Loading...
HomeMy WebLinkAbout _ 4.11(a)--Resolution Accepting List of Projects Funded by SB1 � � �' � � � � � � ' � �' � � ' � ` CITY OF REDDING REPORT TO THE CITY COUNCIL MEETING DATE: May 21,2024 FROM: Michael Webb, Public Works ITEIVI NO. 4.11(a) Director ***APPROVED BY*** � �c a� � �bEi� 'c�r�Cs I7�reetcsr 5f1C�12t}`?� r5�' �p�i��,C�i �r� �, ^��'��,{'2{�? mwebb@cityofredding.org btippin@cityofredding.org SUBJECT: 4.11(a)--Resolution Accepting the List of Projects Funded by Senate Bill 1: The Road Re air and Accountabilit Act of 201'7 Recommendation Adopt Resolution accepting the City of Redding's List of Projec�s for Fiscal Year 2024-ZS funded by Senate Bill 1: The Road Repair and Accountability Act of 2017. Fiscal Impact The estimated Fiscal Year 2024-25 Road Maintenance and Repair Account (RMRA) funding allocation to the City of Redding (Ci�y) is $2,401,484. Alternatzve Action The City Council (Cauncil) may choose not ta adapt the attached resolution. The Ci�y would no� be eligible to receive Senate Bi11(SB) 1 funding in the amount of$2,401,484. Backg�ound/Analysis On April 28, 2017, the Governor signed SB l, the Road Repair and Accauntability Act of 201'7, to address basic road maintenance, rehabilitation, and critical safety needs on both the State highway and local streets and road systems. SB 1 increases per-gallon fuel excise taxes; increases diesel fuel sales taxes and vehicle registration fees; and provides for inflationary adjustments to gas tax rates in future years. RMRA funds are apportioned by formula to eligible cities and counties. The City's portion of RMRA funds for Fiscal Year 2024-25 is estimated to be $2,401,484. SB 1 emphasizes the importanee of aeeountability and transparency in the delivery of California's transportation programs. Therefore, in order to be eligible for RMRA funding, cities must submit a project list. The attached project list may be funded with RMRA funds depending on the availability of other funding sources within the Streets Division. The RMRA legislation reeognizes the need for, and provides agencies with, the flexibility to fund projects in accordance Report to Redding City Council May 14,Z024 Re: 4.12(a)--Resolution Accepting List of Projects Funded by SB1 Page 2 with local needs and priorities. As such, the project list is simply a proposal of potential projects that may utilize these funds. Agencies are required, however, to submit expenditure reports by December 1, of each year that detail each project and corresponding amount of RMRA funds utilized to ensure program accountability. The RMRA provides much needed funds to repair and rehabilitate existing transportation facilities at both the state and local 1eve1. The City's backlog of deferred maintenance continues to grow as need outpaces resources. The resolution has been approved as to form by the City Attorney. Envi�^onmental Review Acceptance of the project list is not a project as defined by the California Environmental Quality Act, and no further action is required. Council PrioNity/City Manage� Goals • This agenda item is a routine operational item. Attachments ^Resolution ^Attachment A Proposed_Projects_List RESOLUTION NO. 2024- A RESOLUTION OF THE CITY OF REDDING ADOPTING TAE LIST OF PROJECTS FOR FISCAL I'EAR 2024-25 FUNDED BI' SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into 1aw by the Governor in April 2017 in order to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that wi11 ensure the residents of the City of Redding (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WT-IEREAS, the City must include a list of all projects (Attachment A) proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City wi11 receive an estimated $2,401,484 in RMRA funding in Fiscal Year 2024-25 froin SB 1; and WHEREAS, this is the seventh year in which the City is receiving SB 1 funding and wi11 enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, increasing aceess and mobility options for the traveling public that would not have otherwise been possible without SB1; and WHEREAS,the City has undergone a public process to ensure public input into our community's project list; and WHEREAS, the City used a Pavement Management System to develop portions of the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community's priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets and roads and add active transportation infrastructure throughout the City this year and numerous similar projects into the future; and WIIEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge tecl�nology, materials and practices, wi11 have significant positive co-benefits statewide; NOW THEREFORE, BE IT RESOLVED THAT the City Council of the City of Redding, County of Shasta, State of California, accepts the proposed projects which will utilize Fiscal Year 2024-25 Road Maintenance and Rehabilitation revenues in their delivery. With the listing of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues List of Projects (Attachment A) funded by SB 1, the Road Maintenance and Rehabilitation Account for Fiscal Yeax 2024-25. I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 21 st day of May, 2024, and was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: TENESSA AUDETTE,Mayor ATTEST: FORM APPROVED: SHARLENE TIPTON, City Clerk CHRISTIAN M. CURTIS, City Attorney ATTACHMENT A STATE OF CAIIFORNIA�CALIFORNIA TRANSPORTATION COMMISSION Senate Bill(SB)1 Proposed Project�ist Form I�c�c�l �fir�ets �nd Rc�ads Pr�agram A enc Name: A enc Contact: cV Brendart Carr � i �z�a��n ��a z��-���s 24-25 �oCode: 51768 bcarr ci 'ofretldin '.ar s�ma e Project Estimated Completion Date Useful Life Na Relisted Project Title Project Description Project Location �#of ears Pre- Consteuction Min. Max. Consteuction PP01 Relisted General Maintenance to include,but not Citywide 07/2024 06/2025 1 5 General Maintenance limited to pothole patching,crack sealing, street signs,street striping,etc.�This project will include:Public Works Staffing, Other,Procurement of Public Works Equipment,Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear. PP02 Relisted This project will include:bridge structure Old Alturas Road at Churn Creek 06/2024 10/2025 15 50 Old Alturas Bridge over Churn rehab/repair(existing),sidewalk and/or and 200'before and after bridge Creek crosswalk installation(new),and bridge limits. structure widening. PP03 Replace AC Surfacing 2024 This project will include pavement Multiple Locations along Oasis 06(2024 06/2025 5 12 rehab/repair(existing). Rd,Twin View Blvd,Quartz Hill Rd,and Airport Road in addition to the CoR Transfer Station PP04 Relisted This project will include cost estimating, Oregon Street between Shasta 02/2020 10l2025 10 30 Oregon Street Improvements preliminary design,sidewalk andlor Street and Yuba Street. crosswalk installation(new)and storm drain/culvert installation(new). PP05 Relisted This project will include 2-way cycle track, Sundial Bridge Drive above and 02/2020 10l2025 20 30 Turtle Bay to Downtown Gap shared use path,raised intersection with north of SR44,throughout Turtle Compietion curb extension,bollards,lane reductions, Bay Park and connecting to the raised crosswalks with bikelped Sacramento River Trail. separations,and shade trees.