HomeMy WebLinkAbout _ 4.11(e)--Project Acceptance BS 5222 Redding Aquatic Center 50 Meter PoolC IT Y OF
REMDINO�"
AN CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: February 20, 2024
FROM: Michael Webb, Public Works
ITEM NO. 4.11(e)
Director
***APPROVED
BY***
Am 6eau *'orksMirectcrs
?.tit}?
ry 1pis n, Ci ars e 2'13/202
mwebb@cityofredding.org
btippin@cityofredding.org
SUBJECT: 4.11(e) --Project Acceptance, Bid Schedule No. 5222, Job No. 7336, Redding
Aquatic Center 50 Meter Pool Improvements
Recommendation
Accept Bid Schedule No. 5222 (Job No. 7336), Redding Aquatic Center 50 -Meter Pool
Improvements, awarded to Western Water Features, Inc., as satisfactorily complete, with a final
cost of $1,255,347.
Fiscal Impact
The Redding Aquatic Center 50 -Meter Pool Improvement Project (Project) was funded by the
General Fund. The total project cost is $1,255,347 and includes surveying, design, bidding,
construction, field engineering, inspection, and contract administration.
Alternative Action
The City Council (Council) may choose not to accept the project as satisfactorily complete, and
advise staff on how to proceed.
Background/Analysis
On November 2, 2021, the Council awarded a construction contract for the project to Western
Water Features, Inc. for $908,765 and approved a $110,000 construction contingency fund. Also
authorized was $118,000 for contract administration and construction inspection fees, and
$50,000 for project development costs. The City Manager was authorized to approve additional
increases in either the construction management or construction contingency amounts up to
$15,000, for a total authorized project amount of $1,201,765. Project development costs include
engineering, environmental, and consultant services.
Report to Redding City Council February 14, 2024
Re: 4.11(e) --Project Acceptance BS 5222 Redding Aquatic Center 50 Meter Pool Page 2
Western Water Features, Inc., has completed all items of work for the project as of May 26,
2023, which was within the contract time frame. The project warranty period expires one year
from the completion date. Subsequently, the Public Works Department filed a notice of
completion with Shasta County.
During construction, additional funds were requested or transferred to cover the costs of change
orders as detailed in the attached reports. Additional funds included an increase of $20,000 to the
construction management budget and $145,000 to the construction contingency budget to fund
change orders, for a new total authorized amount of $1,351,765. During construction, there were
six change orders in the amount of $239,582 leaving a balance of $15,418 in the contingency
fund. The final project cost was $1,255,347.
The project included the removal of existing 50 -meter pool plaster and tile, as well as the
removal of the activity pool water slide.
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA). On
November 2, 2021, Council determined that the project is categorically exempt from
environmental review under CEQA Guidelines, pursuant to Section 15301, and no further action
is required.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Location Map
11-2-21 Previous Staff Report
02-06-23 Transfer of Project Funds Memorandum
2-21-23 Previous Staff Report
Cost Summary
Awarded Amounts
Adjusted Amounts
Actual Cost
1
�=
Additional
New Total
$
d i
$50,000
Project Development Costs
$50,000 $0 $50,000
Construction Contract
$1,018,765
$145,000
$1,163,765
;
Contingency
a r
Construction Contract
��
$1,148,347
Contract Change Orders
4�
$118,000
$20,000
$138,000
Contract Administration &
$57,000
Inspection
City Manager Funds
$15,000
($15,000)
$0
$0
Total
$1,201,765
$150,000
$1,351,765
$1,255,347
The project included the removal of existing 50 -meter pool plaster and tile, as well as the
removal of the activity pool water slide.
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA). On
November 2, 2021, Council determined that the project is categorically exempt from
environmental review under CEQA Guidelines, pursuant to Section 15301, and no further action
is required.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
^Location Map
11-2-21 Previous Staff Report
02-06-23 Transfer of Project Funds Memorandum
2-21-23 Previous Staff Report
b0 0
SACRAIWSAfro RIVER
CITY OF REDDING
PUBLIC WORKS
DEPARTMENT
4ya
EXHIBIT A
REDDING AQUATIC CENTER
50 METER POOL IMPROVEMENTS
LOCATION MAP
REPORT TO THE CITY COUNCIL
MEETING DATE: November 2, 2021
FROM: Chuck Aukland, Public
ITEM NO. 4.11(g)
Works Director
***APPROVED
BY***
Construction Contract + Contingency
$1,018,765
2
u and, Public Works s erec00
n„�
aSa, Dffcc r z >
caukiand0a d.redding.ca.usbtippin@cityofredding.org
$15,000
: 4.1l(g)--Award Bid Schedule No. 5222 (Job No. 7336) Redding Aquatic Center
=Meter
ool Improvements
Recommendation
Authorize the following actions relative to Bid Schedule No. 5222 (Job No. 7336) Redding
Aquatic Center 50 Meter Pool Improvements Project:
(1) Award to Western Water Features, Inc. in the amount of $908,765;
(2) Approve an additional $118,000 to cover the cost of administration and inspection fees;
and $50,000 for project development costs;
(3) Approve $110,000 to provide construction contingency funding;
(4) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of $15,000; and
(5) Find that the Project is categorically exempt from the California Environmental Quality
Act per Section 15301(d) - Existing Facilities.
Fiscal Impact
The Redding Aquatic Center 50 Meter Pool Improvement Project (Project) is being funded by
the General Fund.
Cost Summar
Item
Estimated
Project Development Costs
$50,000
Construction Contract + Contingency
$1,018,765
Contract Administration, Inspection, Testing
$118,000
Additional City Manager Authority
$15,000
Total Pf*ct Costs
$1,201,765
Project Budget
$1,800,000
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
Report to Redding City Council October 25, 2021
Re: 4.11(g) --Award BS No. 5222, Redding Aquatic Center 50 Meter Pool Page 2
project within the approved budget.
Alternative Action
The City Council (Council) could choose not to award the bid for the Redding Aquatic Center 50
Meter Pool Improvement Project and provide staff with alternate direction. If the project is not
awarded, the 50 -meter pool at the Aquatic Center, as well as the waterslide at the activity pool,
will have ongoing maintenance and be in jeopardy of failing.
Background/Analysis
Attached is a tabulation of bids received and opened on October 1.4, 2021, for the Redding
Aquatic Center 50 Meter Pool Improvement Project. The low bid in the amount of $908,765 was
received from Western Water Features, Inc., of El Dorado Hills, California. The engineer's
estimate was $1,100,000. Total project development costs for this project are estimated to be
$50,000. Project development costs include engineering, surveying, right-of-way, environmental,
consultant services, and permit fees. There is $1,800,000 budgeted for the total project.
This project includes the removal of the existing 50 -meter pool plaster and tile, in addition to the
removal of the activity pool water slide. The project will install new plaster, tile, activity pool
water slide, and complete water slide refurbishment.
Staff has determined that the project qualifies as Categorically Exempt from environmental
review under California Environmental Quality Act Guidelines Section 15301. The project area
does not have significant values for wildlife habitat or other environmental resources, and the
project has no potential to have a significant effect on the environment.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Bid Tabulation
Location Map
Notice of Exemption
DATE: January 30, 2023
TO: Barry Tippin, City Manager
FROM: Chuck Aukland, Director of Pulbic Works
SUBJECT: Request for Transfer of Project Funds
Redding Aquatic Center 50 Meter Pool Improvements
Bid Schedule 5222, Job No. 7336
In accordance with the Council Approved Award of Bid Schedule No. 5222, City Manager Funds
(Job No. 7336) to Project Contingency Funds in the amount of fifteen thousand dollars ($15,000)
is requested. Additional contingency funds are necessary to cover the change order costs for the
replacement of the slide landing. A transfer of $15,000 from the available remaining City Manger
Budget is necessary to fully fund these change orders.
Current
Requested
Newly
Expended
Balance
Authorized
Increase
Authorized
Projected
Projected
Contract
$908,765
0.00
$908,765
$908,765
0.00
Contingency
$110,000
$15,000
$125,000.00
$123,573
$1,427
Construction
Management
$118,000
0.00
$118,000
$118,000
0.00
City Manager
Funds
$15,000
0.00
0.00
0.00
0.00
Total
$1,151,765.00
$15,000.00
$1,151,765.00
$1,150,338.00
$1,427.00
There is currentl a balance of $15,000 available in
y i City Manager Funds. The existing
Construction Management budget has sufficientfun-Wrig -wjj
Please call me at 245-7155 or Nick Visconti at 225-4582 if you have any questions or need
additional informatio-c.
11,;V2
City Engineer Date
City Manager - Date
nv/mk
Attachments
c: Construction Manager
Resident Engineer
Finance
APPROVED
CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: February 21, 2023
FROM: Chuck Aukland, Public
ITEM NO. 4.11(a)
Works Director
***APPROVED
BY***
4r
ikland, Public Winks [erect 2/8/21023
yy ippin,4rtl n e 2/13/202.3
caukland@ci.redding.ca.us
btippin@cityofredding.org
SUBJECT: 4.11(a) --Approve Increase to Project Budget for the Redding Aquatic Center 50
Meter Pool Improvement Project
Recommendation
Approve increases to the project budget in the amount of $150,000 for the completion of Bid
Schedule No. 5222, Redding Aquatic Center 50 Meter Pool Improvement Project as outlined
below for additional improvements:
(1) Increase of $20,000 to the construction management budget, bringing the construction
management total to $1.38,000; and
(2) Increase of $130,000 to the construction contingency budget, bringing the construction
contingency total to $240,000.
Fiscal Impact
The Redding Aquatic Center 50 -meter Pool Improvement Project is being funded by the General
Fund. The proposed $150,000 increase in funding is available in the existing allocation for the
project in the Parks Division Budget. The total project cost, including the proposed increase, is
expected to be $1,950,000.
Alternative Action
The City Council (Council) may choose to reject the request and provide alternative direction to
staff.
Background/Analysis
On November 2, 2021, the Council awarded the construction contract for the project to Western
Water Features, Inc. The project includes the removal of the existing 50 -meter pool plaster and
tile, as well as the removal of the activity pool water slide.
APPROVED
Report to Redding City Council February 15, 2023
Re: 4.11(x) --Approve Increase to Project Budget for Redding Aquatic Center 50 Meter
Improvement Project Page 2
During the course of construction, conditions in the field warranted design revisions to meet the
original project intent. After the resurfacing of the 50 -meter pool was completed, the water -stop
in the expansion joint failed. The pool is leaking a significant amount of water and will continue
to do so until it is repaired. The consultant design team recommends replacing the expansion
joint with a poured -in place repair. The scope of work for this repair includes the following:
providing daily moisture conditioning to the new plaster finish, saw -cutting the old expansion
joint (approximately 40" wide by 95 feet), removing and disposing of concrete, placement of
dowel in new rebar, using shotcrete in new concrete section, tiling of new sections to match
existing sections, repairing any damaged plaster areas (if needed), and finally filling and
balancing the pool. The noted changes will result in the contract bid item exceeding the bid
quantity and the additional time needed will increase the construction management services
required.
The additional work will cause the project budget to exceed the awarded amounts. An additional
$150,000 is requested to cover increases to the construction contingency ($130,000) and
construction management ($20,000) project components.
COST SUMMARY
Item
Awarded Amount
Projected Amount
Increase
Contract Administration,
Inspection, Testing
$118,000
$138,000
$20,000
Construction Contingency
$110,000
$240,000
$130,000
Revised Totals
$228,000
$378,000
$1.50,000
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA)
Guidelines, and no further action is required. On November 2, 2021, the Council determined that
the Redding Aquatic Center 50 -Meter Pool Improvement Project is categorically exempt from
review under the CEQA Guidelines, per Section 15301(d) — Existing Facilities.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Previous Staff Report It -2-21.
APPROVED
REPORT TO THE CITY COUNCIL
MEETING DATE: November 2, 2021
FROM: Chuck Aukland, Public
ITEM NO. 4.11(g)
Works Director
***APPROVED
BY***
Construction Contract + Contingency
$1,01.8,765
Contract Administration, Inspection, Testing
$118,000
kland, Public Works Direct 0/20/202 1
i • . i 4 � Y1 "Y I FI Y L)l"SS SCR St" )fTa'CkL1P
caukland@ci.redding.ca.us
H btippin@cityofredding.org
SUBJECT: 4.1l(g)--Award Bid Schedule No. 5222 (Job No. 7336) Redding Aquatic Center
50 Meter Pool Improvements
Recommendation
Authorize the following actions relative to Bid Schedule No. 5222 (Job No. 7336) Redding
Aquatic Center 50 Meter Pool Improvements Project:
(1) Award to Western Water Features, Inc. in the amount of $908,765;
(2) Approve an additional $118,000 to cover the cost of administration and inspection fees;
and $50,000 for project development costs;
(3) Approve $110,000 to provide construction contingency funding;
(4) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of $15,000; and
(5) Find that the Project is categorically exempt from the California Environmental Quality
Act per Section 15301(d) - Existing Facilities.
Fiscal Impact
The Redding Aquatic Center 50 Meter Pool Improvement Project (Project) is being funded by
the General Fund.
Cost Summar
Item
Estimated
Project Development Costs
$50,000
Construction Contract + Contingency
$1,01.8,765
Contract Administration, Inspection, Testing
$118,000
Additional. City Manager Authority
$15,000
Total Project Costs
$1,201,765
Project Bud et
$1,800,000
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
APPROVED
Report to Redding City Council October25, 2021
Re: 4.11(8) --Award BS No. 5222, Redding Aquatic Center 50 Meter Pool Page 2
project within the approved budget.
Alternative Action
The City Council (Council) could choose not to award the bid for the Redding Aquatic Center 50
Meter Pool Improvement Project and provide staff with alternate direction. If the project is not
awarded, the 50 -meter pool at the Aquatic Center, as well as the waterslide at the activity pool,
will have ongoing maintenance and be in jeopardy of failing.
Background/Analysis
Attached is a tabulation of bids received and opened on October 14, 2021, for the Redding
Aquatic Center 50 Meter Pool Improvement Project. The low bid in the amount of $908,765 was
received from Western Water Features, Inc., of El Dorado Hills, California. The engineer's
estimate was $1,100,000. Total project development costs for this project are estimated to be
$50,000. Project development costs include engineering, surveying, right-of-way, environmental,
consultant services, and permit fees. There is $1,800,000 budgeted for the total project.
This project includes the removal of the existing 50 -meter pool plaster and tile, in addition to the
removal of the activity pool water slide. The project will install new plaster, tile, activity pool
water slide, and complete water slide refurbishment.
Staff has determined that the project qualifies as Categorically Exempt from environmental
review under California Environmental Quality Act Guidelines Section 15301. The project area
does not have significant values for wildlife habitat or other environmental resources, and the
project has no potential to have a significant effect on the environment.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Bid Tabulation
Location. Map
Notice of Exemption