HomeMy WebLinkAboutReso 2023-040 - Adopting the list of Projects for FY 23-24 Funded by SB 1RESOLUTION NO. 2023-040
A RESOLUTION OF THE CITY OF REDDING ADOPTING THE LIST OF
PROJECTS FOR FISCAL YEAR 2023-24 FUNDED BY SB 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April
2017 in order to address the significant multi -modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of the City of Redding (City) are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City must include a list of all projects (Attachment A) proposed to receive
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in
the City budget, which must include a description and the location of each proposed project, a
proposed schedule for the project's completion, and the estimated useful life of the improvement;
and
WHEREAS, the City, will receive an estimated $2,319,648 in RMRA funding in Fiscal Year
2023-24 from SB 1; and
WHEREAS, this is the sixth year in which the City is receiving SB 1 funding and will enable the
City to continue essential road maintenance and rehabilitation projects, safety improvements,
increasing access and mobility options for the traveling public that would not have otherwise been
possible without SBI; and
WHEREAS, the City has undergone a public process to ensure public input into our community's
project list; and
WHEREAS, the City used a Pavement Management System to develop portions of the SB 1
project list to ensure revenues are being used on the most high-priority and cost-effective projects
that also meet the community's priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets and roads
and add active transportation infrastructure throughout the City this year and numerous similar
projects into the future; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co -benefits statewide;
1�
J
NOW THEREFORE, BE IT RESOLVED THAT the City Council of Redding, County of
Shasta, State of California, accepts the proposed projects which will utilize Fiscal Year 2023-
24 Road Maintenance and Rehabilitation revenues in their delivery. With the listing of
these projects in the adopted fiscal year resolution, the City is reaffirming to the public and
the State our intent to fund these projects with Road Maintenance and Rehabilitation
Account revenues List of Projects (Attachment A) funded by SB 1, the Road Maintenance and
Rehabilitation Account for Fiscal Year 2023-24.
I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the
City Council of the City of Redding on the 2nd day of May, 2023, and was duly adopted at
said meeting by the following vote:
AYES:
COUNCIL MEMBER: - Audette, Mezzano, Munns, Winter, and Dacquisto
NOES:
COUNCIL MEMBER: - None
ABSENT:
COUNCIL MEMBER: -N o n e
ABSTAIN:
COUNCIL MEMBER: - None
MICHAEL DACQUISTO, Mayor
ATTEST: FORM APPROVED:
X/AAMELA —Nf1ZE'-CiW Clerk
BARRY E. De AL , City Attorney
ATTACHMENT A
STATE OF CALIFORNIA • CALIRNIA TRANSPORTATION COMMISSION
Senate Bill (SB) 1 Proposed PrFOoject List Form
r i p ii �i i���ilii li u t G " N ltd �tii� iG! li ylL ii t t
i�Streets and Roads wrogra:m
�,) /�_
FY
Agency Name:
A enc Contact:
Estimated
o
Redden 16i Ij(G 1i,
Ai
LoCode: ` 5068 'rr
Useful Life
s ki6n6y@cityofr6dc1' I
FY
Estimated
Estimated Completion Date
Useful Life
Project
Relisted Project Title
Project Description
Project Location#
of ears
No.
Pre-
Construction
Min.
Max.
Construction
PP01
Relisted
General Maintenance to include, but not
Citywide
7/2023
06/2024
1
5
General Maintenance
limited to pothole patching, crack sealing,
street signs, street striping, etc. I This
project will include: Public Works Staffing,
Other, Procurement of Public Works
Equipment, Procurement of Road
Maintenance and Rehab Materials,
Procurement of Public Works Safety
Materials and Gear.
PP02
Relisted
This project will include: bridge structure
Old Alturas Road at Chum Creek
6/2024
10/2025
15
50
Old Alturas Bridge over Churn
rehab/repair (existing), sidewalk and/or
and 200' before and after bridge
Creek
crosswalk installation (new), and bridge
limits.
structure widening.
PP03
Cape Seal
This project will include pavement
On side streets along Lake Blvd
6/2023
11/23
5
12
rehab/repair (existing).
from Clay Street to Oasis and
Redwood Blvd from Lake Blvd to
Caterpillar Way.
PP04
Oregon Street Improvements
This project will include cost estimating,
Oregon Street between Shasta
02/2020
10/2025
10
30
preliminary design, sidewalk and/or
Street and Yuba Street.
crosswalk installation (new) and storm
drain/culvert installation (new).
PPO
Turtle Bay to Downtown Gap
This project will include 2 -way cycle track,
Sundial Bridge Drive above and
02/2020
10/2025
20
30
Completion
shared use path, raised intersection with
north of SR44, throughout Turtle
curb extension, bollards, lane reductions,
Bay Park and connecting to the
raised crosswalks with bike/ped
Sacramento River Trail.
separations, and shade trees.