REPORT TO THE CITY COUNCIL
MEETING DATE: May 16, 2023 FROM: Chuck Aukland,Public
ITEM NO. 4.11(a) Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
ukl�n�l,H'ciblic Wc�aks L'��reGt ' S;'3/2423 ry ip}�in,�C"i ana � 41�/2423
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(a)--Award Bid Schedule No. 5351 (Job Order No. 2621) Lake Boulevard
Transmission Watermain Pro'ect
Recommendation
Authorize the following actions relative to Bid Schedule No. 5351 (Job No. 2621) Lake
Boulevard Transmission Watermain Project:
(1) Award to SnL Group, Inc., in the amount of$5,988,883;
(2) Approve an additional $775,261 to cover the cost of administration and inspection fees;
and$429,000 for project development costs;
(3) Approve $600,000 to provide construction contingency funding;
(4) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of$60,000; and
(5) Find that the Project is categorically exempt from the California Environmental Quality
Act per Section 15301(b & c) — Existing Facilities, Section 15302(c) — Replacement or
Reconstruction, and Section 15303(d) — New Construction or Conversion of Existing
Structures.
Fiscal Impact
The Lake Boulevard Transmission Water Main Project (Project) is being funded by the Water
Utility Fund.
Cost Summa
Item Estimated
Pro'ect Develo ment Costs $429,000
Construction Contract+ Contin enc $6,588,883
Contract Administration, Ins ection, Testin $775,261
Additional Cit Mana er Authorit $60,000
Total Pro'ect Costs $7,853,144
Pro'ect Bud et $8,000,000
Report to Redding City Council May 9,2023
Re: 4.11(a)--Award BS No. 5351 Lake Boulevard Transmission Watermain Project Page 2
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Alter�native Action
The City Council (Council) may choose not to award the bid for the project and provide staff
with alternate direction. If the project is not awarded, there will be a greater potential for
increased maintenance costs and a decrease in reliability for City of Redding (City) customers.
Background/Analysis
Attached is a tabulation of bids received and opened on Apri1 20, 2023, for the project. The low
bid in the ainount of$5,988,883 was received from SnL Group, Inc., of Redding, California. The
engineer's estimate was $5,207,088. Total project development costs for this project are
estimated to be $429,000. Project development costs include engineering, surveying, right-of-
way, environmental, consultant services, and permit fees.
The purpose of this project is to convey increased quantities of water from the Buckeye Zone to
the Hilltop-Dana and Enterprise Zones to provide better reliability and more robust health and
safety standards. This project includes the installation of approximately 9,400 feet of new 24-
inch water main in Lake Boulevard from Keswick Dam Road to Masonic Avenue. The project
also incl�udes the installation of approximately 1,970 feet of new $-inch water main in
Northpointe Road, Redwood Boulevard, Y�uletide Avenue, and J�uly Way along with the
replacement of approximately 300 feet of storm drain pipe in Keswick Dam Road. In addition,
water services will be replaced and reconnected and minor modifications of the Lake Boulevard
Bridge over the Union Paci�c Railroad will be constructed.
Envir�onmental Review
Staff has determined that the project qualifies as categorically exempt from environmental
review under California Environmental Quality Act Guidelines Section 15301(b & c) — Existing
Facilities, Section 15302(c)-Replacement or Reconstruction, and Section 15303(d) — New
Construction or Conversion of Existing Structures. Class 1 exemptions include the minor
alteration of existing public structures and facilities. Class 2 exemptions consist of replacement
or reconstruction where the new structure will be located on the same site and will have
substantially the same purpose and capacity. Class 3 exemptions consist of construction and
location of new small facilities and equipment or the conversion of existing structures. The
project will be located in the right-of-way parallel to the existing water line and will result in a
negligible expansion of use. The action area does not have significant values for wildlife habitat
or other environmental resources and the project has no potential to have a significant effect on
the environment.
Council Priority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Location Map
^Bid Tabulation
^Notice of Exemption
� ,
_. . _ _ � , y ,
,
��
� _
�, � _:
_
/
,,
�
� �,
_
t
<_ �
A � _ , ..� : � , � , � »� �
. �
� r � �
_.. .s. . ,
_ � , �
�_ , �
�
�,
. i � . .., . . .� i � �� I. '..\\ j� ` i I
. .... " .... ..... .... . .. `. , .� ,,
� � '� , �.; ., i,�. i 4 ..
, .... ,_ , . , � , �,
�, �. �K�S'I�V��K D�4M R�_ _� � �� � t .
� _ ��,
� - �
, ._r , , � �
�. ,
� � � ,- = � 3
i
_ ,
, � _ -
_
���, �
� � ti ; `�
� _ . _ �—
,
�,.
_ _ .. _ _ .� b ; � � ,.
l,
, �
�,
, ��. ., � , , �
>
� . . � , ,.
„ �� �
, ... t . �,�
` , � �
�� �.
�. � �
�.
�
4 � ,
�
, ..� 3 ' ' _„ ' - " ,
1,' \
�
, � .. . . ` ,� ''�.�
�
�
\ \ /
� ; �.. . ..�... ,,, • �•� -. . , �'�� .. � ,
"; e
, �, ,,i . ,_ �,/
� '�.,' �� , . �� _ �� � �
%\
�-
�
`� \ �
; �` > -.� ^� /��� r
. \ � .� ��.. / ' �.� .�
�
�,�' � Ar `� ,�, .' '� \ , �
i �
�
_ � �
, _..-- . , ...
� .. . . . � . _.
r � _
��
��,,� , ' � �,. , �� _ . . �
� n
.;. ,.. <, �, , - .- , .
�,. �
�- ,- �
. . ; .. . ,� � ._.
; �ti � �
�
�. �
_ ,:�"�� ! � \ �t
�
, , � .
_ , � � , � . ` , . ,.._.
� : : : . ,.... < ,, ��` � ' ,'' ,
� \ , ��
�, A
, � � �, .. ;� \ � �'�
, � �� � :, .. ,. .
�.
� � ti
� �� � �
d
i e
ti ` '\j
p
�
�
, � � �.. r , , ., '
r
� � � �,
�. . , , r , ; ,,
� �.
r:'
.. ,.. �.; , , � .,. _ .
�. � /
\��
�' -,. f �x 4`� `� 1.
...... A, , .... ,:. ,� .., ., ..
� . � �
� � � �ROJ EC7'
, � ��
`
t .
. �<
�
,,�
r � :
�t� .. ���: r P
_ � ,
� � r ��,�.
� �C��AT�t�N
� �
, ♦ '
�
. -
�
� , �
� r
�.
�
� �
� � ����
_ �� � � �
,
� , , ` � ,
� r
.� , � � � � ., � ,>
� ��� ��� ��� �� ♦���� '�
, �.
��� � r �, � �� �
� � �
�� F _ _ _� .
_� �
. __ _ . � , ,� �� _ _ � � , ��,��� �
} I
J
�.. l --u � � "_
\
li \ `
� . .. � � ,..... ,.
�
i .. . . � . . .,
l ti
c :\ . .� �.. y
t
�
\, s
� .: t
� �� . ,. ,.. �
� '. � � ,. \ . � i � t,—
�
', � ",, � �. '. , �w
`'
� y , , � �;� , � .
v
�'
� ��� �. �
_��, ,,
����
_ ...� , �- �`� '
�t. � w �.�� , ' .
;,
........ \ � � ,�i �. '
,
�� �
� . .� � , � ..a ..
�,,
`
. , 7-� ..� - . .,
r�
,
N
t � r \i �
.
� �. �, `, /_ ���.���� �
� � ,
� ,
;
, � � ,, � , i� ,� ,
, . �
, �. ��
� � ,
,
� r �� � _
_. . , � , �
�``
. � � ,. _
� �
�
, ,
� „ 3 ..� � ; � . ��
_ _� , � �,
�
`� �� �
, . _ . . . �
z �� �
�°., i �
� � � "
� �� � �� � �/ �
__ �� � `.,,'
� ;
� �, � ��� �,��v
, .,
�� , , , �.
�. _
� .4
=
, , � :��
_ � �� � �
,
_. � �,
,
_.
_,
. ti �
, �. , � . ���
;
� �� , � t ; �� _
� � �`Q,�s
� , � � e_ _ , _ �_
� . __�> � _ _
, �e � _._ . . __�_.. .
oF ��o CITY OF REDDING
,� _�2 LAKE BLVD TRANSMISSION
�? �„ �' PUB�IC WORKS WATER MAIN PROJECT
� �� � '����� DEPARTMENT
����o�`' LOCATION MAP
BID TABULATIQN FOR�
Lake Baulevard Transmission Watermain Project
Bid Schedule Na.: 5351
ENGINEER°S EST SnL Grou Allen Gil Construction
4/2012Q23 tJRIlT UNIT 11NlT
ITEM DESGF2IPTION UNIT QT`Y PRICE TOTAL PRICE TfJTAL PI210E TGITAL
1 Prepare Water Pollution Gontrol Plan LS 1 $4;OOQ00 $�,OOQ.00 $1,20Q.00 $1,2Q0:00 $855.00 $85b.00
2 Water Poilution Gontral Plan LS 1 $50;000.00 �50,0(iO:OQ $5yQ00.00 $5,Q00.00 $16,722.00 $16;722.00
3 Traffic Contral LS 1 $300,Q00.00 $300,OOO:QO $167,OOOAO $167,OOOAO $23Q,406.00 $230,4Q6.00
4 Permit and Flagging Fees LS 1 $4Q,000.00 $40,0OO:OQ $30;QOO.QO $30,000.00 $58,043.Q0 $58;048.00
5 Canst�uction Area Signs EA 40 $365:Q0 $14,6Q0:00 �220.00 $8,800.00 $719.75 $28;T90.Od
6 Project Funding Sign EA 1 $1,200A0 $1,200.00 $1,50L1.00 $1,500,00 $3,664:00 $3,664.QQ
7 Trench Sheeting and Shoring L a 1 $145,Q00.00 $145,p00:00 $8,OQ0.00 $8,000.00 $112,719:00 $112;719.00
8 Water Main(8"PVC) LF 1995 $135A0 $269,46Q:tI0 $158.00 $315;368.Q0 $212.Q0 $423,152.00
9 WaterMain{12"'DIP,Sdurry) LF 75 $265:Q0 $19,875;00 $1,OOQ.QO $75;q00.00 $1,183.00 $88,725.00
10 Water Main(24"DtP,Slurry) LF 9168 $400:00 $3,667,2QO:QQ $447.OQ $4,t798,096.Q0 $464.00 $4,253;952:00
11 Fire Hydrant Assembly EA 7 $10,000.00 $70,OOO.pO $14,$50A0 $103,950.00 $20;932.00 $146;�24.00
12 Replace Water Service EA 15 $3,500:00 $52,500.d0 $6,13U.U0 $91,950A0 $7;609.OQ $114,135.QQ
13 Valve(�"Gate) EA 11 $2,700:OQ $29,700:Q0 �4,45Q.QQ $48,950.OQ $2,455.00 $27;005.00
14 Valve(12"ButterflY) EA 9 $3,900.Q0 $35,100:00 $5,860:00 $52,74Q.00 $4,698.00 �42,282.OQ
15 Valve(24"Butterfly) EA 7 $7,OOO:QO $49,aoo.oa $16,175:00 $113,225.00 $15,745.OQ $"11Q;215.00
16 Valve{30"Butterfly) EA 1 $10,OOO.QO $1Q,000.00 $38,J65:0C1 $38„965.Q0 $25;984.00 $25,984.00
17 Water Senriae Connectian(6") EA 1 $4,0OO.Op $4,OOOAQ $17,550.00 $17;550.00 $22,409.Q0 $22,409.00
18 Imported Borrow LS 1 $30,000;00 $3Q,OOq.UO $26,768:00 $26,768.QQ $25,405.00 $25,405.00
19 Structural Cancrete(Bridge} GY 3Q $9QO.OQ $27;000:00 $1,725.00 $51,750.00 $2,327.OQ $69;810.i1Q
20 Minor Cancrete{Cradle) CY 5 $1,100:OQ $5;50Q:00 $2,5Q0:00 $12,500.00 $5,363.00 $26;815.00
21 Bar Reinforeing Steel(Bridge) LB 4024 $2.OQ $8,048.00 $4:75 $19,114.0(7 $11.00 $44,264.Op
� � �
23 Care Goncrete(1��) �F 65 $315:�0 $2Q;475.OQ $760:Q0 $49;400.OQ $410.00 $26,650.00
24 Drill and Bond Dowel �F 260 $50:00 $13;000.00 $'175.OQ $45,600.00 $105.00 $27,30Q.OQ
25 Miseellaneous Metal(Bridge)(Mechanical EA 58 $15Q:Q0 $8;700.Q0 $325.Q0 $18,850.Q0 $247.Q0 $14,326:00
26 Miscellaneous Metal(Bridge) LB 68p3 $10.00 $68,03t7.OQ $19:00 $129,257.00 $16.00 $108,848A0
27 Double BaII,Expansion Jaint EA 2 $12,OOQ.QO $24,000.00 ' $60,000:00 �120,OQ0.00 $56,148A0 $112,296�QQ
28 Water Main{24"Glass 250 DIP, Bridge) LF 21Q $250.00 $52,500.00 $400:Q0 $84,0t70.00 $456:OCt $95,760.00
29 Combination Air Valve EA 2 $5,600.00 $11,200A0 $16,875;00 $33,750:00 $1 a;641.00 $31,282,Qd
3Q Welded Steel Pipe Casing(36", Bridge) LF 1 a8 $50p.Ot� $79�OOO.qO $445.0� $70,310:00 $475:OQ $75,050.00
31 4"Blow aff Assembly E,4 1 $6,5QO.OQ $6;50(?.00 $15,OOO.QO $15,Oq0:00 $14,022.OQ $14,022.00
32 Storm Drain(18"SDP} LF 170 $200.00 $34;0OO.Ot7 $412.00 $70,040.QQ $374.OQ $63,580:OQ
33 Catch Basin No.3 ER 1 $5;OOO.QO $5,000.00 $10,750.t10 $10,750:�0 $8,89Q:00 $8,890:Ot�
34 Manhole(Storm Drain) EA 1 $7;5QO.Q0 $7,500.00 $15,OOO:aO $'15,000:00 $8,417.Q4 $8,417:00
35 Reset Centerline-Monument EA 18 $2,500.Q0 $45,OOQ.00 $2,200.00 $39,6Q0.00 $342:OQ $6,156:00
TOTAL-CC)NTRACT ITEMS $5,ZQ7,08$.00 $5;988,883:00 $6,464,453:OQ
Shaded areas indicate correctians made
in accardance with the special provisions.
Page 1 of 2
BID TABULATIQN FOR:
l.ake Boulevard Transmission Watermain Project
Bid Schedule No.: 5351
StimpeE-WiebeBhaus
Jason Abel Constructian Site Works Solutions Assaciates Inc Mauntain Gascade Inc
4l2Q/2023 UMT UNIT UNIT UNIT
ITEM DESGRIPTIO�N UNIT QTY PRICE TOTA� PRICE TQTAL PRIGE Tt?TAL PRICE TOTAL
1 Prepara Water Pollution Cantrol Plan LS 1 $�72.00 $772:00 $5,735.40 $5,735.40 $1,OOO.QO $1,QOa.OQ $1,OOQ.OQ $1,Q00:00
2 Water Pallutian Gantral Pian LS 1 $990.Op $99Q_00 $13,1G2.51 $13,162.59 $10,000.00 $10,Q00:00 $3;500.00 $3,500:00
3 Traffic Control LS 1 $25,000.00 $25,0OO:OC7 $225,726.55 $225,726.55 $700,OOO.QO $70Q,000.00 $2,500.Q0 $2,500:QQ
4 Permit and Flagging Fees LS 1 $31,50a.OQ $31,50Q.00 $36,088.24 $36;088.24 $150,OQ0.00 $950,OQt3.Q0 $100;OOQ.QO $10d,Q0f�:00
5 Construction Area 5igns EA 40 $400.00 $16,QQO;OQ $223.23 $8�929.20 $200.00 $8,OOQ.00 $250.00 $1Q,Q00.00
6 Project Funding Sign EA 1 $2,50C1.00 $2,500:00 $2,852:33 $2,852.33 $2,5QOAQ $2,50Q.00 $2,OOQ.QO $2,000.00
7 Trench Sheeting and Sharing LS 1 $50,000.00 $50,000:00 $49,047 78 $49;047.78 $125;0OO.OQ $125;OOQ.00 �25;OOQ.00 $25,000:00
8 Wat�r Ma'in(8°PVG) LF 1996 $165:00 $329,340:00 $189:82 $378,880.72 $160.00 $319,360.00 $272.00 $542,912.00
9 Water Main(12"DIP,Slurry) LF 75 $350:00 $26,250:OD $757.18 $56,788.50 $7Q0.00 $52,500.Q0 $9Q0.00 $67,50Q.00
10 Water Main(24"DIP;Slurry} LF 9168 $43Q.OQ $3,942,240.00 $527,87 $4,839;512.16 $496.00 $4,547,328.00 $669.00 $6,133,392A0
11 Fire HydrantAssembly EA 7 $20,Q00.4Q $140,000:00 $17,877:23 $125,14Q.61 $21,QOO.OQ $147,OQ0.00 $35,000.00 $245,0OO.OQ
12 R�place Water Senrice EA 15 $4,750:OQ $71,250.d0 $7,63Q.27 $114,454.05 $4,600.OQ $69;OQ0.00 $22,OOQ.00 $330,000:00
13 Valve(g��Gate) EA 11 $2,780:00 $30,58Q.OQ $5,737A8 $63;1Q7.88 $4,200.00 $46,200.00 $3,400.00 $37,400.00
14 Valve(12"Butterfly} EA 9 $5,352.OQ $48,168,OQ $9,300:34 $83,703.06 $6;500.00 $58;500.00 $5;300.00 $47,700:OQ
15 Valve(24"Butterfly) EA 7 $20,377;00 $142;639.OQ $23,059:87 $161,419.09 $18;000.00 $126,OQ0.00 $18,000.�0 $126;U00.00
16 Valve(3Q"Butterfly) EA 1 $24,350.00 $24,350:00 $49,076:24 $49,076.24 $23,OQO.QO $23;000.00 $45,000.00 $45;000.00
17 Water SenPice Connection(6'�) EA 1 $18,360:OQ $18,360.00 $25,386:39 $25,386.39 $13,000.00 $13,000.00 $50,OOQ:00 $50,OQO:OQ
18 Imported Barrow LS 1 $39,OOQAO $39,000.00 $36,760.41 $36,760.41 $35,0OO.Op $35,OOQ:00 $1,OU0.00 �1,OOQ.00
19 Structural Goncrete{Bridge) CY 30 $2,350:00 $70,500.00 $1,407;27 $42,218.10 $5,000.00 $150;000.40 $3,200.00 $96;Op0.00
2Q Minor Cancrete{Cradle) GY 5 $6,500.00 $32;500.00 $1,592:94 $7,964.70 $2;700:00 $1�;50Q,00 �2,86p:00 $'14,3Qp.OQ
21 Bar Reinfarcing Steel(Bridge) LB 4p24 $7.25 $29,174.00 $14.93 $60,078.32 $4.00 $16,096.00 $3.Q0 $12,072.00
� � �
23 Core Goncrete{1"} LF 65 $150.00 $9,750.00 $112.69 $7,324.85 $420.00 $27,300:OQ $355.t1Q $23;075AQ
24 Drill and Band Dowel LF 26Q $98.00 $�25,480.00 $7Q:32 $18,283.20 $7Q.OQ $18,200,OQ $58.Q0 $15;08Q.00
25 Miscellaneous Metal(Bridge}(Mechanical EA 58 $7,750.OQ $449,500.Q0 $312.45 $18,122.10 $85:00 $4,930.00 $104;OQ $6;p32A0
26 Miscellaneous Metal(Bridge} LB 68p3 $25.00 $170�075.00 $11:12 $75,649.36 $15;OQ $102;045.00 $18:00 $122,454.00
27 Daubla Ball Expansion Jcain# EA 2 $125�100.00 $250;2Q0.00 $65,819.Q8 $131,638.16 $50,000:00 $100,OOO.QO $72,�OC7.00 $144,OOa:00
28 Water Main(24"Class 25Q DIP, Bridge) LF 210 $1,195.00 $250;950.00 $565.21 $198,694.10 $5QQ,OQ $105,000.00 $1,10d:00 $231,OOQ.00
29 Combination Rir Valve EA 2 $6,950A0 $13,900.OQ $7,308.92 �14,617:84 $8,600:00 $17,200.Q0 $18,OQO:OQ $36;000.00
30 Welded Steel Pipe Casing(36",Bridge) LF 158 $3,550.Q0 $56Q,900.00 $483.72 $76,427.76 $43q:p(? $67,940.00 $450:Ot? $71,1q0.00
31 4°'BlawoffAssembly EA 1 $12;612.QQ $12,6'i2.00 $24,037.98 $24,037:98 $11,p00:00 $11,000.00 $16,0OO.OQ $16;000.00
32 Starm brain(18"SDP) LF 17t? $199.00 $33,83Q.QQ $445.13 $75,672.10 $366:00 $62,220.Qd $65Q.Q0 $110,500.00
33 Gatch Basin Na.3 ER 1 $?;499.00 $7,499.Qd $6;424.27 $6,424.27 $9,100:00 $9,100.Q0 $14,000.00 $14;�C1Q.00
34 Manhale(Storm Drain} EA 1 $8;76�.00 $8,760,00 $14;444.04 $14,444.04 $36,5C10:00 $36�500:Ot� $30,340:00 $30;340.00
35 Reset Centerline Monument EA 18 $1,500.00 $27,�OO.QO $676.95 $12,174:30 $1,20Q:00 $21,600:00 $765.Q0 $13,770.00
TOTAL-CC}NTRfl.GT lTEMS $6�891,569.00 $6;979,542.30 $7,196,019:00 $8;725,627.00
Shaded areas indicate carrections made
in accordance with the special provisians:
Rage 2 of 2
l�TOTICE QF EXEMPTI(JN
TO; Q Office of Plannzng ai�d Researcla FRo1vt: Grty of Redding
14D0 Tenth Street,Room 121 Public Works Department
Sacramento, CA 95814 777 Cypress Avenue
Redding,CA 9600I
� Shasta County Clerk
County of'Shasta
P.O. Box 990880, 1643 Market Street
Redding, CA 96099-0$80
Project Title: Lake Boulevard Transm�ssion Water Main Praject J O#Zb21-10
Project Lacation—Specific4 Lake Boulevard Nortlluoint Drive Redwood Boulevard Julv Way and Yuletide Avenue
Project Lacation—City:Reddin�Project Lacation—County: Shasta
Descript►on af Praject: The Citv of Reddin� (Citv1 will install a new water tiransmissian main in nortll Reddin� The
proi'ect includes the installation c�f approxirnatelv 10 000 feet af 24-inch 150 feet of 12-lnch and 2 00(? feet of 8 lncla
water line. Existin� water services, meters and hydrants will be replaced or reconnected The praiect also includes
installation of apt�roximatelv 2QQ Iillear feet of 18-inc1� reinforced cancrete storm drain p�e catch basins manholes and
minor madificatioil of tlze Lake Boulevard Brid�e over the Unian Pacific Railroad line Erosion cazztrol will be applied to
disturbed areas. Work will be canducted witllin the ri�llf of way and witl�in easement areas The public will be natified of
traffic restrictions,
Name af Public Agency Approving Project.Citv of Reddiri�
Name af Person or Agency Carrying C?ut Praject: Kristen Rea�an;Proaect En�ineer
Exempt Status: (check r�ne)
❑ Ministerial [Section 21080(b)(1}, 15268]
❑ Declared Emergency [5ection 21080(b)(3); 15269(a)]
❑ Emerge��cy Project[Section 21{?80(b}(4), 15269(b)]
❑ Statutory E�emptions. State code number;
❑ Camman Sense E:�emption (This praject does not fall within an exempt class,but it can be seen with certainty that there is
no possibility that the activity may have a significant effect on the environment(14 CCR 15061[b][3]j.
� Categorical Exemption. State type and section nurnber: Section 153Q1(b& c).Existin�Facilities 15302(c}
Replacemezlt ar Reconstruction, and 153Q3(dl.New Construction or Conv�rsion of Existing St��uctures
� No exceptions apply that would bar the use of a categorical exemptian(PRD 21084 and 14 CCR 15300.2).
Reasons why project xs exempt: Class 1 �xemptions iXlclude the minor alteration of existin� public structures and
facilities: Class 2 exelnptions coz�sists of replacement or reconstructian where the new structure will be located on t11e
sarne site and will have substantiallv the sarne �urpos� and eapacitv Class 3 exemptions consist of construction and
location of new sznall faczlities and equipinent or convai-sion of existitl�structures The existin�utilities will be extended
to provide reliabie servi�e tliat meets public healfh and safety stai7dards TIZe projact will be located in the ri�ht af way
parallal ta t11e existin� water lir7e and tlie project will result in a negli�ible expansion of use The actian area does not
have si�nificaiit values for wildlife habitat or ather environmental resources and the praiect has no potential to have a
si�ni�icant effect on the envrronment.
Lead Agency Contact Persona Amber Ke11ev Telephane: 530.225.4046
If Filed by Applicant.
1. Attach certified docutnenY of exemption finding.
2. Has a notice of exemption been filed by the public agency approving the pro�ect? ❑ Yes ❑No
Signature> llate: °"0`�
Title: Environgnentat Cam liance ana er
0 Signed by Lead Agency I7ate r�ceived for filing at OPR.
❑ Signed by Applicant
n.r.r�n n�.��r..__. cinn��