HomeMy WebLinkAbout _ 4.11(a)--Resolution Accepting List of Projects Funded by SB1 � � �' � � �
� � � ' � �' � � ' � ` CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: May 21,2024 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(a) Director
***APPROVED BY***
�
�c a� � �bEi� 'c�r�Cs I7�reetcsr 5f1C�12t}`?� r5�' �p�i��,C�i �r� �, ^��'��,{'2{�?
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(a)--Resolution Accepting the List of Projects Funded by Senate Bill 1: The
Road Re air and Accountabilit Act of 201'7
Recommendation
Adopt Resolution accepting the City of Redding's List of Projec�s for Fiscal Year 2024-ZS
funded by Senate Bill 1: The Road Repair and Accountability Act of 2017.
Fiscal Impact
The estimated Fiscal Year 2024-25 Road Maintenance and Repair Account (RMRA) funding
allocation to the City of Redding (Ci�y) is $2,401,484.
Alternatzve Action
The City Council (Cauncil) may choose not ta adapt the attached resolution. The Ci�y would no�
be eligible to receive Senate Bi11(SB) 1 funding in the amount of$2,401,484.
Backg�ound/Analysis
On April 28, 2017, the Governor signed SB l, the Road Repair and Accauntability Act of 201'7,
to address basic road maintenance, rehabilitation, and critical safety needs on both the State
highway and local streets and road systems. SB 1 increases per-gallon fuel excise taxes;
increases diesel fuel sales taxes and vehicle registration fees; and provides for inflationary
adjustments to gas tax rates in future years. RMRA funds are apportioned by formula to eligible
cities and counties. The City's portion of RMRA funds for Fiscal Year 2024-25 is estimated to
be $2,401,484.
SB 1 emphasizes the importanee of aeeountability and transparency in the delivery of
California's transportation programs. Therefore, in order to be eligible for RMRA funding, cities
must submit a project list. The attached project list may be funded with RMRA funds depending
on the availability of other funding sources within the Streets Division. The RMRA legislation
reeognizes the need for, and provides agencies with, the flexibility to fund projects in accordance
Report to Redding City Council May 14,Z024
Re: 4.12(a)--Resolution Accepting List of Projects Funded by SB1 Page 2
with local needs and priorities. As such, the project list is simply a proposal of potential projects
that may utilize these funds. Agencies are required, however, to submit expenditure reports by
December 1, of each year that detail each project and corresponding amount of RMRA funds
utilized to ensure program accountability.
The RMRA provides much needed funds to repair and rehabilitate existing transportation
facilities at both the state and local 1eve1. The City's backlog of deferred maintenance continues
to grow as need outpaces resources.
The resolution has been approved as to form by the City Attorney.
Envi�^onmental Review
Acceptance of the project list is not a project as defined by the California Environmental Quality
Act, and no further action is required.
Council PrioNity/City Manage� Goals
• This agenda item is a routine operational item.
Attachments
^Resolution
^Attachment A Proposed_Projects_List
RESOLUTION NO. 2024-
A RESOLUTION OF THE CITY OF REDDING ADOPTING TAE LIST OF
PROJECTS FOR FISCAL I'EAR 2024-25 FUNDED BI' SB 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed into 1aw by the Governor in April
2017 in order to address the significant multi-modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that wi11 ensure the
residents of the City of Redding (City) are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WT-IEREAS, the City must include a list of all projects (Attachment A) proposed to receive
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in
the City budget, which must include a description and the location of each proposed project, a
proposed schedule for the project's completion, and the estimated useful life of the improvement;
and
WHEREAS, the City wi11 receive an estimated $2,401,484 in RMRA funding in Fiscal Year
2024-25 froin SB 1; and
WHEREAS, this is the seventh year in which the City is receiving SB 1 funding and wi11 enable
the City to continue essential road maintenance and rehabilitation projects, safety improvements,
increasing aceess and mobility options for the traveling public that would not have otherwise been
possible without SB1; and
WHEREAS,the City has undergone a public process to ensure public input into our community's
project list; and
WHEREAS, the City used a Pavement Management System to develop portions of the SB 1
project list to ensure revenues are being used on the most high-priority and cost-effective projects
that also meet the community's priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets and roads
and add active transportation infrastructure throughout the City this year and numerous similar
projects into the future; and
WIIEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge tecl�nology, materials and practices, wi11 have significant
positive co-benefits statewide;
NOW THEREFORE, BE IT RESOLVED THAT the City Council of the City of Redding,
County of Shasta, State of California, accepts the proposed projects which will utilize Fiscal
Year 2024-25 Road Maintenance and Rehabilitation revenues in their delivery. With the
listing of these projects in the adopted fiscal year resolution, the City is reaffirming to the
public and the State our intent to fund these projects with Road Maintenance and
Rehabilitation Account revenues List of Projects (Attachment A) funded by SB 1, the Road
Maintenance and Rehabilitation Account for Fiscal Yeax 2024-25.
I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the
City Council of the City of Redding on the 21 st day of May, 2024, and was duly adopted at
said meeting by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
TENESSA AUDETTE,Mayor
ATTEST: FORM APPROVED:
SHARLENE TIPTON, City Clerk CHRISTIAN M. CURTIS, City Attorney
ATTACHMENT A
STATE OF CAIIFORNIA�CALIFORNIA TRANSPORTATION COMMISSION
Senate Bill(SB)1 Proposed Project�ist Form
I�c�c�l �fir�ets �nd Rc�ads Pr�agram
A enc Name: A enc Contact: cV
Brendart Carr � i
�z�a��n ��a z��-���s 24-25
�oCode: 51768 bcarr ci 'ofretldin '.ar
s�ma e
Project Estimated Completion Date Useful Life
Na Relisted Project Title Project Description Project Location �#of ears
Pre- Consteuction Min. Max.
Consteuction
PP01 Relisted General Maintenance to include,but not Citywide 07/2024 06/2025 1 5
General Maintenance limited to pothole patching,crack sealing,
street signs,street striping,etc.�This
project will include:Public Works Staffing,
Other,Procurement of Public Works
Equipment,Procurement of Road
Maintenance and Rehab Materials,
Procurement of Public Works Safety
Materials and Gear.
PP02 Relisted This project will include:bridge structure Old Alturas Road at Churn Creek 06/2024 10/2025 15 50
Old Alturas Bridge over Churn rehab/repair(existing),sidewalk and/or and 200'before and after bridge
Creek crosswalk installation(new),and bridge limits.
structure widening.
PP03 Replace AC Surfacing 2024 This project will include pavement Multiple Locations along Oasis 06(2024 06/2025 5 12
rehab/repair(existing). Rd,Twin View Blvd,Quartz Hill
Rd,and Airport Road in addition
to the CoR Transfer Station
PP04 Relisted This project will include cost estimating, Oregon Street between Shasta 02/2020 10l2025 10 30
Oregon Street Improvements preliminary design,sidewalk andlor Street and Yuba Street.
crosswalk installation(new)and storm
drain/culvert installation(new).
PP05 Relisted This project will include 2-way cycle track, Sundial Bridge Drive above and 02/2020 10l2025 20 30
Turtle Bay to Downtown Gap shared use path,raised intersection with north of SR44,throughout Turtle
Compietion curb extension,bollards,lane reductions, Bay Park and connecting to the
raised crosswalks with bikelped Sacramento River Trail.
separations,and shade trees.