HomeMy WebLinkAbout _ 4.11(a)--Project Acceptance, BS No. 5286 Job No. 2667, East Cypress Avenue Storm Drain ReplacementT Y OF
REDDIN
CALIFORNIVCITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: October 17, 2023
FROM: Chuck Aukland, Public
ITEM NO. 4.11(a)
Works Director
***APPROVED
BY***
ukland, Public Warks Direct 10x'5/2023
ry ippin, Ci ana e : 10/9/2023
caukland&i.redding.ca.us
btippin@cityofredding.org
SUBJECT: 4.1 l(a)--Project Acceptance, Bid Schedule No. 5286 Job No. 2667, East Cypress
Avenue Storm Drain Replacement Project
Recommendation
Accept Bid Schedule No. 5286 (Job No. 2667), East Cypress Avenue Storm Drain Replacement
Project, awarded to Northstate Earth and Water, Inc., as satisfactorily complete, with a final cost
of $527,467.02.
Fiscal Impact
Storm Drain Maintenance funding in the amount of $562,427.07 was approved for this project
for Fiscal Year 2022-23. The total project cost, including surveying, design, bidding,
construction, field engineering, inspection, and contract administration, is $527,467.02.
Alternative Action
The City Council (Council) may choose not to accept the project as satisfactorily complete, and
advise staff on how to proceed.
Background/Analysis
Northstate Earth and Water, Inc., has completed all items of work on the East Cypress Avenue
Storm Drain Replacement Project as of July 21, 2023, which was within the contract time frame.
Subsequently, the Public Works Department filed a notice of completion with the County. The
project warranty period expires one year from the completion date of July 21, 2023.
At its meeting of June 7, 2022, the Council awarded a construction contract to Northstate Earth
and Water, Inc. for $322,472.07 and approved a $35,000 construction contingency fund. Also
authorized was $85,000 for contract administration and construction inspection fees, $30,000 for
project development costs, and the City Manager was authorized to approve additional increases
in either the construction management or construction contingency amounts up to $15,000, for a
total authorized project amount of $487,472.07. Project development costs include engineering,
Report to Redding City Council October 9, 2023
Re: 4.11(a) --Project Acceptance, BS No. 5286 job No. 2667, East Cypress Avenue Storm Drain
Replacement Page 2
environmental, and consultant services. During construction, there were areas that required
design changes and quantity adjustments due to several unknown utility conflicts discovered
during excavation. On February 3, 2023, the City Engineer authorized a transfer of construction
management funds in the amount of $25,000 to the projects contingency fund which increased
the projects contingency to $60,000. Additionally, after project contingency funds were
transferred, more design changes were required for further utility conflicts, including a PG&E
gas line conflict, requiring additional funds to be added to the project. At its February 21, 2023,
the Council approved an increase of $75,000 to the construction contingency budget. These
increases to the projects contingency budget increased the total authorized amount to
$562,427.07. There were six change orders in the amount of $129,994.95, leaving a balance of
$5,005.05 in the contingency fund. The final project cost was $527,467.02.
Cost Summary
Awarded Amounts
Actual Cost
Project Development Costs
$30,000.00
$30,000.00
Construction Contract
$457,472.07
Contingency
Construction Contract +
$452,467.02
Contract Chane Orders
Contract Administration &
$60,000.00
$45,000.00
Inspection
Additional City Manager
$15,000.00
0.00
Authority
Total
$562,472.07
$527,467.02
The project involved the replacement of approximately 155 linear feet of deteriorating storm
drain box culvert with precast and cast -in-place box culvert. Additionally, this project upgraded
the storm drain connections on the upstream side of the box culvert which incorporated the
installation of a new catch basin and replaced some concrete sidewalk adjacent to the new catch
basin.
Environmental Review
This activity is not a project as defined by the California Environmental Quality Act (CEQA),
and no further action is required.
On June 7, 2022, Council determined that the project is categorically exempt from environmental
review under the CEQA Guidelines, pursuant to Section 15301(b) - Existing Facilities.
Council Priority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Location Map
Previous Staff Report 022123
Previous Staff Report 060722
T Y OF
REDDIN
CALIFORNIVCITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: February 21, 2023
FROM: Chuck Aukland, Public
ITEM NO. 4.11(e)
Works Director
***APPROVED
BY***
ukland, Public Works Direct 2'9/2423
ry ippin, Ci ana e : 2/13/2423
caukland@ci.redding.ca.us
btippin@cityofredding.org
SUBJECT: 4.11(e) --Approve Contingency Increase for the East Cypress Avenue Storm Drain
Replacement Project Bid Schedule No. 5286
Recommendation
Approve a project budget increase in the amount of $75,000 for the completion of Bid Schedule
No. 5286, East Cypress Storm Drain Replacement Project.
Fiscal Impact
The East Cypress Storm Drain Replacement Project (Project) is being funded by the Storm Drain
Utility Fund. The proposed $75,000 increase will come from already budgeted funds in the
Strom Drain Division. The total project cost, including the proposed increase, is expected to be
just under $563,000.
Alternative Action
The City Council (Council) may choose to reject the request and provide alternative direction to
staff.
Background/Analysis
On June 7, 2022, the Council awarded the construction contract for the project to Northstate
Earth and Water, Inc. The project consists of replacing a deteriorating six-foot by two -feet -eight -
inch storm drain box culvert that has reached the end of its useful life with a new pre -cast box
culvert. This facility crosses East Cypress Avenue between Oxford Road and Bunker Street. This
project also includes replacing asphalt concrete paving, curb, gutter, sidewalk, storm drainage
inlets, and other miscellaneous items of work.
During the course of construction, conditions in the field warranted changes to meet the original
project's intent. These changes include unidentified water service conflicts, trench shoring, and
compaction issues. However, the most significant item was the discovery of a PG&E gas service
and AT&T duct bank that was poured directly into the foundation of the culvert being replaced,
Report to Redding City Council February 10, 2023
Re: 4.11(e) --Approve Contingency Increase for the East Cypress Avenue Storm Drain
Replacement Project Page 2
which caused re-routing and delays to the project. The noted changes will result in the contract
bid item exceeding the bid quantity.
The additional work will also cause the project budget to exceed the awarded amounts. An
additional $75,000 in construction contingency funds is being requested to cover the additional
expense.
COST SUMMARY
Item Awarded Amount Projected Amount Increase
Construction Contingency $35,000 $110,000 $75,000
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA), and
no further action is required. On June 7, 2022, the Council determined that the project is
categorically exempt from review under the CEQA Guidelines, pursuant to Section 15301(b) —
Existing Facilities.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Previous Staff Report 06-07-22
T Y OF
REDDIN
CALIFORNIVCITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: June 7, 2022
FROM: Chuck Aukland, Public
ITEM NO. 4.11(d)
Works Director
***APPROVED
BY***
Construction Contract + Contingency
$357,472
ukland, Public Warks Direct 5/25/2422
ry ippin, Ci ana e : 6/1/2422
caukland&i.redding.ca.us
btippin@cityofredding.org
SUBJECT: 4.11(d) --Award Bid Schedule No. 5286 (Job Order No. 2667) East Cypress
Avenue Storm Drain Replacement Project
Recommendation
Authorize the following actions relative to Bid Schedule No. 5286 (Job No. 2667), East Cypress
Avenue Storm Drain Replacement Project:
(1) Award to Northstate Earth and Water, Inc., in the amount of $322,472.07;
(2) Approve an additional $85,000 to cover the cost of administration and inspection fees;
(3) Approve $35,000 to provide construction contingency funding;
(4) Approve $30,000 for project development including environmental and permits;
(5) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of $15,000; and
(6) Find that the Project is categorically exempt from the California Environmental Quality
Act per Section 15301(b) —Existing Facilities.
Fiscal Impact
Sufficient Storm Drain Maintenance funds have been budgeted for Fiscal Year 2021-22 to pay
for this project.
Cost Summary
Item
Estimated
Project Development Costs
$30,000
Construction Contract + Contingency
$357,472
Contract Administration, Inspection, Testing
$85,000
Additional City Manager Authority
$15,000
Total Project Costs
$487,472
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Report to Redding City Council June 1, 2022
Re: 4.11(d) --E. Cypress Avenue Storm Drain Replacement Project Page 2
Alternative Action
The City Council (Council) may choose not to award the bid for the East Cypress Avenue Storm
Drain Replacement Project Bid Schedule and direct Storm Drain maintenance crews to continue
monitoring the deteriorating concrete soffit of the existing box culvert and repair as needed.
Roadway failure on this section of East Cypress would impact local business and traffic.
Background/Analysis
The project consists of replacing a deteriorating six-foot by two -feet -eight -inch storm drain box
culvert that has reached the end of its useful life with a new pre -cast box culvert. This facility
crosses East Cypress between Oxford Road and Bunker Street. This project also includes
replacing asphalt concrete paving, curb, gutter, sidewalk, storm drainage inlets and other
miscellaneous items of work.
Attached is the tabulation of bids received and opened on May 5, 2022. The low bid in the
amount of $322,472.07 was received from Northstate Earth and Water, Inc., of Redding,
California. The engineer's estimate was $290,250. Total project development costs for this
project are estimated to be $30,000. Project development costs include engineering and
environmental with permits.
Staff has determined that the project qualifies as Categorically Exempt from environmental
review under CEQA Guidelines Section 15301. The project has been reviewed for sensitive
resources such as threatened or endangered species or their habitats, sensitive vegetation
communities, and tribal cultural resources. The project has no potential to have a significant
effect on the environment.
Council Priority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Bid Tabulation
^Location Map
^Notice of Exemption (unfiled)
BID TABULATION FOR:
E. CYPRESS AVENUE STORM DRAIN REPLACEMENT PROJECT
Bid Schedule No.: 5286
5/5/2022
ENGINEER'S
EST
Northstate Earth
& Water
TOTAL
Site Work Solultions
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
UNIT
PRICE
ITEM
DESCRIPTION
UNIT
QTY
1
WATER POLLUTION
CONTROL
LS
1
$8,000.00
$8,000.00
$4,140.00
$4,140.00
$1,351.00
$1,351.00
2
CONSTRUCTION SIGNS
EA
6
$300.00
$1,800.00
$583.48
.. ... ... ,84
$563.00
$3,378.00
3
PROJECT FUNDING SIGN
LS
1
$1,200.00
$1,200.00
$1,380.00
$1,380.00
$1,500.00
$1,500.00
4
SIGN (PORTABLE
CHANGEABLE MESSAGE)
EA
2
$1,500.00
$3,000.00
$2,466.15
$4,932.30
$1,861.00
$3,722.00
5
TRAFFIC CONTROL
LS
1
$45,000.00
$45,000.00
$50,059.46
$50,059.46
$25,182.00
$25,182-00
6
TRENCH SHEETING AND
SHORING
LS
1
$6,000.00
$6,000.00
$18,906.38
$18,906.38
$3,507.00
$3,507.00
7
PRECAST REINFORCED
BOX CULVERT (6'X Z-8")
CY
77
$2,650.00
$204,050.00
$2,457.73
.....................
......................................................................................................
11 .. .......................................................................................................
. ...... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..
$3,278.00
$252,406.00
8
CAST -IN-PLACE
REINFORCED BOX
CULVERT (6- X 2-8")
CY
8
$2,650.00
$21,200.00
$6,288.48
°$ . . . . 33'17.8 �3'07.oj
$11,061.00
$88,488.00
TOTAL - CONTRACT ITEMS $290,250.00 0�bj$379,534.00
Shaded areas indicate corrections made in accordance with the special provisions.
""'I OTICE OF EXEMPTION
I
To: 0 Office of Planning and Research
1400 Tenth Street, Room 121
Sacramento, CA 95814
County of Shasta
P.O. Box 990880, 1643 Market Street
Redding, CA 96099-0880
FRom: City of Redding
Public Works Departmen)
777 Cypress Avenue
Redding, CA 96001
Project Title: E. Cypress Avenue Storm Drain Replacement Project, J.O. #2667-10
Project Location — Specific: East Cypress Avenue between Oxford Road and Bunker Street
Project Location — City: Redding Project Location — County: 'Shasta
Description of Project: The City of Redding will replace approximately 150 linear feet of deteriorated 6' wide by 2' 8"
high concrete box culvert. The open trench method will be used and all trenches will be covered at the end of each work
day. Work will occur within City right of way and the public will be notified of the Droiect.
Name of Public Agency Approving Project: City of Redding
Name of Person or Agency Carrying Out Project: Dennis Russo, Project Manager
Exempt Status: (check one)
0 Ministerial [Section 21080(b)(1); 15268]
0 Declared Emergency [Section 21080(b)(3); 15269(a)]
0 Emergency Project [Section 21080(b)(4); 15269(b)]
0 Statutory Exemptions. State code number:
0 Common Sense Exemption (This project does not fall within an exempt class, but it can be seen with certainty that there i
no possibility that the activity may have a significant effect on the environment (14 CCR 15601 [b][3]).
El Categorical Exemption, State type and section number: See. 15301(b). Existing Facilities
Based on an examination of this proposal and supporting information, the following statements are true and exceptions do not apply:
• If this praject falls within an exempt class3, 4, 5, 6, or 1I, it does not impact an environmental resource of hazardous or critical concern where
successivedesignated:,. precisely mapped, and officially adopted pursuant to law:
• There will not be a significant cumulative effect by this praject and projects of the same type in the same place, over time.
* There is not a reasonable possibility that the praject will have a significant effect on the environment due to unusual circumstances.
designated• This project does not damage a scenic resource within an officially state scenic highway.
• This protect is not located on a site included on any list compiled pursuant to Govt. Code § 56962.5 ("Cortese List")
• This praject does not cause a substantial adverse change in the significance f a historical resource.
Reasons why project is exempt: Class I exemptions include the operation, repair, maintenance, or minor alteration of
existing facilities, structures, or equipment involving nepligible or no expansion of use. The storm drain DiDe will be
replaced in the same location and with the same size pipe. The project involves no expansion of use. The project has been
reviewed for sensitive resources such as threatened or endangered species or their habitats, sensitive vegetation
communities, tribal lands, or tribal cultural resources. The project has no potential to have a significant effect on the
environment.
Lead Agency Contact Person: Amber Kelley Telephone: 530.225.4046
If Filed by Applicant:
1. Attach certified document of exemption finding.
2. Has a notice of exemption been filed by the public agency approving the project? o Yes o No
Signature -
lei
Title. Environmental CompliaLice Maqa_e=-
Fx1 Signed by Lead Agency Date received for filing at OPR:
0 Signed by Applicant
Date: � z
V
T Y OF
REDDIN
CALIFORNIVCITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: June 7, 2022
FROM: Chuck Aukland, Public
ITEM NO. 4.11(d)
Works Director
***APPROVED
BY***
Construction Contract + Contingency
$357,472
ukland, Public Warks Direct 5/25/2422
ry ippin, Ci ana e : 6/1/2422
caukland&i.redding.ca.us
btippin@cityofredding.org
SUBJECT: 4.11(d) --Award Bid Schedule No. 5286 (Job Order No. 2667) East Cypress
Avenue Storm Drain Replacement Project
Recommendation
Authorize the following actions relative to Bid Schedule No. 5286 (Job No. 2667), East Cypress
Avenue Storm Drain Replacement Project:
(1) Award to Northstate Earth and Water, Inc., in the amount of $322,472.07;
(2) Approve an additional $85,000 to cover the cost of administration and inspection fees;
(3) Approve $35,000 to provide construction contingency funding;
(4) Approve $30,000 for project development including environmental and permits;
(5) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of $15,000; and
(6) Find that the Project is categorically exempt from the California Environmental Quality
Act per Section 15301(b) —Existing Facilities.
Fiscal Impact
Sufficient Storm Drain Maintenance funds have been budgeted for Fiscal Year 2021-22 to pay
for this project.
Cost Summary
Item
Estimated
Project Development Costs
$30,000
Construction Contract + Contingency
$357,472
Contract Administration, Inspection, Testing
$85,000
Additional City Manager Authority
$15,000
Total Project Costs
$487,472
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Report to Redding City Council June 1, 2022
Re: 4.11(d) --E. Cypress Avenue Storm Drain Replacement Project Page 2
Alternative Action
The City Council (Council) may choose not to award the bid for the East Cypress Avenue Storm
Drain Replacement Project Bid Schedule and direct Storm Drain maintenance crews to continue
monitoring the deteriorating concrete soffit of the existing box culvert and repair as needed.
Roadway failure on this section of East Cypress would impact local business and traffic.
Background/Analysis
The project consists of replacing a deteriorating six-foot by two -feet -eight -inch storm drain box
culvert that has reached the end of its useful life with a new pre -cast box culvert. This facility
crosses East Cypress between Oxford Road and Bunker Street. This project also includes
replacing asphalt concrete paving, curb, gutter, sidewalk, storm drainage inlets and other
miscellaneous items of work.
Attached is the tabulation of bids received and opened on May 5, 2022. The low bid in the
amount of $322,472.07 was received from Northstate Earth and Water, Inc., of Redding,
California. The engineer's estimate was $290,250. Total project development costs for this
project are estimated to be $30,000. Project development costs include engineering and
environmental with permits.
Staff has determined that the project qualifies as Categorically Exempt from environmental
review under CEQA Guidelines Section 15301. The project has been reviewed for sensitive
resources such as threatened or endangered species or their habitats, sensitive vegetation
communities, and tribal cultural resources. The project has no potential to have a significant
effect on the environment.
Council Priority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Bid Tabulation
^Location Map
^Notice of Exemption (unfiled)
BID TABULATION FOR:
E. CYPRESS AVENUE STORM DRAIN REPLACEMENT PROJECT
Bid Schedule No.: 5286
5/5/2022
ENGINEER'S
EST
Northstate Earth
& Water
TOTAL
Site Work Solultions
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
UNIT
PRICE
ITEM
DESCRIPTION
UNIT
QTY
1
WATER POLLUTION
CONTROL
LS
1
$8,000.00
$8,000.00
$4,140.00
$4,140.00
$1,351.00
$1,351.00
2
CONSTRUCTION SIGNS
EA
6
$300.00
$1,800.00
$583.48
.. ... ... ,84
$563.00
$3,378.00
3
PROJECT FUNDING SIGN
LS
1
$1,200.00
$1,200.00
$1,380.00
$1,380.00
$1,500.00
$1,500.00
4
SIGN (PORTABLE
CHANGEABLE MESSAGE)
EA
2
$1,500.00
$3,000.00
$2,466.15
$4,932.30
$1,861.00
$3,722.00
5
TRAFFIC CONTROL
LS
1
$45,000.00
$45,000.00
$50,059.46
$50,059.46
$25,182.00
$25,182-00
6
TRENCH SHEETING AND
SHORING
LS
1
$6,000.00
$6,000.00
$18,906.38
$18,906.38
$3,507.00
$3,507.00
7
PRECAST REINFORCED
BOX CULVERT (6'X Z-8")
CY
77
$2,650.00
$204,050.00
$2,457.73
.....................
......................................................................................................
11 .. .......................................................................................................
. ...... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..
$3,278.00
$252,406.00
8
CAST -IN-PLACE
REINFORCED BOX
CULVERT (6- X 2-8")
CY
8
$2,650.00
$21,200.00
$6,288.48
°$ . . . . 33'17.8 �3'07.oj
$11,061.00
$88,488.00
TOTAL - CONTRACT ITEMS $290,250.00 0�bj$379,534.00
Shaded areas indicate corrections made in accordance with the special provisions.
""'I OTICE OF EXEMPTION
I
To: 0 Office of Planning and Research
1400 Tenth Street, Room 121
Sacramento, CA 95814
County of Shasta
P.O. Box 990880, 1643 Market Street
Redding, CA 96099-0880
FRom: City of Redding
Public Works Departmen)
777 Cypress Avenue
Redding, CA 96001
Project Title: E. Cypress Avenue Storm Drain Replacement Project, J.O. #2667-10
Project Location — Specific: East Cypress Avenue between Oxford Road and Bunker Street
Project Location — City: Redding Project Location — County: 'Shasta
Description of Project: The City of Redding will replace approximately 150 linear feet of deteriorated 6' wide by 2' 8"
high concrete box culvert. The open trench method will be used and all trenches will be covered at the end of each work
day. Work will occur within City right of way and the public will be notified of the Droiect.
Name of Public Agency Approving Project: City of Redding
Name of Person or Agency Carrying Out Project: Dennis Russo, Project Manager
Exempt Status: (check one)
0 Ministerial [Section 21080(b)(1); 15268]
0 Declared Emergency [Section 21080(b)(3); 15269(a)]
0 Emergency Project [Section 21080(b)(4); 15269(b)]
0 Statutory Exemptions. State code number:
0 Common Sense Exemption (This project does not fall within an exempt class, but it can be seen with certainty that there i
no possibility that the activity may have a significant effect on the environment (14 CCR 15601 [b][3]).
El Categorical Exemption, State type and section number: See. 15301(b). Existing Facilities
Based on an examination of this proposal and supporting information, the following statements are true and exceptions do not apply:
• If this praject falls within an exempt class3, 4, 5, 6, or 1I, it does not impact an environmental resource of hazardous or critical concern where
successivedesignated:,. precisely mapped, and officially adopted pursuant to law:
• There will not be a significant cumulative effect by this praject and projects of the same type in the same place, over time.
* There is not a reasonable possibility that the praject will have a significant effect on the environment due to unusual circumstances.
designated• This project does not damage a scenic resource within an officially state scenic highway.
• This protect is not located on a site included on any list compiled pursuant to Govt. Code § 56962.5 ("Cortese List")
• This praject does not cause a substantial adverse change in the significance f a historical resource.
Reasons why project is exempt: Class I exemptions include the operation, repair, maintenance, or minor alteration of
existing facilities, structures, or equipment involving nepligible or no expansion of use. The storm drain DiDe will be
replaced in the same location and with the same size pipe. The project involves no expansion of use. The project has been
reviewed for sensitive resources such as threatened or endangered species or their habitats, sensitive vegetation
communities, tribal lands, or tribal cultural resources. The project has no potential to have a significant effect on the
environment.
Lead Agency Contact Person: Amber Kelley Telephone: 530.225.4046
If Filed by Applicant:
1. Attach certified document of exemption finding.
2. Has a notice of exemption been filed by the public agency approving the project? o Yes o No
Signature -
lei
Title. Environmental CompliaLice Maqa_e=-
Fx1 Signed by Lead Agency Date received for filing at OPR:
0 Signed by Applicant
Date: � z
V