REPORT TO THE CITY COUNCIL
MEETING DATE: May 16, 2023 FROM: Chuck Aukland,Public
ITEM NO. 4.11(c) Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
ukl�n�l,H'ciblic Wc�aks L'��reGt ' S;'3/2423 ry ip}�in,�C"i ana � 41�/2423
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(c)--Project Acceptance, Bid Schedule 5201 Job No. 2619, West Street Area
School Safety Improvement Project
Recommendation
Accept Bid Schedule No. 5201 (Job No. 2619), West Street Area School Safety Improvement
Project, awarded to Lakmann Builders, Inc., as satisfactorily complete, with a final construction
contract cost of$3,450,356.57.
Fiscal Impact
The project was funded by two State of California grant sources: the Active Transportation
Program (ATP) (78%) and the Loca1 Streets and Roads Program (22%). The total project cost,
including surveying, design, bidding, construction, field engineering, inspection, and contract
administration, is $3,450,356.57.
Alternative Action
The City Council (Council) may choose not to accept the project as satisfactorily complete, and
advise staff on how to proceed.
Background
Lak.mann Builders, Inc., has completed a11 items of wark on the West Street Area School Safety
Improvement Project as of November 2, 2022, whieh was within the contract time frame. The
project warranty period expires one year from the completion date of November 2, 2022, and the
Public Works Department subsequently filed the notice of completion with the County of Shasta.
At its May 18, 2021, meeting, the Council awarded a construction eontraet to Lakmann Builders,
Inc., of Redding, California, for $2,222,111.81 and approved a $210,000 construction
eontingeney fund. Also authorized was $2$5,000 for eontract administration and construerion
inspection fees and $525,000 for project development costs, and the City Manager was
authorized to approve additional increases in either the construction management or construetion
Report to Redding City Council May 9,2023
Re: 4.11(c)--ProjectAcceptance BS 5201 West Street Area School SIP Page 2
contingency amounts up to a total of $15,000, for a total authorized amount of $3,25'7,111.81.
Project development costs include engineering, environmental, and consultant services. During
construction, there were areas that needed design changes and quantities adjusted. Additional
funds were required to complete the project, and at its April 5, 2022 meeting, the Council
approved an increase of $80,000 to the construction management budget and $1'70,000 to the
construction contingency budget. This increased the total authorized amount to $3,507,111.81.
There were 23 change orders in the amount of $340,491.76. The final project cost is
$3,450,356.57.
The project included the construction of bicycle and pedestrian safety improvements along West
Street from Seventh Street to Eureka Way as well as Magnolia Avenue between North Street and
Shasta Street and Magnolia Avenue between Eureka Way and Seventh Street. The improveinents
included constructing enhanced pedestrian crossings and buffered bicycle lanes; completing
sidewalk, curb, and gutter gaps; installing Americans with Disabilities Act (ADA) compliant
curb ramps; applying micro-surfacing to West Street; and installing additional street lighting. In
addition to the safety improvements, trees were planted along West Street between Eighth Street
and Tenth Street and miscellaneous storm drain improvements were installed at both the
intersections of Eighth Street and West Street, and also Ninth Street and West Street.
Cost Summary
Awarded Amounts Actual Cost
Project Development Costs $525,000.00 $526,568.00
Construction Contract+ Contingency $2,602,111.81
Construction Contract+ Contract Change Orders � $2,562,603.57
Contract Administration&Inspection $365,000.00 $361,185.00
Additional City Manager Authority $15,000.00 $0.00
Total $3,507,111.81 $3,450,356.57
Environmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA), and
no further action is required. On May 18, 2021, Council determined that the West Street Area
School Safety Improvement Project is categorically exempt from review under the CEQA
Guidelines,per Section 15301(c)—Existing Facilities.
Council Pr�ioNity/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Location Map
Previous Staff Reports 4-OS-22 and 5-18-21
PROJECT
LOCATION
2 � �f SR2gg� o
y z ��
a Q o
� RD• � y �c�
CREEK ~ �.� �� �,
� Q-� ��p �
�P �o �
z SACRAMENTO
� ER � OLD ALTURAS �
_ Q
SR2ggW
P
CypRFs S�QR
VIKI G
qV E. CYPRES
CI l l OF HARTNELL >-
Q
J z
REDDING W w �
_ > m
� �
W Q
0
N m U �
W � Q
_
�
S�N.�I\E� RANCHO
0�N p� �
Y
� o REDDING
z � MU�IICIPAL
� � ¢ AIRPORT
_
�
�°
�ti �
��o� �F. o F.9S s
T
c�P � `S�p� ��o
�- �,e
J �-� DERSCH RD
>
�PPey �-�— -
-\
�o� RFo� CITY OF REDDING WEST STREET AREA SCHOOL SAFETY
.
v �' PUB�IC WORKS IMPROVEMENTS PROJECT
o � � a
��CB����.�P DEPARTMENT �OCATION MAP
GI �" Y � F
� � � ° � � � " � � CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: April 5, 2022 FROM: Chuck Aukland, Public
ITEM NO. 4.11(d) Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
ukl�n�l,H'ciblic Wc�aks L'��reGt ' 3/?R(7t�2? ry ip}�in,�C"i ana � 3/31(242?
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(d)--Approve Increase to Project Budget for the West Street Area School
Safet Improvement Pro'ect
Recommendation
Approve increases to the project budget in the amount of $250,000 for the completion of Bid
Schedule No. 5201, West Street Area School Safety Improvement Project as outlined below for
additional improvements:
(1) Increase of $80,000 to the construction management budget, bringing the construction
management total to $365,000; and
(2) Increase of $170,000 to the construction contingency budget, bringing the construction
contingency total to $380,000.
Fiscal Impact
The majority of the project is funded through an Active Transportation Program (ATP) grant.
However, additional funding from the ATP program is not available beyond the original grant
amount. Therefore the $250,000 cost increase will come from already budgeted Streets Division
funds. The total project cost, including the proposed increase, is expected to be just over
$3,500,000.
Alternative Action
The City Council (Council) may choose to reject the request and provide alternative direction to
staff.
Report to Redding City Council March 32,2022
Re: 4.11(d)--Approve Increase to Project Budget for West StreetArea School Safety
Improvement Project Page 2
Background/Analysis
The West Street Area School Safety Improvement Project (Project) is a planned active
transportation improvement project designed to provide continuous sidewalk and bicycle
facilities, enhanced pedestrian crossings, and other similar improvements on routes leading to
three area schools (Shasta High School, University Preparatory School (U-PREP), and Pioneer
High School) located off of Eureka Way. The improvements are located along West Street froin
Seventh Street to Eureka Way as well as Magnolia Avenue between North Street and Shasta
Street and between Eureka Way through Seventh Street. Work elements include constructing
enhanced pedestrian crossings and buffered bicycle lanes; completing sidewalk, curb, and gutter
gaps; installing Americans with Disabilities Act (ADA) compliant curb ramps; applying micro-
surfacing to West Street; and installing additional street lighting. In addition to the safety
improvements, trees will be planted along West Street between Eighth Street and Tenth Street
and miscellaneous storm drain improvements will be installed at the intersections of Eighth
Street and West Street, and also at Ninth Street and West Street.
On May 18, 2021, the Council awarded the construction contract for the Project to Lakmann
Builders, Inc. During the course of construction, conditions in the field warranted design
revisions to meet the original project intent. These changes include: a re-design of Eighth Street
between West Street and Lakeview due to competing design constraints associated with ADA
accessibility and drainage, revisions to the main entrance of U-PREP related to incorrect design
grade data, design and construction of a concrete electrical transformer structure relocated from a
utility pole, modifications necessary to match existing features to the new design layout, and
other miscellaneous undocumented items encountered during construction. Often, these changes
require significant effort by the contractor to calculate grades, re-work the subgrade, and
establish new finish elevations. The noted changes wi11 result in several of the contract bid items
exceeding their bid quantities and the additional time needed wi11 increase the construction
management services required.
The additional work will cause the project budget to exceed the awarded amounts. An additional
$250,000 is requested to cover increases to the construction contingency ($170,000) and
construction management($$0,000)project components.
COST SUMMARY
Item Awarded Amount Pro'ected Amount Increase
Contract Administration, $285,000 $365,000 $80,000
Ins ection, Testin
Construction Contin enc $210,000 $380,000 $170,000
Totals $495,000 $745,000 $250,000
Council Pr�ioNity/City Manager Goals
• This agenda item is a routine operational item.
Attachments
5-18-21 Staff Report (available online)
�
� � ��" CITY OF REDDING
� � `y REPORT TO THE CITY COUNCIL
MEETING DATE: May 18, 2021 FROM: Chuck Aukland,Public
ITEM NO. 4.11(a) Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
.. 11�GIc�31L�..,��tl�?�.]C�'C?ff�fS�II?CGt ' _. 5l�,r7/��Y�.� i�'�;; �i, rr,Cii3�'�1��iat �:�� c4��1r z�a, �t Sc�w�i4es�s��cck���° S'lt)�7(}2.1
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(a)--Award Bid Schedule No. 5201, West Street Area School Safety
Im rovement Pro'ect
Recommendation
Authorize the following actions relative to Bid Sched�ule No. 5201, (Job No. 2619) West Street
Area School Safety Improvement Project:
(1) Award to Lakmann Builders, Inc., in the amount of$2,222,111.81;
(2) Approve $285,000 to cover the cost of administration and inspection fees and $525,000
for project development costs;
(3) Approve $210,000 to provide construction contingency funding;
(4) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of$15,000; and
(5) Find that the project is categorically exempt from the California Environmental Quality
Act per section 1530(c)—Existing Facilities.
Fiscal Impact
The West Street Area School Safety Improvement Project (Project) is being funded by two
sources including a state grant from the State of California Active Transportation Program(ATP)
(78 percent) and matched with Local Streets and Roads Funding (22 percent).
Cost Summa
Item Estimated
Pro'ect Develo ment Costs $525,000
Construction Contract+ Contin enc $2,432,111.81
Contract Administration, Ins ection, Testin $2$5,000
Additional Cit Mana er Authorit $15,000
Total Pro'ect Costs $3,25�,111.81
Project cost components are estimates and some shifting of the project development,
eonstruetion management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Report to Redding City Council May 10,2021
Re: 4.11(a)--Award Bid Schedule No. 5201, WestStArea School Safety Improv Proj Page 2
Alternative Action
The City Council (Council) may choose to not award the bid for the West Street Area School
Safety Improvement Project and provide staff with alternative direction. Without this project,
much needed pedestrian and bicycle mobility and safety will not be improved, and the project
may not be built. In addition, if this project is not awarded, the City of Redding (City) is at risk
of losing state funding due to grant requirements for project delivery.
Background/Analysis
The West Street Area School Safety Project is a planned active transportation improvement to
provide continuous sidewalk and bicycle facilities, enhanced pedestrian crossings, and other
similar improvements on routes leading to three area schools (Shasta High School, University
Preparatory School, and Pioneer High School) located off Eureka Way within the City of
Redding. This project is included in the City's Active Transportation Plan and the Regional
Transportation Plan.
On December 5, 2017, the Council accepted and appropriated ATP grant funds in the amount of
$400,000 for design and environmental documentation for the project. Subsequently, the
Council, on March 2, 2021, accepted ATP grant funds in the amount of $2,138,000 for
construction and adopted Budget Resolution No. 2019-050 to appropriate the funds that
ultimately provides the total project funding of$3,258,000.
Attached is a tabulation of bids received and opened on Apri122, 2021, for the West Street Area
School Safety Improvement Project. The low bid in the amount of$2,222,111.81 was received
from Lakmann Builders, Inc., of Redding, California. The engineer's estimate was $2,254,591.
Total project development costs for this project are estimated to be $525,000. Project
development costs include engineering, surveying, right-of-way, environmental, and consultant
services.
The project involves the construction of bicycle and pedestrian safety improvements along West
Street from Seventh Street to Eureka Way as well as Magnolia Avenue between North Street and
Shasta Street and between Eureka Way through Seventh Street. The improvements include
constructing enhanced pedestrian crossings and buffered bicycle lanes; completing sidewalk,
curb, and gutter gaps; installing Americans with Disabilities Act (ADA) compliant curb ramps;
applying micro-surfacing to West Street; and installing additional street lighting. In addition to
the safety improvements, trees wi11 be planted along West Street between Eighth Street and
Tenth Street and miscellaneous storm drain improvements will be installed at the intersections of
Eighth Street and West Street, and also Ninth Street and West Street.
Council Pr�ioNity/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Bid Tab
Location Map
Notic� of Exemption
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 ENGINEER'S EST Lakmann Builders Inc. Builder Solutions Inc.
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTA� PRICE TOTAL
Prepare Storm Water Pollution Prevention
1 Plan �S 1 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $7,500.00 $7,500.00
Implement Storm Water Pollution Prevention
2 Plan �S 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $12,825.00 $12,825.00
3 Traffic Control LS 1 $50,000.00 $50,000.00 $20,000.00 $20,000.00 $65,000.00 $65,000.00
4 Construction Area Signs EA 30 $205.00 $6,150.00 $200.00 $6,000.00 $486.00 $14,580.00
5 Project Funding Sign LS 1 $1,150.00 $1,150.00 $900.00 $900.00 $1,750.00 $1,750.00
6 Rain Event Action Plans (REAPS) EA 5 $500.00 $2,500.00 $1,900.00 $9,500.00 $160.00 $800.00
7F Excavation (Unclassified) CY 50 $100.00 $5,000.00 $99.00 $4,950.00 $185.00 $9,250.00
8 Clearing and Grubbing �S 1 $15,000.00 $15,000.00 $100,000.00 $100,000.00 $12,500.00 $12,500.00
9 Surveying (Construction LS 1 $37,000.00 $37,000.00 $57,600.00 $57,600.00 $61,800.00 $61,800.00
10 Remove Concrete SF 14916 $7.00 $104,412.00 $5.00 $74,580.00 $5.00 $74,580.00
11 Remove Asphalt Concrete SF 19896 $6.00 $119,376.00 $4.00 $79,584.00 $3.50 $69,636.00
12 Concrete Curb and Gutter(4"Vert) LF 769 $59.00 $45,371.00 $40.00 $30,760.00 $44.00 $33,836.00
13 Concrete Curb and Gutter(6"Vert) �F 6181 $61.00 $377,041.00 $40.00 $247,240.00 $48.00 $296,688.00
14 Concrete Curb and Gutter(8"Vert) LF 78 $65.00 $5,070.00 $45.00 $3,510.00 $60.00 $4,680.00
15 Concrete Curb (6") �F 185 $46.00 $8,510.00 $32.00 $5,920.00 $45.00 $8,325.00
16 Sidewalk (4"PCC) SF 32147 $13.00 $417,911.00 $12.00 $385,764.00 $9.00 $289,323.00
17 Concrete (4" DECO) SF 176 $32.00 $5,632.00 $25.00 $4,400.00 $47.00 $8,272.00
18 Concrete Curb Ramp SF 3545 $25.00 $88,625.00 $18.00 $63,810.00 $20.00 $70,900.00
19 Driveway(Residential) SF 4524 $22.00 $99,528.00 $14.50 $65,598.00 $18.00 $81,432.00
20 Driveway(Depressed) SF 3494 $17.00 $59,398.00 $18.00 $62,892.00 $20.00 $69,880.00
21 Cross Gutter SF 1235 $25.00 $30,875.00 $18.00 $22,230.00 $72.00 $88,920.00
22 Asphalt Concrete TON 438 $130.00 $56,940.00 $282.00 $123,516.00 $250.00 $109,500.00
23 Replace Asphalt Concrete Surfacing (3") CF 2091 $20.00 $41,820.00 $37.27 $77,931.�7 ' $35.00 $73,185.00
24 Asphalt Concrete (Micro Surfacing) SY 13820 $2.50 $34,550.00 $6.53 $9t�,244,60 ' $4.50 $62,190.00
25F Aggregate Base (Class 2) CY 1667 $100.00 $166,700.00 $100.00 $166,700.00 $220.00 $366,740.00
26 Pavement Marking (Thermoplastic) SF 3188 $7.00 $22,316.00 $7.18 $22,889.84 ' $8.00 $25,504.00
27 Traffic Stripe (6"Thermoplastic) LF 16628 $1.50 $24,942.00 $1.20 ' 9�1�,953.6t� $2.00 $33,256.00
28 Traffic Stripe (8"Thermoplastic) �F 90 $2.50 $225.00 $1.20 $108.00 $2.50 $225.00
29 Pavement Marker EA 249 $7.50 $1,867.50 $7.20 �1,792.$(7 $8.00 $1,992.00
30 Remove Pavement Marking (Thermoplastic) SF 1045 $4.00 $4,180.00 $1.08 $1,128.60 ' $4.00 $4,180.00
31 Remove Pavement Stripe (Thermoplastic) �F 5185 $1.00 $5,185.00 $0.84 �4,355.40 $1.35 $6,999.75
32 Install Sign EA 21 $430.00 $9,030.00 $400.00 $8,400.00 $450.00 $9,450.00
Shaded areas indicate corrections made in accordance with the Special Provisions.
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 ENGINEER'S EST Lakmann Builders Inc. Builder Solutions Inc.
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTA� PRICE TOTAL
33 Relocate Sign EA 11 $375.00 $4,125.00 $300.00 $3,300.00 $150.00 $1,650.00
34 Replace Sign EA 3 $175.00 $525.00 $400.00 $1,200.00 $450.00 $1,350.00
35 Pedestrian Barricade Sign (Type 1) EA 1 $1,800.00 $1,800.00 $1,800.00 $1,800.00 $4,725.00 $4,725.00
36 Beacon (Rectangular Rapid Flashing)2-pole EA 5 $15,000.00 $75,000.00 $19,200.00 $96,000.00 $8,500.00 $42,500.00
37 Salvage Bench EA 1 $500.00 $500.00 $200.00 $200.00 $500.00 $500.00
38 Relocate Fence LF 373 $80.00 $29,840.00 $100.00 $37,300.00 $25.00 $9,325.00
39 Reset Mailbox EA 1 $500.00 $500.00 $200.00 $200.00 $450.00 $450.00
40 Street Light(Standard & LED Luminaire) EA 5 $6,500.00 $32,500.00 $8,300.00 $41,500.00 $5,800.00 $29,000.00
41 Conductor(#6) �F 437 $5.50 $2,403.50 $10.20 $4,457.40 $6.00 $2,622.00
42 Conduit(4" PVC) LF 151 $55.00 $8,305.00 $55.00 $8,305.00 $16.00 $2,416.00
43 Conduit(2" PVC) �F 286 $70.00 $20,020.00 $50.00 $14,300.00 $16.00 $4,576.00
44 Pullbox (2E) EA 4 $1,800.00 $7,200.00 $200.00 $800.00 $1,500.00 $6,000.00
45 Abandon Storm Drain EA 4 $1,800.00 $7,200.00 $300.00 $1,200.00 $1,500.00 $6,000.00
46 Storm Drain Pipe (15" HDPE) �F 48 $155.00 $7,440.00 $130.00 $6,240.00 $200.00 $9,600.00
47 Storm Drain Pipe (18" HDPE) LF 53 $180.00 $9,540.00 $135.00 $7,155.00 $220.00 $11,660.00
48 Storm Drain Pipe (24" RCP) �F 8 $250.00 $2,000.00 $150.00 $1,200.00 $225.00 $1,800.00
49 Catch Basin #3 EA 2 $4,500.00 $9,000.00 $3,500.00 $7,000.00 $3,500.00 $7,000.00
50 Catch Basin #3 (modified) EA 4 $6,500.00 $26,000.00 $3,500.00 $14,000.00 $4,500.00 $18,000.00
51 Replace Storm Drain Manhole EA 1 $8,000.00 $8,000.00 $3,800.00 $3,800.00 $1,750.00 $1,750.00
52 Remove Storm Drain Inlet EA 4 $1,500.00 $6,000.00 $1,000.00 $4,000.00 $400.00 $1,600.00
53 Storm Drain Manhole (Modified) EA 3 $2,500.00 $7,500.00 $2,800.00 $8,400.00 $6,500.00 $19,500.00
54 Adjust Manhole EA 1 $1,100.00 $1,100.00 $500.00 $500.00 $1,650.00 $1,650.00
55 Adjust Catch Basin Lid EA 1 $2,000.00 $2,000.00 $500.00 $500.00 $850.00 $850.00
56 Under Sidewalk Drain EA 1 $2,000.00 $2,000.00 $1,800.00 $1,800.00 $2,600.00 $2,600.00
57 Replace Catch Basin Top EA 6 $2,500.00 $15,000.00 $2,000.00 $12,000.00 $1,250.00 $7,500.00
58 Reset Water Valve EA 7 $500.00 $3,500.00 $1,000.00 $7,000.00 $1,600.00 $11,200.00
59 Relocate Water Meter Box EA 9 $1,000.00 $9,000.00 $1,100.00 $9,900.00 $320.00 $2,880.00
60 Replace Water Meter Box EA 35 $550.00 $19,250.00 $450.00 $15,750.00 $360.00 $12,600.00
61 Fire Hydrant Assembly EA 1 $9,500.00 $9,500.00 $10,000.00 $10,000.00 $4,500.00 $4,500.00
62 Relocate Lateral Cleanout EA 7 $1,000.00 $7,000.00 $950.00 $6,650.00 $1,450.00 $10,150.00
63 Reset�ateral Cleanout EA 8 $500.00 $4,000.00 $650.00 $5,200.00 $300.00 $2,400.00
64 Remove 2" CARV Assembly EA 1 $10,000.00 $10,000.00 $3,200.00 $3,200.00 $750.00 $750.00
65 Trees EA 12 $917.00 $11,004.00 $2,940.00 $35,280.00 $1,400.00 $16,800.00
Shaded areas indicate corrections made in accordance with the Special Provisions.
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 ENGINEER'S EST Lakmann Builders Inc. Builder Solutions Inc.
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTA� PRICE TOTAL
66 Water Meter(5/8") EA 2 $3,000.00 $6,000.00 $200.00 $400.00 $2,650.00 $5,300.00
67 Electric Valve Assembly EA 2 $4,500.00 $9,000.00 $3,360.00 $6,720.00 $3,500.00 $7,000.00
68 Reduced Pressure Principle Device (1") EA 2 $2,000.00 $4,000.00 $7,800.00 $15,600.00 $9,600.00 $19,200.00
69 Valve (Quick Coupling) EA 2 $1,800.00 $3,600.00 $540.00 $1,080.00 $2,200.00 $4,400.00
70 Irrigation Bubbler EA 24 $50.00 $1,200.00 $300.00 $7,200.00 $245.00 $5,880.00
71 PVC Pipe (0.75") �F 814 $16.00 $13,024.00 $54.00 $43,956.00 $10.00 $8,140.00
72 PVC Pipe (1") LF 10 $18.00 $180.00 $60.00 $600.00 $10.00 $100.00
73 PVC Sleeve (3" SCH 40) EA 1 $30.00 $30.00 $2,160.00 $2,160.00 $500.00 $500.00
TOTA� -CONTRACT ITEMS $2,254,591.00 ; $2,222,1'I"I.$1 $2,2$2;122.75
Shaded areas indicate corrections made in accordance with the Special Provisions.
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 Sunrise Excavatin S.T. Rhoades Construction In SnL Grou Inc.
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTAL PRICE TOTA�
Prepare Storm Water Pollution Prevention
1 Plan �S 1 $2,500.00 $2,500.00 $7,500.00 $7,500.00 $2,900.00 $2,900.00
Implement Storm Water Pollution Prevention
2 Plan �S 1 $8,000.00 $8,000.00 $12,500.00 $12,500.00 $10,160.00 $10,160.00
3 Traffic Control LS 1 $167,000.00 $167,000.00 $143,500.00 $143,500.00 $98,000.00 $98,000.00
4 Construction Area Signs EA 30 $185.00 $5,550.00 $200.00 $6,000.00 $290.00 $8,700.00
5 Project Funding Sign LS 1 $1,550.00 $1,550.00 $1,750.00 $1,750.00 $1,102.00 $1,102.00
6 Rain EventAction Plans (REAPS) EA 5 $100.00 $500.00 $500.00 $2,500.00 $280.00 $1,400.00
7F Excavation (Unclassified) CY 50 $250.00 $12,500.00 $60.00 $3,000.00 $110.00 $5,500.00
8 Clearing and Grubbing �S 1 $73,600.00 $73,600.00 $30,000.00 $30,000.00 $74,600.00 $74,600.00
9 Surveying (Construction LS 1 $48,000.00 $48,000.00 $40,000.00 $40,000.00 $56,830.00 $56,830.00
10 Remove Concrete SF 14916 $4.00 $59,664.00 $7.00 $104,412.00 $7.45 $111,124.20
11 Remove Asphalt Concrete SF 19896 $3.00 $59,688.00 $10.00 $198,960.00 $5.22 $103,857.12
12 Concrete Curb and Gutter(4"Vert) LF 769 $57.70 $44,371.30 $57.00 $43,833.00 $46.75 $35,950.75
13 Concrete Curb and Gutter(6"Vert) �F 6181 $53.70 $331,919.70 $57.00 $352,317.00 $54.40 $336,246.40
14 Concrete Curb and Gutter(8"Vert) LF 78 $62.00 $4,836.00 $57.00 $4,446.00 $80.00 $6,240.00
15 Concrete Curb (6") �F 185 $103.00 $19,055.00 $57.00 $10,545.00 $49.80 $9,213.00
16 Sidewalk (4"PCC) SF 32147 $13.80 $443,628.60 $14.00 $450,058.00 $12.37 $397,658.39
17 Concrete (4" DECO) SF 176 $48.00 $8,448.00 $45.00 $7,920.00 $21.80 $3,836.80
18 Concrete Curb Ramp SF 3545 $42.85 $151,903.25 $40.00 $141,800.00 $21.00 $74,445.00
19 Driveway(Residential) SF 4524 $18.40 $83,241.60 $14.00 $63,336.00 $13.65 $61,752.60
20 Driveway(Depressed) SF 3494 $18.40 $64,289.60 $14.00 $48,916.00 $14.65 $51,187.10
21 Cross Gutter SF 1235 $37.50 $46,312.50 $15.00 $18,525.00 $18.00 $22,230.00
22 Asphalt Concrete TON 438 $202.00 $88,476.00 $260.00 $113,880.00 $273.25 $119,683.50
23 Replace Asphalt Concrete Surfacing (3") CF 2091 $50.00 $104,550.00 $24.00 $50,184.00 $36.31 $75,924.21
24 Asphalt Concrete (Micro Surfacing) SY 13820 $5.44 $75,180.80 $3.50 $48,370.00 $3.86 $53,345.20
25F Aggregate Base (Class 2) CY 1667 $66.55 $110,938.85 $130.00 $216,710.00 $175.85 $293,141.95
26 Pavement Marking (Thermoplastic) SF 3188 $6.00 $19,128.00 $6.00 $19,128.00 $7.15 $22,794.20
27 Traffic Stripe (6"Thermoplastic) LF 16628 $1.00 $16,628.00 $1.00 $16,628.00 $1.20 $19,953.60
28 Traffic Stripe (8"Thermoplastic) �F 90 $1.00 $90.00 $1.00 $90.00 $4.40 $396.00
29 Pavement Marker EA 249 $6.00 $1,494.00 $6.00 $1,494.00 $8.12 $2,021.88
30 Remove Pavement Marking (Thermoplastic) SF 1045 $0.90 $940.50 $0.90 $940.50 $1.35 $1,410.75
31 Remove Pavement Stripe (Thermoplastic) �F 5185 $0.70 $3,629.50 $0.70 $3,629.50 $0.95 $4,925.75
32 Install Sign EA 21 $350.00 $7,350.00 $400.00 $8,400.00 $289.00 $6,069.00
Shaded areas indicate corrections made in accordance with the Special Provisions.
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 Sunrise Excavatin S.T. Rhoades Construction In SnL Grou Inc.
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTAL PRICE TOTA�
33 Relocate Sign EA 11 $340.00 $3,740.00 $250.00 $2,750.00 $285.00 $3,135.00
34 Replace Sign EA 3 $275.00 $825.00 $225.00 $675.00 $242.00 $726.00
35 Pedestrian Barricade Sign (Type 1) EA 1 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $2,465.00 $2,465.00
36 Beacon (Rectangular Rapid Flashing)2-pole EA 5 $16,000.00 $80,000.00 $12,000.00 $60,000.00 $7,600.00 $38,000.00
37 Salvage Bench EA 1 $250.00 $250.00 $200.00 $200.00 $1,771.00 $1,771.00
38 Relocate Fence LF 373 $48.00 $17,904.00 $35.00 $13,055.00 $87.50 $32,637.50
39 Reset Mailbox EA 1 $340.00 $340.00 $135.00 $135.00 $377.00 $377.00
40 Street Light(Standard & LED Luminaire) EA 5 $7,000.00 $35,000.00 $7,500.00 $37,500.00 $5,255.00 $26,275.00
41 Conductor(#6) �F 437 $8.50 $3,714.50 $9.00 $3,933.00 $4.35 $1,900.95
42 Conduit(4" PVC) LF 151 $50.00 $7,550.00 $70.00 $10,570.00 $63.20 $9,543.20
43 Conduit(2" PVC) �F 286 $45.00 $12,870.00 $50.00 $14,300.00 $51.25 $14,657.50
44 Pullbox (2E) EA 4 $555.00 $2,220.00 $750.00 $3,000.00 $2,113.00 $8,452.00
45 Abandon Storm Drain EA 4 $750.00 $3,000.00 $1,150.00 $4,600.00 $8,430.00 $33,720.00
46 Storm Drain Pipe (15" HDPE) �F 48 $200.00 $9,600.00 $145.00 $6,960.00 $125.75 $6,036.00
47 Storm Drain Pipe (18" HDPE) LF 53 $200.00 $10,600.00 $175.00 $9,275.00 $129.75 $6,876.75
48 Storm Drain Pipe (24" RCP) �F 8 $700.00 $5,600.00 $220.00 $1,760.00 $853.25 $6,826.00
49 Catch Basin #3 EA 2 $3,875.00 $7,750.00 $3,000.00 $6,000.00 $5,107.00 $10,214.00
50 Catch Basin #3 (modified) EA 4 $6,500.00 $26,000.00 $4,100.00 $16,400.00 $6,834.00 $27,336.00
51 Replace Storm Drain Manhole EA 1 $8,135.00 $8,135.00 $4,500.00 $4,500.00 $8,618.00 $8,618.00
52 Remove Storm Drain Inlet EA 4 $640.00 $2,560.00 $1,200.00 $4,800.00 $4,136.00 $16,544.00
53 Storm Drain Manhole (Modified) EA 3 $8,500.00 $25,500.00 $3,900.00 $11,700.00 $7,757.00 $23,271.00
54 Adjust Manhole EA 1 $350.00 $350.00 $1,950.00 $1,950.00 $4,065.00 $4,065.00
55 Adjust Catch Basin Lid EA 1 $350.00 $350.00 $845.00 $845.00 $2,235.00 $2,235.00
56 Under Sidewalk Drain EA 1 $2,500.00 $2,500.00 $1,000.00 $1,000.00 $3,735.00 $3,735.00
57 Replace Catch Basin Top EA 6 $1,450.00 $8,700.00 $1,500.00 $9,000.00 $2,320.00 $13,920.00
58 ResetWaterValve EA 7 $200.00 $1,400.00 $1,300.00 $9,100.00 $2,265.00 $15,855.00
59 Relocate Water Meter Box EA 9 $1,260.00 $11,340.00 $1,500.00 $13,500.00 $1,485.00 $13,365.00
60 Replace Water Meter Box EA 35 $250.00 $8,750.00 $500.00 $17,500.00 $1,742.00 $60,970.00
61 Fire Hydrant Assembly EA 1 $7,500.00 $7,500.00 $12,800.00 $12,800.00 $9,760.00 $9,760.00
62 Relocate Lateral Cleanout EA 7 $1,500.00 $10,500.00 $1,775.00 $12,425.00 $3,633.00 $25,431.00
63 Reset�ateral Cleanout EA 8 $200.00 $1,600.00 $600.00 $4,800.00 $2,138.00 $17,104.00
64 Remove 2" CARV Assembly EA 1 $2,400.00 $2,400.00 $1,675.00 $1,675.00 $4,275.00 $4,275.00
65 Trees EA 12 $2,450.00 $29,400.00 $1,100.00 $13,200.00 $1,375.00 $16,500.00
Shaded areas indicate corrections made in accordance with the Special Provisions.
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 Sunrise Excavatin S.T. Rhoades Construction In SnL Grou Inc.
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTA� PRICE TOTAL PRICE TOTA�
66 Water Meter(5/8") EA 2 $1,200.00 $2,400.00 $2,000.00 $4,000.00 $3,640.00 $7,280.00
67 Electric Valve Assembly EA 2 $2,800.00 $5,600.00 $2,900.00 $5,800.00 $3,510.00 $7,020.00
68 Reduced Pressure Principle Device (1") EA 2 $6,500.00 $13,000.00 $8,000.00 $16,000.00 $8,980.00 $17,960.00
69 Valve (Quick Coupling) EA 2 $100.00 $200.00 $1,900.00 $3,800.00 $2,350.00 $4,700.00
70 Irrigation Bubbler EA 24 $24.00 $576.00 $210.00 $5,040.00 $256.00 $6,144.00
71 PVC Pipe (0.75") �F 814 $45.00 $36,630.00 $39.00 $31,746.00 $45.60 $37,118.40
72 PVC Pipe (1") LF 10 $50.00 $500.00 $39.00 $390.00 $45.50 $455.00
73 PVC Sleeve (3" SCH 40) EA 1 $1,800.00 $1,800.00 $450.00 $450.00 $675.00 $675.00
TOTA� -CONTRACT ITEMS $2,475,117J0 $2,549,906.00 $2,620,548.70
Shaded areas indicate corrections made in accordance with the Special Provisions.
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 Site Work Solutions
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTA� PRICE TOTAL
Prepare Storm Water Pollution Prevention
1 Plan �S 1 $4,499.92 $4,499.92
Implement Storm Water Pollution Prevention
2 Plan �S 1 $12,864.79 $12,864.79
3 Traffic Control LS 1 $62,393.85 $62,393.85
4 Construction Area Signs EA 30 $222.31 $6,669.30
5 Project Funding Sign LS 1 $1,905.52 $1,905.52
6 Rain Event Action Plans (REAPS) EA 5 $243.72 $1,218.60
7F Excavation (Unclassified) CY 50 $155.16 $7,758.00
8 Clearing and Grubbing �S 1 $27,254.56 $27,254.56
9 Surveying (Construction LS 1 $48,552.54 $48,552.54
10 Remove Concrete SF 14916 $5.88 $87,706.08
11 Remove Asphalt Concrete SF 19896 $5.31 $105,647.76
12 Concrete Curb and Gutter(4"Vert) LF 769 $56.23 $43,240.87
13 Concrete Curb and Gutter(6"Vert) �F 6181 $54.69 $338,038.89
14 Concrete Curb and Gutter(8"Vert) LF 78 $107.46 $8,381.88
15 Concrete Curb (6") �F 185 $68.52 $12,676.20
16 Sidewalk (4"PCC) SF 32147 $13.67 $439,449.49
17 Concrete (4" DECO) SF 176 $42.40 $7,462.40
18 Concrete Curb Ramp SF 3545 $40.37 $143,111.65
19 Driveway(Residential) SF 4524 $26.02 $117,714.48
20 Driveway(Depressed) SF 3494 $28.84 $100,766.96
21 Cross Gutter SF 1235 $28.08 $34,678.80
22 Asphalt Concrete TON 438 $362.90 $158,950.20
23 Replace Asphalt Concrete Surfacing (3") CF 2091 $58.22 $121,738A2
24 Asphalt Concrete (Micro Surfacing) SY 13820 $7.44 $102,820.80
25F Aggregate Base (Class 2) CY 1667 $97.38 $162,332.46
26 Pavement Marking (Thermoplastic) SF 3188 $7.62 $24,292.56
27 Traffic Stripe (6"Thermoplastic) LF 16628 $1.27 $21,117.56
28 Traffic Stripe (8"Thermoplastic) �F 90 $1.27 $114.30
29 Pavement Marker EA 249 $7.62 $1,897.38
30 Remove Pavement Marking (Thermoplastic) SF 1045 $1.15 $1,201.75
31 Remove Pavement Stripe (Thermoplastic) �F 5185 $0.89 $4,614.65
32 Install Sign EA 21 $381.11 $8,003.31
Shaded areas indicate corrections made in accordance with the Special Provisions.
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 Site Work Solutions
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTA� PRICE TOTAL
33 Relocate Sign EA 11 $254.07 $2,794.77
34 Replace Sign EA 3 $190.55 $571.65
35 Pedestrian Barricade Sign (Type 1) EA 1 $952.65 $952.65
36 Beacon (Rectangular Rapid Flashing)2-pole EA 5 $9,527.57 $47,637.85
37 Salvage Bench EA 1 $471.35 $471.35
38 Relocate Fence LF 373 $60.34 $22,506.82
39 Reset Mailbox EA 1 $1,247.12 $1,247.12
40 Street Light(Standard & LED Luminaire) EA 5 $9,010.21 $45,051.05
41 Conductor(#6) �F 437 $10.79 $4,715.23
42 Conduit(4" PVC) LF 151 $113.96 $17,207.96
43 Conduit(2" PVC) �F 286 $91.81 $26,257.66
44 Pullbox (2E) EA 4 $1,117.38 $4,469.52
45 Abandon Storm Drain EA 4 $1,548.55 $6,194.20
46 Storm Drain Pipe (15" HDPE) �F 48 $229.25 $11,004.00
47 Storm Drain Pipe (18" HDPE) LF 53 $242.10 $12,831.30
48 Storm Drain Pipe (24" RCP) �F 8 $664.47 $5,315.76
49 Catch Basin #3 EA 2 $4,797.14 $9,594.28
50 Catch Basin #3 (modified) EA 4 $9,300.52 $37,202.08
51 Replace Storm Drain Manhole EA 1 $8,665.99 $8,665.99
52 Remove Storm Drain Inlet EA 4 $2,906.38 $11,625.52
53 Storm Drain Manhole (Modified) EA 3 $8,348.34 $25,045.02
54 Adjust Manhole EA 1 $1,964.72 $1,964.72
55 Adjust Catch Basin Lid EA 1 $1,881.53 $1,881.53
56 Under Sidewalk Drain EA 1 $2,598.27 $2,598.27
57 Replace Catch Basin Top EA 6 $1,818.71 $10,912.26
58 Reset Water Valve EA 7 $712.29 $4,986.03
59 Relocate Water Meter Box EA 9 $2,890.25 $26,012.25
60 Replace Water Meter Box EA 35 $938.61 $32,851.35
61 Fire Hydrant Assembly EA 1 $10,444.36 $10,444.36
62 Relocate Lateral Cleanout EA 7 $3,121.57 $21,850.99
63 Reset�ateral Cleanout EA 8 $856.10 $6,848.80
64 Remove 2" CARV Assembly EA 1 $1,505.95 $1,505.95
65 Trees EA 12 $3,112.35 $37,348.20
Shaded areas indicate corrections made in accordance with the Special Provisions.
BID TABULATION FOR:
WEST STREET AREA SCHOOL SAFETY IMPROVEMENT PROJECT
Bid Schedule No.: 5201
Job No.: 2619 Site Work Solutions
4/22/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTA� PRICE TOTAL
66 Water Meter(5/8") EA 2 $3,290.27 $6,580.54
67 Electric Valve Assembly EA 2 $3,556.97 $7,113.94
68 Reduced Pressure Principle Device (1") EA 2 $8,257.23 $16,514.46
69 Valve (Quick Coupling) EA 2 $571.66 $1,143.32
70 Irrigation Bubbler EA 24 $317.58 $7,621.92
71 PVC Pipe (0.75") �F 814 $57.17 $46,536.38
72 PVC Pipe (1") LF 10 $63.52 $635.20
73 PVC Sleeve (3" SCH 40) EA 1 $2,286.62 $2,286.62
TOTA� -CONTRACT ITEMS $2,76$',b74.4� '
Shaded areas indicate corrections made in accordance with the Special Provisions.
���o
�FC
RF
,� F�Ro
S
��
��
N� �
'9��`�F
S� �
`b,� O,Q
/
�
9
PROJECT �
,�
�4CATION '�
�
� or
r
� �
OLD EUREKA WAY �
� EURE� WAY
CC�
� �
�
O NORTH ST Z �
0
m D r� �
D m Z � (n �
r' {I/
= m cn �
< y < —�
m <
m
���� S(�ST��1 �
�oF RFo� CITY OF REDDING EXHIBIT A
v � � WEST STREET AREA SCHOO�
p : � o PUB�IC WORKS SAFETY IMPROVEMENT PROJECT
�'.�����a�,�`� DEPARTMENT �OCATION MAP
.���.�� �
. C 3 � 2Q1S
�T()TICE CiF EX�I�IPTI�10i � S����., �t��y
To: � Shasta County Clerk F1tolvr: City of Redding
County of Shasta Public Works Department
P.O. Box 990880, 1643 Market Street 777 Cypress Avenue
Redding, CA 96099-0880 Redding, CA 96001
Project Title: West Street Area School Safetv Improvement Project JO#2619-20 (ED-37-18)
Project Location—Specific: West Street and Ma�nolia Avenue, as well as 7tn 8t'' 9"' l0t'' & 11`" Streets
Project Location—City: Redding Project Location—County: Shasta
Description of Project:
The Citv of Reddin�pro�oses an Active Transportation Project to improve pedestrian cvclist and motorist safet�
and encoura�e alternate modes of transportation.Improvements wi11 include continuous sidewalk ADA compliant
curb and�utter bicvcle lanes shortened pedestrian crossin�-s enhanced pedestrian crossin�s with flashin�beacons
l��htin� ar3d draina�e improvements, delineated parkin� traffic calmin� buib-outs and islands new irri�ation
systems, and shade tree �lantin�. Constructian work will consist of earthwork tree removal utilitv relocation
trenchin�, reta.inin�wall construction, paving, striping and si�n installation Utilities will be relocated as needed
to implement the ADA compliant improvements. Existing storm drains and draina�e inlets will be modified or
replaced to accommodate the new sidewalk and ADA features.The sidewalk im�rovements will conform on private
property and temporarv construction easements will be reauired Disposal material will be taken to the Citv of
Reddin�Landfill.
Name of Public Agency Approving Project: Citv of Reddin�
Name of Person or Agency Carrying Out Project: Shelby Nadin, Project En�ineer
Exempt Status: (check one)
❑ Ministerial [Section21080(b)(1); 15268]
❑ Declared Emergency [Section 21080{b}(3); 15269(a)]
0 Emergency Project [Section 21080(b)(4); 15269(b)�O]
� Categorical Exemptian. State type and section number: Sec. 15301. Existin�Facilities
❑ Statutory Exemptions. State code number:
Reasons why project is exempt:Class 1 exemptions include minor alteration of existinQ nublic or private structures
facilities, or topo�raphical features involvin�ne�li�ible or no expansion of use The pro�ject proposes im�rovement
of existin�facilities and does not involve raadwav widenin�or the addition of vehicle travel lanes The�project has
been reviewed for sensitive resources and will not have a significant effect on biolo�ical or cultural resources such
as threatened or endan e� red species or their habitats,sensitive ve�etation communities tribal lands ar tribal cultural
resaurces. The rsroiect has no�otential to have a si�nificant effect on the environment
Lead Agency Contact Person: Amber Kelley Telephone: 530.225.4046
If Filed by Applicant:
1. Attach certified document of exemption finding.
2. Has a notice of exemption been filed by the public agency approving the project? ❑ Yes ❑ No
Signature: ���C..�-� Date: /c.�-'��/�
Title: Environmental Compliance ager
❑ Signed by Lead Agency Date received for filing at OPR:
❑ Signed by Applicant
� - ,�=���':��� ��
i M�_ "r.O710E WAS POSTED ON
i�._� I -,�v / 8` DEC 3 1 201�
I'C 41ALi_I�cRAA(N POSTED THROUGH -
��/ - �C� -- a C� t � SHASTA GOUI1tTY CL,�RIC
/.PERIOD OF 30 DAYS
eYGA'fH't`GRt2L �f�,Ci�CLERK
DEPUTY CLERK
� �' � C_,J � �
Shasta County Clerk 2�18 CEQA Filing Cover Sheet
Complete and attach this form to each CEQA Notice of DeterminationJExemption filed with the County Clerk
Type or Print Clearly
�eadAgency C�tY Of R2CIClICIg EmaiiAddress akelleyC�cityofredding.org
ProjectTitle West Street Area Schoo( Safety Improvement Project {ED-37-18)
Project Applicant Amb�-'r K2II@�! Email Address akelley�cityofredding.org
- .,.: _ _ _
Applicant Type:�Public Agency�School.District�Other Special Disttict�5tate Agency�Pr�vafe Entity
Project Applicant Address 777 CYpreSS /�V@CiU@
�;�,, Redding State�A Z;p 96001 Phone tvumber.530-225-4170
Contact person Amber Kel(ey Phone tvumber 53C1-225-4O4G
,
Environmentai Impact Report{EIR}
Department of Fish and Wildiife Filing Fee $ 3,168.OQ
Previously Paid{must attach receipt} Receipt#
County Administrative Fee $ 5$.00
Mitigated Negative Declaration{MND)or Negative Declaration (ND) -
Department of Fish and Wiidlife Filing Fee $ Z 2ga�S
Previously Paid(must attach receipt) Receipt#
County Administrative Fee $ 58.00
, : ,
Notice�of Ezemption/No Effect Determination "
Notice of Exemption(must attach letter) No Fee
(Vo Effect Determination(must attach letter) No Fee
�/ CountyAdministrative Fee $ 58.Ot1
_::. _ , , _
Payment Method: Receipt Information:
Cash �Credit/Debit Card Receipt# 45- /,� � J �(j/ g" — (���
�/ Check �Other State Clearing House# .
Filing fees are due at the time a Notice of DeterminationJExemption is filed with our office. For more information on
filing fees and No Effect Determinations,please refer to California Code of Regulations,Title 14,section 753.5.