HomeMy WebLinkAbout4.5(a)--Approve Issuance of Request for Proposals for Electric Utility Line Construction Contract CITY OF REDDING REPORT TO THE CITY COUNCIL Recommendation Approve the issuance of Request for Proposals for electric utility line construction contractor services to address Redding Electric Utility’s aging distribution system infrastructure. Fiscal Impact No fiscal impact is associated with the Request for Proposal (RFP) issuance. Upon selecting a Line Construction Contractor, Redding Electric Utility (REU) will present all contracts, budget resolution(s), and short-term and long-term fiscal impacts for the City Council’s (Council) consideration. Ongoing funding will be requested as part of biennial budgeting processes. Staff anticipates capital expenses related to this effort to begin in Fiscal Year 2024 - 25. This estimate correlates with REU’s five-year financial plan presented to the Council on September 20, 2022, which estimated expenses related to the Five-Year Capital Plan beginning after July 1, 2023. Alternative Action The Council could choose not to approve the issuance of an RFP and provide alternative direction to staff. Background/Analysis On August 17, 2021, the Council approved REU’s Five-Year Capital Improvement Plan and REU’s 2026 Strategic Plan. Goal Two of the Strategic Plan, Replace Aging Distribution System Infrastructure, states: MEETING DATE: January 17, 2023 ITEM NO. 4.5(a) FROM: ***APPROVED BY*** nzettel@cityofredding.org btippin@cityofredding.org SUBJECT: 4.5(a)--Approve Issuance of Request for Proposals for Electric Utility Line Construction Contract Nick Zettel, Director of Redding Electric Utility Report to Redding City Council January 10, 2023 Re: 4.5(a)--Approve Issuance of Request for Proposals for Electric Utility Line Construction Contract Page 2 With a focus on reliability and completion of an internal aging infrastructure assessment, we identified several distribution system elements that require replacement as part of ongoing routine operations. The projects will center on underground, overhead, and meter system replacement to ensure a solid platform is established for future modernization efforts. Key performance indicators such as total customers and outage minutes are used to gauge the effectiveness of aging asset replacement. Replacement of at-risk elements will reduce outage events while providing customers with a higher degree of reliable service. REU typically performs all distribution system maintenance utilizing in-house staff. However, based on the volume of work identified in the Five-Year Capital Improvement Plan coupled with existing staffing levels, REU requires contractors over the next five years and possibly longer, depending on the infrastructure replacement schedule. Current estimates indicate the need for two additional line crews over a multi-year contract with provisions for yearly contract extensions. Typically, the City of Redding issues RFPs after the Council has authorized funds. Based on the proposal and expenditure uncertainty for this particular effort, REU requests authorization to issue an RFP before funding approval. The result would be a proposed solution, budget resolution(s), and fiscal impacts presented as one item for the Council’s consideration at a future meeting. Environmental Review This is not a project defined under California Environmental Quality Act, and no further action is required. Council Priority/City Manager Goals • Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to m ake better decisions today.” Attachments Previous Staff Report - August 17, 2021, item no. 9.5(c)--Redding Electric Utility's Strategic Plan Previous Staff Report - August 17, 2021, item no. 9.5(d)--Redding Electric Utility's Five-Year Capital Improvement Plan CITY OF REDDING REPORT TO THE CITY COUNCIL Recommendation Approve Redding Electric Utility’s 2026 Strategic Plan establishing new vision and mission statements, identifying core organizational values; and setting goals. Fiscal Impact There is no fiscal impact associated with accepting Redding Electric Utility’s (REU) 2026 Strategic Plan. Alternative Action The City Council (Council) could choose to not accept REU’s 2026 Strategic Plan and provide alternative direction to staff. Background/Analysis The previous REU 2020 Strategic Plan was approved by the Council in 2015. At that time, REU embarked on a structural overhaul to better align the workforce with customer needs, and the strategic plan helped staff focus on several critical areas, including technology, workforce and culture, communications, and financial stability. To address today’s fast pace of change to the utility industry, REU staff engaged in a new strategic planning effort. With the assistance of Hometown Connections, Inc. (HCI), an advisory team of community members, City of Redding staff, and members of the Council worked to develop the 2026 Strategic Plan (Plan). The strategic planning team examined REU’s strengths and limitations to confirm the utility’s mission and priorities that will serve as guideposts for long-term project development and planning. MEETING DATE: August 17, 2021 ITEM NO. 9.5(c) FROM: APPROVED BY*** dbeans@cityofredding.org btippin@cityofredding.org SUBJECT: 9.5(c)--Consider Redding Electric Utility's 2026 Strategic Plan. Daniel Beans, Director of Electric Utility Report to Redding City Council August 10, 2021 Re: 9.5(c)--Redding Electric Utility's Strategic Plan Page 2 New vision and mission statements as well as six core organizational values were identified as part of the strategic plan development process. Additionally, nine strategic goals were identified to allow REU to successfully fulfill its vision and mission: Complete Critical Wildfire Mitigation Projects Replace Aging Distribution System Infrastructure Initiate Distribution Modernization Program Element Implement Distribution Risk Management Plan Complete Energy Trading Modernization and Integrated Resource Plans Minimize Compliance Failures and Penalties Align Revenue Collection with Cost-of-Service Enhance Communication with Customers and the Community Enhance Employee Development, Attraction, and Retention These goals were designed to aid REU staff in meeting the three strategic priorities identified within the Plan: mitigate risk, maximize reliability, and meet regulations. Council Priority/City Manager Goals Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.” Attachments REU's 2026 Strategic Plan (available online) Strategic Plan 2021-2026 Redding Electric Utility Executive Summary Proud of our History, Preparing for the Future Vision, Mission & Core Values Strategic Priorites Goals Acknowledgements 03 05 07 09 10 13 Contents In 2021, Redding Electric Utility (REU) celebrates 1 00 years o f service. REU take s great pride in h elping to make the C ity of Redding a nd Shasta County a great place to live, w ork a nd play. Today, w e continue to provide reliable and a ordable electric service to the residents and busin esse s of Red ding, wh ile developing the exibility and in novation to respond to the changing u tility m ar ketplace. We remain committed to providing strong va lu e to the Redding community fa r into the fu ture. 03 Executive Summary Redding and Shasta County powered on through the Carr Fire of 2018 and Snowmaggedon in 2019. The year 2020 represented another challenge for the electric utility industry. The COVID-19 pandemic proved to be devastating to our community and nation as citizens struggled to remain healthy many parts of the nation as natural disasters damaged equipment and disrupted lives. Our employees worked together, as front- line responders, to keep the power on while keeping themselves and our customers safe As we look ahead, we must continue to think and act strategically, addressing changes in technology, customer expectations, regulations and the climate, especially related to wildres. We must continue to be proactive and adapt quickly to the changes impacting the electric utility industry to best serve the Redding community for the next 100 years. Change is a constant in the electric utility industry, and we are determined to act in a way that best serves our customers and the community far into the future. As a local, publicly-owned utility, we are invested in the success of Redding. REU completed its previous strategic plan in 2015. At that time, the organization embarked on a structural overhaul to better align the workforce with our customer needs, and the strategic plan helped us focus on several critical areas, including technology, workforce and culture, communications and nancial stability. To address today’s fast pace of change to the utility industry, we engaged in a new strategic planning face when possible, and virtually when COVID-19 restrictions reduced our ability to meet in person. Several meetings were conducted with City of Redding Council stakeholders to update REU’s strategic plan and chart a course for the future. The strategic planning team examined our strengths and limitations, conrming the utility’s mission and priorities that will serve as guideposts for long-term project development and planning. 04 The 2021 Strategic Plan includes several important updates to our vision, mission and priorities. The vision statement, identifying the value we seek to bring to the Redding community states: REU makes Redding better by connecting with our customers and being their trusted and reliable, community-owned utility The mission statement, which describes what we will do to achieve that vision reads: REU, in partnership with the Redding community, is committed to improving the public’s safety and providing reliable, cost- effective service Our organizational values will play a key role in how we fulfill our mission and vision. We have an obligation to the community to act in its best interests. As such, we have identified six core values which will drive our actions: Safety Integrity Customer Focus Teamwork Communication Stewardship Looking ahead to the coming years, we have identified three key areas in which we must excel for the utility to serve the Redding community. They are: Mitigate Risk Maximize Reliability Meet Regulations We believe attention to these three areas will position us to deliver valuable service to the community for many years to come. When the utility was formed 100 years ago, city leaders recognized the wisdom of allowing the community to control its own destiny by building and managing its electric service. Today, the City continues to deliver value to the community through the local control of utility services, maintaining high reliability at very competitive rates, while keeping dollars and jobs in the community. We invite you to review this strategic plan and share your thoughts with us about the direction of the utility. You, the customer and citizen, are the owners of Redding Electric Utility. The ownership partnership formed in 1921 has been – and will remain – a key to our success in the years ahead. Executive Summary 05 Proud of Our History, Preparing for the Future The world has changed greatly since REU began distributing electricity to the people of Redding 100 years ago. The utility, too, has seen significant change from the days when it purchased all of its wholesale power from area investor-owned utilities. Over the decades, we established greater control over our power supply, contracting with the federal government for low cost hydroelectric power, partnering with other agencies to access significant economies of scale and building our own generation facilities. These forward-looking steps by past city and utility leaders ensured greater reliability, rate stability and predictability. As a result, Redding’s lights remain on, bills remain manageable and its owners’ best interests are being supported. And who are those owners? No, it is not Wall Street investment firms, hedge funds and other shareholders. It is you, the customers of the utility and the citizens of Redding. As a public power utility, rather than an investor- owned utility, our owners are our customers. This means decision-making on issues important to you, such as rates, power supply, reliability and customer service, are made locally. The utility’s governing board is the Redding City Council, which embraces the critical role that the utility plays in serving the community. REU employs 193 people, who serve 44,905 residential and commercial customers within the corporate boundries of the City of Redding. Redding’s population and economy have remained remarkably stable for many years. Most of this century has seen modest growth in population, lagging behind both California and the U.S. population growth rates. Yet, interest in Shasta County’s vast natural resources continues to drive strong tourism as well as new residents, citing the area’s natural beauty as a draw. The regional economic outlook is good, having recovered fairly quickly from the pandemic-fueled downturn. The local industry is diversified, with the largest employment sectors being healthcare, retail, education, food, lodging and government. Redding is well-positioned to remain economically vibrant in the years ahead. The utility must continue to adapt to changes in our natural environment, new state and federal regulations, technology advancements and evolving customer expectations. For example, the wildfire “season” is nearly a year-round issue now. We recognize the important role we must play in planning for and responding to fires that may impact our service territory. In 2021, technology and human resources in the Redding Fire Department and Parks Division have been provided extraordinary tools to battle the wildfires that continue to impact California. A state- of-the-art emergency operations center was established at our headquarters building to allow first responders and leaders within 06 our community to work closely together to prevent loss of life and property due to catastrophic events. We work closely with other Redding departments and rst responders to ensure public safety. Numerous other technological tools are being implemented, including new communication systems, IQ FireWatch cameras, security cameras in and around electric infrastructure and aerial imagery for assessing the vegetation canopy. All of these tools are congregated in the City of Redding’s new emergency operations center. Looking within the utility, REU’s infrastructure, reliability, and operations are generally in good shape. However, many years of deferred maintenance are resulting in more frequent outages of longer duration. We are at a pivotal time regarding our aging distribution system, and signicant capital maintenance and upgrades are needed in order for us to continue providing reliable community. but we contend with higher wages at utilities in Northern California which draw from our workforce. Financially, the utility is in solid shape, with strong city council leadership and diversied revenue. REU’s system reliability is among the highest in the state. Yet maintaining system reliability is a never-ending process, and REU must continue to evaluate its infrastructure and ensure upgrades and technology are manner. In concert with a robust power generation, transmission and distribution system, REU’s Customer Services Division provides outstanding service, continually going above and beyond to help our customers. In response to the COVID-19 pandemic, our Customer Services team developed an extensive community outreach program, the Comprehensive Community Assistance Program to inform our customers about available resources. These technologies improve operations, reliability, safety and customer service. By providing funding for reghters and vegetation management personnel, we have been able to carefully identify and mitigate potential re hazards that could impact or be caused by our utility. In addition, we have funded a large goat program as part of vegetation management. Through proactive measure and working closely with other city departments, we will continue to reduce the large risks wildres pose to our beautiful area. Proud of Our History, Preparing for the Future 07 Vision, Mission Core Values Vision an ideal future for the utility as it serves the community. It can be thought of as a destina- tion; we hope an ambitious one. With this as our responsibility, our vision statement reads: REU makes Redding better by connecting with our customers and being their trusted and reliable, community-owned utility High reliability, competitive rates, and excel- lent customer service are the foundation of our values proposition to the community. Yet there is much more we can and will do as we embrace this vision. Mission If a vision statement describes a destination, the mission statement describes how an organization will get there. What will we do to attain that vision? Our mission reads: REU, in partnership with the Redding community, is committed to improving the public’s safety and providing reliable, We very much view our role in the commu- nity as a partnership, whether this is with other city departments or outside agencies or organizations. For example, REU and the Redding Fire Department and Parks Depart- ment coordinate their wildre prevention and business customers, REU must deliver ally exploring ways to improve all aspects of our operations. its enduring mission, vision, and values. Central to Redding Electric Utility’s planning for the future is ensuring all eorts align with 08 Core Values The vision and mission describe what we do in order to support the Redding community. But how will the utility act as it fulfills these priorities? Establishing our core values is a key part of defining who we are, how we will serve our customers and how we will treat each other. These are expectations we have of ourselves, and to which we will hold each other accountable. Below are outlined six core values with corresponding behaviors and actions. Safety We promote ownership and accountability for safety within the department We have an uncompromising commitment for the public and employees’ safety Through our safety committee, programs, activities and other initiatives, we promote a culture of safety We promote public safety through ongoing education, training, awareness and compliance We support an environment in which the public can be served safely Integrity We are accountable, ethical, honest, and transparent in everything we do We will protect and maintain the goodwill and trust our community has placed in us We are loyal to the public interest and fairness to all ratepayers Customer Focus REU employees consider the customer first in every decision we make so that we consistently exceed customer expectations We listen to, anticipate and proactively serve customer wants and needs We focus on delivering what is most beneficial to our internal and external customers Customers and their safety and satisfaction are our highest priority Teamwork Our team consists of employees of the Electric Utility, the City, the Redding community and Joint Powers Agencies We demonstrate the principles of Hungry, Humble and Smart as explained by the best-selling author Patrick Lencioni in his book The Ideal Team Player We are a cohesive unit that exists solely for the benefit of the community we serve We believe Teamwork is vital for success We feel, act and behave as one big team Open Communication By actively listening to the needs of the community, we provide timely responses, create understanding of other’s perspectives and show we care Through transparent communication, we keep all stakeholders informed, avoid unnecessary surprises and reduce confusion We are committed to action and follow up when necessary, to help provide closure for our stakeholders Stewardship We strive to represent and incorporate the values and needs of the community in the management of the utility We focus on maximizing value for all customers over the long term We manage our physical assets to maximize safety and reliability at the lowest possible cost We offer programs and education to help our customers save money and/or reduce their impacts on the environment We continuously decrease our impacts on the environment while striving to maintain affordable electric rates for our customers Vision, Mission Core Values 09 Strategic Priorities Three strategic priorities have been identied as points of emphasis in our strategic planning process. To take advantage of our organizational strengths and to address opportunities for growth and improvement, the following strategic priorities serve as the framework for our strategic plan. 01 Manage risk necessary to protect our customers from physical and nancial harm. From wildres to pandemics, change is the new normal. We continue to assess the impacts, risks – and opportunities that this change brings. 02 Provide best in class safety, reliability and services to support the needs of our community. We will continue to take the steps necessary to maintain and upgrade our distribution system. Reliability also means being a good corporate citizen, acting in the best interests of the community, being responsive to customer needs, and continuing to build trust among our many stakeholders. 03 To comply with all mandated regulations in a manner to maximize reliability and As the state and federal regulatory landscape continues to change, the comply with these regulations while ensuring customer needs for reliability 10 Below are our initial goals that will be critical in allowing REU to successfully fulfill its vision to “make Redding better.” For most of these, related metrics will allow the utility to keep staff, the City Council, our customers and our community updated on their progress. We look forward to sharing that progress with you. Goals GOAL 1 Complete Critical Wildfire Mitigation Projects GOAL 2 Replace Aging Distribution System Infrastructure GOAL 3 Initiate Distribution Modernization Program Element STRATEGIC PRIORITIES STRATEGIC PRIORITIES STRATEGIC PRIORITIES In order to continually manage wildfire risk and the threat to public safety, our Wildfire Mitigation Plan identified several technology and distribution system improvements as significant mitigating factors to the detection and prevention of future wildfires in our service territory. Due to the long lead time for planning and construction, several critical projects remain outstanding with targeted completion within the 5-year horizon. The majority of the technology improvements have been deployed, with the remainder focusing on vegetation inspection systems. Distribution system improvements range from circuit hardening and strategic underground to developing a more coordinated vegetation management program. With a focus on reliability and completion of an internal aging infrastructure assessment, we identified several distribution system elements that require replacement as part of ongoing routine operations. The projects will center on underground, overhead and meter system replacement to ensure a solid platform is established for future modernization efforts. Key performance indicators such as total customers and outage minutes are used to gauge the effectiveness of aging asset replacement. Replacement of at-risk elements will reduce outage events while providing customers with a higher degree of reliable service. New technologies are available for deployment on our system to provide faster outage detection, real-time situational awareness and modernized software solutions for system operators. By modernizing our distribution system, we can ensure outage times are minimized by faster detection and response by pinpointing the outage and focusing resources on the needed repairs. Communication systems will be bolstered by the deployment of fiber optic lines on our system with additional spare capacity for future use. Power quality will be enhanced with projects aimed at line capacity upgrades and power factor improvement. mitigate risk mitigate risk meet regulations maximize reliability maximize reliability maximize reliability 11 GOAL 5 Complete Energy Trading Modernization and Integrated Resource Plans GOAL 6 Minimize Compliance Failures and Penalties STRATEGIC PRIORITIES STRATEGIC PRIORITIES Our recent overhaul of the Energy Risk Management Policy requires detailed processes to ensure all policy requirements are achieved. To align the policy with day-to-day staff duties, a set of business rules will be developed to identify modeling and analytical methods used to provide energy trading and hedging recommendations to the Energy Risk and Risk Oversight Committees. Key performance indicators from this project will center on the ability to keep our energy portfolio metrics in compliance with the Energy Risk Policy. Separately, updated Integrated Resource Plans will be needed to address the future energy landscape in California, with particular focus paid to electrification of transportation and buildings. In addition to focusing on load growth from carbon reduction efforts, additional renewable energy resources will be required to maintain compliance with the State’s Renewable Portfolio Standard requirements. As part of our North American Electric Reliability Corporation registration as a Transmission Owner and Operator, we are continually striving to develop a culture of compliance with a particular focus on regulatory best practices. To support a culture of compliance and the development of best practices, a Regulatory Compliance Internal Controls project will be completed to ensure any compliance failures are minimized. With the recent requirement to provide enhanced system security by SB699, we will be focusing on bolstering the security at our substations by adding additional layers of protection from sabotage or break-ins. mitigate risk mitigate risk meet regulations meet regulations maximize reliability GOAL 4 Implement Distribution Risk Management Plan STRATEGIC PRIORITIES Upon completion of our internal Operational Risk Assessment, we discovered several opportunities to improve our internal working systems to minimize risk from organization structures, inventory and workflow management techniques. In tandem with replacing aging equipment and installing new technologies to modernize the system, several projects have been selected to ensure the support systems are intact to minimize system risk. This includes a new inventory control system, workflow management systems and software, and organizational structure and staffing changes to reflect a more streamlined operations team. mitigate risk maximize reliability Goals 12 Goals GOAL 7 Align Revenue Collection with Cost-Of-Service GOAL 8 Enhance Communication with Customers and the Community GOAL 9 Enhance Employee Development, Attraction and Retention STRATEGIC PRIORITIES STRATEGIC PRIORITIES STRATEGIC PRIORITIES Aligning revenues with the cost of providing electric service is imperative to mitigate risks. REU will implement two projects to analyze and recommend a rate structure. The first project will consist of a cost-of-service study that analyzes electric consumption patterns of service. To garner support for the rate structure recommendation, a second project will ensure significant outreach and community engagement to gather comments, provide education and develop consensus. Our Customer Focus Core Value is intended on meeting the needs of our customers and fostering an ownership relationship with the community. To support this core value, we must increase our communication channels, frequency of outreach and inclusion with our customers as we move through this Strategic Plan cycle. Two projects have been developed to meet this goal. A customer needs survey project will help us identify the areas requiring more attention and communication, while an updated communications plan project will ensure we are more effective at stakeholder processes and customer outreach. Future surveys will be used to gauge the effectiveness of these projects. Because we value our employees, REU identified several employee training and procedure management projects to ensure our teams understand their roles and responsibilities in serving our customers. Furthermore, in order to attract and retain quality and dedicated team members, ongoing labor market analysis must occur to ensure the working environment of REU is one that attracts and maintains employees. This will include studies of pay and benefits and working conditions. These workforce initiatives are imperative to deliver the strategic plan successfully. mitigate risk mitigate risk meet regulations maximize reliability mitigate risk meet regulations maximize reliability 13 Acknowledgements We wish to acknowledge the many contributions of Redding City Council Members and members of the public. This is a better strategic plan because of extensive discussion, debate and challenges that arose throughout this process. Our process relied heavily on an advisory team of stakeholders from within the City and the community for their perspectives. We thank all of you for your commitment and diligence. ADVISORY TEAM Chuck Aukland Public Works Director Steve Bade Deputy City Manager Tim Danielson Salvation Army Captain Nate Fairchild Director of Science and Charter School Administration Jake Mangas President & CEO, Chamber of Commerce Mark Mezzano City Council Kristen Schreder City Council Chad Scott CEO of the Builder’s Exchange Jerrod Vanlandingham Fire Chief For more information: City of Redding Electric Utility 3611 Avtech Parkway Redding, CA 96002 530.339.7300 www.reupower.com 9.5(c) 2026 Strategic Plan Presented to the Redding City Council August 17, 2021 Presented by: Electric Utility Director Dan Beans 100 Years of Redding Electric Utility The City of Redding purchased the electric utility from a predecessor of PG&E on December 21, 1921 for $57,356.18. o In the first year of operations, the City made a net gain of $29,820 and had a lower kWh rate set than before being publicly owned o Redding was the first city in Northern California to acquire a public electric utility through eminent domain proceedings REU continues to create value and deliver exceptional service through the challenges of meeting an uncertain regulatory future. Strategic Plan Development Process Vision REU makes Redding better by connecting with our customers and being their trusted and reliable, community-owned utility Mission REU, in partnership with the Redding community, is committed to improving the public’s safety and providing reliable, cost- effective service. Core Values Establishing core values is a key part of defining who we are, how we will serve our customers and how we will treat each other. o Safety o Integrity o Customer Focus o Teamwork o Communication o Stewardship These organizational values play a key role in how we will fulfill our mission and values. Priorities Three strategic priorities have been identified as points of emphasis in our strategic planning process. o Mitigate Risk o Maximize Reliability o Meet Regulations These Strategic Priorities serve as the framework for our Strategic Plan. Risk Reliability Regulation Strategic Plan Goals o Complete Critical Wildfire Mitigation Projects o Replace Aging Distribution System Infrastructure o Initiate Distribution Modernization Program Element o Implement Distribution Risk Management Plan o Complete Energy Trading Modernization and Integrated Resource Plans o Minimize Compliance Failures and Penalties o Align Revenue Collection with Cost-of-Service o Enhance Communication with Customers and the Community o Enhance Employee Development, Attraction and Retention Thank you to our Strategic Plan Advisory Team for your commitment and contributions o Council Member MarkMezzano o Council Member KristenSchreder o Chuck Aukland, Public Works Director o Steve Bade, Deputy City Manager o Tim Danielson, Salvation Army Captain o Nate Fairchild, Director of Science and Charter School Administration, Shasta County Office of Education o Jake Mangas, President & CEO, Chamber of Commerce o Chad Scott, CEO, Shasta Builders’ Exchange o Jerrod Vanlandigham, Fire Chief Approve Redding Electric Utility’s 2026 Strategic Plan establishing new vision and mission statements, identifying core organizational values, and setting goals. Recommendation CITY OF REDDING REPORT TO THE CITY COUNCIL Recommendation Authorize the following actions relative to Redding Electric Utility (REU): 1) Accept the Five-Year Capital Improvement Plan; and 2) Adopt Resolution approving and adopting the 6th Amendment to the City Budget Resolution No. 2021-078 authorizing the creation of four additional line personnel positions for Redding Electric Utility. Fiscal Impact There is no fiscal impact associated with accepting the Five-Year Capital Improvement Plan. Staff will return to the City Council (Council) with a contract for Engineering Services as identified in the Five-Year Capital Improvement Plan along with the necessary budget resolution. Additionally, Redding Electric Utility (REU) will return to the Council with project specific budget resolutions as design services are completed. The annual cost of the four additional Lineman positions is estimated at $800,000 per year subject to change based on future labor agreements). Budgetary savings from current vacant positions is anticipated to cover the cost of filling the new positions for the current budget cycle, with the ongoing annual cost of the positions included as part of REU’s biennial budget requests. For reference, in Fiscal Year 2020-21 REU realized personnel savings due to vacancies of approximately $2.5 million, which resulted in personnel savings net of salary adjustments and overtime of approximately $900,000. However, depending on actual savings, REU may be seeking additional budget authorization at future mid-year or mid-cycle budget updates. Alternative Action The Council could choose to adopt any combination of the recommendations above, and/or provide additional direction to staff. MEETING DATE: August 17, 2021 ITEM NO. 9.5(d) FROM: APPROVED BY*** dbeans@cityofredding.org btippin@cityofredding.org SUBJECT: 9.5(d)--Consider Redding Electric Utility's Five-Year Capital Improvement Plan; and Resolution authorizing additional line personnel positions. Daniel Beans, Director of Electric Utility Report to Redding City Council August 10, 2021 Re: 9.5(d)--Redding Electric Utility's Five-Year Capital Improvement Plan Page 2 Background/Analysis The Five-year Capital Improvement Plan (CIP), created by Ulteig Engineers, Inc. (Ulteig), provides an overview of the current state of REU ’s distribution system and provides a roadmap that will assist REU in achieving its goal of providing safe and reliable power to its customers while preparing the distribution system for future transportation and building electrification load growth. The Five-Year CIP is a subset of REU’s Distribution Modernization Program. The Distribution Modernization Program is a ten-year integrated outlook factoring in wildfire mitigation and system hardening, replacement of aging distribution assets (both overhead and underground), efforts to increase system reliability by reducing system outage events and durations, and greater situational awareness to increase visibility of outages providing reduced response time and repair. These critical system improvements have been prioritized based on the strategic priorities outlined in REU’s Five-Year Strategic Plan: maximize reliability, mitigate risk, and meet regulations. The entire Distribution Modernization Program, including cost estimates, workforce assessments, schedule projections, available resources, and description of improvements, is available for review by contacting REU. Based upon Ulteig’s and REU staff’s workforce assessment, the current REU staffing level is insufficient to complete the necessary improvements in the required timeline. However, REU does not recommend filling this need solely from hiring new full-time staff to supplement a large scale, short-term project uplift. Alternatively, REU is recommending four additional Line personnel and the use of third-party contractor support to supplement existing REU crew capabilities. Contracting the work will require coordination and cooperation with IBEW- Electric. As the resources needed to implement the Five-Year CIP and other Strategic Plan items, including meeting increased regulations and mitigating risk, are addressed, REU will embark on a process to review rates for future recommendations to the Council. This process will include public outreach, a cost-of-service study, and a communication plan. REU will work with the City of Redding Equity Officer to ensure outreach and communication is available and understandable to all REU customers. This process will be targeted to begin in September and be completed by the end of 2021. Council Priority/City Manager Goals Government of the 21st Century – “Be relevant and proactive to the opportunities and challenges of today’s residents and workforce. Anticipate the future to make better decisions today.” Attachments Resolution REU's Five-Year Capital Improvement Plan (available online) RESOLUTION NO. 2021-____ A RESOLUTION OF THE CITY OF REDDING APPROVING AND ADOPTING THE 6TH AMENDMENT TO CITY BUDGET RESOLUTION NO. 2021-078 APPROPRIATING 0 FOR THE CREATION OF FOUR ADDITIONAL LINE PERSONNEL POSITIONS FOR REDDING ELECTRIC UTILITY FOR FISCAL YEAR 2021-22 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF REDDING THAT Budget Resolution No. 2021-078 be and is hereby amended as follows: FUND DIVISION DESCRIPTION INCREASE DECREASE 142 853 ELECTRIC $0 THAT account titles and numbers requiring adjustments by this Resolution are as follows: PERSONNEL FY 2020-21 Lineman (Certification Rate) 4 FTE THAT the purpose is to appropriate $0 for the creation of four additional line personnel positions for Redding Electric Utility for fiscal year 2021-22. I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 17th day of August, 2021, and was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: ABSTAIN: COUNCIL MEMBERS: ERIN D. RESNER, Mayor ATTEST: FORM APPROVAL: PAMELA MIZE, City Clerk BARRY E. DeWALT, City Attorney Confidential 5-Year Capital Improvement Plan Last printed 8/4/2021 5-Year Capital Improvement Plan Project Name: 5-Year Capital Improvement Plan Ulteig Project Number: 20.02208 Department: Technical Services – Transmission and Distribution Prepared For: Document Owner(s) Project/Organization Role Redding Electric Utility Municipal Utility Ulteig Engineers, Inc. 3350 38th Avenue South Fargo, North Dakota 701.280.8500 www.ulteig.com Revision History Revision Date Description 1 8/3/2021 100% Submittal 5-Year Capital Improvement Plan Redding Electric Utility Confidential 2 TABLE OF CONTENTS 1 5-Year Capital Improvement Plan (CIP) ........................................................................... 3 1.1 Overview ............................................................................................................................... 3 1.2 5-Year CIP Results ................................................................................................................. 5 LIST OF TABLES Table 1: 5-Year CIP - Project Cost and Duration Estimates ......................................................................... 5 Table 2: 5-Year CIP - Estimated Spend per Year ......................................................................................... 6 Table 3: 5-Year CIP - Estimated Project Execution Timeline ...................................................................... 7 Table 4: 5-Year CIP - Estimated Total Labor Hour Breakout ...................................................................... 8 Table 5: 5-Year CIP - Estimated Labor Breakout per Year .......................................................................... 9 Table 6: 5-Year CIP - Estimated Total Engineering Hour Breakout .......................................................... 10 Table 7: 5-Year CIP - Estimated Labor Breakout per Year ........................................................................ 11 5-Year Capital Improvement Plan Redding Electric Utility Confidential 3 1 5-Year Capital Improvement Plan (CIP) 1.1 Overview REU’s 5-year Strategic Plan sets the goals and the expectation of an electric grid which is more reliable, resilient to natural disasters, and more flexible for the increased installation of Distributed Energy Resources (DERs) and transportation and building electrification load growth. However, through years of deferred maintenance, REU’s extensive infrastructure continues to age and decreasing reliability statistics confirm this. This Capital Improvement Plan outlines the necessary improvements over the next five years to address the highest priority items identified. It is imperative that REU acts quickly to make these significant infrastructure improvements outlined herein while working towards the goal of a more modern grid and to meet the needs of continued electrification. With the immense workload that will be required to accomplish this objective, ensuring these efforts commence promptly will be vital to ensuring that our manpower is best utilized performing proactive improvements rather than emergency repairs and power restorations. The 5-Year Capital Improvement Plan was formed from an in-depth look at the first 5 years of the Distribution Modernization Program (DMP), a separate document. Each project was analyzed against the goals outlined in REU’s Strategic Plan using analytical scoring techniques and priority projects were determined which could best be accomplished within this 5-year period. This involved evaluating capital vs engineering only projects, assessing the total number of hours anticipated to complete the work, determining the existing backlog of existing work and projecting cost and labor that would be required for any new construction projects. These construction labor hours were then evaluated against the historic available construction labor hours within REU. Table 1 shows that to initiate construction, a great deal of engineering design efforts will need to take place. The total spending in the first year is lower than the remaining years for this reason. As designs are prepared and construction ramps up, the capital spend is expected to significantly increase in year 2 and beyond as can be seen in Table 2. Through multiple prioritization discussions, the overall 5-year CIP schedule, Table 3, was developed to layout the required timeline for the 5-Year CIP to accomplish the goals set forth in the DMP. Historic records show that REU Line staff can only commit approximately 12,480 hours/year to new Capital Improvement Projects over and above any day-to-day activities such as new construction & emergency repairs. This approximation includes 2,080 hours for overtime associated with these projects. When evaluating the total number of construction labor hours required to complete the effort proposed within this plan, it is apparent that contract labor is required to supplement REU staffing in order to meet the goals of this plan. Tables 4 & 5 below show a breakdown of the total projected hours required per year and the amount of estimated internal labor hours. Additionally, this table illustrates the effect of REU hiring an additional 4-person line crew within the first year of this plan. Prior to initiating many of these improvement projects, an engineering evaluation of the distribution system model as described in the DMP must be performed. This necessary engineering effort will better identify system weaknesses, determine critical construction project phasing, and develop improved construction standards. These estimated prerequisite 5-Year Capital Improvement Plan Redding Electric Utility Confidential 4 engineering hours and dollars were then rolled into the associated capital projects as part of their overall scope. The estimated values are listed in the tables below and the tables in the DMP. In addition to the system evaluation, engineering design and construction services will also be required prior to and during execution of each construction project. This engineering services effort was estimated at 15% of the cost for each project. One exception to this estimate is the Aging Asset – Underground Cable Replacements project where this service was calculated at 7.5%. Current availability of REU engineering staff is limited to an estimated 2,200 hours per year to work on these projects over and above day-to-day base workload. As can be seen in Tables 6 & 7 below, the estimated engineering labor required to complete this work is significantly greater than the hours available through current REU staff. 5-Year Capital Improvement Plan Redding Electric Utility Confidential 5 1.2 5-Year CIP Results TASK NAME Total Cost 2022 2023 2024 2025 2026 Circuit Hardening $2,167,951 $694,500 $722,280 $751,171 - - Install reclosers at T1 boundary $477,360 Design Only $234,000 $243,360 - - Install switches at T1 boundary/Feeder Reconfiguration to T1 only $226,481 Design Only $111,020 $115,461 - - Transmission Hardening $844,081 Design Only Design Only $270,400 $281,216 $292,465 1-Phase Recloser Deployment $332,735 - - Design Only $163,105 $169,629 Aging Asset - Pole Replacements $10,332,645 $1,500,000 $2,080,000 $2,163,200 $2,249,728 $2,339,717 Switch Replacement Program $742,036 $137,000 $142,480 $148,179 $154,106 $160,271 Aging Asset - Underground Cable Replacements $29,497,935 $3,000,000 $6,240,000 $6,489,600 $6,749,184 $7,019,151 Strategic Undergrounding $3,610,896 Design Only $850,330 $884,343 $919,717 $956,506 Fiber Optic Backbone $4,773,600 Design Only $2,340,000 $2,433,600 - - Substation Security $938,469 Design Only $221,000 $229,840 $239,034 $248,595 Faulted Circuit Indicator and Line Sensor Deployment $402,558 $150,000 $104,000 $47,590 $49,494 $51,474 Line Capacity Upgrades/VVO $1,463,073 Design Only - $468,693 $487,441 $506,939 New Construction/Backlog (Labor Only) $7,670,022 $1,416,094 $1,472,738 $1,531,647 $1,592,913 $1,656,630 Facilities Field Verification $575,000 $575,000 - - - - Engineering Design and Construction Services $7,395,881 $2,690,649 $854,839 $939,921 $1,426,702 $1,483,770 Total $71,450,723 $10,163,243 $15,372,686 $16,717,007 $14,312,640 $14,885,146 Table 1: 5-Year CIP - Project Cost and Duration Estimates LEGEND Fire Mitigation Overhead Underground Substation Operational Efficiency/Reliability Other 5-Year Capital Improvement Plan Redding Electric Utility Confidential 6 Table 2: 5-Year CIP - Estimated Spend per Year 10,163,243 15,372,686 16,717,007 14,312,640 $ 14,885,146 0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000 14,000,000 16,000,000 18,000,000 2022 2023 2024 20252026SPENDING ($) YEAR Spending Per Year 5-Year Capital Improvement Plan Redding Electric Utility Confidential 7 Table 3: 5-Year CIP - Estimated Project Execution Timeline LEGEND Fire Mitigation Overhead Underground Substation Operational Efficiency/Reliability Other 5-Year Capital Improvement Plan Redding Electric Utility Confidential 8 TASK NAME Total Individual Labor Hours 2022 2023 2024 2025 2026 Circuit Hardening 5,840 1,947 1,947 1,947 - - Install reclosers at T1 boundary 234 - 117 117 - - Install switches at T1 boundary/Feeder Reconfiguration to T1 only 540 - 270 270 - - Transmission Hardening 4,750 - - 1,583 1,583 1,583 1-Phase Recloser Deployment 150 - - - 75 75 Aging Asset - Pole Replacements 30,750 4,855 6,474 6,474 6,474 6,474 Switch Replacement Program 4,275 855 855 855 855 855 Aging Asset - Underground Cable Replacements 37,100 4,122 8,244 8,244 8,244 8,244 Strategic Undergrounding 12,600 - 3,150 3,150 3,150 3,150 Fiber Optic Backbone 10,800 - 5,400 5,400 - - Substation Security 1,080 - 270 270 270 270 Faulted Circuit Indicator and Line Sensor Deployment 750 295 196 86 86 86 Line Capacity Upgrades/VVO 4,388 - - 1,463 1,463 1,463 New Construction/Backlog (Labor Only) 51,902 10,380 10,380 10,380 10,380 10,380 Facilities Field Verification 2,475 2,475 - - - - Engineering Design and Construction Services - - - - - - AVG per year 167,634 24,929 37,303 40,239 32,580 32,580 Table 4: 5-Year CIP - Estimated Total Labor Hour Breakout 5-Year Capital Improvement Plan Redding Electric Utility Confidential 9 Table 5: 5-Year CIP - Estimated Labor Breakout per Year 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 2022 2023 2024 2025 2026 Construction Labor Hour Breakout REU Hours Available Additional Crew Hire Total Hours Req 5-Year Capital Improvement Plan Redding Electric Utility Confidential 10 TASK NAME Total Engineering Hours 2022 2023 2024 2025 2026 Circuit Hardening 450 225 225 - - - Install reclosers at T1 boundary 160 80 80 - - - Install switches at T1 boundary/Feeder Reconfiguration to T1 only 420 210 210 - - - Transmission Hardening 0 - - - - - 1-Phase Recloser Deployment 500 - - 500 - - Aging Asset - Pole Replacements 0 - - - - - Switch Replacement Program 0 - - - - - Aging Asset - Underground Cable Replacements 0 - - - - - Strategic Undergrounding 0 - - - - - Fiber Optic Backbone 0 - - - - - Substation Security 225 100 125 - - - Faulted Circuit Indicator and Line Sensor Deployment 0 - - - - - Line Capacity Upgrades/VVO 0 - - - - - New Construction/Backlog (Labor Only) 0 - - - - - Facilities Field Verification 0 - - - - - Engineering Design and Construction Services 36,979 13,453 4,274 4,700 7,134 7,419 Total 38,734 14,068 4,914 5,200 7,134 7,419 Table 6: 5-Year CIP - Estimated Total Engineering Hour Breakout 5-Year Capital Improvement Plan Redding Electric Utility Confidential 11 Table 7: 5-Year CIP - Estimated Labor Breakout per Year 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 2022 2023 2024 2025 2026 Engineering Hour Breakout REU Eng Available Total Eng Hours Req 9.5(d) Five-Year Capital Improvement Plan Strategic Priorities Risk Reliability Regulation Customers Impacted by Outages 5,652 5,161 4,842 3,311 2,592 3,046 11,641 4,203 6,543 8,645 8,119 8,347 8,853 10,162 18,864 6,626 11,626 13,229 23,486 20,087 5,000 10,000 15,000 20,000 25,000 30,000 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 Customer Count Underground Overhead Total Customer Outage Minutes 488,559 552,440 676,921 411,425 332,211 506,776 1,427,111 379,065 994,762 766,621 578,203 768,391 1,029,456 811,560 1,613,489 660,337 1,002,635 823,580 1,890,865 1,740,887 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 Minutes FY 19 excludes Carr Fire and Snow Storm outage minutes Underground Overhead Reliability Trend –Number of Sustained Events 8 16 10 7 16 99 18 9 0 2 4 6 8 10 12 14 16 18 20 Equipment - Overhead Equipment - Underground Tree-Related 5 Year Average 3 Year Average 2020 Project Cost Estimates Engineering hours included with other Task Name Total Engineering Hours Total Labor Hours Total Cost Fire Mitigation 1030 11,364 $ 3,715,873 Overhead 500 35,175 $ 11,407,416 Underground 0*49,700 $ 33,108,831 Substation 225 11,880 $ 5,712,069 Operational Efficiency/Reliability 0*5,138 $ 1,865,631 Other 36,979 54,377 $ 15,640,903 Total 38,734 167,634 $ 71,450,723 Construction Labor Hours Breakout Historic records show that REU Line staff can only commit approximately 12,480 hours/year to new Capital Improvement Projects over and above any day- to -day activities such as new construction & emergency repairs. 12,480 12,480 12,480 12,480 12,480 6,240 6,240 6,240 6,240 6,240 6,209 18,583 21,519 13,860 13,860 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 2022 2023 2024 2025 2026 REU Hours Available Four Additional Line Personnel Contract Hours Required 23 23 20 22 20 19 17 6 4 4 3 1 3 4 0 5 10 15 20 25 30 6/30/2014 6/30/2015 6/30/2016 6/30/2017 6/30/2018 6/30/2019 6/30/2020 Available Inspector Vacant Decreasein Line Positions Engineering Hours Breakout Current availability of REU engineering staff is limited to an estimated 2,200 hours per year to work on these projects over and above day-to -day base workload. The estimated engineering labor required to complete this work is significantly greater than the hours available through current REU staff. 1,100 1,100 2,200 2,200 2,200 12,353 3,814 3,000 4,934 5,219 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 2022 2023 2024 2025 2026 REU Hours Available Total Engineering Hours Required Rate Process Revenue assumptions required to support the Plan were largely accounted for in the 5-Year Financial Plan included in REU’s biennial budget adopted by the Council on June 15, 2021. Rates currently being designed for Council’s consideration this winter will be: o Based on an updated cost-of-service study o Reviewed by a Director’s Committee o Shared at public workshops o Communicated to all customers via public outreach and education including diversity, equity, and inclusion efforts) Recommendations Authorize the following relative to Redding Electric Utility: 1) Accept the Five-Year Capital Improvement Plan; and 2) Adopt Resolution approving and adopting the6thAmendment to the City Budget Resolution No. 2021-078 authorizing the creation of four additional line personnel positions for Redding Electric Utility. Public Power Week –October 3 -9 Join us on Friday, October 8th for REU’s 100 Years of Public Power Celebration in Downtown Redding from 4-7PM! o Raffle prizes o Demos o High voltage safety trailer o Free ice cream & drinks o Bucket truck rides & more! Thank You!