HomeMy WebLinkAbout _ 4.11(e)--Approve Contingency Increase for the East Cypress Avenue Storm Drain Replacement Project GI �" Y � F
� � � ° � � � " � � CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: February 21, 2023 FROM: Chuck Aukland,Public
ITEM NO. 4.11(e) Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
ukl�n�l,H'ciblic Wc�aks L'��reGt ' 2�'9(7t�23 ry ip}�in,�C"i ana � `?l13/2423
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(e)--Approve Contingency Increase for the East Cypress Avenue Storm Drain
Re lacement Project Bid Schedule No. 5286
Recommendation
Approve a project budget increase in the amount of$75,000 for the completion of Bid Schedule
No. 5286, East Cypress Storm Drain Replacement Project.
Fiscal Impact
The East Cypress Storm Drain Replacement Project (Project) is being funded by the Storm Drain
Utility Fund. The proposed $75,000 increase will come from already budgeted funds in the
Strom Drain Division. The total project cost, including the proposed increase, is expected to be
just under $563,000.
Alternative Action
The City Council (Council) may choose to reject the request and provide alternative direction to
staff.
Background/Analysis
On June 7, 2022, the Council awarded the construction contract for the project to Northstate
Earth and Water, Ine. The project consists of replacing a deteriorating six-foot by two-feet-eight-
inch storm drain box culvert that has reached the end of its useful life with a new pre-cast box
culvert. This facility crosses East Cypress Avenue between Oxford Road and Bunker Street. This
project also includes r�placing asphalt concrete paving, curb, gutter, sidewalk, storm drainage
inlets, and other miscellaneous items of work.
During the course of construction, conditions in the field warranted changes to meet the original
project's intent. These changes include unidentified water service conflicts, trench shoring, and
eompaetion issues. However, the most significant item was the discovery of a PG&E gas service
and AT&T duct bank that was poured directly into the foundation of the culvert being replaced,
Report to Redding City Council February 10,2023
Re: 4.11(e)--Approve Contingency Increase for the East Cypress Avenue Storm Drain
Replacement Project Page 2
which caused re-routing and delays to the project. The noted changes wi11 result in the contract
bid item exceeding the bid quantity.
The additional work will also cause the project budget to exceed the awarded amounts. An
additional $75,000 in construction contingency funds is being requested to cover the additional
expense.
COST SUMMARY
Item Awarded Amount P�^o'ected Amount Increase
Construction Contin enc $35,000 $110,000 $75,000
Envir�onmental Review
This action is not a project as defined by the California Environmental Quality Act (CEQA), and
no further action is required. On June 7, 2022, the Council determined that the project is
categorically exempt from review under the CEQA Guidelines, pursuant to Section 15301(b) —
Existing Facilities.
Council Priority/City Manager Goals
• This agenda item is a routine operational item.
Attachments
Previous Staff Report 06-07-22
GI �" Y � F
� � � ° � � � " � � CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: June'7,2022 FROM: Chuck Aukland, Public
ITEM NO. 4.11(d) Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
ukl�n�l,H'ciblic Wc�aks L'��reGt ' S(?41242? ry ip}�in,�C"i ana � f�/1(242?
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(d)--Award Bid Sched�ule No. 5286 (Job Order No. 2667) East Cypress
Avenue Storm Drain Re lacement Pro'ect
Recommendation
Authorize the following actions relative to Bid Sched�ule No. 5286 (Job No. 2667), East Cypress
Avenue Storm Drain Replacement Project:
(1) Award to Northstate Earth and Water, Inc., in the amount of$322,472.07;
(2) Approve an additional $85,000 to cover the cost of administration and inspection fees;
(3) Approve $35,000 to provide construction contingency funding;
(4) Approve $30,000 for project development including environmental and permits;
(5) Authorize the City Manager to approve additional increases in either the construction
management or construction contingency amounts up to a total of$15,000; and
(6) Find that the Project is categorically exempt from the California Environmental Quality
Act per Section 15301(b)—Existing Facilities.
Fiscal Impact
Sufficient Storm Drain Maintenance funds have been budgeted for Fiscal Year 2021-22 to pay
for this project.
Cos�Summa
Item Estimated
Pro'ect Develo ment Costs $30,000
Construction Contract+ Contin enc $357,472
Contract Administration, Ins ection, Testin $85,000
Additional Cit Mana er Authorit $15,000
Total Project Costs $48�,4�Z
Project cost components are estimates and some shifting of the project development,
construction management, and construction contingency funds may be necessary to balance the
project within the approved budget.
Report to Redding City Council June 1,2022
Re: 4.11(d)--E. CypressAvenue Storm Drain Replacement Project Page 2
Alternative Action
The City Council (Council) may choose not to award the bid for the East Cypress Avenue Storm
Drain Replacement Project Bid Schedule and direct Storm Drain maintenance crews to continue
monitoring the deteriorating concrete soffit of the existing box culvert and repair as needed.
Roadway failure on this section of East Cypress would impact local business and traffic.
Background/Analysis
The project consists of replacing a deteriorating six-foot by two-feet-eight-inch storm drain box
culvert that has reached the end of its useful life with a new pre-cast box culvert. This facility
crosses East Cypress between Oxford Road and Bunker Street. This project also includes
replacing asphalt concrete paving, curb, gutter, sidewalk, storm drainage inlets and other
miscellaneous items of work.
Attached is the tabulation of bids received and opened on May 5, 2022. The low bid in the
amount of $322,472.07 was received from Northstate Earth and Water, Inc., of Redding,
California. The engineer's estimate was $290,250. Total project development costs for this
project are estimated to be $30,000. Project development costs include engineering and
environmental with permits.
Staff has determined that the project qualifies as Categorically Exempt from environmental
review under CEQA Guidelines Section 15301. The project has been reviewed for sensitive
resources such as threatened or endangered species or their habitats, sensitive vegetation
communities, and tribal cultural resources. The project has no potential to have a significant
effect on the environment.
Council Pr�iority/City Manager Goals
This agenda item is a routine operational item.
Attachments
^Bid Tabularion
^Location Map
^Notice of Exemption (unfiled)
BID TABULATION FOR:
E. CYPRESS AVENUE STORM DRAIN REPLACEMENT PROJECT
Bid Schedule No.: 5286
ENGINEER'S EST Northstate Earth &Water Site Work Solultions
5/5/2022 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
WATER POLLUTION
1 CONTROL LS 1 $8,000.00 $8,000.00 $4,140.00 $4,140.00 $1,351.00 $1,351.00
2 CONSTRUCTION SIGNS EA 6 $300.00 $1,800.00 $583.48 �i�,�p€����; $563.00 $3,378.00
3 PROJECT FUNDING SIGN LS 1 $1,200.00 $1,200.00 $1,380.00 $1,380.00 $1,500.00 $1,500.00
SIGN (PORTABLE
4 CHANGEABLE MESSAGE) EA 2 $1,500.00 $3,000.00 $2,466.15 $4,932.30 $1,861.00 $3,722.00
5 TRAFFIC CONTROL LS 1 $45,000.00 $45,000.00 $50,059.46 $50,059.46 $25,182.00 $25,182.00
TRENCH SHEETING AND
6 SHORING LS 1 $6,000.00 $6,000.00 $18,906.38 $18,906.38 $3,507.00 $3,507.00
PRECAST REINFORCED
7 BOX CULVERT (6'X 2'-8") CY 77 $2,650.00 $204,050.00 $2,457.73 ;„�'lF�9�24���'� $3,278.00 $252,406.00
CAST-IN-PLACE
REINFORCED BOX
8 CULVERT (6'X 2'8") CY 8 $2,650.00 $21,200.00 $6,288.48 �=$��3���17.�3� $11,061.00 $88,488.00
TOTAL-CONTRACT ITEMS $290,250.00 ����,+��2w�7°' $379,534.00
Shaded areas indicate corrections made in accordance with the special provisions.
NTS
--._
--- � � _
– - , .,,,. - � �
�
, �
�
, �
, , ,
,
, , ,
, -
� , : � , �
� � ' _ ___.
, a
�
;
� � .....,� �
E CYPRESS AVENUE PROJECT
SITE
I �
I� � �
, , �
, ,
, z �
o � �,� - � �,�,; ; � u_
- o �� ;� � = I A ; ' w ��� �
p „1 � .., � � >
� ..r_ ,,._ � � i t!1 . � '�C
, „ ,
", „� " �
Q - - - �
i..� � � �„ - �
,
-- W =
O � „r �
Z _ C,�
-- - N= � �
(
, ! ,
�
.-�
- ; \ -
-- 1
MAY/2022
CITY OF REDDING oF RFo EAST CYPRESS AVENUE
� —�'2 STORM DRAIN REPLACEMENT
� � � PROJECT
PUBLIC WORKS ° � �� ��� � °
DEPARTMENT �c,�aa�'P PROJECT LOCATION MAP
1 of 1
NQTIGE QF EXEMFTION
Tom ❑ Office of Planning and Research FROM: City of Redding
1400 Tenth Street,Room 121 Public Works Department
Sacramento,CA 95814 777 Cypress A:venue
��aa���,ca�rao1
� Shasta County Clerk
Caunty of Shasta
P.O.�ox 99Q880, 1643 Market Street
Redding,CA 96099-0880
PrQject Title. E.Cvpress Avenue Storm Drain Replacement Project J.O. #26b?-10
Praject Lacation—Specific. East Cvpress AVenue between C7xford Raad and Bunker Street
Project Locatian—City:Reddffn� Praject Location—Caunty: Shasta
Descriptian of Praject: Tha Citv of Reddin will replace a�proximatel� 150 linear feet of deteriarated 6' wide by 2' 8"
hi�h concrete box culvert. The open trench znethad will be used and all trenches will be covered at the end of each work
dav.Work witi occur within Ci right of wa�and the public wrll be natified afthe prolecY
Name af Fubiic Agency Approving Project: City of Redding
Name of Person or Agency Carrying Oat Praject: Dennis Russo,Proiect Mana�er
Exempt Status: (check one)
❑ Ministerial jSection 210$0(b}(1); 15268]
❑ Declared Emergency'[Section 21080(b)(3}� 15269(a}]
❑ Ernergency Froject [Section 210$0(b)(4}a 15269(b)]
❑ Statutary Exernptions. State code number:
❑ Corrtmon Sense Exemption(This�aroject does not fall within an exempt class,but it can be seen with certainty that there is
no passibility that the activity may have a signlficant effect on the environrnent{I4 CCR 15601[b][3]).
� Categorical Ea:emption. State iype and section number: Sec. 15301(b). Existin�Facilities
Based an an exarnination of this proposal and supporting infarrnat'ron,tlie following statements ace true and exceptions do not apply:
• Ifthis projectFalls within an exempt class3,4,5,6,or l l,it daes not impact an enviranmental resource of hazardous ot critical concem where
designated,precrsely rnapped,and officially aflopted pursuant ta law:
• There will not be a stgnificant c�amulative effect by this praject and successive projects of the same type in the sarne place,over time.
* There is not a reasonab(e possibility that the project w311 have a significant effect on the environrnent due to unusual circumstances:
• This project does not damage a scenic resource witlain an officialIy designated state scenSc highway:
• This praJect is not located on a site included on any list compi(ed pursuant to Govt.Code§S69G2.5("Cartese List")
• This praject does not cause a substantial adverse change in the significance of a histarical resource:
Reasons why project is exempt: Class 1 exemptions include the operation, repair rnaintenance or rninor alteration of
existin� facilities, stru�tures, ar equipment involvin� negl�ible or no expansion af use The starm drain p�pe will be
replaced in the same location and with the same size�pe The project involves no expansion of use The pro�ect has been
reviewed for sensitive resources such as threatened or endan er�ed species or their habitats sensitive ve etation
cammunities, tribal lands, or tribal cultural resources. The�praject has no potential ta haVe a si�nifcant effect on the
environment.
Lead Agency Gantact Fersan:Amber Kelley Telephone: 53Q.225.4Q46
If Filed by Applicant:
1. Attach certifed document of exemption finding:
2. Has a notice of exemption been filed by the public agency appraving the project? ❑ Yes ❑No
Signaturet ['�.�� ...�'.>� .,�" Date: �o'c��k� c�'�
Title< Environmental Carnpliance Ma a�er (f�
�Signed by Lead Agency I}ate received for filing at OPR:
❑ Signed by Applicant