MEETING DATE: November 21, 2023 FROM: Chuck Aukland, Public
ITEIVI NO. 4.11(c) Works Director
***APPROVED BY***
� r ,.� � _,tr,,,��
c�k������nc�,P��rlic G�+c��•�s�irect t 1;'9�`�(??� � � �p�z��,C`i ��� �� t�� 1 l,'l_�,�'2{}2�:
caukiand@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(c)--Award Bid Negotiation No. 5408 (Job Order No. 2688) Stillwater
Wastewater Treatment Plant Facultative S1ud e La oon and Slud e Dr in Bed Pro'ect
Recommendation
Authorize the following actions relative to Bid Nego�iation No. 5408 (Job No. 2688), Stillwater
Wastewater Treatment Plant Facultative Sludge Lagoon and Sludge Drying Bed Project:
(1) Reject the apparent low bid by T & S Construction Co., Inc. as nonresponsive and award
the project to the second low bidder SnL Group, Tnc., in the amount of$7,660,744.83;
(2) Approve an additional $780,000 to cover the cost of administration and inspection fees
and$228,074 for project development costs;
(3) Approve $760,000 to provide construction contingency funding;
(4) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of$50,000; and
(5) Find that the Project is categorically exempt from review under the California
Environmental Quality Act Guidelines, pursuant to Section 15301 - Existing Facilities,
Section 15302 —Replacement or Reconstruction, and Section 15303 —N�ew Construction
or Conversion of Existing Facilities.
Fiscal Impact
The Stillwater Wastewater Treatment Plant (SWWTP} Facultative Sludge Lagoon and Sludge
Drying Bed (Project) is being funded by the Wastewater Utility Fund. Sufficient funding for the
project is available in the 2023-24 Wastewater Utility budget.
Cost Summa
Item �stimated
Pro'ect Develo ment Costs $228,074
Construction Contract+ Contin enc $8,420,744.83
Contract Administration, Ins ection, Testin $780,000
Additional Cit Mana er Authorit $50,000
TotaZ Pro'ect Costs $9,478,818.83
Project cost components are estimates and some shifting of the project development,
Report to Redding City Council November 14,2023
Re: 4.12(c)--Award BN No. 5408 SWWTP FSL&SDB Project Page 2
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Alternative Action
The City Council may choose not to award the bid for the project and provide staff with alternate
direction. Without this project, staff would need to pursue other alternatives to managing
biosolids disposal at the treatment plant. This may present future regulatory and fmancial
impacts to the Wastewater Utility.
Ba ckgro u n d/f1 n alysis
Attached is a tabulation of bids received and opened on October 26, 2023, for construction of the
project. The low bid in the amount of $7,245,000 was received from T & S Construction Co.
Inc., of Sacramento, California. T & S Construction failed to list a11 subcontractors per the
project bid documents and Public Contract Code (PCC) 4104 in their proposal. Since T & S did
not list a subeontractar to complete the coating and painting on the projeet, they would be
required per PCC 4106 to self-perform this work. The City requested T & S to provide details, in
writing, regarding their intention to self-perform the work. However, no response was received.
The City Attorney's office advised and the City Engineer agrees that T & S's bid is
nonresponsive.
The second low bid in the amount of $7,660,744.83 was received from SnL Group, Inc., of
Redding, California. The engineer's estimate was $7,301,660. Total project development costs
for this project are estimated to be $228,074. Project development costs inelude engineering,
surveying, environmental, consultant services, and permit fees.
The SWWTP project includes the following items of work: construction of two facultative
sludge lagoons with LLDPE liners, floating aerators, dredge equipment, and flow splitting
facilities; construction of two concrete walled, asphalt lined sludge drying beds with underdrain
systems; installation of a 20-foot wet well and package lift station; associated yard piping, site
grading, fencing, plant road improvements, drainage systems, and associated electrical and
instrumentation improvements.
Environmental Review
Staff has determined that the project is categorically exempt from environmental review under
California Environmental Quality Act Guidelines, pursuant to Sections 15301 - Existing
Facilities, Section 15302 — Replacement or Reconstruction, and Section 15303 — N�ew
Construction or Conversion of Existing Structures. Class 1 exemptions include the operation,
repair, maintenance, or minor alteration of existing facilities, struct�ures, ar equipment involving
negligible or no expansion of use. Class 2 exemptions consists of replacement or reconstruction
where the new structure wi11 be located on the same site and will have substantially the same
purpose and capacity. Class 3 exemptions consist of construction and location of limited
numbers of new small facilities and equipment, as well as the reconstruction or conversion of
existing structures. The project involves the construction of limited numbers of new sludge
facilities and eQuipment, as we11 as the reconstruction or conversion of existing facilities and
equipment. The project will be constructed within the existing SWWTP facility and will result in
negligible expansion of use. The project area has been reviewed for sensitive resources such as
threatened or endangered species or their habitats, sensitive vegetation communities, tribal lands,
or tribal cultural resources. The project area has no potential to have a significant effect on the
environment.
Report to Redding City Council November 14,2023
Re: 4.12(c)--Award BN No. 5408 SWWTP FSL&SDB Project Page 3
Council P�^iority/City Manage� Goals
This agenda item is a routine operational item.
Attachments
^Location Map
^Notice of Exemption
^Bid Tabulation.
, r f
,
i �
I � 1
._..._ —._w__. �---. '
�________ �_..r_______ - _ -- _� -�_—�_ �– ---�—� a 1
�� �, � � � � � -� __
�
� � �
� f
71 1 ______�""" 1 ____L '_____ �__
_____. .___......_. .
�'�� � � � � � � ` '
� �
G i E
t
�. � i
'� � �___ �............,___�__ �.i_ � �
„� ti t
� �
� ...,. .-_____ "
�__. """__�
� l
I
� ,\ � i � �
'
�"_
� �
-_ �
� � j Y
� _.1 z d , _— --- ----
�� �
� t ; 1
� Cy � ��_ � ,
� __URN CRFE._. � � _ � � � �
; _ �
� � K RD __ �,�_ ; �
: _ ______ �_
_ -- ______ ! �� ��1�__ �__ _
� ____ ____ __-- . ___.__
-_ ........_ ,
,
ID�
,
! _,
i- - _._- �;
_---- ' .o, ;
,,o; �-� PROJECT
a LOCATION
----
� �
;- __ _-_ _--— -_ _.- -_-_-_ _--
_ ,-���
,
� � .
---
�� z
v;---------— ���_ ___ ------- ___�.
___________---------------------------_ -- �
�-- � � ���� `
p '�
,
��
�,
;�
I ; ,,--~�,
` _� � � �,
�� � �
�_ _ --__ _ — --.—_ _ � ,,
�_ a � ,
�
, 1
.
�����
? , _ �������� �
RIVE VA��EY RD '� ', -�\�1�� ��� \
____ --- __ ......__ _ _ �.,��___- - -
- - -- -- ;-�__ �.
---- _
_ �,l C ���"�' ����_
� �� �� ��
` � � � � ��r--- � � ��-�� �_
, � -.,�� �
; � � c�� � �
----- �
---_..� �'�— — ---'� �--�� �
� �� I
� — ----- __ � _ i �
! � 1 {
� 1 ', \�
� ; � � �
; , �
� j ' i
� � ' �
,' �
1 � � !t '�t7 �
F I � t` �
� pFa� CITY OF REDDING EXHIBIT A
� � STI�LWATER WASTEWATER TREATMENT
� � PUBLIC WORKS PLANT FACU�ATIVE SLUDGE �AGOON
° ''' "' j� � AND SLUDGE DRYING BED PROJECT
�,q`r����� DEPARTMENT LOCATION MAP
l�OT�CE OF E�EMPTItt�N
To: ❑ Office of Planning and Research FROM; City of Redding
1400 Tenth Street,Room 121 �ublic Works Department
Sacramento;CA 95814 777 Cypress Avenue
�@(�t�ITI�,�A1��0�}1
0 Shasta County Clerk
County of Shasta
P.C3:Bax 9908$0, 1643 Market Street
Redding,CA 96Q99-0880
Project Title: Stiltwater Wastewater Treatment Piant(WWTP)Facuitative Sludge Lagoon and Dryin�Bed Project
Project Locatiom—Specific: 6475 Airport R�ad
Pro,�ect Lacation—C�ty; Reddin� Project Locatian—County: Shasta
Description af Project: The City of Redding will implement a Wastewater Utili im�rovement p�ect at the Stillwater
WWTP. The t�roiect in�ludes the construction of two lined facultative slud�e ta�aons° two co�acrete-walled dual cell
asphaltic paved sludge d ing beds a below r�ade pump statio�l� associated p�� drainage systems and electrical
equipment. Modification will also be made to the existin� di�ested solids pump station The pi•aject requires �rading,
concrete work,and road iinprovements.A11 wt�rk wi11 occur within the existin�WWTP facilitv
Name of Public Agen�y Approving Project;CitY of Redding
Name of Person�r Agency Carrying Qut Project; Corri Vandiv�r,Praiect En�ineer
Exempt Status: (check one)
❑ Ministerial [Section 21080(b){1}; 15258]
❑ Declared Emergency[Section 21080{b)(3}; 15269{a)]
❑ Emergency Project [Section 2108d(b)(4); 152�9{b}]
❑ Statutory Exemptic�ns. State code number:
❑ Comman Sense Exemption(This praject does not fall w�thin an exempt class,but it can be seen with cerkainry'that th�re is
no�aossibility that the activity may have a signzficant effect on the environment{14 C�R 15061[b][3]).
� Categorical Exemption, �tate type and sectian number: Sectian 15301, Existing FaciIities, Section 15302.
Replacernent or Recanstructron, and 15303.New Construction or Converslon�f Existin�Structures
� N+a exceptions appty that would bar the use of a categoricai exemption{PRD 21084 and 14 GGR 15300.2).
R�asans why praject is exem�t. G1ass 1 exemptions include the operation repair maintenance or minor alteration t�f ;
existin� facilities, structures, ar equipment invc�ivin�- ne�ligible or nc� expansion of use Class 2 exem�tions cons�sts of
ret�lacement or reconstruction where the new structure wi11 be located on tke same site and will ha�e substantialls�� the
same purpc�se and capacity. Class 3 exem�tic�ns consist of ct�a�struction and location of lirnited numbers af new small
facilities and equzpment, or conversion of existin�structures. The proiect involves the constructi�n of limited numbers of
new slcad�e facilities and equipment, as well as the reconstructit�n�r conversion of existin�facilzties and equipment The
pro�ect wi11 be constructed within the existin� WWTP facility and wiil result in ne�li ible �xpansion of�zse Tlae �roiect
area has been reviewed for sensitive a-esources such as threatened or endan er�ed species or their habltat� sensitive
ve�etation communities tribal Iands or tribal cultural resources The project has no ptitential to have a si�nificant effect
on tl�e environinent.
Lead Agency Contact Persan: Arnber Keliev Telephone: 530.225.4046
If Filed bY APPlicant:
l. Attach certi�ed d�cument of exemptic�n finding:
2. Has a notice afexempti�n been�led by the pu6isc agency appraving the project? ❑Yes❑No
Signature: Date: �`�`'`��
Titie: Envrronmental Com liance Man r
0 Signed by Lead Agency Date received for filing at OPR::
❑ Signed by Applicant
BID TABULATION FOR:
STILLWATER WASTEWATER TREATMENT PLANT FACULTATNE SLUDGE LAGOON AND SLUDGE DRYING BED PROJECT
Bid Schedule No.: 5408
ENGINEER'S EST T 8�S Construction Co Inc SnL Group, inc
10/26/2023 U N IT U N IT U N IT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 Prepare SWPPP �S 1 $2,500.00 $2,500.00 $3,000.00 $3,000.00 $5,933.00 $5,933.00
2 Implement SWPPP �S 1 $97,525.00 $97,525.00 $69,000.00 $69,000.00 $57,003.31 $57,003.31
3 Trench Sheeting and Shoring �S 1 $99,125.00 $99,125.00 $16,000.00 $16,000.00 $26,990.48 $26,990.48
4 Modification to Existing Digested �S 1 $44,000.00 $44,000.00 $46,000.00 $46,000.00 $20,795.74 $20,795.74
5 Splitter Box Facility Construction �S 1 $291,700.00 $291,700.00 $180,000.00 $180,000.00 $282,172.77 $282,172.77
6 Facultative Sludge Lagoon Facility �S 1 $744,400.00 $744,400.00 $1,200,000.00 $1,200,000.00 $1,381,018.20 $1,381,018.20
7 Paved Sludge Drying Bed Facility �S 1 $1,762,700.00 $1,762,700.00 $2,000,000.00 $2,000,000.00 $2,529,992.83 $2,529,992.83
8 FSL and SDB Pump Station Installation �S 1 $462,600.00 $462,600.00 $366,000.00 $366,000.00 $381,526.30 $381,526.30
9 Civil and yard piping work including site �S 1 $2,873,410.00 $2,873,410.00 $1,685,000.00 $1,685,000.00 $1,224,094.07 $1,224,094.07
10 Instrumentation and Electrical �S 1 $923,700.00 $923,700.00 $1,680,000.00 $1,680,000.00 $1,751,218.13 $1,751,218.13
TOTAL -CONTRACT ITEMS $7,301,660.00 $7,245,000.00 $7,660,744.83
RTA Construction Inc Stewart En ineerin Inc AUERAGE
UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTAL PRICE
1 Prepare SWPPP �S 1 $7,500.00 $7,500.00 $6,000.00 $6,000.00 $5,608.25 '
2 Implement SWPPP �S 1 $45,000.00 $45,000.00 $340,400.00 $340,400.00 $127,8�0.83
3 Trench Sheeting and Shoring �S 1 $110,000.00 $110,000.00 $178,000.00 $178,000.00 $82,747.62
4 Modification to Existing Digested �S 1 $154,000.00 $154,000.00 $86,000.00 $86,000.00 $76,69$.94
5 Splitter Box Facility Construction �S 1 $385,000.00 $385,000.00 $276,900.00 $276,900.00 $2$1,Q18.19
6 Facultative Sludge Lagoon Facility �S 1 $1,250,000.00 $1,250,000.00 $1,130,300.00 $1,130,300.00 $1,240,329.55
7 Paved Sludge Drying Bed Facility �S 1 $3,100,000.00 $3,100,000.00 $2,971,500.00 $2,971,500.00 $2,65�,373.21 '
8 FSL and SDB Pump Station Installation �S 1 $295,000.00 $295,000.00 $436,600.00 $436,600.00 $369,781.58
9 Civil and yard piping work including site �S 1 $1,250,000.00 $1,250,000.00 $3,528,900.00 $3,528,900.00 ; $"1,921,99$.52
10 Instrumentation and Electrical �S 1 $2,000,000.00 $2,000,000.00 $1,974,500.00 $1,974,500.00 $1,851,429.53
TOTAL -CONTRACT ITEMS $8,596,500.00 $10,929,100.00 $ 8,607,836.2� '