $65d.t�� ' 13 Adjust Manhole EA 14 $1,100.00 $15,400.00 $1,0��.67 14 Adjust Monument EA 14 $1,100.00 $15,400.00 $1,D68.33 TOTA�-CONTRACT ITEMS $2,675,886.00 $�,"199,813.73 Page 1 of 1