HomeMy WebLinkAbout4.11(d)--Accept Bid Schedule No. 5233 Replace AC Surfacing 2021 Project GI �" Y � F
� � � ° � � � " � � CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: January 17, 2023 FROM: Chuck Aukland,Public
ITEM NO. 4.11(d) Works Director
***APPROVED BY***
� „
�:
�
ukl�n�I,H'ciblic Wr�aks L'�ireGt ' 1;'S12423 5 �ri I�cMaa�d,Ass��tant C"ity = :, Ir'�/2423
caulcland@ci.redding.ca.us btippin@cityofredding.org �
SUBJECT: 4.11(d)--Accept Bid Sched�ule No. 5233 Replace AC Surfacing 2021 Project
Recommendation
Accept Bid Schedule No. 5233 (Job No. 2633), Replace Asphalt Concrete (AC) Surfacing 2021
Project, awarded to J.F. Shea Construction, Inc., as satisfactorily complete, with a final cost of
$2,448,421.62.
Fiscal Impact
Streets Division funding in the amount of $2,500,000 was approved for this project for Fiscal
Year 2021-22. The total project cost, including surveying, design, bidding, construction, field
engineering, inspection, and contract administration is $2,448,421.62.
Alternative Action
The City Council (Council) may choose to not accept the project as satisfactorily complete and
provide staff alternative direction.
Background
J.F. Shea Construction, Inc., has completed all items of work on the Replace AC Surfacing 2021
Project as of September 30, 2022, which was within the adjusted contract time frame following
weather delays and additional work. The project warranty period expires one year from the
completion date of September 30, 2022, and the Public Works Department subsequently filed a
notice of completion with Shasta County.
At its meeting on September 21, 2021, the Council awarded a construction contraet to J.F. Shea
Construction, Inc., of Redding, California, for $1,431,134 and approved a $250,000 construction
contingency fund. Also authorized was $148,000 for contract administration and construction
inspection fees and $40,000 for project development costs. The City Manager was authorized to
approve additional increases in either the construction management or construction contingency
Report to Redding City Council January 6,2023
Re: 4.11(d)--Accept Bia'Schedule No. 5233 Replace AC Surfacing 2021 Project Page 2
amounts up to a total of $50,000. The total authorized amount for the project was $1,919,134.
Project development costs include engineering, environmental, and consultant services.
At its meeting on March 1, 2022, the Council approved an additional $430,000 in construction
contingency for improvements on a section of Twin View Boulevard, which included installation
of curb, gutter, sidewalk, additional AC pavement, and bike lanes in concert with the City
Council's Complete Streets Policy. At its meeting on June 21, 2022, the Council approved an
additional $150,000 in construction contingency utilizing Storm Drain Utility funds for
replacement of a failed storm drain pipe on Shasta View Drive, which brought the total
authorized construction contingency to $830,000 and the total project authorized amount to
$2,499,134.
During construction, there were five change orders in the amount of$793,319.62, which includes
the items previously noted. Due to the increase in the overall project scope, additional staff time
was necessary to complete the project and required the shifting of funds from construction
contingency to contract administration and inspection fees in the amount of$36,000 to balance
the project within the approved budget. The final project cost was $2,448,421.62, which is within
the amount budgeted at the time the project was awarded.
The project involved removing and replacing approximately 126,000 cubic feet of asphalt
concrete in worn and deteriorated sections of Churn Creek Road, Shasta View Drive, Caterpillar
Road, Twin View Boulevard, Old Alturas Road, and Mission De Oro Drive as well as
appropriate traffic control, striping, and pavement markings as required.
Cost Summary
Awarded Amounts Actual Cost
Project Development Costs $40,000.00 $40,000.00
Construction Contract + �""��°'��
Contin enc
�2,261,134.00 : \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\�``��
Construction Contract +
� 2 224 4 2
: $
� ,
53.6
ntra t han r r
Co c C eOdes
Contract Administration & �148,000.00 $183,968.00
Ins ection
Additional City Manager �50,000.00 $0.00
Authorit
Total $2,499,134.00 $2,448,421.62
Environmental Review
This action is not a project as defined by the California Environmental Quality Act, and no
further action is required. On September 19, 2021, the Council determined that the project is
categorically exempt from review under the California Environmental Quality Act Guidelines,
per Section 15301 (Existing Facilities).
Report to Redding City Council January 6,2023
Re: 4.11(d)--Accept Bia'Schedule No. 5233 Replace AC Surfacing 2021 Project Page 3
Council Priority/City Manage� Goals
This agenda item is a routine operational item.
Attachments
^Replace AC Surfacing Location Map
Previous Report 09-21-21
Previous Report 03-01-22
Previous Report 06-21-22
�> �� Z
���� �, O
/ �
� � O
� � ��i� O
F' �' O
'��!q�KER �� o >
��
� �
�
i _
CATERPILLAR RD oP��� TWIN VIEW BLVD
o�qR�r� i
`� ��� �� SNASTA
� COMMUNITY
r COLLEGE
G� DAM �
`�S� � R 2gg E
i n v� S
qjr�� � � �R
Q�qR � � ��EW
�' '� ti co�-E�� SHASTA VIEW DR
CHURN CREEK RD
��
�
�- g�NTON�P�
�f.—��/ �` d
MISSION DE ORO DR � OLD A�TURAS RD
��� � oi� a�TURAs
_ z
EUREKA_� � o
o �e - �ANa a
�� �� �O`'Tti� ��� SHASTA VIEW DR
� �,
ARY�
�
aKE � O
�n CYP R�SS ti
�Rp�RK _ -_�_�.
� �
� NARTNE��� �
�y� r� � ....
� — �
�� � i.�
��G�'9 w C' w
m z >
� Q
q z � Q u�
_i c� o � Q
cn � w z
o � � U'
m � Q
Q
�EFZ � RAN C H 0
�_P� o �NN���
� v" S 8
� �
��
i.�
� �
� �
7 0
� �
� �
� Q REDDING
�� GIRVAN � MUNICIPAL
� �� AIRPORT
CREEK �� � _ �
CLEAR � �
��`.... B
� �� MEADOWVIC
�D
v�
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
INSPIRATION PL
w
> '.
� s
Cs „ .,. .... .. . ....... ....._. ..... .._.
� �. � :
_ W S
' ' ' j , ... . .. „ ;
a ;
�
N :
Q
2 :
y: i
_
v , � .
�
',„ . �, ",�,� :,,,,,. _ m..:„ ... . . ........... . . ;' . . ._.
g . � ,
; w
J
OLD A�TURA3,RD
� TURPS`R� _
t � O�-D��-� 5
�„, , � _ � MAl'11V�Ub LN; , �� � ' . �.
•� � .. , . '. . ATRIUM WAY._ .
. .
, w. � � � _
YdITAIR�WAY i,� . �
. ���� VIKING�111IAY
Sp ^. � �� TARMA�RD
��F � � � -
� �
yy,y � � � � � _ _ _
AQ �' � .... -
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
_, .. ',
� � �gS R�������
, Gp`-1EGE'V\EW�R
'"; � �
�� ` , . � ,�� �` ''. '' �, �''qS
�, �', � ... T,9
` ����L
:. ' 9.� .... . . .. , � 6
�. �. <b0
� �.
�. � ��
� _
, �
�
�2 �s
G ; .. ,,, �.
� � �� '� �
�, � e, �. ' ,. �� ' ' -, �
Z �, '_ � � �
_ .. �. Ci � �`; . „ � � .,.,
, . � _ � � ��:,. ,
� m'. �� � � � � � � � � PALACIO DR � � �
° � � �� � � � � a�
`. ,O �;�
�,. �
��� �/ �
� �� F
„ . . � z, e. � /
�, �-. . � .
PA�pC10 OR
�'�y
�
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
OqSiS RD
� ....
5���p��� _
OP
y '
h
h
t� :i
' , Z ,� ; .� �. .."
'
�� ^, , . � m ' i
G
��ti�� ��`
. ,
> > '� d" � ��
� ,G � � � .,;;.
�l z
� � „ �
, _ — , ^,
� ��c0�, � � ... . � �,-� � �.,
� ���! � � �
�� „ .
,
CqTF��/� ,�� ,�, ': , : �.' � �
, � . �,qRR� � �.` � �,
� �., ,
� � ��. e�fi ., ...,.:
;� °.
� e... .... _ ,..., � _ � = � ��,�, � ��;�
y° � �
� .
, „
� �,. , , �, � ''� cn
. . . ,., . �M . �. , ,
, � ' '. � �'. ., �
:. Xr
�, � . ' " . � ' " . � ' N � ., , � � ' . �
,, .. � '' t.. �...... 1 �:�
Z
.
� �,
.. - ., .. JQ ' .
.. ;=, � �; v� :< ..
��� ,
� �� �
,�.. ,,,' , .�� , , .,. ' ' � ':, ..,. ��; , " � �
' "...,� ', . ..: .`�� � .' � './' , ,. . „ ,�
.. .:, �... � ,. ;
N
�, ..... . . , , ,
. .� '.,, � . > > ,
� y �,,a .. �, �
� �� � � �
� � �
e
� �',�- � m '- , e
�� ,,`
�
� : . ,.. � . . � � �, �
� >
� �,� � � �.,�,
. ., � �� � � �
� .. ,.
� i i
., , , �.
_ i`
� , � �gS RT����99 E
� � �� �
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
INSPIRATION PL ` Q
�
�
s�;
_.. ,. .... ,_. .. , . . . . .... `''m.. „.. .,.,.
.... ;Z ... ....
� .
_ im
� TANGLEWOOD DR � � 'm'�
_ _ � _
� �'C p�,yp�q����' ��
w
F
Q � < �
�
�
�
w
�- �_ �,;. �,. _. _
z .
�
0
0
+ � :
_ _._ �
w
o', �'
O Mis
_, v� .�S�
�. � �,
, �..
� ��S�F,p
�C.j�;.
� .... . _
� !
a i
. O `
J
J
S , .
. BROWNING ST
t�i
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
GI �" Y � F
� � � ° � � � " � � CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: September 21,2021 FROM: Chuck Aukland, Public
ITEM NO. 4.11(g} Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
ukl�n�l,H'ciblic Wc�aks L'��reGt ' �ll'9(7t�21 ry ip}�in,�C"i ana � 9,i13/2421
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(g)--Award Bid Schedule No. 5233 (Job No. 2633), Replace Asphalt
Concrete Surfacin 2021
Recommendation
Authorize the following actions relative to Bid Sched�ule No. 5233 (Job No. 2633), Replace
Asphalt Concrete (AC) Surfacing 2021:
(1) Award to J.F. Shea Construction, Inc., in the amount of$1,431,134;
(2) Approve an additional $148,000 to cover the cost of contract administration and
inspection fees;
(3) Approve $250,000 to provide construction contingency funding;
(4) Approve $40,000 for project development costs;
(5) Authorize the City Manager to approve additional increases, in either the construction
management or construction contingency amounts, up to a total of$50,000; and
(6) Find that the Project is Categorically Exempt from review under the California
Environmental Quality Act(CEQA) Guidelines Section 15301 (Existing Facilities).
Fiscal Impact
This project is funded by the Streets Department and is included in its approved budget for Fiscal
Year 2021-22. Project cost components are estimated, and some shifting of the funds may be
necessary to balance the project within the approved budget.
Cost Summav
Item Estimated
Pro�ect Develo ment Costs $40,000
Construction Contract+Contin ency $ 1,681,134
Contract Administration, Ins ection, Testin $ 148,000
Additional Cit Mana er Authorit $ 50,000
Total Pro'ect Costs $ 1,919,134
P�o'ect Bud et $ 2,500,000
Report to Redding City Council September 23, 2021
Re: 4.11(g)--Award Bid Schedule No. 5233, Replace AC Surfacing 2021 Page 2
Alternative Action
The City Council could choose to not award the project, in which case, the streets will continue
to deteriorate and require roadway reconstruction.
Background/Analysis
This project involves removing and replacing approximately 126,000 cubic feet of asphalt
concrete in worn and deteriorated sections of Churn Creek Road, Shasta View Drive, Caterpillar
Road, Twin View Boulevard, Old Alturas Road, and Mission De Oro Drive.
Attached is a tabulation of the two bids opened on September 7, 2021. The low bid in the amount
of $1,431,134 was received from J.F. Shea Construction, Inc., of Redding, California. The
engineer's estimate was $1,810,000. Total project development costs for this project are
estimated to be $90,000. Project development costs include engineering, environmental, and
consultant services (design and construction support).
Staff has determined that the project qualifies as Categorically Exempt from environmental
review under CEQA G�uidelines Section 15301. The project has been reviewed for sensitive
resources such as threatened or endangered species or their habitats, sensitive vegetation
communities, tribal lands, or tribal cultural resources. The project has no potential to have a
significant effect on the environment.
CounciZ PNior�ity/City Manager Goals
� This agenda item is a routine operational item.
Attachments
Bid Tabulation
Location Map
Notice of Exemption
BID TABU�ATION FOR:
REPLACE AC SURFACING 2021
Bid Schedule No.: 5233
Job No.: 2633 ENGINEER'S EST J. F. Shea Construction Inc. Tullis, Inc.
9/7/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 Water Pollution Control LS 1 $2,500.00 $2,500.00 $3,489.00 $3,489.00 $750.00 $750.00
2 Traffic Control LS 1 $120,000.00 $120,000.00 $117,150.46 $117,150.46 $125,650.00 $125,650.00
Replace Asphalt oncrete u acing
3 (2") CF 126657 $9.00 $1,139,913.00 $7.15 $905,597.55 $8.90 $1,127,247.30
4 Asphalt Concrete Overlay TON 2140 $90.00 $192,600.00 $74.00 $158,360.00 $80.00 $171,200.00
5 Paving Fabric SY 35166 $2.00 $70,332.00 $2.15 $75,606.90 $2.15 $75,606.90
6 Thermoplastic Traffic Stripe (6") LF 100037 $1.60 $160,059.20 $0.62 $62,022.94 $0.62 $62,022.94
7 Thermoplastic Traffic Stripe (8") LF 1957 $2.00 $3,914.00 $1.75 $3,424.75 $1.75 $3,424.75
8 Pavement Markings (Thermoplastic) SF 2383 $9.00 $21,447.00 $6.50 $15,489.50 $6.50 $15,489.50
9 Pavement Marking (Green Bike Lane) SF 1060 $16.00 $16,960.00 $15.00 $15,900.00 $15.00 $15,900.00
10 Pavement Markers EA 2579 $6.00 $15,474.00 $5.10 $13,152.90 $5.09 $13,127.11
11 Adjust Water Valve EA 34 $750.00 $25,500.00 $685.00 $23,290.00 $750.00 $25,500.00
12 Adjust Manhole EA 20 $1,500.00 $30,000.00 $1,200.00 $24,000.00 $1,000.00 $20,000.00
13 Adjust Monument EA 10 $750.00 $7,500.00 $1,365.00 $13,650.00 $1,000.00 $10,000.00
TOTAL -CONTRACT ITEMS $1,806,199.20 $1,431,134.00 $1,665,918.50
�> �� Z
���� �, O
/ �
� � O
� � ��i� O
F' �' O
'��!q�KER �� o >
��
� �
�
i _
CATERPILLAR RD oP��� TWIN VIEW BLVD
o�qR�r� i
`� ��� �� SNASTA
� COMMUNITY
r COLLEGE
G� DAM �
`�S� � R 2gg E
i n v� S
qjr�� � � �R
Q�qR � � ��EW
�' '� ti co�-E�� SHASTA VIEW DR
CHURN CREEK RD
��
�
�- g�NTON�P�
�f.—��/ �` d
MISSION DE ORO DR � OLD A�TURAS RD
��� � oi� a�TURAs
_ z
EUREKA_� � o
o �e - �ANa a
�� �� �O`'Tti� ��� SHASTA VIEW DR
� �,
ARY�
�
aKE � O
�n CYP R�SS ti
�Rp�RK _ -_�_�.
� �
� NARTNE��� �
�y� r� � ....
� — �
�� � i.�
��G�'9 w C' w
m z >
� Q
q z � Q u�
_i c� o � Q
cn � w z
o � � U'
m � Q
Q
�EFZ � RAN C H 0
�_P� o �NN���
� v" S 8
� �
��
i.�
� �
� �
7 0
� �
� �
� Q REDDING
�� GIRVAN � MUNICIPAL
� �� AIRPORT
CREEK �� � _ �
CLEAR � �
��`.... B
� �� MEADOWVIC
�D
v�
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
INSPIRATION PL
w
> '.
� s
Cs „ .,. .... .. . ....... ....._. ..... .._.
� �. � :
_ W S
' ' ' j , ... . .. „ ;
a ;
�
N :
Q
2 :
y: i
_
v , � .
�
',„ . �, ",�,� :,,,,,. _ m..:„ ... . . ........... . . ;' . . ._.
g . � ,
; w
J
OLD A�TURA3,RD
� TURPS`R� _
t � O�-D��-� 5
�„, , � _ � MAl'11V�Ub LN; , �� � ' . �.
•� � .. , . '. . ATRIUM WAY._ .
. .
, w. � � � _
YdITAIR�WAY i,� . �
. ���� VIKING�111IAY
Sp ^. � �� TARMA�RD
��F � � � -
� �
yy,y � � � � � _ _ _
AQ �' � .... -
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
_, .. ',
� � �gS R�������
, Gp`-1EGE'V\EW�R
'"; � �
�� ` , . � ,�� �` ''. '' �, �''qS
�, �', � ... T,9
` ����L
:. ' 9.� .... . . .. , � 6
�. �. <b0
� �.
�. � ��
� _
, �
�
�2 �s
G ; .. ,,, �.
� � �� '� �
�, � e, �. ' ,. �� ' ' -, �
Z �, '_ � � �
_ .. �. Ci � �`; . „ � � .,.,
, . � _ � � ��:,. ,
� m'. �� � � � � � � � � PALACIO DR � � �
° � � �� � � � � a�
`. ,O �;�
�,. �
��� �/ �
� �� F
„ . . � z, e. � /
�, �-. . � .
PA�pC10 OR
�'�y
�
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
OqSiS RD
� ....
5���p��� _
OP
y '
h
h
t� :i
' , Z ,� ; .� �. .."
'
�� ^, , . � m ' i
G
��ti�� ��`
. ,
> > '� d" � ��
� ,G � � � .,;;.
�l z
� � „ �
, _ — , ^,
� ��c0�, � � ... . � �,-� � �.,
� ���! � � �
�� „ .
,
CqTF��/� ,�� ,�, ': , : �.' � �
, � . �,qRR� � �.` � �,
� �., ,
� � ��. e�fi ., ...,.:
;� °.
� e... .... _ ,..., � _ � = � ��,�, � ��;�
y° � �
� .
, „
� �,. , , �, � ''� cn
. . . ,., . �M . �. , ,
, � ' '. � �'. ., �
:. Xr
�, � . ' " . � ' " . � ' N � ., , � � ' . �
,, .. � '' t.. �...... 1 �:�
Z
.
� �,
.. - ., .. JQ ' .
.. ;=, � �; v� :< ..
��� ,
� �� �
,�.. ,,,' , .�� , , .,. ' ' � ':, ..,. ��; , " � �
' "...,� ', . ..: .`�� � .' � './' , ,. . „ ,�
.. .:, �... � ,. ;
N
�, ..... . . , , ,
. .� '.,, � . > > ,
� y �,,a .. �, �
� �� � � �
� � �
e
� �',�- � m '- , e
�� ,,`
�
� : . ,.. � . . � � �, �
� >
� �,� � � �.,�,
. ., � �� � � �
� .. ,.
� i i
., , , �.
_ i`
� , � �gS RT����99 E
� � �� �
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
INSPIRATION PL ` Q
�
�
s�;
_.. ,. .... ,_. .. , . . . . .... `''m.. „.. .,.,.
.... ;Z ... ....
� .
_ im
� TANGLEWOOD DR � � 'm'�
_ _ � _
� �'C p�,yp�q����' ��
w
F
Q � < �
�
�
�
w
�- �_ �,;. �,. _. _
z .
�
0
0
+ � :
_ _._ �
w
o', �'
O Mis
_, v� .�S�
�. � �,
, �..
� ��S�F,p
�C.j�;.
� .... . _
� !
a i
. O `
J
J
S , .
. BROWNING ST
t�i
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
OTICE QF XEMPTIO►N
Toa 0 Shasta County Clerk FROMa City of Redding
County af Shasta Public Works Department
F.O: Box 990880, 1643 Market Street 777 Cypress Avenue
Redding,CA 96d99-0880 Redding, CA 96(�01
Project Title. Ret�lace AG Surfacin�2021 Proaect J O #2645-21
Projec#Lacation—Specific; Shasta View Drive t71d Alturas Road Twin ViewBoulevard Twin View Boulevard Churn
Greek Road, and Caterpillar Raad
ProJect Locatzan—Cityc Redd�n� Project Lacation—County. Shasta
Descriprtian of Praject: The Citv c�f Reddin� proposes a pavement maint�nance project at various locations in Reddin�
Work will consist of asphalt m111rn� a two-mch asphalt cancrete overla�d pavement stripin� Manhole covers will be
ad�usted to conform to the new nav�ment All work will occur within existin� streets and sta�ing will occur in the Citx
ra�ht ofwav. One wav traffic control or tam ararv street closures ma bY e required The public will be notified prior to the
pra�ect.
Name of Publfc Agency Approving Froject: Citv of Reddin�
Name ofPerson or Agency Carrying OutProject; Tom Semb,Proiect Ivlana�er
Exempt Status: (clreck one)
❑ Minlsterial [Section 21 Q$0(b)(1), 15268]
❑ Declared Emergen�y [Section 21Q$0(b)(3); 152b9(a)]
❑ Emergency Project [Section 21080(b)(4j; 15269{b}]
❑ Statutory Exemptidns. State code number.
❑ Common Sense Exemption(This projectdoes not fall within an exempt class;but it can be saen with certainty that there is
no possibility that the activity may have a significant effect on the environmant(14 CCR 15601[b][3])•
� Categarical Exemptian. State type and sect�on number: Sec. 15301{a). Existin�Fac�iities(c)
Based on an examrnation af this propc�sal and supportmg informat�on, the following statements are true and
exceptions do not apply:
* If this project falls within an exempt class 3, 4, 5, 6, ar 11, it does not impact an environm,ental resource af
hazardous or c1�ltrcal concern where designated,precisely mapped;and officially adopted pursuant to law.
• There will not be a significant cumulative effect by this prt�ject and successive projects of the same type in the
same place,over tirne:
• There rs not a reasonable possibility that the project will have a significant effect on the environrnent due to
unusual circumstances.
• Th1s pro�ect does not damage a scenic resouree within an officially designated state scenic highway.
• This ra�ect is not located on a site included on any list compiled pursuant to Gavt. Code § 56962.5 ("Cortese
List"�
• This project does not cause a substantial adverse change in the significance of a historical resaurce.
Reasons why graject is exennptt Class 1 exemntions include the operation repair rnalntenance or m`rnar alteratian of
existin�facilities structures or equipment involvin ne�gible ar no expansion of use The broject will extend the life of
the existin�pavement but will not create additional vahicle capacity The pro�ect has been reviewed for sensitive resources
and will not haVe a significant effect on biolo�ical or eultural resources such as threatened or endan ered s ecies ar their
habitats, senslttve ve�etatzQn communities tribal lands or tribal cultural resources The nraject has no potential to have a
sx mrficant effect on the environment
Lead Agency Contact Person:Amber Kellev Telephane; 530.225.4046
If Filed by Applicant:
l. Attach certified document of exemption finding,
2. Has a notice Qf exemptlan been filed by the public agency apprc�ving the project?❑ Yes o No
'°�' �v' `
.C.lgilatUi'e: (�,..�� _ _.-�".:..�.��,La t.late. `"f " r/
Title; Environmental Compliance Man �r
;�' Signed by Lead Agency Date reeeived for filzng at OPR;
❑ Signed by Applicant
GI �" Y � F
� � � ° � � � " � � CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: March 1, 2022 FROM: Chuck Aukland,Public
ITEM NO. 4.11(b} Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
ukl�n�l,H'ciblic Wc�aks L'��reGt ' 2/17/242? ry ip}�in,�C"i ana � `?l22/242?
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(b)--Approve Increase to the Project Budget for Bid Schedule No. 5233 (Job
Order No. 2633) Replace Asphalt Concrete Surfacin 2021.
Recommendation
Approve an increase to the project budget for completion of Bid Sched�ule No. 5233, (Job Order
No. 2633) Replace Asphalt Concrete Surfacing 2021 in the amount of $430,000 to the
construction contingency budget, bringing the construction contingency total to $680,000.
Fiscal Impact
Additional work will cause the project budget to exceed the awarded amounts. An additional
$430,000 is requested to cover an increase to the construction contingency.
COST SUMMARY
Item Awarded Amount Pro'ected Amount
Construction Contin enc $250,000.00 $680,000.00
Total Pro'ect Cost $1,919,134.00 $2,349,134.00
Total Cost Increase �430,000.00
Sufficient Street funds are available in the Fiscal Year 2021-22 budget to cover the estimated
cost increase.
Alternative Actzon
The City Council (Council) may choose to reject the project budget increase or provide
alternative direction to staf£ If the Council rejects the project budget increase, the additional
improvements on Twin View Boulevard would not be constructed and there would continue to
be gaps in sidewalk and bicyele facilities. Future improvements would cost more than if
constructed now.
Report to Redding City Council February 23,2022
Re: 4.21(b)--Approve Increase to Project Budget for the Replace Asphalt Concrete Surfacing
2022 Project Page 2
Background/Analysis
On September 21, 2021, the Council awarded the Replace Asphalt Concrete Surfacing 2021
(Project) to J.F. Shea Construction, Inc. This project is part of the annual pavement maintenance
program and involves removing and replacing approximately 126,000 cubic feet of asphalt
concrete in worn and deteriorated sections of Churn Creek Road, Shasta View Drive, Caterpillar
Road, Twin View Boulevard, Old Alturas Road, and Mission De Oro Drive.
Due to rain events and cold nighttime temperatures arriving early this season, construction was
not able to begin and the project was placed in winter suspension from December l, 2021,
through April l, 2022.
During the suspension, staff has re-evaluated the portion of the work on Twin View Boulevard.
The current project only includes replacing a 24-foot wide section of asphalt concrete along the
roadway between Valley Ridge Drive and Caterpillar Road and keeping the road configuration
as it currently stands. In concert with the City Council's Complete Streets Policy, staff noticed
that there are other safety related concerns that can be addressed more economically at this time.
There are two gaps of approximately 479 linear feet that lack curb, gutter, sidewalk, and
shoulder/bike lanes on the westside of Twin View Boulevard. In addition, there is no center turn
lane to ease traffic flow and provide for safe turning movements. Widening these two sections,
adding the center t�urn lane and resurfacing the entire roadway will provide standard
pedestrian/cycling facilities throughout the entire 2,375-foot corridor and increase safety. Much
of the additional cost is attributed to increases to existing contract line items. However, there are
a few additional work elements identified including excavation, concrete work, and minor storm
drainage work.
Council Priority/City Manager Goals
� Public Safety — "Work to improve all aspects of public safety to help people feel secure
and safe where they live, work, and play in the City of Redding."
� Government of the 21st Century — `Be relevant and proactive to the opportunities and
challenges of today's residents and workforce. Anticipate the future to make better
decisions today."
Attachments
Location Map
Twin View Map
Previous Staff Report 92121 (available online)
_.. ; y ' +
ti. ... '
�Q � '�
a � .
ti
_ � 2
,,� �,
y y�� .m � �
Gy� � � �� � � � �
� �� -
.. � , �' ��'L� , _. ..� � � . �.' . �
`'y�� �
�,
�'� ... :�
< „'
>>�� � ��.
, "'��lL� ���
_ ��rFRP�tt ��` `:, ��� , „
� �� �� : qRR� �� �.''� ,; �,
» ��., �,�
� �� ' �
� � , . „ �
� 5
� � `,„ , �
��� ���x
. , ,,,, . , � ,,. , , '. , ., ,. ,"�
^'� , ;., . '�. . � � .' �. , .' -";. , „��' �,`;6�
�, �e '' .,,,,, .
.,, ,,�, ,ti' , � F , ; , .
��. ' '
, . . � . ,, .. , ....; .. .. �
. , � . ,. , . ,.
_ . .�,
� � �� � � �� � , ��o.�ECT �oca�r��nre e
�;
, P
� � ..
� � , � � ,��� � �
� � , m� �� �
� ����� , � ��� � � � � � � �� ���
l
� � � �.
� � � �
� � � ,
, . � � ,. � � ,
� �,
�� � .
: � � � .
_ �
� e
� � �
, .� . �� m � . _; �� ��� .
� , m ,
� �
� , �
�, � , � �
�, ,
�., ,
,
� � � ,,
�.,,,,
, ,
� � � � �
�
; � _.. �., ,
,.
.
Sj Pj���29g E
�oF '��0�2 CITY OF REDDING REPLACE AC SURFACING PROJECT 2021
� �„ OQ PUBLIC WORKS TWIN VIEW BLVD
DEPARTMENT
��'��a`� LOCATION MAP
��c2���� � ���r,°, k' '��qu� 9�r.,��. �`�`,,y .�r `� `�, �`�. �ll��> �e."�2'� >.� �. a�� e ��,�'� �`i�Yu�� ���* i�'�.:`.�� ; .,� `°��''``�a�, '\e�z�2�S���
��
�� � �' ���ti�' �t ,�� �1�� �r�a .' 6 P � � t., .- .€M..,,., .
� � � hrF� 1'.i . � �a ��*� �'';;' � �
�� �. � ����� }z���'--�����t`��,,,St'� �z�� � �ca�,�,�`' s,
�? �,!. �t} �;,���� i��"�,'1��,3>s '
��`� ��� ��it �,� 2������`�j'�.�, � �r ?s �.
� �rtt ��` �`t�%�l��� ' t �� '���' x�`� .,��,
� � � ������ �
�*,� �m �� ' � ������2� � t(���£t ;� � V
� ��,� ��'' �� ` �•. ,�
,�
`� ' ����'�����°��� ��" � ���,1 "�
� ,'.'
�� . '����j ��. >�����`,���„'`��a�t� n;. � � Y
h '��. � ���? k ��h����"��.� �t
��. e ���;�c� .,���� ; �`�a,d ,��, ° ,r� .,
. � t� � � �,�,.
^�v�ba�,�;•���t,{t.`., �� ��i��7 � .�.
�
»
��� ����
�,s � � �
�k „y�� ��1~ 2
!����`� a�rr �>
u
i �
8 �� �� '
i�, �v � e
�� '' 1� � � " ."
� ��� �� � �< �
� y� i '�
�u � �� � �
��� ;
`��'�U�.,..�' '�'7 � ,�;�......�`R
� � � �;�w �, � �' .i ' +� ti� �� ti w
a �
�° �� Ci� �r� � �.
t v�=��� ��.. � �. �� � �
� � � �1 '
�� �,ti ��. �� ��� �'��*�.� „��a*��� ,r�'
�" h4
� �
T.:
� q � � ��. � S '�ih �r,. ����
a � `Z�`}',�
� ��� � r s �r �� '
s .��.
,� � �,.
, � ��� �.r �, �
� � � � � a � �� i�4i� '� �
�
�� � 0� �7,
� , � ���, � ��
� ;
� �� � � ��. � q� �
_ � . a
�t
�
w� � � �
� . � � ���� � ��
� �
j� :�� ,s��� � .i
�� � �
# �� 4 l�
��' 1� � � � � � r
� �� � °� �
, 1 � �
��� � ��,�
te �atht} � �":� 4�"�� � � `s�� ��^ �� ��`v�������� t.
� tv ��
��, a ��f ,��.:i�.. � ,. .,. ., .. , . �
G
��� � �
,� ,; `� i t1+�.
s�, ' � "[y �1.�,�,1 '�. � �� � �� 4��.
°�roX�` �
t �
� �?Y�t ���;l� �
� } Y � � d��� �' ��i". `d '3� �v;�`���
it' AVv
:.3� }i � k` �"'��s�
c, r
� �
� �t�� , . � ., , �� �
�,. �
^
' ,� ,�4 ' `i .��' ` ,' , �<.,.A '�r
i i�u �.:�. � e� ���a
t.,. �x�, �.a '�
k � �� � � a� � �m �.
� � � ,, �
��� ,V, ' �
o-� `
� A � $ $.
��"��� w4
�� ����' ����
.����� �` �
,�, ° �
�' ',,`�z s"� ya.� J r i � y
I
, n
�� , � 2„ � � . a<
�
, f� � � ��,7�`��
�m;
3� �� �.
� ,,.? �" � �i?�h ;a.,
y .
t
«� ���� .ti�
� , s �� �
� ,: k
� �� , �
t �, �.:� � �
a�
� �
�� �
s� � ��:� �, � '""^�..
'^�
�', �� �}
,'
..p ,� � e,; w�..:;,. ��'1.
�S ;.. '� , ..,t ;
z,�,� ��
k 4 jh�u��t�v}�\�Itti ' u" �
. ,�,
.. � y,
. �n �
�. r� at„� � � '� ;, ...
t. � fi
� ��
�
�
, yN t l
;�
i v s
i
v
�r�, �.: ..,.� , ,
a t�:: �
�
� � t t
�
�"' "
., . .�.���...
. ,>�'s ^, ' .:: i� :,:< :
�� .
r . ""i c
S3 z
y f
�`.. ��� .l �.
�
e
� ��, . �� , .,,;
� . � � y'
�,
W
.:a�� '; Y ..,�«.,,, .�,'�. xi�4 .
�R,�� �
i .� ��� ' � � .
�
§,.s;:.P.- 'ut .."�`„�
,,
i
�e. �3 , •� , ,
....a w i:�7 1 ;,
k.
}
t.,, �
. .. . . .. �.r ..:. �a; :..
.. � .. �...;,. � '
�
� � ��" CITY OF REDDING
� � `y REPORT TO THE CITY COUNCIL
MEETING DATE: September 21,2021 FROM: Chuck Aukland, Public
ITEM NO. 4.11(g} Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
.. 11�GIc�31L�..,��tl�?�.]C�'C?ff�fS�II?CGt ' _. �r'��,�7d��i� i�'�;; ��, rr,Cii3�'�1��iat �:�� c4��1r z�a, �t Sc�w�i4es�s��cck���° ^)'l��'2(�2.1
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(g)--Award Bid Schedule No. 5233 (Job No. 2633), Replace Asphalt
Concrete Surfacin 2021
Recommendation
Authorize the following actions relative to Bid Sched�ule No. 5233 (Job No. 2633), Replace
Asphalt Concrete (AC) Surfacing 2021:
(1) Award to J.F. Shea Construction, Inc., in the amount of$1,431,134;
(2) Approve an additional $148,000 to cover the cost of contract administration and
inspection fees;
(3) Approve $250,000 to provide construction contingency funding;
(4) Approve $40,000 for project development costs;
(5) Authorize the City Manager to approve additional increases, in either the construction
management or construction contingency amounts, up to a total of$50,000; and
(6) Find that the Project is Categorically Exempt from review under the California
Environmental Quality Act(CEQA) Guidelines Section 15301 (Existing Facilities).
Fiscal Impact
This project is funded by the Streets Department and is included in its approved budget for Fiscal
Year 2021-22. Project cost components are estimated, and some shifting of the funds may be
necessary to balance the project within the approved budget.
Cost Summav
Item Estimated
Pro�ect Develo ment Costs $40,000
Construction Contract+Contin ency $ 1,681,134
Contract Administration, Ins ection, Testin $ 148,000
Additional Cit Mana er Authorit $ 50,000
Total Pro'ect Costs $ 1,919,134
P�o'ect Bud et $ 2,500,000
Report to Redding City Council September 23, 2021
Re: 4.11(g)--Award Bid Schedule No. 5233, Replace AC Surfacing 2021 Page 2
Alternative Action
The City Council could choose to not award the project, in which case, the streets will continue
to deteriorate and require roadway reconstruction.
Background/Analysis
This project involves removing and replacing approximately 126,000 cubic feet of asphalt
concrete in worn and deteriorated sections of Churn Creek Road, Shasta View Drive, Caterpillar
Road, Twin View Boulevard, Old Alturas Road, and Mission De Oro Drive.
Attached is a tabulation of the two bids opened on September 7, 2021. The low bid in the amount
of $1,431,134 was received from J.F. Shea Construction, Inc., of Redding, California. The
engineer's estimate was $1,810,000. Total project development costs for this project are
estimated to be $90,000. Project development costs include engineering, environmental, and
consultant services (design and construction support).
Staff has determined that the project qualifies as Categorically Exempt from environmental
review under CEQA G�uidelines Section 15301. The project has been reviewed for sensitive
resources such as threatened or endangered species or their habitats, sensitive vegetation
communities, tribal lands, or tribal cultural resources. The project has no potential to have a
significant effect on the environment.
CounciZ PNior�ity/City Manager Goals
� This agenda item is a routine operational item.
Attachments
Bid Tabulation
Location Map
Notice of Exemption
BID TABU�ATION FOR:
REPLACE AC SURFACING 2021
Bid Schedule No.: 5233
Job No.: 2633 ENGINEER'S EST J. F. Shea Construction Inc. Tullis, Inc.
9/7/2021 UNIT UNIT UNIT
ITEM DESCRIPTION UNIT QTY PRICE TOTAL PRICE TOTAL PRICE TOTAL
1 Water Pollution Control LS 1 $2,500.00 $2,500.00 $3,489.00 $3,489.00 $750.00 $750.00
2 Traffic Control LS 1 $120,000.00 $120,000.00 $117,150.46 $117,150.46 $125,650.00 $125,650.00
Replace Asphalt oncrete u acing
3 (2") CF 126657 $9.00 $1,139,913.00 $7.15 $905,597.55 $8.90 $1,127,247.30
4 Asphalt Concrete Overlay TON 2140 $90.00 $192,600.00 $74.00 $158,360.00 $80.00 $171,200.00
5 Paving Fabric SY 35166 $2.00 $70,332.00 $2.15 $75,606.90 $2.15 $75,606.90
6 Thermoplastic Traffic Stripe (6") LF 100037 $1.60 $160,059.20 $0.62 $62,022.94 $0.62 $62,022.94
7 Thermoplastic Traffic Stripe (8") LF 1957 $2.00 $3,914.00 $1.75 $3,424.75 $1.75 $3,424.75
8 Pavement Markings (Thermoplastic) SF 2383 $9.00 $21,447.00 $6.50 $15,489.50 $6.50 $15,489.50
9 Pavement Marking (Green Bike Lane) SF 1060 $16.00 $16,960.00 $15.00 $15,900.00 $15.00 $15,900.00
10 Pavement Markers EA 2579 $6.00 $15,474.00 $5.10 $13,152.90 $5.09 $13,127.11
11 Adjust Water Valve EA 34 $750.00 $25,500.00 $685.00 $23,290.00 $750.00 $25,500.00
12 Adjust Manhole EA 20 $1,500.00 $30,000.00 $1,200.00 $24,000.00 $1,000.00 $20,000.00
13 Adjust Monument EA 10 $750.00 $7,500.00 $1,365.00 $13,650.00 $1,000.00 $10,000.00
TOTAL -CONTRACT ITEMS $1,806,199.20 $1,431,134.00 $1,665,918.50
�> �� Z
���� �, O
/ �
� � O
� � ��i� O
F' �' O
'��!q�KER �� o >
��
� �
�
i _
CATERPILLAR RD oP��� TWIN VIEW BLVD
o�qR�r� i
`� ��� �� SNASTA
� COMMUNITY
r COLLEGE
G� DAM �
`�S� � R 2gg E
i n v� S
qjr�� � � �R
Q�qR � � ��EW
�' '� ti co�-E�� SHASTA VIEW DR
CHURN CREEK RD
��
�
�- g�NTON�P�
�f.—��/ �` d
MISSION DE ORO DR � OLD A�TURAS RD
��� � oi� a�TURAs
_ z
EUREKA_� � o
o �e - �ANa a
�� �� �O`'Tti� ��� SHASTA VIEW DR
� �,
ARY�
�
aKE � O
�n CYP R�SS ti
�Rp�RK _ -_�_�.
� �
� NARTNE��� �
�y� r� � ....
� — �
�� � i.�
��G�'9 w C' w
m z >
� Q
q z � Q u�
_i c� o � Q
cn � w z
o � � U'
m � Q
Q
�EFZ � RAN C H 0
�_P� o �NN���
� v" S 8
� �
��
i.�
� �
� �
7 0
� �
� �
� Q REDDING
�� GIRVAN � MUNICIPAL
� �� AIRPORT
CREEK �� � _ �
CLEAR � �
��`.... B
� �� MEADOWVIC
�D
v�
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
INSPIRATION PL
w
> '.
� s
Cs „ .,. .... .. . ....... ....._. ..... .._.
� �. � :
_ W S
' ' ' j , ... . .. „ ;
a ;
�
N :
Q
2 :
y: i
_
v , � .
�
',„ . �, ",�,� :,,,,,. _ m..:„ ... . . ........... . . ;' . . ._.
g . � ,
; w
J
OLD A�TURA3,RD
� TURPS`R� _
t � O�-D��-� 5
�„, , � _ � MAl'11V�Ub LN; , �� � ' . �.
•� � .. , . '. . ATRIUM WAY._ .
. .
, w. � � � _
YdITAIR�WAY i,� . �
. ���� VIKING�111IAY
Sp ^. � �� TARMA�RD
��F � � � -
� �
yy,y � � � � � _ _ _
AQ �' � .... -
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
_, .. ',
� � �gS R�������
, Gp`-1EGE'V\EW�R
'"; � �
�� ` , . � ,�� �` ''. '' �, �''qS
�, �', � ... T,9
` ����L
:. ' 9.� .... . . .. , � 6
�. �. <b0
� �.
�. � ��
� _
, �
�
�2 �s
G ; .. ,,, �.
� � �� '� �
�, � e, �. ' ,. �� ' ' -, �
Z �, '_ � � �
_ .. �. Ci � �`; . „ � � .,.,
, . � _ � � ��:,. ,
� m'. �� � � � � � � � � PALACIO DR � � �
° � � �� � � � � a�
`. ,O �;�
�,. �
��� �/ �
� �� F
„ . . � z, e. � /
�, �-. . � .
PA�pC10 OR
�'�y
�
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
OqSiS RD
� ....
5���p��� _
OP
y '
h
h
t� :i
' , Z ,� ; .� �. .."
'
�� ^, , . � m ' i
G
��ti�� ��`
. ,
> > '� d" � ��
� ,G � � � .,;;.
�l z
� � „ �
, _ — , ^,
� ��c0�, � � ... . � �,-� � �.,
� ���! � � �
�� „ .
,
CqTF��/� ,�� ,�, ': , : �.' � �
, � . �,qRR� � �.` � �,
� �., ,
� � ��. e�fi ., ...,.:
;� °.
� e... .... _ ,..., � _ � = � ��,�, � ��;�
y° � �
� .
, „
� �,. , , �, � ''� cn
. . . ,., . �M . �. , ,
, � ' '. � �'. ., �
:. Xr
�, � . ' " . � ' " . � ' N � ., , � � ' . �
,, .. � '' t.. �...... 1 �:�
Z
.
� �,
.. - ., .. JQ ' .
.. ;=, � �; v� :< ..
��� ,
� �� �
,�.. ,,,' , .�� , , .,. ' ' � ':, ..,. ��; , " � �
' "...,� ', . ..: .`�� � .' � './' , ,. . „ ,�
.. .:, �... � ,. ;
N
�, ..... . . , , ,
. .� '.,, � . > > ,
� y �,,a .. �, �
� �� � � �
� � �
e
� �',�- � m '- , e
�� ,,`
�
� : . ,.. � . . � � �, �
� >
� �,� � � �.,�,
. ., � �� � � �
� .. ,.
� i i
., , , �.
_ i`
� , � �gS RT����99 E
� � �� �
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
INSPIRATION PL ` Q
�
�
s�;
_.. ,. .... ,_. .. , . . . . .... `''m.. „.. .,.,.
.... ;Z ... ....
� .
_ im
� TANGLEWOOD DR � � 'm'�
_ _ � _
� �'C p�,yp�q����' ��
w
F
Q � < �
�
�
�
w
�- �_ �,;. �,. _. _
z .
�
0
0
+ � :
_ _._ �
w
o', �'
O Mis
_, v� .�S�
�. � �,
, �..
� ��S�F,p
�C.j�;.
� .... . _
� !
a i
. O `
J
J
S , .
. BROWNING ST
t�i
�o��ooZ CITY OF REDDING REPLACE AC SURFACING
� PUBLIC WORKS PROJECT 2021
� �- - /i i �
� ' �� DEPARTMENT
�t,Foa�'' LOCATION MAP
OTICE QF XEMPTIO►N
Toa 0 Shasta County Clerk FROMa City of Redding
County af Shasta Public Works Department
F.O: Box 990880, 1643 Market Street 777 Cypress Avenue
Redding,CA 96d99-0880 Redding, CA 96(�01
Project Title. Ret�lace AG Surfacin�2021 Proaect J O #2645-21
Projec#Lacation—Specific; Shasta View Drive t71d Alturas Road Twin ViewBoulevard Twin View Boulevard Churn
Greek Road, and Caterpillar Raad
ProJect Locatzan—Cityc Redd�n� Project Lacation—County. Shasta
Descriprtian of Praject: The Citv c�f Reddin� proposes a pavement maint�nance project at various locations in Reddin�
Work will consist of asphalt m111rn� a two-mch asphalt cancrete overla�d pavement stripin� Manhole covers will be
ad�usted to conform to the new nav�ment All work will occur within existin� streets and sta�ing will occur in the Citx
ra�ht ofwav. One wav traffic control or tam ararv street closures ma bY e required The public will be notified prior to the
pra�ect.
Name of Publfc Agency Approving Froject: Citv of Reddin�
Name ofPerson or Agency Carrying OutProject; Tom Semb,Proiect Ivlana�er
Exempt Status: (clreck one)
❑ Minlsterial [Section 21 Q$0(b)(1), 15268]
❑ Declared Emergen�y [Section 21Q$0(b)(3); 152b9(a)]
❑ Emergency Project [Section 21080(b)(4j; 15269{b}]
❑ Statutory Exemptidns. State code number.
❑ Common Sense Exemption(This projectdoes not fall within an exempt class;but it can be saen with certainty that there is
no possibility that the activity may have a significant effect on the environmant(14 CCR 15601[b][3])•
� Categarical Exemptian. State type and sect�on number: Sec. 15301{a). Existin�Fac�iities(c)
Based on an examrnation af this propc�sal and supportmg informat�on, the following statements are true and
exceptions do not apply:
* If this project falls within an exempt class 3, 4, 5, 6, ar 11, it does not impact an environm,ental resource af
hazardous or c1�ltrcal concern where designated,precisely mapped;and officially adopted pursuant to law.
• There will not be a significant cumulative effect by this prt�ject and successive projects of the same type in the
same place,over tirne:
• There rs not a reasonable possibility that the project will have a significant effect on the environrnent due to
unusual circumstances.
• Th1s pro�ect does not damage a scenic resouree within an officially designated state scenic highway.
• This ra�ect is not located on a site included on any list compiled pursuant to Gavt. Code § 56962.5 ("Cortese
List"�
• This project does not cause a substantial adverse change in the significance of a historical resaurce.
Reasons why graject is exennptt Class 1 exemntions include the operation repair rnalntenance or m`rnar alteratian of
existin�facilities structures or equipment involvin ne�gible ar no expansion of use The broject will extend the life of
the existin�pavement but will not create additional vahicle capacity The pro�ect has been reviewed for sensitive resources
and will not haVe a significant effect on biolo�ical or eultural resources such as threatened or endan ered s ecies ar their
habitats, senslttve ve�etatzQn communities tribal lands or tribal cultural resources The nraject has no potential to have a
sx mrficant effect on the environment
Lead Agency Contact Person:Amber Kellev Telephane; 530.225.4046
If Filed by Applicant:
l. Attach certified document of exemption finding,
2. Has a notice Qf exemptlan been filed by the public agency apprc�ving the project?❑ Yes o No
'°�' �v' `
.C.lgilatUi'e: (�,..�� _ _.-�".:..�.��,La t.late. `"f " r/
Title; Environmental Compliance Man �r
;�' Signed by Lead Agency Date reeeived for filzng at OPR;
❑ Signed by Applicant
GI �" Y � F
� � � ° � � � " � � CITY OF REDDING
REPORT TO THE CITY COUNCIL
MEETING DATE: June 21,2022 FROM: Chuck Aukland,Public
ITEM NO. 4.11(1} Works Director
***APPROVED BY***
�
��n � .�.._ s.N,.��
� � � ���
ukl�n�l,H'ciblic Wc�aks L'��reGt ' 6(ll�/242? ry ip}�in,�C"i ana � 6,i1�/242?
caulcland@ci.redding.ca.us btippin@cityofredding.org
SUBJECT: 4.11(1)--Approve Increase to the Project Budget for Bid Sched�ule No. 5233 (Job
Order No. 2633) Replace As halt Concrete Surfacin 2021.
Recommendation
Approve increases to the project budget in the amount of$150,000 for emergency repairs of Bid
Schedule No. 5233, Replace Asphalt Concrete Surfacing 2021 as outlined below:
(1) Increase of $150,000 to the construction contingency budget, bringing the construction
contingency total to $830,000;
(2) Adopt Resolution approving and adopting the 44th Amendment to the City Budget
Resolution No. 2021-078 appropriating $150,000 in Storm Drain Utility funds to the
project; and
(3) Find that the project is Categorically Exempt from review under the California
Environmental Quality Act Guidelines Section 1530 L (c)—Existing Facilities.
Fiscal Impact
Additional work will cause the project budget to exceed the awarded amounts. An additional
$150,000 is requested to cover an increase to the construction contingency. This is a preliminary
estimate based on information available at this time. Staff will direct the contractor to make the
necessary repairs to replace a failed storm drain pipe and ensure the roadway is safe for vehicular
traffic. However, costs may increase due to unforeseen conditions and staff may return to the
City Council (Council) to ratify additional costs, if nec�ssary. Storm Drain Utility funds of
$150,000 are available to be applied to this project, and are accounted for in the budget
resolution.
COST SUMMARY
Item Awarded Amount P�o'ected Amount
Construction Contin enc $680,000.00 $830,000.00
Total Pro'ect Cost $2,349,134.00 $2,499,134.00
Total Cost Increase $150,000.00
Report to Redding City Council June 15,2022
Re: 4.11(1)--Approve Increase to Project Budget-Replace Asphalt Concrete Surfacing 2021
Project Page 2
Alternative Action
The Council may choose to reject the project budget increase or provide alternative direction to
staf£ If the Council rejects the project budget increase, the storm drain replacement on Shasta
View Drive will not be constructed, and there would continue to be a safety hazard requiring the
closure of one of the northbound lanes located about 1,500 feet north of Tarmac Road.
Background/Analysis
On September 21, 2021, the Council awarded the Replace Asphalt Concrete Surfacing 2021
(Project) to J.F. Shea Construction, Inc. This project is part of the annual pavement maintenance
program and involves removing and replacing approxunately 126,000 cubic feet of asphalt
concrete in worn and deteriorated sections of Churn Creek Road, Shasta View Drive, Caterpillar
Road, Twin View Boulevard, Old Alturas Road, and Mission De Oro Drive.
Shortly after paving Shasta View Drive in June 2022, a sinkhole appeared in the north bound
number one lane approximately 1,500 feet north of Tarmac Road. The travel lane was
immediately closed to vehicular traffic. Staff investigated and found that a 135-foot-long section
of storm drain pipe under Shasta View Drive had failed and was washing away bedding and road
base material which resulted in the collapse of the road surface above.
To prevent further collapse of the road surface and fully reopen Shasta View Drive, the old 36-
inch wide concrete pipe will be removed and replaced with a similarly sized high density
polyethylene pipe that is better suited for the soil conditions. The increased contingency amount
is estimated to cover the cost of the additional work.
Staff has determined that the project qualifies as Categorically Exempt from environmental
review under California Environmental Quality Act Guidelines Section 15301. The project has
been reviewed for sensitive resources such as threatened or endangered species or their habitats,
sensitive vegetation communities, tribal lands, or tribal cultural resources. The project involves
the repair and maintenance of existing facilities and wi11 not result in expansion of use. The
project has no potential to have a significant effect on the environment.
Council Pr�iority/City Manager Goals
• Public Safety — "Work to improve all aspects of public safety to help people feel secure
and safe where they live, work, and play in the City of Redding."
Attachments
^Resolution
^Location Map
NOE Updated Replace AC Surfacing 2021
RESOLUTION NO. 2022-
A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTING THE
44Tx AMENDMENT TO CITY BUDGET RESOLUTION NO. 2021-078
APPROPRIATING $150,000 IN STORM DRAIN FUNDING FOR THE REPLACEMENT
OF ASPHALT CONCRETE SURFACING 2021 PROJECT FOR FISCAL YEAR 2021-22
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDDING
THAT Budget Resolution No. 2021-078 be and is hereby amended as follows:
FUND DIVISION DESCRIPTION 1NCREASE DECREASE
147 809 Storm Drain Utility Capital $150,000
THAT account titles and numbers requiring adjustments by this Resolution are as follows:
I1SE SOURCE
OF FUNDS OF FUNDS
Decrease(Increase)Beginning Balance
147-809-1-0001-01 Beginning Balance $ 150,000
Increase Expenditures
147-809-3576-01 S1tu-�y/Chip/Cape Seal $150,000
Total $ 150,000 $ 150,000
THAT the purpose is to appropriate $150,000 in Storm Drain funding for the Replace Asphalt
Concrete Surfacing 2021 Project for fiscal year 2021-22.
I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the
City Council of the City of Redding on the 21 S` day of June, 2022, and was duly adopted at said
meeting by the following vote:
AYES: COUNCIL MEIVIBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
KRISTEN SCHREDER, Mayor
ATTEST: FORM APPROVAL:
PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney
OLD ALTURAS RD
l O��pt3URAs RD
� � � MAYWOl?R 1�N � �
_ .
� ., e, � �
e � � �
�, � �- �� : � ��.. . .. � ; �.�
� ... -� A7R(U11t1 WAY � �, . .� .....
�� �;. , 0 _ � , . ,. _ . _ �
�
� .
� � A m . �
� � � � e ..�. ,.,. � ., ' �.. � � , . . -
, . _ , � e. ' '�m � '., ', � � �
; � � � �
,. {n..... _ ':
�„,.,,,,,. , � .
�� " � vocTa�r��W�v.,. z: � : m
� � � _ � _ ��� �. .� _
�
��� PROJ ECT � � � � ��� �
VIKING WAY
L4CATION .
�
TARMAC RD� � _
„, , ° . �
S�
,9�� � � _ _
ti� ���� ��,� ��� �,, �
�� ,
�oF RFoo CITY OF REDDING REPLACE AC SURFACING PROJECT 2021
� Emergency Storm Drain Repair
� � ���� a PUBLIC WORKS
t�� �.Q DEPARTMENT �OCATION MAP
�iFoa
NOTIGE OF EXEMPTIQN
To. ❑ Office of Planning and Research FROM: City of Redding
1400 Tenth Street,Room 121 Public Works Department
Sacramento, CA 95$14 777 Cypress Avenue
Redding,CA 96001
� Shasta County Clerk
County of Shasta
P.O.Box 9908$0, 1643 Market Str�et
Redding, CA 96099-0880
Praject Tit1e: Replace AC Surfac�n�2021 Project 3:0.#2645-21
Pro;�ect Lacation — Specific. Shasta View Drrve, Old Alturas Road Twin View Boulevard Twiri View Boulevard
Churn Creelc Road,and Caterpillar Road.
Praject Location—City: Reddin� Project Location—County: Shasta
D+escription af Project: The Citv of Reddin�; proposes a pavement maintenance proieet at various lacations in Redding:,
Work will consist of�s halt mi111n a two-inch asphalt concrete averlay and pavement stripin� Manhole cavers will be
adiusted to canform to the new pavement The project will also replace approximately 15Q feet of 36" concrete starrn
drain pipe on Shasta View Drive. The deteriorated and coilapsed�pe will be repiaced with a similarly sized hi�h density
polyethylene pipe"that is better suited for the soil conditions All work wi11 occur within existin�streets and sta i�ng will
occur in the Crtv ri�ht of wav. One wav traffic control car temporar�street elosures ma be requxred The public will be
notified priar to the pro�ect.
Name af Public Agency Apgroving Projec#; Citv ofRedding
Name of Person ar Agency Carrying Out Project: Tom Semb;Project Mana�er
Exempt Status: (check one)
❑ Ministerial [Section 21080(b)(1}; 152&8]
❑ Declared Ernergency [Section 21080(b)(3)3 15269(a}]
Q Emergency Project [Section 21080(bj(4); 15269(b)]
❑ Statutory Exemptions. State code numb�r:
I� Common Sens�Exemption(This project does not fall within an exempt class,but it can be seen with certainty that there is
no possibility that the actiuiiy may have a signrficant effect on the enviroinment(14 CCR 1S6Q1[b][3]).
� Categorical Exemption, State type and section number: Sec. 15301. Existin�Facilities(c)
Based on an exarnmation of tl�is proposal and supporking information,xhe fallawing statements are tnae and exceptions do not apply:
• If this project falls within an exempt class 3,4,5,6,or I 1,it does nat impact an environmental resource of hazardous or critical cancem wllere
designated,precrsely mapped,and officialty adopted pursuant to law:
• Tlaere wili not be a s�gnificant cumulative effect bytlais project and successive projects oP the same type in the sarne p(aca,over time:
• 'There is not a reasonable possibility that the project will have a significant effect on the environment due to unusual crrcumstances.
• This project does not damage a scenic eesource within an officially designated state scenic highway:
` This pro�ect is not located on a site included on any list cornpiled pursuant to Govt.Code§5b962:5("Cortese LisY')
• Th'rs project does nat cause a substantial adverse change in the significance of a h'rstorical resource:
Reasons why project is exempt: Class 1 exemptians include the operation repair maintenance or minor alteration of
existin�facilities, structures, ar equipment involvin�negli�ible or na expansion of use The praject will extend the 1°tfe af
the e�istin� pavement but will not' create additional vehicle capacitv The project has been reViewed for sensrtive
resources and will not have a significant effect on biolo�ical or cultural resaurces such as threatened or endan eg red
species ar their habitats, sensitive vegetation communities tribai Iands or tribal cultural resources The project has no
potential to have a si�nificant effect on the enviranment
Lead Agency Contact Person:Amber Kellev Telephane: 530:225.4046
If Filed by Applicant;
1. Attach certifed docurnent ofexemption finding.
2. Has a notice of exemption been filed by the public agency approving the pra�ect`? o Yes n No
,�-
Signature: ���'•�k'��✓. Dated �c.� ��`"c�c-�-.
Titlet Environmental Compliance na�er
❑ Signed by Lead Agency Date received for filing at QPR;