Loading...
HomeMy WebLinkAboutReso 2023-040 - Adopting the list of Projects for FY 23-24 Funded by SB 1RESOLUTION NO. 2023-040 A RESOLUTION OF THE CITY OF REDDING ADOPTING THE LIST OF PROJECTS FOR FISCAL YEAR 2023-24 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 in order to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Redding (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must include a list of all projects (Attachment A) proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $2,319,648 in RMRA funding in Fiscal Year 2023-24 from SB 1; and WHEREAS, this is the sixth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, increasing access and mobility options for the traveling public that would not have otherwise been possible without SBI; and WHEREAS, the City has undergone a public process to ensure public input into our community's project list; and WHEREAS, the City used a Pavement Management System to develop portions of the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community's priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets and roads and add active transportation infrastructure throughout the City this year and numerous similar projects into the future; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co -benefits statewide; 1� J NOW THEREFORE, BE IT RESOLVED THAT the City Council of Redding, County of Shasta, State of California, accepts the proposed projects which will utilize Fiscal Year 2023- 24 Road Maintenance and Rehabilitation revenues in their delivery. With the listing of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues List of Projects (Attachment A) funded by SB 1, the Road Maintenance and Rehabilitation Account for Fiscal Year 2023-24. I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 2nd day of May, 2023, and was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBER: - Audette, Mezzano, Munns, Winter, and Dacquisto NOES: COUNCIL MEMBER: - None ABSENT: COUNCIL MEMBER: -N o n e ABSTAIN: COUNCIL MEMBER: - None MICHAEL DACQUISTO, Mayor ATTEST: FORM APPROVED: X/AAMELA —Nf1ZE'-CiW Clerk BARRY E. De AL , City Attorney ATTACHMENT A STATE OF CALIFORNIA • CALIRNIA TRANSPORTATION COMMISSION Senate Bill (SB) 1 Proposed PrFOoject List Form r i p ii �i i���ilii li u t G " N ltd �tii� iG! li ylL ii t t i�Streets and Roads wrogra:m �,) /�_ FY Agency Name: A enc Contact: Estimated o Redden 16i Ij(G 1i, Ai LoCode: ` 5068 'rr Useful Life s ki6n6y@cityofr6dc1' I FY Estimated Estimated Completion Date Useful Life Project Relisted Project Title Project Description Project Location# of ears No. Pre- Construction Min. Max. Construction PP01 Relisted General Maintenance to include, but not Citywide 7/2023 06/2024 1 5 General Maintenance limited to pothole patching, crack sealing, street signs, street striping, etc. I This project will include: Public Works Staffing, Other, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Procurement of Public Works Safety Materials and Gear. PP02 Relisted This project will include: bridge structure Old Alturas Road at Chum Creek 6/2024 10/2025 15 50 Old Alturas Bridge over Churn rehab/repair (existing), sidewalk and/or and 200' before and after bridge Creek crosswalk installation (new), and bridge limits. structure widening. PP03 Cape Seal This project will include pavement On side streets along Lake Blvd 6/2023 11/23 5 12 rehab/repair (existing). from Clay Street to Oasis and Redwood Blvd from Lake Blvd to Caterpillar Way. PP04 Oregon Street Improvements This project will include cost estimating, Oregon Street between Shasta 02/2020 10/2025 10 30 preliminary design, sidewalk and/or Street and Yuba Street. crosswalk installation (new) and storm drain/culvert installation (new). PPO Turtle Bay to Downtown Gap This project will include 2 -way cycle track, Sundial Bridge Drive above and 02/2020 10/2025 20 30 Completion shared use path, raised intersection with north of SR44, throughout Turtle curb extension, bollards, lane reductions, Bay Park and connecting to the raised crosswalks with bike/ped Sacramento River Trail. separations, and shade trees.