REPORT TO THE CITY COUNCIL
MEETING DATE: September 3,2024 FROM: Michael Webb, Public Works
ITEIVI NO. 4.11(� Director
***APPROVED BY***
�
�c a� � �bEi� 'c�r�Cs I7�reetcsr �f2?t2t}`?� r5' �p�i��,C�i �r� �, �,f?7�'2{�?
mwebb@cityofredding.org btippin@cityofredding.org
SUBJECT: 4.11(f�--Award Bid Negotiation No. 5500 (Job Order No. 3697) ARPA Storm
Drain Pro'ect
Recommendation
Authorize the following actions relative to Bid Nego�iation No. 5500 (Job No. 3697), American
Rescue Plan Act Storm Drain Project:
(1) Award to RTA Construction Inc., in the amount of $826,640 for the Base Bid, an
additional $125,400 for Additive Alternate 1, and an additional $79,000 for Additive
Alternate 2;
(2} Approve an additional $155,000 to cover the cost of administration and inspection fees;
(3) Approve $103,000 to provide construction contingency funding;
(4) Approve $306,447 for project development costs;
(5) Authorize the City Manager to approve additional increases in either the eonstnzction
management or construction contingency amounts up to a total of$25,000; and
(6) Find that the Project is categorically exempt from review under the California
Environmental Quality Act, pursuant to Section 15301— Existing Facilities and Section
15302—Replacement or Reconstruction.
Fiscal Impact
The American Rescue Plan Aet (ARPA) Storm Drain Project is being funded by $1,143,656 in
ARPA funds and$476,831 of Fiscal Year 2024-25 Capital Storm Drains funds.
Cost Summar
Item Estimated
Pro�ect Develo ment Costs $306,447
Construction Contract+ Contin enc $1,134,040
Contract Administration, Ins ection, Testin $155,000
Additional Cit Mana er Authorit $25,000
7'otal Pro'ect Costs $1,620,487
Total P�o'ect Bud et $1,620,487
Report to Redding City Council August 26,2024
Re: 4.12(f)--ARPA Storm Drain Project Page 2
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Alternative Action
The City Council (Council) may choose not to award the bid for the ARPA Storm Drain Project
and direct Storm Drain maintenance crews to continue monitoring the multiple deteriorating
storm drain facilities.
Background/Analysis
Attached is the tabulation of bids received and opened on August 12, 2024. The low bid in the
amount of $826,640 was received from RTA Construction Inc., of Redding, California. The
engineer's estimate was $686,197. Total project development costs for this project are estimated
to be $306,447. Project development costs include engineering, surveying, and environmental.
The project consists of replacing deteriorating storm drain facilities in several locations as
follows:
• Harpole Road area will replace three undersized catch basins with larger
openings;
• Fairway Avenue area will replace a 40-inch by 67-inch metal arch pipe with a 3-
foot by 6-foot concrete box culvert (Additive Alternate 1);
• Robert Court area will replace a 40-inch by 67-inch metal arch pipe with a 3-foot
by 6-foot concrete box culvert(Additive Alternate 2);
• Victor Avenue area will replace a 40-inch by 67-inch metal arch pipe with a 3-
foot by 6-foot concrete box culvert;
• Wilson Avenue area will replace a 36-inch by 22-inch metal storm drain pipe with
a new 30-inch concrete pipe;
• Placer Street area will replace an existing concrete pipe tivith a new 24-inch high
density polyethylene pipe (HDPE); and
• Masonic Avenue, at the former Redding Area Bus Authority bus stop,wi11 replace
the 18-inch metal storm drain pipe with a new 18-inch HDPE pipe, as well as
replace the existing broken catch basin lids.
In addition, the project includes replacing asphalt concrete paving, curb, gutter, sidewalk, and
other miscellaneous items of as detailed on the plans and in the specifications.
Environmental Review
Staff has determined that the project is categorically exempt from environmental review under
the California Environmental Quality Act, pursuant to Sections 15301 — Existing Facilities and
Section 15302 - Replacement or Reconstruction. C1ass 1 exemptions include the minor alteration
of existing public structures and facilities. Class 2 exem�ptions consists of replacement or
reconstruction where the new structure will be located on the same site and will have
substantially the same purpose and capacity. The existing utilities will be replaced and extended
to provide reliable service that meets public health and safety standards, and the project will
result in a negligible expansion of use. The project area has been reviewed for sensitive resources
Report to Redding City Council August 26,2024
Re: 4.12(f)--ARPA Storm Drain Project Page 3
such as wetlands, threatened or endangered species or their habitats, sensitive vegetation
communities, cultural resources and hazardous waste sites. The project has no potential to have a
significant effect on the environment.
ARPA allows funds to be used for necessary investments in water, sewer, or broadband
infrastructure, and the National Environmental Policy Act does not apply to ARPA funds
administered through the U.S. Treasury Department. No further action is required.
Council PrioNity/City NfanageN Goals
• Public Safety—"Work to improve all aspects of public safety to help people feel secure
and safe where they live, work and play in the City of Redding."
Attachments
^Location Map
^Bid Tab
NOE ARPA Storm Drain Project
�o
s��
OP'
��PM RD
�.����G �akF � MASONIC AVE
e��o
SR2gg� �
0
�
�
y �
�-�� ``�� �
SACRAMEN70 Rlt/ER �P A �
� O�D AL7URAS �
a
SR299W � VICTOR AVE
QQ
P��ER CypRFs S�� viKiN WILSON AVE
q� E. CYPRES �
P�ACER ST HARTNE L >-
6'G
F
J
'9GF�' W w w
TG'9 N W U Q Q
C,� �
Z � Q
HARPOLE RD � � `�
����1 v >
S goNN RANCHO ��
o' p� � ''o
�F
�
w �
� � �
v o
�
z �
� Q
CRK R� � � REDDING
G��p,R z,� KNIGHTON M U N I C I PA�
� AIRPORT
�� s
o� �o �s�
���� } S��F �.��
�., �
Q � DERSCH RD
>
�
�Pee ��-\ ��
�� p�0� CITY OF REDDING EXHIBIT A
f
� ' jf � PUBLIC WORKS ARPA STORM DRAIN PROJECT
�,�t'�a�+'a" DEPARTMENT LOCATION MAP
BID TABULATION FOR:
ARPA Storm Drain Project
Bid Schedule No.: 5500
ENGINEER'S EST RTA Construction Inc SnL Grou inc
8/12/2024 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTAL PRICE TOTAL
1 Water Pollution Control �S 1 $2,500.00 $2,500.00 $9,000.00 $9,000.00 $6,700.00 $6,700.00
2 Traffic Control �S 1 $23,000.00 $23,000.00 $20,000.00 $20,000.00 $35,000.00 $35,000.00
3 Construction Area Signs EA 20 $300.00 $6,000.00 $245.00 $4,900.00 $450.00 $9,000.00
4 Curb and Gutter(6") �F 200 $80.00 $16,000.00 $150.00 $30,000.00 $80.00 $16,000.00
5 Trench Sheeting and Shoring �S 1 $17,000.00 $17,000.00 $1,600.00 $1,600.00 $2,900.00 $2,900.00
6 Storm Drain Pipe (12" CPP) �F 142 $450.00 $63,900.00 $300.00 $42,600.00 $250.00 $35,500.00
7 Storm Drain Pipe (18" HDPE) �F 45 $380.00 $17,100.00 $1,200.00 $54,000.00 $1,080.00 $48,600.00
8 Storm Drain Pipe (24" HDPE) �F 214 $200.00 $42,800.00 $260.00 $55,640.00 $416.00 $89,024.00
9 Storm Drain Pipe (30" RCP) �F 510 $300.00 $153,000.00 $300.00 $153,000.00 $386.00 $196,860.00
10 Storm Drain Pipe (3'x 10' RBC) �S 1 $188,097.00 $188,097.00 $268,000.00 $268,000.00 $220,000.00 $220,000.00
11 Wilson Avenue Easement Miscellaneous �S 1 $15,000.00 $15,000.00 $40,000.00 $40,000.00 $9,000.00 $9,000.00
12 Catch Basin No.3 EA 1 $6,000.00 $6,000.00 $13,000.00 $13,000.00 $13,000.00 $13,000.00
13 Catch Basin No.4 EA 2 $6,000.00 $12,000.00 $13,000.00 $26,000.00 $15,000.00 $30,000.00
14 Catch Basin No.3 (Modified) EA 3 $6,000.00 $18,000.00 $26,000.00 $78,000.00 $28,000.00 $84,000.00
15 Storm Drain Manhole (Type 1-5') EA 1 $10,000.00 $10,000.00 $9,000.00 $9,000.00 $16,000.00 $16,000.00
16 Remove Trees �S 1 $75,000.00 $75,000.00 $5,000.00 $5,000.00 $9,000.00 $9,000.00
17 Water Main (8"DIP) �F 26 $800.00 $20,800.00 $650.00 $16,900.00 $365.00 $9,490.00
TOTAL BASE BID $686,197.00 $826,640.00 $830,074.00
Additive Alternate 1
18 Traffic Control �S 1 $1,000.00 $1,000.00 $2,000.00 $2,000.00 $26,000.00 $26,000.00
19 Construction Area Signs EA 4 $300.00 $1,200.00 $250.00 $1,000.00 $400.00 $1,600.00
20 Storm Drain Pipe (18" RCP) �F 14 $250.00 $3,500.00 $600.00 $8,400.00 $1,400.00 $19,600.00
21 Storm Drain Pipe (3 x 6 RBC) �S 1 $92,929.00 $92,929.00 $114,000.00 $114,000.00 $194,000.00 $194,000.00
TOTAL ADDITIVE A�TERNATE 1 $98,629.00 $125,400.00 $241,200.00
Additive Alternate 2
22 Traffic Control �S 1 $1,000.00 $1,000.00 $2,000.00 $2,000.00 $21,000.00 $21,000.00
23 Construction Area Signs EA 4 $300.00 $1,200.00 $250.00 $1,000.00 $400.00 $1,600.00
24 Storm Drain Pipe (3 x 6 RBC) �S 1 $53,566.00 $53,566.00 $76,000.00 $76,000.00 $152,000.00 $152,000.00
TOTAL ADDITIVE A�TERNATE 2 $55,766.00 $79,000.00 $174,600.00
TOTAL -BASE BID PLUS ADDITIVE ALTERNATES 1 &2 $840,592.00 $1,031,040.00 $1,245,874.00
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 1 of 2
BID TABULATION FOR:
ARPA Storm Drain Project
Bid Schedule No.: 5500
Eddie A�cner Construction
Inc Sunrise Excavatin AVERAGES
8/12/2024 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTA� PRI�E
1 Water Pollution Control �S 1 $11,467.05 $11,467.05 $36,500.00 $36,500.00 $15,916.76
2 Traffic Control �S 1 $54,724.00 $54,724.00 $100,000.00 $100,000.00 'I $52,431.Ofl
3 Construction Area Signs EA 20 $435.75 $8,715.00 $450.00 $9,000.00 ' $395.19
4 Curb and Gutter(6") �F 200 $140.24 $28,048.00 $40.00 $8,000.00 $1�2.56
5 Trench Sheeting and Shoring �S 1 $15,905.66 $15,905.66 $20,000.00 $20,000.00 $10,�U'1.42 '
6 Storm Drain Pipe (12" CPP) �F 142 $180.66 $25,653.72 $404.00 $57,368.00 'I $2$3.67
7 Storm Drain Pipe (18" HDPE) �F 45 $751.22 $33,804.90 $880.00 $39,600.00 $977.81
8 Storm Drain Pipe (24" HDPE) �F 214 $252.20 $53,970.80 $502.00 $107,428.00 $357.55
9 Storm Drain Pipe (30" RCP) �F 510 $323.29 $164,877.90 $550.00 $280,500.00 $3$9.82 '
10 Storm Drain Pipe (3'x 10' RBC) �S 1 $245,768.46 $245,768.46 $322,000.00 $322,000.00 "I $263,942.�2 '
11 Wilson Avenue Easement Miscellaneous �S 1 $74,941.32 $74,941.32 $143,000.00 $143,000.00 ; $6G,735.33
12 Catch Basin No.3 EA 1 $7,096.83 $7,096.83 $15,000.00 $15,000.00 $12,(124.2'1
13 Catch Basin No.4 EA 2 $9,554.50 $19,109.00 $11,000.00 $22,000.00 $12,"138.63
14 Catch Basin No.3 (Modified) EA 3 $14,735.34 $44,206.02 $12,000.00 $36,000.00 'I $20,183.84
15 Storm Drain Manhole (Type 1-5') EA 1 $8,863.25 $8,863.25 $15,000.00 $15,000.00 $12,215.81
16 Remove Trees �S 1 $8,897.24 $8,897.24 $40,000.00 $40,000.00 $15,724.31
17 Water Main (8"DIP) �F 26 $1,386.75 $36,055.50 $2,000.00 $52,000.00 $1,100.44
TOTAL BASE BID $842,104.65 $1,303,396.00 'I $950,553.66
Additive Alternate 1
18 Traffic Control �S 1 $15,925.00 $15,925.00 $20,000.00 $20,000.00 $9,5$1.25
19 Construction Area Signs EA 4 $882.00 $3,528.00 $890.00 $3,560.00 ! $855.5t�
20 Storm Drain Pipe (18" RCP) �F 14 $704.63 $9,864.82 $750.00 $10,500.00 $4�,(113.66
21 Storm Drain Pipe (3 x 6 RBC) �S 1 $173,612.30 $173,612.30 $250,000.00 $250,000.00 $',179,2U4.10
TOTAL ADDITIVE A�TERNATE 1 $202,930.12 $284,060.00 $�'13,397.53 '
Additive Alternate 2
22 Traffic Control �S 1 $12,020.00 $12,020.00 $20,000.00 $20,000.00
23 Construction Area Signs EA 4 $882.00 $3,528.00 $890.00 $3,560.00 '
24 Storm Drain Pipe (3 x 6 RBC) �S 1 $139,541.84 $139,541.84 $225,000.00 $225,000.00 "
TOTAL ADDITIVE A�TERNATE 2 $155,089.84 $248,560.00 $192,749.95
TOTAL -BASE BID PLUS ADDITIVE ALTERNATES 1 8 $1,200,124.61 $1,836,016.00 $1,356,701.14
Shaded areas indicate corrections made in accordance with the Special Provisions. Page 2 of 2
NoT��� o�' E�EMPT�t�N
Ta. � C?ffice Qf Planning and Research FRt3M. City af Redding
1404 Tenth Street,Roam 121 Public Works I?epartment
Sacramenta,CA �5814 777 Cypress Avenue
Redding;CA 96001
� Shasta Cou�lty�lerk
County of Shasta
P.O. BQx 990880, 1643 Market Street
Redding,CA 9b099-08�0
Project Title. ARPA Starm Drain Project
Pr�je�t Location — Speeific: +Churn Creek Road and Har�ole Rc�ad, Wilson Avenue and Belladc�nna Street, and along
Fairwav Avenue,P'lacer Street and Masonic Avenue
Praject Location—City. Redding_Project Location—County. Shasta
Descriptian of Prc�ject: The City af l�eddin�propases the replacement and installation of storm drain facilities at seven
�)locations The existing box culverts will be replaced and a�aroximately � 100 linear feet af high-density�solyeth lene
(HDPE) storm drain piping will be repiaced or extended. Work will invoive vegetation remaval excavatian and pavin�
Traffic contral and ni�ht work may be necessary for pc�t�tions ofthe praject,Wc�rk is lacated�vithin CitY ri h�t o_fuwav'tROW�
and witl�tin easement areas, The public will be notified of the pra'et ct�rior ta constructican.
lYame af Public Age�cY AAPrc�ving Project. City tsfRedding
Name of Pet•son or Agency Carrying C}ut Project: Corri Vandiver,Praject Engineer
Exem�t Sfatus; {check ane)
� Ministeriai [Sectiion 21080tb}('1), 15268�
CI L?eclared Emergency [Section 2108(��b}{3); 15269(a)]
C] Emergency Project [Section 21�8iJ(b}{4}; 15269{b)] �
❑ Statutory Exelnptions. State cc�de number:
[� Conrtmon SenSe Exemption(This project does not fall within an exempt class;but if can be seen with certainty that there is
no possibility that the activity may have a significant effect an the environment{14 CCR I5�61[b][3]�.
� �ategcrrical Exernptic�n: State type and section nurnber: 15301 Existin�Fac�lities and Section 15302
Replacement or Reconstructian
� No exceptians apply that would bar the use af a categt�ricaI exemptioil(PRD 21484 and 14 CCR 15300.2).
Reasons why project is exempt: Class 1 exemptions include the minor alteration c�fexisting�public structures and facilities.
Class 2 exernptians cansists of replacement or recanstr�►ction where the new structure will be located on the same site a�d
will izave substantially the same purpose and capacitv.The existin�utilities will be replaced and extel7ded to provide reliable
service that meets public health and safety star�dards and the�roject will result in a ne�li�;ible ex�aansian of use There
.�roject area has been reviewed fcsr sensiti�e resources such as wetlands threatened or e�idan e�; red species or their habitats
sensitive ve�etation comrnunities, cultural resources and hazardous waste sites. The project has no patential to l��.ve a
si�nificant effect on tlle environment.
Lead Ag�n�y Cont�cf Person:Amber Kelley Telephone:'S30.225.4046
I�Fl��{I �)y Ap�IIC�ll1t.'
1. Attiach certified dacument c�f exemptian finding,
2, Has a notice of exeinption been filed by the public agency appra�ing the project? o Yes o No
� ,�
�
Signature. �`P�.�.,� ���.,�°�`�° ��� �'„� D�.te; �i?�.� ��"�-�.��°�
r
Title: Envirt�nrnental Gompliance Mar�a�er
�Signed by Lead Agency Date received for filing aY C}PR:
❑ Signed by Applicant
C'F't)�i i�I�7[=.a'�'t,. � ?{➢�,�