Loading...
HomeMy WebLinkAboutReso 2023-008 - Adopting the Redding Capital Improvement Plan for 2022-23 and 2027-28RESOLUTION NO. 2023-008 a 6 tA MUMMER= 2022-23 to 2027-28 WHEREAS, a Capital Improvement Plan (CIP) has been prepared which identifies the City's long-term capital improvement project needs in a comprehensive and consistent format; and WHEREAS, the CIP was prepared in a format and with content that is consistent with the requirements of Government Code Section 66002, which establishes requirements for the preparation of a CIP that includes projects subject to development impact fees; and WHEREAS, the CIP was reviewed by the Redding Planning Commission on October 25, 2022, and was approved as consistent with the General Plan pursuant to Government Code Section 65103c; and WHEREAS, on January 17, 2023, the City Council held a duly noticed public hearing to allow opportunity for public comment on the draft CIP; and WHEREAS, having satisfied the requirements of law governing preparation, content, general plan consistency, and opportunity for public review, the City Council wishes to adopt said CIP to formalize the document so it can become available for consideration in budgeting, land use planning, and accounting, among other benefits; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Redding does hereby approve and adopt the Redding Capital Improvement Plan for 2022-23 to 2027-28 included herewith as Attachment "A." I HEREBY CERTIFY that the foregoing resolution was introduced at a regular meeting of the City Council of the City of Redding on the 17th day of January, 2023, and was adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: Audette, Mezzano, Moons, Winter, and Dacquisto NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None MICHAEL DACQUISTO, Mayor ATTEST: FORM APPROVED: r7l CAPITAL IMPROVEMENT CAPITAL IMPROVEMENT PLAN TABLE OF CONTENTS AIntroduction ... —.................. ----........... —........ ....... ---......... ---....... ---.... A,1 B General Overview ~ Division DesCrDik>Ds--......... -----...... -----......... -------....... B-1 " Project SUO1Ol@[y—........ --- ......... ....... -------............... ....... ................ B-6 � Funding Overview bvDivision ................. .............. ---- ........ ...... —..... —... .... B-13 ° Funding Overview bvSource .............. ........ —......... ....... —...... ............. --B-16 C Detailed Program Summary ° Airports ......... --............. --------...... ---------...... ---....... C-1 " Community Services ........................ ---...... —...... —........ ---..... —........... _C-12 ° Redding Electric Utility .................... —................. ....... --...... —................ —,C-15 ° Redding Fire ent...... '....... ' ............... ° Solid Waste ............... ........... ---.............. ....... ----...... .............. ......... C-26 ° Storm Drain Utility .......... .............. --- ................ --- ....... —............ ------'C'29 ° Streets ... —......................... ............... ...... .......... .... —......... --...... --.......... C-32 , Wastewater ...... ........ ------....... ... ...... ........... —...... ....... —...... --... C-43 ° Water. —.............. ----------...... ---------.............. ---..... C-54 ~ Future/Unfunded Projects.... ---------------------------C'6O SECTION a INTRODUCTION INTRODUCTION The City of Reddina's 2022-23 to 2027-28 Capital Improvement Plan (CIP) is a five-year outlook on anticipated capital projects in the City of Redding. The City is required by Government Code 66002 to prepare and adopt a CIP, This document is used as a too! to help ensure that the City's short- and long-term capital investments are made in the context of careful consideration of the City's needs as well as the resources available to fund the related capital projects. THE ACIP AND GOOD PLANNING In general, all projects have their roots 'in the City's General Plan and in a particular department's master plan or other long-range planning document. For example, the General Plan includes goals and policies related to the City's wastewater treatment and collection system while the Wastewater Master Plan incorporates this direction, accounts for expected growth and the condition of the existing infrastructure, anticipates revenue, and identifies resulting infrastructure needs. These needs are then rolled into projects, a project delivery schedule is developed and then the projects summarized in the CIP. Section 65103c of the Government Code requires planning agencies to review the CIP for consistency with the General Plan. The Planning Commission reviewed the CIP on October 25, 2022, and found it consistent with the General Plan. THE DIP AND THE CITY'S 2-YEARBUT DGEAND 10 -YEAR FINANCIAL PLAN 0 The budgeting for the City's CIP starts with the development of the City's 2 - year budget and 10 -year financial plan. This biennial process includes a combination of detailed staff analysis and broad public involvement. It is during this process that basic municipal operational and specific infrastructure needs are identified and matched with revenues generated from various local, state and federal funding sources. This CIP is a projected $602 million plan with revenue from 37 different sources that can be grouped into eight different funding source categories. A detailed breakdown of the CIP funding by funding source can be found beginning on page B16 while a summary by funding source category is provided on the chart. Gener 36,51 Airport Fund 749,063 Grant 217,608,296 A-1 Utility Rates 232,533,483 Impact Fees 58,119,661 ocal Streets and Roads Fund 36,658,830 PFC ),108,993 TEAM EFFORT IN BUILDING THE CIP The document is prepared by the Engineering Division in the Public Works Department with input from all Departments in the City. As noted above, many other commissions, community groups and partners have ongoing input into the planning and budget documents that are the foundation of the CIP. The plan includes projects from all areas in the City including, but not limited to, projects that improve the City's streets, sewerfacilifies, water facilities, storm drain facilities, airports, and park facilities. The major emphasis in this CIP is rehabilitation and replacement of aging infrastructure in the 'City's five rate -funded utilities and streets program. This section contains two charts breaking out the CIP by program and each of the programs by their basic funding sources. Water 76,336,737.00 Wastewater 114,797,584.00 btreets 125,455,734.00 FUNDING TOTALS sorts 3,695.00 Community Services 22,857,856.00 REU 64,927,570.00 RFD 25I 581I450.00 Storm Drain Solid Waste 5,519,800.00 5,683,350.00 Water Wastewater Streets Storm Drain Solid Waste RFD 9�sfaft w 1;R11RD. ".0 MAMMA, REU Community Services Airports 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% A-2 a Airport Fund Donation General Fund * Grant * Impact Fees is Local Streets and Roads Fund PFC Utility Rates Grant CIP ORGANIZATION The document includes a general overview followed by detailed program -by -program summaries of the entire plan. Section B - General Overview The general overview includes an overview of each City division contributing to the CIP, followed by a division by division summary of all projects with projected project costs (project development plus construction) and anticipated year of construction and concluding with a Y detailed overview of the various funding sources, The Cit 's CIP includes 1964 projects with a projected funding need of $602 million. The funding for the five-year CIP consists of local, state and federal funding from 37 different funding sources. Section C - Detailed Program Summaries The detailed program summary includes an overview of the program including project by project summaries. These summaries include project descriptions, locations, funding source 015MM" be needed. Funding Legend ATP —Active Transportation Program CDBG — Community Development Block Grant HBP — Local Highway Bridge Program HSIP — Highway Safety Improvement Program PFC — Passenger Facility Charge SRTS — Safe Routes to School STIP — State Transportation Improvement Program PFC —Airport Passenger Facility Charge RRA — City of Redding as Successor Agency for the Redding Redevelopment Agency A-3 SECTION B GENERAL OVERVIEW MMMMEW There are two airports located within Redding. The Redding Regional Airport, located in the southeast portion of the City, is designated as a certified airport for commercial airline operations. Benton Airpark, located close to Downtown Redding at Placer Street and Airpark Drive, is a general aviation facility which provides reliever support to the Redding Municipal Airport. Both facilities are owned and operated by the City. The availability of convenient air transportation for residents and businesses is an asset to the community and can be used as a marketing tool in the City's economic development efforts. The 2010 Airport Master Plans outline future improvements planned for the Redding Municipal Airport and Benton Airpark. In addition to a listing of proposed improvement projects, the Master Plans identify estimated costs and general time frames (short-term, long-term, etc.) for installation of the improvements. General Plan Consistency: The projects planned for both airports are consistent with the General Plan's goals, objectives, and policies, which promote the maintenance and enhancement of our airports to provide convenient airport service for the community and strive to minimize any adverse impacts resulting from aircraft operations or airport expansion. Reference: Goals T9, T10, PF14; Policies T9F, T10A, T10C, PF14A, PF14B, and PF14C. COMMUNITY SERVICES The Community Services Department oversees all the programming within the park system and the development, expansion, and enhancement of thepark, trail, and open -space amenities. Currently, the City of Redding owns and operates a complete range of park and recreation facilities that include 68 park sites on approximately 598 acres of land. The park system includes the smallest of neighborhood parks, large regional parks, state-of-the-art athletic facilities, and special -use facilities, e.g., boat ramps and a dog park. The Department maintains over 39 miles of trails throughout the city. The trail system has been recognized by federal and state agencies as a model. The core of the trail system is the Sacramento River Trail with many connecting trails and public to spaces, With several large athletic facilities completed in the last decade, including the Big League Dreams Park, the Redding Aquatic Center, and the Redding Soccer Park, resources have been redirected to the development of large neighborhood parks. Currently, the Department has agreements with five subdivision developers to build neighborhood parks concurrent with the houses. Park development fee credits will fund the bulk of the construction. General Plan Consistency: The proposed park and recreation projects are consistent with the General Plan's goals, objectives, and policies which promote the improvement of park and recreation facilities Citywide. Reference: Goals R4, R1 1, R12, PF15; Policies (all policies listed under the noted goals). PUBLIC SAFETY Police Department. The Redding Police Department has the primary responsibility of providing police protection and emergency -service response within the City limits. A mutual aid agreement is in effect with agencies on a statewide basis. The Redding Police Department has three main divisions —Administrative Services, Field Operations, and Investigations. Officers are assigned to ME 1E21QKf_1VM -4 E-0 0 VVIL[lin ine 1,7y ilryms. 7 mufuai To agreement is in efTect with California Department of Forestry and Fire Protection (CDF) during the wildland fire season for wildland and structure fires within a one -mile fringe area surrounding the City. An automatic aid agreement with the Shasta County Fire Department is also in effect for structure fires outside the wildland fire season. Under these agreements, the Redding Fire Department responds within a one - mile fringe area surrounding the City and to county islands. Shasta County Fire Department responds to a small geographic area on the east side of the City. The Redding Fire Department has three main divisions: Administration, Operations, and Fire Prevention. It operates from eight Oations, and a Fire Headquarters at City Hall. There are currently no planned 5 -year capital improvement needs for the Fire Department. REDDING ELECTRIC UTILITY As a California municipal corporation, the City of Redding owns, operates, and maintains power generation, transmission, and distribution facilities within the City limits. Given the investment in such facilities and a commitment to providing power at the lowest possible rates, it has historically been Redding's policy to be the sole provider of electric service within the City limits. As areas are annexed, City electric service is made available when PG&E facilities can be purchased or when service can be provided through a logical extension of the City's electric distribution system. Redding Electric Utility (REU) presently provides service to its customers in an area approximately 61 square miles in size, with 72 miles of 115 -kV transmission lines and 752 miles of overhead and underground 12 -kV distribution lines. REU is proud of its record over the past year of 99.9994 percent electric service reliability (excluding the Carr Fire Damage). To meet the demands of the changing state regulations due to wildfire and the increase of the distributed energy installations, the Electric Utility must adapt in the following ways, • Harden our existing distribution system as described in the REU Wildfire Mitigation Plan • Increase the operational efficiency of electrical system to quickly identify, track, and restore outages through the Outage Management System and workforce management tools. • Improve Communications Network to provide Operations & Engineering with real-time awareness of customer usage, circuit load, and system voltages to identify system bottlenecks, The City of Redding filed its first comprehensive Integrated Resource Plan (IRP) with the California Energy Commission (CEC) in 2019 as required by state regulation, and will update the plan at least every five years as required. The IRP is a guidance document outlining the utility's plan for meeting clean energy mandates and customer resource needs over the next 20 years, system upgrades needed to support load growth, managing load impacts from increased electrification adoption, and provides a framework for future resource procurements needed to support customer demands. As the state increases the focus on carbon reduction through building and transportation electrification, the City has begun implementing policies and procedures to aid in the adoption of infrastructure supporting electrification. The City will evaluate the need to,expand its electric transmission and distribution systems based on transmission system assessments and distribution B-2 planning studies to reliably deliver energy to its customers. In addition to securing various long- and short-term power purchase contracts, the City owns and operates 183 MW of gas-fired generation within the City Limits. General Plan Consistency. The projects planned for the Electric Utility are consistent with the General Plan's goals, objectives, and policies, which promote programs that provide safe, reliable, and competitively priced electricity for existing and future City electric customers. Reference: REU's 2021 Strategic Plan, 2019 Integrated Resource Plan, 2019 Wildfire Mitigation Plan. SOLID WASTE Solid waste generated in the City is disposed of at Shasta County's Richard W. Curry/West Central Sanitary Landfill. Under existing state permits, the landfill has sufficient capacity to accommodate the disposal of solid waste at least to the year 2030. Expansion of the facility also appears to be plausible at such time as increased capacity is warranted beyond the extent of existing permits, Although Shasta County owns the Richard W. Curry Landfill, it has contracted with the City of Redding for the operation and management of the facility, This arrangement was formalized in 1988. All residential, commercial, and industrial refuse in Redding is collected by City personnel. Since 1995, the City has operated its own Solid Waste Transfer Station for the transfer of City - collected residential, commercial, and industrial refuse and the transfer of self -haul public refuse. The facility also has the capability of processing materials collected by curbside recycling programs and contains a household hazardous waste drop-off/processing area and a composting area. General Plan Consistency: The proposed solid waste projects are consistent with the Solid Waste Facility Master Plan and the City's General Plan goals, objectives, and policies, which prornote the efficient collection and disposal of solid waste, while maintaining an adequate waste -disposal capacity. Reference: Goals CDD2 and P178; Policies CDD2E and PF8A. STORM DRAINS The Redding Planning Area contains 15 watershed basins. Public storm -drainage facilities withii the City limits are operated and maintained by the City. Surrounding unincorporated areas are t responsibility of the County of Shasta. As new areas are annexed, the City assumes responsibili for stormwater management. 1� The City currently has a range of public and private storm -drain faces to provide safe and efficient capture and conveyance of stormwater runoff and minimize the risks of flooding. Storm -drain facilities include more than 200 miles of storm drain pipe, more than 7,000 inlets, 1,300 outfalls and 200 miles of open channel. These systems typically outfall into natural ravines or tributaries and ultimately to the Sacramento River, General Plan Consistency: The proposed storm -drainage projects are consistent with the General Plan's goals, objectives, and policies, which promote efforts to reduce flooding and to properly manage stormwater runoff from development. Reference: Goals CDD2 and PF9; Policies CDD2E, PF9A, PF913, and PF9F. B-3 1311MMUN Redding is both defined and constrained by its network of highways, roads, trails, railroads, and transit services that move its residents and goods in, through, and out of the community. The City is responsible for ensuring the construction and maintenance of all public streets, sidewalks, bridges, bikeways, traffic signals, and street signage within the City limits. The City also maintains a variety of Caltrans facilities consistent with the terms of various cooperative agreements. Developers are either partially or totally responsible for new street construction depending on the type and location of the project. The City uses public funds to build or improve major streets when the improvements were not constructed as part of a land development project. General Plan Consistency: The projects planned for streets are consistent with the General Plan's goals, objectives, and policies, which promote the development and maintenance of a safe and efficient public -street and bicycle -route system. Reference: Goal T3, T4, T6, T8, PF1 1, and PF12; Policies T3A, T3D, T4A, T413, T6D, T6E, T8B, T8C, PF1 1 B, PF1 1C, PF1 1 D, and PF1 1 E. BUILDING MAINTENANCE maintenance and repair of the City's facilities such as City Hall, the Corporation Yard and the multiple Redding Fire Stations to name a few. There are currently no planned 5 -year capital improvements for the division. WASTEWATER The City of Redding is the sole provider of wastewater service within the City limits. The wastewater system has two major service areas, one served by the Clear Creek Wastewater Treatment Plant and the other served by the Stillwater Wastewater Treatment Plant. Facilities include: the Clear Creek Wastewater Treatment Plant, initially constructed in 1966, which currently has a capacity of 9.4 million gallons per day (mgd); the Stillwater Treatment Plant, put into service in 1992, which has a capacity of 4.0 mgd; and the wastewater collection system, which has approximately 430 miles of sewer mains, 17 lift stations, and over 7,000 manholes. The wastewater system serves nearly all developed property within the City, plus a few small developments in the surround I ing unincorporated area. The City provides service to more than 43,000 household equivalents. One household equivalent is the average amount of wastewater produced by an average single-family residence, which is about 240 gallons per day. General Plan Consistency: The proposed wastewater projects are consistent with the General Plan's goals, objectives, and policies which support efforts to achieve and maintain an adequate level of service in the City's sewage collection and treatment system as needed to meet existing a future needs. Reference: Goals CDD2 and PF6; Policies CDD2E, PF6A, PF6B, and PF6C. B-4 MMMKM The City provides water for domestic and fire -suppression uses to most of the City and to small portions of the surrounding unincorporated area. The water system is supplied by two treatment plants and well fields, Facilities include: the Foothill Treatment Plant, which has a capacity of 28 million gallons per day (mgd)l- the Buckeye Treatment Plant, which has a capacity of 14.0 mgd; the Enterprise and Cascade well systems, which have a capacity of 19.1 mgd; and the City's water distribution system, which has approximately 560 miles of water mains. The water system serves about 83 percent of the current population of Redding and about 1,800 residents in the surrounding unincorporated area. The water utility provides service to approximately 30,000 households. General Plan Consistency: The proposed water projects are consistent with the General Plan's goals, objectives, and policies, which support efforts to maintain an adequate level of service in the City's water treatment and distribution system as needed to meet existing and future needs. Reference: Goals CDD2 and P175; Policies CDD2E, PF5A, PF5B, and PF5C. M PROJECT SUMMARY AIRPORTS Project No. Project Title Anticipated Construction Date Total Costs During Current C|PTlm*fmme Project Detail Page A,BEN22'1 Runway Pavement Preservation 2022'23 $490.000 C'1 A-BEN'22'2 Eastside T-HangarToxi|mneReconstruction 2023'24 $3.466.087 C-1 A,BEN-23-8 Northeast Apron and Taxi|onesReconstruction 2024'25 $2.750.000 C-1 A -BEN -234 Rehab Parallel Taxiway A 2024-25 $380.200 C-2 A'BEN-23-5 Underground PowedineRPZ 2023'24 $45.000 C'2 A'BEN-24-4 Westside T'HungerTaxi|aneReconstruction 2025'20 G4.170.000 C-2 8,8EN-25'2 Security Fencing ' North RPZ 2020'27 $135.000 C'5 A -BEN -26-1 Terminal Construction Project 2027'28 $1.192.000 C -J y+BEN'20-2 East Apron Pavement Rehabilitation 2027'28 $1.045.000 C-3 A-BEN'284 T'Hmngar Taxi|ineConntruction 2027'28 $750.000 C4 A'BEN'26-5 Runway 15Approach Tree C|eurninQ 2027'38 $100.000 C4 A,KXUN-22-2 Terminal Assessment Study 2022'23 $500.000 C4 8'MUN'22-5 Reconstruct Term ina|A\iqportLoop Access Road Phase ||| 2022-23 *2.833.880 C-5 A,MUN-22-6 Reconstruct Term ina|/AiqpnrtLoop Access Road Phase /V 2022'23 G1.160.500 C-5 A-MUN-22'7 Runway 1O-34and Taxiway Connectors Rehabilitation 2024'25 $18.436.280 C'5 A,MUN'22-8 Master Plan Update 2022'23 $1.161.907 C'0 ArK8UN-22'9 Master Drainage Study 2022'23 *585.204 C -O A'MUN'23-2 Wildlife Hazard Assessment 2023-24 $150.000 C -O y-MUN'23-3 Runway 10-34Grading and Runway 34RE|LModifications 2025'20 $21.200.057 C'7 A-MUN-23-4 All Weather Perimeter Road 2024'25 $1.180.000 C'7 A'MUN-23'5 Airport Access Control System 2024'25 $700.000 C-7 A,MUN-24'1 Terminal Construction Project 2024-25 $52.300.000 C-R A'k8UN-24-3 Runway 16'34. 12'3Oand Taxiway Connectors Phase || 2024-25 $18.522.000 C'8 A+MUN'244 Environmental Assessment 2024'25 $500.000 C'O A'MUN'24-5 High -Speed Runway Sweeper 2024-25 $350.000 C'8 A-MUN-24-7 Pavement Preservation 2025'28 $1.120.000 C'9 A,MUN'25-1 Airport Drainage Study 2025-26 $550.000 C'9 A-k8UN'25-3 Runway 17'35Extension 2025'26 *3.000.000 C'10 A-MVN'25-4 Northwest Apron Extension 2025'26 $2.150.000 C'10 A,MUN-20'1 Pono||e|Runwoy/Texiway 2027'28 $11.800.000 C'10 A'MUN'20-2 Expand Solar Farm ' Study &Design 2027'28 $200.000 C'11 A,MUN'26-3 Perimeter Fencing 2027'28 $7.750.000 C'11 *161.199,695 PROJECT SUMMARY COMMUNITY SERVICES Project No. Project Title Anticipated Construction Date Total Costs During Current C|PTimoframm Project Detail Page CG'2005'21 ShasdnaRanch Park Development 2022'23 $2.500.000 C'12 CG -2V11-01 Salt Creek Heights Park 2022-23 $697.008 C'12 CG`2013-01 California Soccer Park 2022-23 820.000 C'12 CS -2018-04 Northeast Crossing Trail (NEXT) 2022-23 $44.850 C'13 C8-2021-01 Caldwell Park Expansion Project 2022-23 $0.736.000 C'13 CS'2022-01 Panorama Park 2023-24 $10.000.000 C'13 CS -2022-02 Martin Luther King Building 2023'24 $560.000 C'14 C8-2022-03 South City Park 2022-23 $2.500.000 C'14 $22.857.856 ������ "����� Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date C|PTimeframe Page REU-2807'08 Electric Utility GIS Mapping (GIS Conversion) Ongoing $835.850 C'15 REU'2011'02 Corporation Yard Expansion 2022-23 $07.240 C-15 REU-2011-07 Asphalt Paving (Plant Resurfacing) 2022-23 $08.178 C'15 REU'2017'13 Next Generation Firewalls 2022'23 $70.300 C-16 REU2017'15 Redding Power Substation Controls Modernization 2022'23 $138.000 C'16 REU-2017'10 Substation Network Upgrades 2022'23 s15.900 C'16 REU-2018-01 T3000 Upgrades 2022'23 $79.290 C'17 REU-2018-02 Remote Commercial Meter 2022-23 $261.880 C-17 REU'2019-02 Unit 5Breaker Replacement 2022'23 $350.000 C'17 REV -2019-05 Inter -Sub Fiber Project 2022'23 $4.841.640 C-18 REU-2019-06 RPP Security Improvement 2022'23 $70.000 C-18 REU'2018'07 Unit 4Fire System Upgrade 2022'23 $228.830 C'18 - REU2O1308 GIS - 20222� $370.280 C49 REU'2019-09 Energy Trading Modernization 2022-28 *131.490 C-18 REU'2021-01 General System Improvements 2022-28 $38.952.890 C'19 REU'2021-02 TO -TOP C|PSecurity Infrastructure 2022-23 s582.490 C-20 REU-2021-03 88901 Tech Solutions 2022'23 G3.301.810 C'20 REU-2021'04 Future Revenue Funded Capital Projects 2022-23 *8.544.741 C-20 REU-2022-01 Stillwater Substation 2024'25 $6.589.980 C'21 $64.927.571 B-7 PROJECT SUMMARY Project No. Project Title Anticipated Construction Dote Total Costs During Current C|PTimeframo Project Detail Page RFD'2023-05 Fire Station 5Upgrades 2023-24 $151.000 C-22 RFD'2023'07 Fire Station 7Upgrades 2023-24 $48.850 C'22 RFD -2023-08 Fire Station OUpgrades 2023-24 $33.000 C'22 RFD -2024'01 Fire Station 1 Build 2024-25 *8.900.000 C'23 RFD'2024-03 SC8ARep|aoement 2024'25 $1.000.000 C'23 RFD'2025-02 Fire Station 2Upgrades 2025'26 $830.500 C'23 RFO'2025-03 Fire Station 3Rebuild 2025'26 $5.500.000 C-24 RFD -2025-04 Fire Station 4Upgrades 2025-26 $759.000 C-24 RFD'2025-06 Fire Station OUpgnageu 2025'20 *759.000 C-24 RFD -2020-09 Fire Station 8Build 2026-27 $6.000.008 C-25 Anticipated Total Costs $25.501.450 SOLID WASTE Construction During Current Detail Project No. Project Title Anticipated Total Costs Project Construction During Current Detail Project No. Project Title Date C|PTimmhnme Page SW -4941 -01 Transfer Station Tipping Floor 202324 $1.350000 C'26 SW -4941-02 Transfer Facility Resurface Asphalt Ongoing $975.000 C-26 SVV4941-03 Slurry Seal 2022-23 $177.000 C-26 bvv4941-06 Crane Repairs 2022-23 $282.000 C-27 Uvv4941'08 Lift Station Retrofit 2822-23 $732.350 C-27 SVV-4941-09 Organics Recycling Pilot Program 2022-23 *250.000 C'27 GVV4941-12 Administrative Office Remodel 2022-23 $117.000 C'28 SVV-4941'13 Materials Recovery Facility Expansion 2023'24 $1.800.000 C'28 GVY4941-14 Marshalling Room Remodel 2023'24 $250.000 C'28 $5,933,350 STORm DRAIN Anticipated Total Costs Pn4en/ Construction During Current Detail Project No. Project Title Dote C|PTimehame Page SD -2027-01 Full Trash Capture Project Phase 2027-28 $1.500.000 C-29 SD'3515-09 Concrete Channel at Linden 2024'25 $350.000 C'29 SD -3515'15 Critical Pipe Lining Ongoing $1.800.000 C-29 SD' 525'U8 Hollow Lane 2022-23 *630.000 C-30 SD -3560-03 Cypress Box Culvert 2022-23 $400.000 C-30 SD4439'03 Hawthorne/Canby 2026'27 $300.000 C'30 SD -4439'05 Crossfire and Tarmac 2024-25 $300.000 C'31 8D4937'01 Master Plan Update Ongoing $238.800 C'31 $5,519,800 ao PROJECT SUMMARY Project No. Project Title Anticipated Construction Date Total Cost During Current C|PTimnfemm Project Detail Page ST2022401 Oregon Street Sidewalk 2023-24 $1.407.310 C'32 GT -2022-02 California SBBikeway Project 2023-24 $4.140.000 C'32 ST -2023'01 Systemic Left Turns 2023-24 $1.201.000 C'32 ST -2023-02 Systemic Intersection Safety Lighting 2023'24 $849.100 C'35 ST -3520'01 Small Projects Ongoing $1.200.000 C'33 ST'3520'01-4 Traffic Calming Ongoing 8300.000 C-33 8T'3572'03 Bridge Maintenance Program 2023-24 *849.988 C-34 8T-3580'01 Pavement Maintenance Ongoing $29.000.000 C-34 8T4226'08 Canby Road Widening 2023-24 $300.000 C-84 8T4228-09 Churn CeeNRanohoyVictorRoundabout 2025'28 $4.650.000 C-35 ST4226'10 Traffic Signal Modification 2022'23 8292.885 C-35 ST -4226-11 Loma Vista Signal 2022'23 $8.250.000 C-35 OT4407'01 Sidewalk Replacement Ongoing $1.500.000 C-36 8T4638'15 ADA Curb Ramps Ongoing $825.000 C'36 GT4775'05 Turtle Bay toDowntown 2024'25 $8.550.000 C'30 ST4775-08 Victor & Cypress ATP (VCAT) 2024-25 $8.973.000 C-36 ST -4775-1 0 8echw||iLane Improvements 2022-23 $11.150.618 C-37 ST477542 Pedestrian Crossing Enhancements 2022'23 $1.137.200 C-38 ST4783'08 Shasta Street Railroad Crossing Improvements 2022'23 *399.719 C'38 8T-4803'01 Airport Corridor Phase || 2023-24 $1.918.850 C'38 ST -4908-04 Old A|tumoRoad Bridge over Churn Creek 2023-24 $4.809.000 C'39 ST4908'05 Sacramento Drive Bridge over Olney Creek 2024'25 $3.813.000 C'39 ST4908'00 Eastside Road Bridge over Canyon Hollow 2028'24 $8.865.000 C'39 GT4808'07 Girvan Road Bridge over Olney Creek 2023-24 $2.455.000 C'40 8T4908'08 Westside Road Bridge over Canyon Hollow 2023-24 $8.900.000 C40 ST4808'09 Canyon Road Bridge over ACID Canal 2023'24 *2.142.200 C'40 8T4908'10 Eastside Road Bridge over Olney Creek 2022-23 $4.655.670 C41 GT4856-04 Old Oregon Trail Widening 2023'24 $2.763.867 C41 GT-NRTBD-01 Oasis Road Specific Plan Update 2027-28 $50.000 C41 8T-S8P'01 Stillwater Business Park Phase 11 2023'24 811.000.000 C42 $125.455.734 B-9 PROJECT SUMMARY WASTEWATER Project No. Project Title Anticipated Construction Date Total Costs During Current C|PTimahame Project Detail Page VVVV-3512'01 Infiltration and Inflow Control Ongoing $10.200.823 C-43 WW -3525-01 Lift Station Improvements Ongoing $1.812.000 C43 VVVV4086-02 Westside Interceptor Phase 111 2025-26 $10.000.000 C43 VVVV4203-02 Repair/Replace Sewer Lines Ongoing $8.836.591 C44 VVVV-4703'01 Clear Creek Wastewater Treatment Plant Ongoing $4.079.140 C44 WW - 4801-05 Stillwater Wastewater Treatment Plant Ongoing $2.719.524 C44 WW -4801 -10 Bi000|idoPyrolysis ' Phase |/|| 2024-25 $7.250.008 C45 VVVV'4801-11 Binxo|idxPyrolysis ' Phase U|/|V 2027'28 $11.750.000 C45 VVVVLS-CC-04 North Market Lift Station 2025-20 $580.685 C45 VVVVP'CC-01 Lake Redding Interceptor | 2026-27 $4.975.000 C46 VVW-P-CC'28 VVoodacneDrive 2022-23 $1.250.000 C40 VVVV-P'CC4 Buenaventura Sewer 3028'27 s3.950.000 C46 VVVVP'CC'5 Mercury Drive 2027'28 $1.450.000 C47 VVVV'P-CC-8-9 Sulphur Creek 2025'26 $2.931.430 C47 WWP-S-01 Oasis Road 2025-28 $414.290 C47 VVYVP-8-06 Magnolia Sewer Repair Phase | 2022-23 $0.400.000 C40 VVVVP'G-07 Magnolia Sewer Repair Phase || 2025-26 $7.000.000 C-48 VVVV-P'3-00 Magnums Area Sewer 2023-24 $3.700.000 C-48 VVVVP-S'OS Tehama Sewer 2023-24 $2.600.000 C49 WW -P -S-10 Center Sewer 2023-24 $1.150.000 C49 VVVVP'8-11 Mary Lake Sewer 2024-25 $2.150.000 C49 VVVV'P'O-12 Lake Keswick 2023'24 $3.550.000 C'50 VVVVP'S-13 Upper Buenaventura Sewer 2024-25 $1.250.000 C-50 VVW-p-S-14 Lakeside Sewer 2024-25 $1.750.000 C-50 VVVV-TP'C'OO Influent Screening 2024-25 $2.000.000 C-51 VVVVTP'C'87 Clear Creek Electrical Maintenance 2023-24 $500.000 C'51 WW -TP -C-3 Clear Creek Pond Upgrades 2027'28 $3.413.095 C'51 VVVVTP'C4 Power Upgrade tnOutfall 2022'22 s225.000 C'52 WW -TP -C-5 Hypo Project 2022'23 $500.000 C'52 VVVV'TP'P'13 Biuu|fi1ePu4ed 2022'23 $250.000 C'52 WW -TP -S-6 Sludge Lagoons & Drying Beds 2024-25 $8.000.000 C'53 *114.797.584 AIRPORTS �Rm ORmS Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total PFC GO $O $U $O $9,340 $9,340 $18,680 Total $D $O $0 $V *100,000 *100.000 $200000 Project Development $0 $U $O *O $100.000 $100.000 $200.000 Construction $0 $0 $O $O $O *U $O Toto( $0 *V $0 $V $100,000 *100'000 $200,000 1 IN MMONEN 11: E11110 Description: Design and construction for perimeter access control system/wildlife mitigation fencing. Location: 6751 Woodrum Circle Project Type: One-time Redding Municipal Airport Project Coot Prior Years/Future Costs: $0 C|PCoots(detailedbelow) $7.750.000 Total Project Cost: $7,750,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total PFC $O $O $0 $U $23,350 $700,500 $723,850 Total $O *V $V $O $2e0000 $7,500,000 *7\750.000 Project Development $O $O $0 $0 $250.000 $0 $250.000 Construction $O $O $U $O *O $7.500.000 $7.500.000 Tum| *V *O *V $V *250.000 $7.500.000 $7.750.000 COMMUNITY Total Project Cost: $3,200,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Park Development Fees $1,800,000 $500,000 $0 $0 $0 $0 $2,300,000 Total $1,800,000 $500,000 $0 $0 $0 $0 $2,300,000 Project Development $300,000 $0 $0 $0 $0 $0 $300,000 Construction $1,500,000 $500,000 $0 $0 $0 $0 $2,000,000 Total $1,800,000 $500,000 $0 $0 $0 $0 $2,300,000 Description: Design and construction of 8 -acre park site on dedicated land in the SE quadrant located in a soon -to -be -developed subdivision. The project will include a multi-purpose playing field, playgrounds, shaded picnic areas, trail connections, and a restroom. Location: SW Quadrant, off Eureka Way Project Type: One-time Park Development Project Cost: Prior Years/Future Costs: $903,000 CIP Costs(detailed below) $697,000 Total Project Cost: $1,600,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Park Development Fees $577,000 $120,000 $0 $0 $0 $0 $697,000 Total $577,000 $120,000 $0 $0 $0 $0 $697,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $577,000 $120,000 $0 $0 $0 $0 $697,000 Total $577,000 $120,000 $0 $0 $0 $0 $697,000 Description: Replace four synthetic turf fields at the existing athletic facility and install additional shade structures. The artificial turf and the underlying drainage system installed during the Park's construction were defective. Location: NE Quadrant Project Type: One-time Park Improvement Project Cost: Prior Years/Future Costs: $5,130,000 CIP Costs(detailed below) $20,000 Total Project Cost: $5,150,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total McConnell Foundation Grant $0 $0 $0 $0 $0 $0 $0 Park Development Fees $20,000 $0 $0 $0 $0 $0 $20,000 Total $20,000 $0 $0 $0 $0 $0 $20,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $20,000 $0 $0 $0 $0 $0 $20,000 Total $20,000 $0 $0 $0 $0 $0 $20,000 C-12 COMMUNITY SERVICES Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total State Park Grant $44,856 $0 $0 $0 $0 $0 $44,856 Total $44,856 $0 $0 $0 $0 $0 $44,856 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $44,856 $0 $0 $0 $0 $0 $44,856 Total $44,856 $0 $0 $0 $0 $0 $44,856 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total State Park Grant $2,000,000 $4,736,000 $0 $0 $0 $0 $6,736,000 Total $2,000,000 $4,736,000 $0 $0 $0 $0 $6,736,000 Project Development $400,000 $0 $0 $0 $0 $0 $400,000 Construction $1,600,000 $4,736,000 $0 $0 $0 $0 $6,336,000 Total $2,000,000 $4,736,000 $0 $0 $0 $0 $6,736,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Park Development Fees $500,000 $1,000,000 $0 $0 $0 $0 $1,500,000 State Park Grant $0 $700,000 $3,000,000 $4,000,000 $800,000 $0 $8,500,000 Total $500,000 $1,700,000 $3,000,000 $4,000,000 $800,000 $o $10,600,000 Project Development $500,000 $0 $0 $0 $0 $0 $500,000 Construction $0 $1,700,000 $3,000,000 $4,000,000 $800,000 $0 $9,500,000 Total $500,000 $1,700,000 $3,000,000 $4,000,000 $800,000 $0 $10,000,000 C-13 Description: Remodel of Dr. Martin Luther King Jr. Building. Location: SW Quadrant Project Type: Onetime Park Development COMMUNITY SERVICES Project Cost: Prior Years/Future Costs: $O C|PCnots(cletailedbelow) $560.000 Total Project Cost: $560,000 Proposed Funding: 2022-23 2023-24 2024-26 2025-26 2026-27 2027-28 Total Total $15,000 $545000 80 $0 $V *0 *560000 Project Development $15.000 $O $0 $O *O *U *15,000 Construction $O $545.000 $U $D *O *0 $545.00 Total $15.000 *545,000 $0 $V $V $0 $560.000 Description: Rev|adzuUonn[South City Park with new design and construction. Location: SW Quadrant Project Type: One-time Park Development Project Cost: Prior Years/Future Costs: $O QPCnets(detailed below) *2.500.000 Total Project Cost: $2,500,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $2,500,000 $0 $V $O *V $O *2,500.000 Project Development $250.000 $O $O $U $O $0 $250.000 Construction *2.250.000 $D $O $D *0 $O *2.250.000 Tmo| *2.500.000 $o $n $O oV $0 $2.500.000 Total Project Cost: $1,759,120 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Description: Addition of concrete or asphalt surfaces to areas of the plant enhances plant safety, cleanliness, and ease of Location: 17120 Clear Creek Road Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $50.831 C1PCuuts(clutailedbelow) *99.170 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Proposed Fundin2: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Description: The controls for this substation are part of a System wide substation control modernization project. Replacement of SCADA equipment manufactured by C3-11ex and control panels that utilize obsolete mechanical protective relays, Location: Multiple Substations Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $O C/PCoots(cletailedbelow) *138.000 Total Project Cost: $138.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Description: Annual update to lifecycle operational computers and network equipment. Substations currently need upgrades to Subnet Solutions computers running Windows XP to eliminate the security risks. Location: Multiple Substations Project Type: One-time System Improvements Project Coot Prior Youm8FutunaCnsts: s10.051 QPCnots(cletailedbelow) $15.900 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Description: Software updgrades to the T3000 system, an SEI distributed controls system (DCS) software and hardware product, to operate and monitor the Redding Power Plant generating units. Location: 1712OClear Creek Road Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $397.744 C|PCoots(detailedbelow) $79.290 Total Project Cost: $477.034 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total mom ilffimm Description: Installation of 1700 electric revenue meters to increase the number of system data points feeding into the Outage Management System and Distribution Management System providing the SO's critical information, improving outage response and restoration time. Location: C4wide Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $1.344.587 QPCouts(dotaibd below) 8261.880 Total Project Cost: $1,606,467 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Description: Replace generator breaker with better system, Location: 17120 Clear Creek Road Project Type: One-time System ImprovementsCIP Costs(detailed below) $350,000 Project Coat Prior Yaam/FutueCosts: *O Total Project Cost: $350,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $350.000 $V $V $O $0 $0 *350.000 Description: Installing fiber from Redding Power to Moore Rd, Moore Rd to Waldon, and Waldon to Oregon. Location: Multiple Substations Project Type: One-time System ImprovementsCIP Costs(detailed below) $4,641,640 Project Cost: Prior Years/Future Costs: $458.305 Total Project Cost: $5,100,005 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total *1,441,640 s1.500.000 $1.700.000 *V $O $O $4,641.840 Description: Modificaiton of front gate to incorporate an entrance and exit gate, relocation of guard shack to the center of the driveway with a new floor plan, and add Cardlock type locks to buildings in the plant site that hold controls or other sensitive equipment, Location: 17120 Clear Creek Road Project Typo: One-time System Improvements Project Cost: Prior Years/Future C�� C|PCoats(detailedbe��) Total Project Cost: Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Mi Description: Creating working space after removal of steam boilers, Location: 17120 Clear Creek Road Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $11.178 C|PCoxts(datai|odbelow) $228.830 Total Project Cost: $240,008 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Description: Project to allow for a GIS software application upgrade and development of new distribution utility network. Location: 3611 Avtech Parkway Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $11,224 CIP Costs(detailed below) $376,290 Total Project Cost: $387,514 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Electric Rates $376,290 $0 $0 $0 $0 $0 $376,290 Total $376,290 $0 $0 $0 $0 $0 $376,290 M MWOM Description: Ongoing internal costs to maintain software requested for energy trading modernization project. Location: 17120 Clear Creek Road Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $1,138,522 CIP Costs(detailed below) $131,490 Total Project Cost: $1,270,012 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Electric Rates $131,490 $0 $0 $0 $0 $0 $131,490 Total $131,490 $0 $0 $0 $0 $0 $131,490 Description: General system improvements including the installation of transformers, capacitor banks, poles, overhead and underground conductors and switches, splices/connectors, conduit, splice boxes and vaults. Location: Citywide Project Type: Ongoing System Improvements Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Electric Rates $8,102,890 $6,050,000 $6,050,000 $6,250,000 $6,250,000 $6,250,000 $38,952,890 Total $8,102,890 $6,050,000 $6,050,000 $6,250,000 $6,250,000 $6,250,000 $38,952,890 C-19 Description: CIP Security Equipment including Physical Access, Cyber -Servers, and Network Upgrades to PCC and Backup PCC Location: 3611 Avtech Parkway Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $167.520 QPCoots(detailedbelow) $582.490 Total Project Cost: $750,010 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total *582,490 $V $V *0 *V $O $582,490 mill Mill I Description: Technology implementation to minimize sources of ignition, manage vegetation within the City's electric grid, harden systems, more effectively protect and notify the public if an issue arises, as well as shorten response and recovery Location: 3611 Avtech Parkway Project Type: Ona -time System Improvements Project Cost: Prior Yeam/FutueCoots: $7.506.018 QPCoats(detai|edbelow) $3.301.610 Total Project Cost: $10,887,628 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Description: Future Revenue Funded Capital Projects, Location: Citywide Project Type: Ongoing System Improvements Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Electric Rates $1,261,048 $1,844,378 $2,084,325 $1,597,330 $878,830 $878,830 $8,544,741 Total s1,261,048 $1,844.378 $2,084,325 $1,597,330 $878.830 *878830 $8,544741 Description: Future development plans on the east side of Redding necessitate REU building a new substation. Addresses system capability and service reliability as Redding adds new load, Location: Venture Parkway Project Type: One-time System Improvements Project Coot: Prior Years/Future Costs: $42 C|PCosts(dotailedbelow) $6.589.960 Total Project Cost: *8.600.002 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Electric Rates $599,960 $1,000,000 $4,000,000 $1,000,000 $0 $0 $6,599,960 C-21 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Fund $0 $151,000 $0 $0 $0 $0 $151,000 Total $0 $151,000 $0 $0 $0 $0 $151,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $151,000 $0 $0 $0 $0 $151,000 Total $0 $151,000 $0 $0 $0 $0 $151,000 Description: Upgrades to Fire Station #7, including exterior paint, PPE containment, new counter tops and water filtration system. Location: 3772 Flight Ave Project Type: One-time Fire Station Improvements Project Cost: Prior Years/Future Costs: $0 CIP Casts(detailed below) $48,950 Total Project Cost: $48,950 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Fund $0 $48,950 $0 $0 $0 $0 $48,950 Total $0 $48,950 $0 $0 $0 $0 $48,950 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $48,950 $0 $0 $0 $0 $48,950 Total $0 $48,950 $0 $0 $0 $0 $48,950 Description: Upgrades to Fire Station #8, including exterior paint and PPE containment Location: 131 Churn Creek Rd Project Type: One-time Fire Station Improvements Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $33,000 Total Project Cost: $33,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total General Fund $0 $33,000 $0 $0 $0 $0 $33,000 Total $0 $33,000 $0 $0 $0 $0 $33,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $33,000 $0 $0 $0 $0 $33,000 Total $0 $33,000 $0 $0 $0 $0 $33,000 C-22 Bowl EM MEMBREM WOMIJORM Description: New build of 12,000 sq. ft. Fire Station. Location: 1535Shasta 8t Project Type: One-time Fire Station Build Project Cost: Prior Years/Future Costs: $0 C|PCosto(detai|ed below) *9.900.000 Total Project Cost: $9,900,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $V $990.000 $8\910\000 $o *0 $O $9.900000 Project Development $U $990.000 $O $0 $O $O $990.000 Construction $0 $0 $8.810.00 $0 $0 $0 $8.910.00 Description: New self contained breathing apparatus units for fire stations. Location: All Fire Stations Project Type: One-time Fire Station Improvements Project Cost: Prior Years/Future Costs: $O C)PCoyts(clotailedbelow) $1.000.000 Total Project Cost: $1,000,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $O $V $1/000,000 $0 *V *V $1,000000 Project Development $O $O $0 *O $0 $0 $0 Construction $O $O $0 $0 $0 *0 $O MM Description: Remodel and expansion of Fire Station #2, including adding 2,000 square feet, exterior paint and a generator. Location: 3491 Placer St Project Type: One-time Fire Station Improvements Project Cost Prior Years/Future Costs: $O C|PCosts(cletaibdbelow) $850.500 Total Project Cost: $830,500 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total *O $0 $V *830,500 $O $O $830,500 Project Development $0 $0 $0 $83.050 $0 Construction $O GO $O $747.450 *O Total $0 $V $0 *830.500 $V $8 $83,050 $U *747.450 $0 $830.500 Description: Rebuild of Fire Station #3. Location: 4255 Westside Rd Project Type One-time Fire Station |mpmvements Project Cost: Prior Years/Future Costs: $O C|PCosto(detai|edbelow) $5.500.000 Total Project Cost: $5,500,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $V $O $650,000 $4,960000 $0 $u $5,500,000 Project Development $O $O $550.000 $O $O $D $550.000 Construction $0 $O $O $4.950.000 $O *U $4.950.000 Total $V $O *550.000 *4.950.000 *V $0 $5.500\000 All NNIMMMI am= ; Mi Description: Remodel and 2.00Osq. ftexpansion nfFire Station #4. Location: 2005SBonnyviewRd Project Type: One-time Fire Station Improvements Project Cost Prior Years/Future Costs: $0 C|PCnsts(cletailedbelow) $758.000 Total Project Cost: $759,000 Proposed Fundin2: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Tota *O $V *D $759000 *V $V $759000 Project Development $U $0 $O $75.800 $0 $O $75.900 Construction DU $0 $O $083.100 *O $O *088.100 Total $O *O $0 $759.000 *0 *V $75e.000 Description: Remodel and 2.0OOsq. ftexpansion ofFire Station #O. Location: 16958elUineRd Project Type: One-time Fire Station Improvements Project Cost: Prior Years/Future Costs: $O QPCunts(detailedbelow) $759.000 Total Project Cost: $759.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $O *O $V $759.000 $n $V *759000 Project Development $O $O $U $75,900 $O Construction $U $O $U $885.100 $U Total $V $V $V *759.000 $0 $O $75,900 $U $883.100 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $O $O $0 $680.000 $5,940,000 $V *6.600000 Project Development $0 $] $0 *660.00 $U Construction $0 *O $0 $O $5.940.000 Total $0 $V *0 *680.000 $5.940.000 $O $660,00 $0 $5.940.000 $V *6.600.000 SOLID WASTE Description: The tipping floor is subject to use by heavy equipment and garbage trucks and wears down over time, requiring periodic resurfacing. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Solid Waste Rates/Fees $0 $600,000 $0 $0 $0 $750,000 $1,350,000 Total $0 $600,000 $0 $0 $0 $750,000 $1,350,000 Project Development $0 $60,000 $0 $0 $0 $75,000 $135,000 Construction $0 $540,000 $0 $0 $0 $675,000 $1,215,000 Total $0 $600,000 $0 $0 $0 $750,000 $1,350,000 Description: The asphalt within the facility is over 18 years old and failing due to aging and daily use by heavy equipment and trucks. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Solid Waste Rates/Fees $250,000 $0 $350,000 $0 $0 $375,000 $975,000 Total $250,000 $0 $350,000 $0 $0 $375,000 $975,000 Project Development $25,000 $0 $35,000 $0 $0 $37,500 $97,500 Construction $225,000 $0 $315,000 $0 $0 $337,500 $877,500 Total $250,000 $0 $350,000 $0 $0 $375,000 $975,000 Description: Slurry seal to seal and maintain the driveways within the Transfer and Recycling Facility. Location: 2255 Abernathy Lane Project Type: Ongoing Facility Maintenance Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Solid Waste Rates/Fees $102,000 $0 $0 $0 $75,000 $0 $177,000 Total $102,000 $0 $0 $0 $75,000 $0 $177,000 Project Development $10,200 $0 $0 $0 $7,500 Construction $91,800 $0 $0 $0 $67,500 Total $102,000 $0 $0 $0 $75,000 C-26 $0 $17,700 $0 $159,300 $0 $177,000 SOLID WASTE NINE Now Description: The crane is used to adjust loads in the transfer trailers prior to hauling to the landfill. Crane repairs cover the cost of replacing parts due to daily wear and tear on the machine. Location: 2255Abernathy Lmne Project Type: Ongoing Facility Maintenance Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Solid Waste Rates/Fees $97,000 $0 $90,000 $0 $95,000 $0 $282,000 Total $87,000 $U $90,000 $O $95,000 $0 $282,000 Project Development *0 *O $O $O $O $O $O Construction *O $U 80 $O $0 $0 $O Total *O *u $O $U $V *V $V Description: Toincrease stormwaterhandling capacity. Location: 2255Abernathy Lane Proiect Type: One-time Facility Improvements Project Cost: Prior Years/Future Costs: G347.000 C|PCoots(detailedbelow) $732.350 Total Project Cost: $1,079,350 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Project Development $140.40 $0 $0 $0 $0 $0 $148.40 Construction $585.880 GO $O $0 $O *O $585.880 Total $732.350 $V *O $0 $V $V $732.350 Description: Pilot de -bagger and grinder to prepare material to inter the Wastewater System. Future implementation c*organics recycling beyond the pilot project isestimated {obeomulti-million dollar project. Data on cost and timeline TBD, Location: 2255Abernathy Lane Project Type: One-time Facility Improvements Project Coat Prior Years/Future Costs: $O C|PCouts(detai|edbelow) *250.000 Total Project Cost: $250,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total *250.000 $0 $O *O $0 *O *250000 Project Development $250.00 $0 $O aO $O Construction $0 *O $O $0 $O Total $250.000 *V $0 $U $0 $O $250,000 $O $0 Description: Remodel administrative building to create additional workspace for growing staff. Location: 2255Abernathy Lane Project Type: One-time Facility Improvements SOLID WASTE Project Cost: Prior Years/Future Costs: $O C|PCosts(detai|edbelow) $117.000 Total Project Cost: $117,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Project Development $11.700 $0 $O $O $0 $8 $11.700 Construction $105.300 $0 $O $0 *D $O $105.300 Total $117.000 $0 *V *O $n $V *117.000 Description: Replacement of sorting screens and conveyor belts to update machine and improve processing capacity. Location: 2255Abernathy Lane Project Type: One-time Facility Improvements Project Cost: Prior Years/Future Costs: $O QPCoats(detailedbelow) *1.800.000 Total Project Cost: $1,800,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Project Development $0 $0 $0 %O *0 $0 $0 Construction $0 $1.800.00 $0 $0 $0 $0 $1.800,000 Description: Extensive remodel of both the men and women's bathroom facilities increasing the size of the men's restroorn by removing walls and relocating plumbing and electrical. Location: 2255Abernathy Lane Project Type: One-time Facility Improvements Project Coot Prior Years/Future Costs: QPCoats(dutailedbelow) Total Project Cost: $O $250,00 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $V o250000 $0 $0 $V $V $250000 Project Development $O *25.000 $0 $U $U $O $25.000 Construction $0 $235.000 $O $U $O $O $225.000 Total oV $250.000 $0 $n $O $0 $250.000 STORM DRAIN Description: Installation of full trash capture devices in storm drain system to comply with state mandates. Location: Citywide Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: GO C|PCnsta(detailedbelow) $1.500.000 Total Project Cost: $1.500.080 Proposed Funding: 2022-23 2023-24 2024-25 2026-26 2026-27 2027-28 Total Storm Drain Connection Fees $0 $0 $0 $0 $0 $1,500,000 $1,500,000 Total $O $O $V $O $u *1,500,000 *1,500.000 Project Development $O $0 $U 80 $0 $300.000 $300.000 Construction $0 $0 $0 $0 $0 $1.200.00 $1.200,00 Total *O *V $V $V *V s1,500000 $1.500.000 INS Description: Install concrete box culvert or open channel similar to downstream portion. Location: Linden Avenue from S. Market toFuvretto Project Type: One-time System ImprovementsCIP Costs(cletailed below) $350,000 Project Cost: Prior Years/Future Costs: $U Total Project Cost: $350,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Storm Drain Connection Fees $0 $0 $0 $0 $70,000 $280,000 $350,000 Total $O *V $V $V s70,000 *280.000 $350.000 Project Development *O $0 $0 $0 S70.000 $O *70.000 Construction $0 $0 $U $O $0 *200.000 $200,000 Total *0 $V $V *U $70.000 $280.000 $350.000 Description: Critical pipe lining at various locations throughout the City, Location: Citywide Project Type One-time System ImprovementsCIP Costs(cletailed below) $1,800,000 Project Cost: Prior Years/Future Costs: $0 Total Project Cost: $1,800,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Storm Drain Rates $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 $1,800,000 Total $300.000 $300.000 *300.000 *300.000 $300.000 *300000 *1,800.000 Project Development $30.000 *30.000 $30.000 $30.000 $30.000 Construction $270.000 $270.000 $270.000 8270.000 $270.000 Total $300.000 *300.000 s300.000 $300.000 *300.000 $JOOOO $180,000 $270,000 $1.020.000 $300.000 $1.800'000 Description: Remove existing undersized pipes and replace with arch culvert. Location: Hollow Lane Project Type: One-time System Improvements STORm DRAIN Project Cost: PhorYears/Futur Costs: $195.804 C|PConts(detailed below) $630000 Total Project Cost $825,804 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Storm Drain Connection Fees $0 $0 $0 $0 $0 $300,000 $300,000 Total $630000 *O *V $0 $0 $0 $630000 Project Development $O $U $O $O $O $O *D Construction *630.000 $U $O $0 $0 $O $030.000 Total $630'000 $0 *O *0 *O $U $630.000 Description: Remove and replace existing box culvert. Location: E Cypress Project Type: One-time System Improvements Project Cost Prior Years/Future Costs: $42.195 C|PCosts(detailedbelow) $400.000 Total Project Cost: $442,195 -Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $400.000 $V $D $O $V $V $400,000 Project Development $O $O $O $O $O $O $O Construction $400.000 $O *0 $O $O $0 $400.000 Total *400.000 *O $V $V $V $V *400.000 Description: Install new storm drain system in area with existing roadside swales and ditches. Location: Hawthorne and Canby Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: $8 C|PCoots(detailedbelow) $300.000 Total Project Cost: $300,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Storm Drain Connection Fees $0 $0 $0 $0 $0 $300,000 $300,000 Total $O $O $0 $O $0 *300.000 $300000 Project Development *0 $O $U $0 $O $45.000 $45.000 Construction *0 $0 $0 $O $O s255.000 $255.000 Total $U *V *U %O $0 $300.000 $300.000 Description: Install new storm drain system in area with existing roadside swales. Location: Crossfire and Tarmac Project Type: One-time System Improvements STORm DRAIN Project Cost Prior Years/Future Costs: $0 QPCoats(detailedbelow) $300.000 Total Project Coot $300.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Storm Drain Connection Fees $0 $0 $0 $300,000 $0 $0 $300,000 Total $0 *0 $U *300.000 $O $V $300000 Project Development $0 $0 $D $45.000 $U $g $45.000 Construction $O $0 $O $255.00 $0 $O $255.000 Description: Development of a new Master Plan to address the current regulatory environment and needs of the utility. Location: Citywide Project Type: One-time System Improvements Project Cost: Prior Years/Future Costs: *19.483 C|PCnsto(debi|edbelow) $239.800 Total Project Cost: $259,283 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Storm Drain Connection Fees $89,800 $150,000 $0 $0 $0 $0 $239,800 Total $89,800 $150,000 *V *O $0 *0 *239,800 Project Development *89.800 $150,000 $D *0 $0 $U $289.800 Construction $O $O $O $0 $U $0 $0 Total $89.800 $150.000 $U $o $V *0 *239.800 gill Description: Extend concrete box culvert for Calaboose Creek along Oregon Street from Shasta Street tnYuba Street. Fill sidewalk gaps, tie inpaving and install pedestrian lighting, Location: Oregon Street Project Type: One-time Street Improvements Project Cost: Prior Years/Future Costs: $0 C|PCoots(detailedbelow) $1.407.310 Total Project Cost: $1,407,310 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Streets and Roads Fund $202,190 $1,205,120 $0 $0 $0 $0 $1,407,310 Project Development $202.190 $D $O $O $O $O $202.190 Construction $0 $1.205,120 $0 $0 $0 $0 *1.205.120 Description: Construction ofatwo-way Class K/bikeway along California Street between Yuba Street and Tehama Street. Improvements of pedestrian access by rebuilding curb ramps, creating bulb -outs, and increasing crossing visability. Location: California SXbetween Yuba and Tehama Project Type: One-time Street Improvement Project Cost: Prior Years/Future Costs: $O C|PCosts(clotailedbelow) $4.140.000 Total Project Cost: $4,140,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Streets and Roads Fund $21,000 $99,100 $0 $0 $0 $0 $120,100 Federal EDA Grant $0 $I410,000 *O $0 $U $O $3,410,000 Total *730.000 $3/410,000 $O *O $0 $V $4,140,000 Project Development $750.008 $O $O *O $O GO $730.000 Construction $O $3.410.000 $O 80 $0 $O $3.410.000 Total $730.000 $3.410.000 $V *O $V $U $4.140.000 Description: Provide left turn lanes and left turn protected phasing where none exists at selected intersections. Includes striping between intersections tofacilitate intersection modifications. Location: Citywide Project Type: One-time Street Improvement Project Cost: Prior Years/Future Coo�� $n C|PCoots(detai|adbelow) $1.201,000 Total Project Cost: $1.201.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Streets and Roads Fund $21,000 $99,100 $0 $0 $0 $0 $120,100 State Grant $189.00 $891.900 $0 $0 $0 $0 $1�80,800 Total $210.000 $991.000 $0 $0 *D $0 *1,201.000 Project Development *210.000 $U $U $O $0 $O $210.000 Construction $U $991.000 $0 $U $0 *U $991.000 Total $210,000 *991.000 *O *0 $0 $V $1,201.000 Description: Install new intersection safety lighting where none exists and correct deficient existing lighting at un -signalized Location: Citywide Project Type: One-time Street Improvement Project Cost Prior Years/Future Costs: $0 C|PCnets(detailedbelow) $849.100 Total Project Cost: $849,100 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Streets and Roads Fund $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 Tn*d $50,000 $50,000 $50,000 $50,000 *50,000 $50,000 $300000 Total $144.500 $704600 *0 *0 $0 $O $849100 Project Development $144.500 $O $O $O $O $0 $144.500 Construction $0 S704.000 *O $0 GO $U *704.000 Total $144.500 *704.600 $0 $O $O *0 $849.100 Description: Various traffic operation and capacity improvements. Funds will be used as match for grant -funded projects or leverage for development projects. Location: Various Project Type: Ongoing Street Improvement Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Traffic Impact Fees $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $1,200,000 Total $200.000 *200,00 $200,00 $200.000 $200.000 $200,000 *1,200,000 Project Development $50,00 $50,00 $50.000 $50,00 $50,000 $50.000 $300.000 Construction $150,080 $15I000 $150.000 $150.000 $150.000 $150.000 $800.000 Total $200.000 *200'000 $200.000 $200.000 *200.000 $200.000 $1.200'000 Description: Install devices to reduce speeds and cut -through traffic in residential neighborhoods. Location: Various Project Type: Ongoing Street Improvement Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Streets and Roads Fund $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $300,000 Tn*d $50,000 $50,000 $50,000 $50,000 *50,000 $50,000 $300000 Project Development $5.00 $5.000 $5.00 $5.000 $5.000 $5.00 $30,00 Construction $45.000 045.000 $45.000 $45.000 s45.000 $45.000 $270.000 Total *50.000 *50.000 $50,000 *50.000 $50'000 $50.000 $300.000 Description: Bridge Maintenance Grant funding various repairs of7Bridges. Location: Various Project Type: One-time Bridges Improvements Project Cost: Prior Years/FutureCnots: $U C|PCoats(detai|edbelow) $849.999 Total Project Cost: $849.999 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Dana Drive Impact Fees $50,000 $250,000 $0 $0 $0 $0 $300,000 Local Streets and Roads Fund $17/435 $66,296 $30,000 $30,000 $30,000 $30,000 $203.731 Tota 1 $152,000 $577,999 *30/000 *30,000 $30,000 $30,000 *849989 Project Development $152.00 $0 $0 $0 $0 $0 $152.00 Construction $O $577.998 $50.000 $30.000 $30.000 $30.000 $897.990 Tmo| $152.000 *577.999 $30.000 $30.000 $30.000 G30.000 $849.939 Description: Roadway surface maintenance work conducted annually unvarious streets, Lnnobun: Citywide Project Type: Ongoing Street Improvements Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Streets and Roads Fund $1.000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3.000,000 $16,000,000 S131RMRA $2,000,000 $2.000,00 $2,000,000 $2.000,000 $2,000,000 $2.000,000 $12.000,000 Project Development $800.000 $600.000 *500.000 $500.000 $500.000 $500.000 $2.900.000 Construction $2.700.000 85.400.000 *4.500.000 $4.500.000 $4.500.000 *4.500.000 *26.100.000 Total $3.000.000 $8.000.000 $5.000.000 $5.000.000 *5.000.000 $5.000.000 $28.000.000 BEIM Description: Widen Canby Road north ofBrowning along the west side. Includes curb, gutter, and sidewalk. Location: Canby Road Project Type: One-time Street Improvement Project Cost: Prior Yaars/FutunaConts: QPCoots(detailedbelow) Total Project Cost: $61,558 $300,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Dana Drive Impact Fees $50,000 $250,000 $0 $0 $0 $0 $300,000 Total $50,000 $250.000 *V $U *O $V s300000 Project Development $O $U *O $O $O $0 $O Construction $50.000 $250.000 $O $O $0 $V $300.000 Total $50.000 $250.000 $0 $O *0 $V *300.000 Description: Construct roundabout at convergence of Churn Creek Road with both Victor Avenue and Rancho Road, Location: Churn Creek/Ranch/Victor Intersection Project Type: One-time Street Improvement Project Cost: Prior Years/Future Costs: *O C|PCnsts(detni|ed below) *4.650.000 Total Project Cost: $4,650,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Traffic Impact Fees $100,000 $200,000 $200,000 $4,150,000 $0 $0 $4,650,000 Total $100,000 *200,000 $200000 $4,150,000 $V $O s4,650000 Project Development $100.000 $200.000 $200.000 $0 $O $U $500.000 Construction $O $O $0 $4.150.000 $U $O $4,150.000 Total *100.000 $200.000 *200.000 $4.150.000 *V $O $4.650.000 OEM Description: Modification nftraffic signal stvarious corners tosupport widening. Lnuebnn: Buenaventura Blvd etSunset Avenue Proiect Type: One-time Street Improvement Project Cost: Prior Years/Future Costs: $43.000 C|PCosts(dotailedbelow) $292.895 Total Project Cost: $335,895 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $292,895 $V $O $V $0 $0 $292.885 Project Development $28.290 $0 $O $0 $O $0 $28.290 Construction $263.606 $0 *0 $U $O $O $263.006 Total $282.896 *O *V $O $0 *o $292.895 froposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $8.250,000 $O $U $O $0 $0 $8.250,000 Project Development $1.250.000 $0 $O $O $0 Construction $7.000000 $0 $O $O $O Total $8.250.000 $O $0 $V $O $U s1.250000 $U $7.000.000 $V *8.260.000 STREETS Description: Annual project to replace worn and/or damaged sections of existing sidewalks. Location: Citywide Project Type: Ongoing Street Improvement Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Local Streets and Roads Fund $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 Total $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 Project Development $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $150,000 Construction $225,000 $225,000 $225,000 $225,000 $225,000 $225,000 $1,350,000 Total $260,000 $250,000 $250,000 $250,000 $250,000 $250,000 $1,500,000 Description: Install ADA -accessible curb ramps at various intersections throughout the city, Location: Various Project Type: Ongoing Street Widening/Extension Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Federal CDBG Grant $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $450,000 Local Streets and Roads Fund $125,000 $125,000 $125,000 $0 $0 $0 $375,000 Total $200,000 $200,000 $200,000 $75,000 $75,000 $75,000 $825,000 Project Development $20,000 $20,000 $20,000 $7,500 $7,500 $7,500 $82,500 Construction $180,000 $180,000 $180,000 $67,500 $67,500 $67,500 $742,500 Total $200,000 $200,000 $200,000 $75,000 $75,000 $75,000 $825,000 Description: Turtle Bay to Downtown Multi -use trail connecting Dana to Downtown and Turtle Bay boat ramp to Continental. Includes a tunnel; shared use path-, and pedestrian safety fighting. Location: North of (parallel to) SR44 Project Type: One-time Street Widening Project Cost: Prior Years/Future Costs: $220,825 CIP Costs(detailed below) $6,550,000 Total Project Cost: $6,770,825 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total State ATP Grant $475,000 $475,000 $5,600,000 $0 $0 $0 $6,550,000 Total $475,000 $475,000 $5,600,000 $0 $0 $0 $6,550,000 Project Development $475,000 $475,000 $0 Construction $0 $0 $5,600,000 Total $475,000 $475,000 $5,600,000 IMIQ $0 $0 $0 $950,000 $0 $0 $0 $5,600,000 $0 $0 $0 $6,550,000 STREETS Total Project Cost: $10,031,260 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Federal Grant $810,000 $810,000 $7,822,000 $0 $0 $0 $9,442,000 Local Streets and Roads Fund $90,000 $90,000 $351,000 $0 $0 $0 $531,000 Total $900,000 $900,000 $8,173,000 $0 $0 $0 $9,973,000 Project Development $900,000 $900,000 $0 $0 $0 $0 $1,800,000 Construction $0 $0 $8,173,000 $0 $0 $0 $8,173,000 Total $900,000 $900,000 $8,173,000 $0 $0 $0 $9,973,000 Total Project Cost: $12,253,618 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total ABPA $500,000 $0 $0 $0 $0 $0 $500,000 Federal ATP Grant $6,740,000 $0 $0 $0 $0 $0 $6,740,000 Local Streets and Roads Fund $2,594,848 $0 $0 $0 $0 $0 $2,594,848 REU Tran $600,000 $0 $0 $0 $0 $0 $600,000 Waste Water $423,770 $0 $0 $0 $0 $0 $423,770 Water $300,000 $0 $0 $0 $0 $0 $300,000 Total $11,158,618 $0 $0 $0 $0 $0 $11,158,618 Project Development $1,115,862 $0 $0 $0 $0 $0 $1,115,862 Construction $10,042,756 $0 $0 $0 $0 $0 $10,042,756 Total $11,158,618 $0 $0 $0 $0 $0 $11,158,618 IMM Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Project Development *0 $0 $D GU GO $O $O Construction $1.137.200 $0 $U $O $0 *0 $1.137.200 Total $1.137.200 $D $0 $V $D $V $1.137.200 Description: Install pedestrian crossing improvements on north side of railroad crossing. Location: Shasta Street Project Type: One-time Street Improvement Project Cost Prior Years/Future Costs: *126.000 C/PCosts(detailedbelow) $399.719 Total Project Cost: $525.719 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Project Development $O $O $O $O GO $0 $0 Construction $398.719 $U $O $0 $0 $U $899.719 Total $399.719 $V *V $U *V *O *399.719 Bill Description: Widen Airport Road for additional capacity and operational safety. Location: Airport Road Corridor ProjectType: One-time Street Widen ing/Extension Project Cost: Prior Yaars/FutunaCoots: *122.030 C|PCoots(detailedbelow) $1.918.350 Total Project Cost: $2.040.380 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total RRA Successor $300.000 $O *O $0 $O $0 $300000 Total $300000 *1,618\350 *0 $V $V $V $1.918,350 Project Development s300.000 $O $O $U *O $O $300.000 Construction $O $1.818.350 $O 80 *O $0 $1.018.350 Total $800.000 *1.618.350 oU *0 $O *O $1.918.350 Description: Replace the bridge on Old Alturas Road over Churn Creek. Location: Old A8uooRoad Project Type: One-time Street Improvement Project Cost: Prior Years/Future Costs: $1,069,336 C1PCusts(detailedbelow) $4.808.000 Total Project Cost: $5,878,336 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Traffic Impact Fees $10,000 $539,090 $0 $0 $0 $0 $549,090 Tota $100,000 $4709,000 $O $O $0 $0 $4,809.000 Project Development $100.000 $O $0 $0 $0 $O $100.000 Construction $U G4.709.000 $O $O *O $O %4.709.000 Total $100.000 **.709.000 oV $O $V $O *4.809.000 Description: Replace the bridge on Sacramento Drive over Olney Creek. Location: Sacramento Drive Project Type: One-time Street Improvement Project Cost: Prior Years/Future Costs: $953.120 C|PCoats(cletailedbelow) $3.918.000 Total Project Cost: $4,866,120 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $63,000 $50.000 $3,800000 *O *0 $0 $3,913,000 Project Development $0.000 $50.000 $0 $0 $0 $0 $113.000 Construction $O $O $8.800.000 *O $O $O $3.800.000 Total *63.000 $50.000 $3.800.000 $U $V $0 $3.913.000 Description: Replace the bridge on Eastside Road over Canyon Hollow Creek Location: Eastside Road Project Type: One-time Street Improvement Project Cost: Prior Years/Future Costs: $406.588 C|PConts(detailedbelow) $3.805.000 Total Project Cost: $4,351,588 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $65,000 $3.800.000 $O *O $V *V $3'865,000 Project Development $85.000 $O $0 $0 $8 $O $65.000 Construction $O $3.800.000 $U *O $0 $O $3.800.000 Total $65.000 $3.800.000 $V $V $O $V $3.865.000 Description: Replace the bridge on Girvan Road over Olney Creek. Location: Girvan Road Project Type: One-time Street ImprovementCIP Costs(detailed below) $2,455,000 Project Cost: Prior Years/Future Costs: $430.260 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Traffic Impact Fees $5,735 $275853 $0 $O aO $O $281.588 Total $50,000 *2,405,000 *O $V $O *0 $2.455.000 Project Development *50.000 $0 $O $0 $0 $O $50.000 Construction $O $2.405.000 $0 $0 $O $O s2.405.000 Total *50.000 $2.405.000 *O $V $n *U $2.455.000 Description: Replace the bridge onRailroad Avenue over Canyon Hollow Creek Location: Westside Road Project Type: One-time Street Improvement Project Cost: Prior Yeurs/FutureCosts: $536.672 C|PCouts(dmtailedbelow) $8.900.000 Total Project Cost: $4,436,672 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Traffic Impact Fees $447,330 $n $O $0 $0 $V $447,30 Total $3,900000 $V $O $0 *V *O *3.900,000 Project Development $U $O $0 $0 $O *0 $O Construction $3.900.000 $O $O $U $0 $0 $3.900.000 Total $3.900.000 $V *0 *U *V *O $3.900.400 1115 1 11 l::�22mm Description: Replace the bridge on Canyon Road over the ACID Canal, Location: Canyon Road Project Type: One-time Street Improvement Project Cost: Prior Ymars/FutomCusts: 8400.130 C|PCoxts(detai|edbelow) $2.142.200 Total Project Cost: $2,542,330 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Traffic Impact Fees $20,850 $224,858 $U $O *0 $0 $245,708 Tota $181.800 *1,960,400 $O $O $V $O $2,142,200 Project Development $181.800 $O *0 $0 $U $O $181.800 Construction $0 $1.360.400 $0 $O $O $O $1.860.400 Total *181.800 $1.980.400 $0 $V $V $V $2.142.200 Description: Replace the bridge on Eastside Road over Olney Creek. Location: Eastside Road Project Type: One-time Street Improvement STREETS Project Cost: Prior Years/Future Costs: $645,000 CIP Costs(detailed below) $4,655,676 Total Project Cost-, $5,300,676 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Federal HBP Grant $4,121,676 $0 $0 $0 $0 $0 $4,121,676 Traffic Impact Fees $534,000 $0 $0 $0 $0 $0 $534,000 Total $4,655,676 $0 $0 $0 $0 $0 $4,655,676 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $4,655,683 $0 $0 $0 $0 $0 $4,655,683 Total $4,655,683 $0 $0 $0 $0 $0 $4,655,683 E Description: Widen and • Old Oregon Trail from Paso Robles to Bear • '•_• Project Type: One-time Street Widening/Extension Project Cost: Prior Years/Future Costs: $762,400 CIP Costs(detailed below) $2,763,667 Total Project Cost: $3,526,067 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Federal HSIP Grant $57,060 $2,403,240 $0 $0 $0 $0 $2,460,300 Traffic Impact Fees $36,340 $267,027 $0 $0 $0 $0 $303,367 Total $93,400 $2,670,267 $0 $0 $0 $0 $2,763,667 Project Development $63,400 $0 $0 $0 $0 $0 $63,400 Construction $30,000 $2,670,267 $0 $0 $0 $0 $2,700,267 Total $93,400 $2,670,267 $0 $0 $0 $0 $2,763,667 Description: Update the Oasis Road Specific Plan. Location: North Redding Traffic Benefit District Project Type: One-time Street Improvement Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $50,000 Total Project Cost: $50,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total North Redding Traffic Benefit $0 $0 $0 $0 $0 $50,000 $50,000 District Fees Total $0 $0 $0 $0 $0 $50,000 $50,000 Project Development $0 $0 $0 $0 $0 $50,000 $50,000 Construction $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $50,000 $50,000 C-41 Description: Improvements to Stillwater Business Park. Location: Stillwater Business Park Project Type: One-time Street Improvement Project Coat Prior Years/Future Costs: $0 C|PCosta(detai|edbelow) $11.000.000 Total Project Cost: $11,000,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total *1,000.000 s5,000\000 $5,000,oOV $O *0 $0 *11,000000 Project Development $1.000.000 $O $0 Construction $O $5.000.000 $5.000.000 Total $1.000.000 $5.000.000 *5.000.000 $0 $0 $O $1,080000 $O $O $U S10.000.000 $O $0 *0 $11.000.000 WASTEWATER WMg1il!w1i IgNmill! Bill Description: Repair and rehabilitation of various aging sewer mains throughout the City as needed to reduce rainwater intrusion into the sewer system. Location: Citywide Project Type: Ongoing Collection System Improvement Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $3,260,823 $1,000,000 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $10,260,823 Total $3,260,823 $1,000,000 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $10,260,823 Project Development $326,082 $100,000 $100,000 $100,000 $200,000 $200,000 $1,026,082 Construction $2,934,741 $900,000 $900,000 $900,000 $1,800,000 $1,800,000 $9,234,741 Total $3,260,823 $1,000,000 $1,000,000 $1,000,000 $2,000,000 $2,000,000 $10,260,823 OEM Description: Repair/Rehab Lift Stations Location: Citywide Project Type: Ongoing Collection System Improvement Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $302,000 $302,000 $302,000 $302,000 $302,000 $302,000 $1,812,000 Total $302,000 $302,000 $302,000 $302,000 $302,000 $302,000 $1,812,000 Project Development $60,400 $60,400 $60,400 $60,400 $60,400 $60,400 $362,400 Construction $241,600 $241,600 $241,600 $241,600 $241,600 $241,600 $1,449,600 Total $302,000 $302,000 $302,000 $302,000 $302,000 $302,000 $1,812,000 Description: Expansion of the main sewer serving the west region of the City to accommodate growth. Phase III will run from Girvan Road south to the Clear Creek Wastewater Treatment Plant. Location: Girvan Road to the Clear Creek WWTP Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $559,579 CIP Costs(detailed below) $10,000,000 Total Project Cost: $10,559,579 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $6,500,000 $0 $3,500,000 $0 $0 $o $10,000,000 Total $6,500,000 $0 $3,500,000 $0 $0 $0 $10,000,000 Project Development $1,300,000 $0 $700,000 $0 $0 $0 $2,000,000 Construction $5,200,000 $0 $2,800,000 $0 $0 $0 $8,000,000 Total $6,500,000 $0 $3,500,000 $0 $0 $0 $10,000,000 C-43 WASTEWATER mamma= MMINISINNIMM Description: Replace aging and damaged clay piping throughout the city. Location: Citywide Project Type: Ongoing Collection System Improvement Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $1,649,500 $999,500 $1,256,857 $309,067 $721,667 $4,000,000 $8,936,591 Total $1,649,500 $999,500 $1,256,857 $309,067 $721,667 $4,000,000 $8,936,591 Project Development $164,950 $99,950 $125,686 $30,907 $72,167 $400,000 $893,659 Construction $1,484,550 $899,550 $1,131,171 $278,160 $649,500 $3,600,000 $8,042,932 Total $1,649,500 $999,500 $1,256,857 $309,067 $721,667 $4,000,000 $8,936,591 Description: Ongoing major maintenance Location: 2220 Metz Road Project Type: Ongoing Treatment System Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $633,950 $651,640 $669,830 $688,520 $707,730 $727,476 $4,079,146 Total $633,950 $651,640 $669,830 $688,520 $707,730 $727,476 $4,079,146 Project Development $126,790 $130,328 $133,966 $137,704 $141,546 $145,495 $815,829 Construction $507,160 $521,312 $535,864 $550,816 $566,184 $581,981 $3,263,317 Total $633,950 $651,640 $669,830 $688,520 $707,730 $727,476 $4,079,146 Description: Ongoing major maintenance Location: 6475 Airport Road Project Type: Ongoing Treatment System Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $422,640 $434,440 $446,570 $459,030 $471,840 $485,004 $2,719,524 Total $422,640 $434,440 $446,570 $459,030 $471,840 $485,004 $2,719,524 Project Development $84,528 $86,888 $89,314 $91,806 $94,368 $97,001 $543,905 Construction $338,112 $347,552 $357,256 $367,224 $377,472 $388,003 $2,175,619 Total $422,640 $434,440 $446,570 $459,030 $471,840 $485,004 $2,719,524 C-44 Description: Full scale build -out for Biosolids final processing. Location: 222OMetz Road Project Type One-time Treatment System WASTEWATERWASTEWATER0� Project Cont Prior Years/Future Costs: $2.027.427 C|PCoots(detailedbelow) $7.250.000 Total Project Cost: $9.277.427 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $V $2,000,000 *5,250000 $O *V $V $7\250.000 Project Development *O $400000 $8 $O *O $0 $400.000 Construction *O s1.600.000 G5.250.000 $O *O $O $8.050.000 Total $O $2.000.000 $5.250.000 *O *O *0 $7.250.000 Description: Future scale build -out for Biosolids final processing. Location: 2230Metz Road Project Type: One-time Treatment System Project Cost: Prior Years/Future Costs: $O C|PCouts(datailedbelow) $11.750.000 Total Project Cost: $11,750,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $0 $0 $0 $0 $1,750,000 $10,000,000 $11,750,000 Total $0 $0 *O $0 *1'750,000 $10.000,000 $11.750,000 Project Development $O $O $0 $O $350.000 $U $850.080 Construction *O $0 $O $O $1.400.000 $10.000000 $11.400.000 Total *V $0 $V $U *1.750.000 $10.000.000 *11.750.000 Description: Increase capacity and improve flow to North Market Lift Station. Location: 971 N Market Street Project Type: One-time Collection System Improvement Project Cost: Prior Yeam/Futun*Custs: $0 C|PCoots(detailedbelow) *580.685 Total Project Cost: *580.685 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $0 $0 $134,000 $0 $0 $0 $134,000 Wastewater Rates $O *0 $30806 s415.879 $O *U $440085 Total $0 *0 $164,806 *415,079 $O $V $580,685 Project Development $O $0 $32.017 $O $U Construction $O $O $131.983 $415.879 $0 Total $0 $0 $184.806 *415.879 $V $O $82.817 $O $547.888 *V $580,685 N� = � " =~�� � �� �"= � � ���� Description: Construct approximately 7SUfeet nf2Tpipe, 4.710 feet of24"pipe, and 60 feet nf2rpipe from NMarket Lift Station tnElk Drive. Location: Lake Redding Estates Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: *120.000 C|PCoxts(detmi|edbelow) $4.875.000 Total Project Cost: *5.095.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $0 $0 $0 $99,500 $398,000 $0 $497,500 Wastewater Rates $O $O $U $895500 $3.502.000 $U $4.477.500 Total $V *O $V $995,000 *:,900,000 $O *4,975,000 Project Development $0 $O $O $985.000 $O $D $995.000 Construction $0 $O *O $V *3.980.000 $O *3.980.000 Total *V $O $V $985.000 $3.980.000 $V $4.975.000 IM Description: Replace approximately 1.4OOfeet ofold pipe constructed atsubstandard grade. Location: VVoodaoreDrive and BeohpUiLane Area Project Type: One -tine Collection System ImprovementCIP Costs(detailed below) $1,250,000 Project Cost: Prior Years/Future Costs: *18.674 Total Project Cost: $1,268,674 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $1,250,080 $V $0 $V $V $0 $1.250,000 Project Development $125.000 $O $0 $U $O *U S125.000 Construction $1.125.000 $O $0 $O $O $0 $1.125.000 Total *1.250'000 $D *V $0 $V *O $1.250.000 Description: Replacement ofundersized sewer pipe ranging insize from 12'to18inche in diameter. Location: Buenaventura Blvd and Westside Road Project Type: One-time Collection System ImprovementCIP Costs(detailed below) $3,950,000 Project Cost: Prior Years/Future Costs: $O Total Project Cost: $3,950,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $0 $0 $0 $0 $237,000 $0 $237,000 Wastewater Rates $0 $D $0 $742.600 $2.970.400 $0 $3.713.00 Tota $O *V *U $742,600 *3,207,400 $0 $3,950,000 Project Development $O $O $O $742.800 $U $0 *742.600 Construction *O $U $U *O $3.207.400 *O $3.207.400 Total $0 *V $0 $742.600 $3.207.400 $O z3.950.000 0� � = � �~°� ° �� = =� = ° ��=� Description: Replace approximately 1,670 feet of existing 8 -inch diameter AC pipe with 12 -inch diameter pipe. Location: Mercury Drive Area Project Typo One-time Collection System Improvement Project Cost: Prior Years/FutunaCosts: 00 C|PCoots(detailedbelow) $1.450.000 Total Project Cost: $1,450,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $O 80 $V $V $450,000 $1,000000 *1,450,000 Project Development $0 $O $O $O s300.000 $O $300.000 Construction $0 $0 $0 $0 $150.00 $1.00.000 $1.150.00 Total $V $V *O *0 *450.000 $1.000.000 $1,450.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $0 $0 $293,143 $2,638,287 $0 $0 $2,931,430 Tota $U *n $293,143 $2,638,287 $O *V o2,931,430 Project Development $0 $0 $283.148 $O $U 80 $233.143 Construction $O $0 $O $2.038.287 *O $V *2.638.287 Total *o $O *293.143 $2.638.287 $0 *V $2.931.430 Description: Replace approximately 1,200 feet of under capacity pipe, Location: Oasis Road Area Project Type: Onetime Collection System Improvement Project Cost: Prior Years/Future Costs: $O C|PCoob<detai|edbelow) $414.280 Total Project Cost: $414,290 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $0 $0 $54,686 $218,745 $0 $0 $273,431 Wastewater Rates $0 $0 $28,172 $112,687 $0 $0 $140,859 Project Development $O $O $82.858 $0 *O Construction $U $0 $O $331.432 $O Total $0 $O $82.858 $331.432 $0 $0 $82,858 $0 $331,432 WASTEWATER Description: Rehabilitation for sanitary sewer mains and lowers laterals. Includes manhole replacement and cover installation. Location: Magnolia Area Project Type: One-time Collection System Improvement Project Cost Prior Years/Future Costs: $128.550 C|PCoots(detailedbelow) $8.400.000 Total Project Cost: $6,526,550 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Project Development $640.000 $0 $O $0 $O $O $840.000 Construction $5.760.00 $0 $0 $0 $0 $0 $5.760.000 Description: Rehabilitation for sanitary sewer mains and lowers laterals. Includes manhole replacement and cover installation. Location: Magnolia Area Project Type One-time Collection System Improvement Project Cunt Prior Years/Future Couts: $O C|PCoats(cletailedbelow) $7.000.000 Total Project Cost: s7.000.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total *0 $700000 $V o6.300000 $0 $0 $7,000.000 Project Development $0 $700.000 $U $650000 $0 $U $1.338000 Construction $0 $O $O $5.670.00 $0 $0 $5.070.000 Description: Installation of 23,725 linear feet of sewer line in the Magnums Lane remote area, Includes rehabilitation of all existing Location: Lake Blvd EtnBe0ineRd Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $O C|PCoots(dotailedbelow) $3.700.000 Total Project Cost: $8.700.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $O $3,700.000 $0 $V *O $0 *3.700,000 Project Development $O S740.000 $O $O Construction $O $2.960.000 $O $O Total $V *3.700.000 $V $0 $0 *O $740,00 $0 $O $2.960.000 $0 $0 $3.700.000 Description: Increase 3800 feet of pipe from 8 -inch to 12 -inch, Location: Tehama Area Project Type: One-time Collection System Improvement WASTEWATERWASTEWATER�� Project Cost: Prior Years/Future Costs: $U C|PCostsNotailedbelow) $2.000.000 Total Project Cost: $2,600,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $520000 *2,080,000 $0 $V *D *V $2,600,000 Project Development $520.000 $U $0 $O $0 $O *520.000 Construction *O $2.080.000 $O $O *O $0 $2.080.000 Total $520.000 *2.080.000 $V $0 $V $U $2.600.000 Description: Increase 1500 feet of sewer line from 12 -inches to 15 -inches. Location: Center Area Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $0 C/PCoots(detaibdbelow) $1.150.000 Total Project Cost: $1,150,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $230,000 $920,000 $0 $0 $0 $0 $1,150,000 Total $230,000 $920.000 $V $V *O *0 $1.150,000 Project Development $230.000 $0 $U $0 $O $O $230.000 Construction $O $920.000 $D $0 $0 $0 $920.000 Total $230.000 $920'000 $0 *D $0 $V s1.150.000 Description: Increase pipe diameter from 8 -inches to 10 -inches for approximately 5150 feet. Location: Mary Lake Area Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $O C|PCoots(detailedbelow) $2.150.000 Total Project Cost: $2,150,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $V $430000 $1.720,000 $V $V *V s2.150,000 Project Development $U $430.000 *0 Construction $O $U $1.720.000 Total *O *430.000 *1.720.000 $0 $O $U $430,00 $O $0 *O $1.720.000 $0 $V $V $2.150.000 Description: Increase pipe diameter from 12 -inches to 15 -inches for approximately 2010 feet. Location: Lake Keswick Area Project Type: One-time Collection System Improvement WASTEWATERWASTEWATER�� Project Cont Prior Years/Future Cunts: *O C|PCuats(detailedbelow) $5.550000 Total Project Cost: $8.550.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Tota $710.000 *2.840,000 *V *0 *O $0 $3,550,000 Project Development $710.00 $0 $0 $0 $0 $0 $710.00 Construction $O $2.840.000 $0 $0 *D oV $2.840.000 Total $710.000 $2.840.000 $V $V $O $V $3.550.000 Description: Increase 750 feet of sewer line from 12 -inches to 15 -inches. Location: Buenaventura Blvd Project Typo: One-time Collection System ImprovementCIP Costs(detailed below) $1,250,000 Project Cost: Prior Years/Future Costs: $8 Total Project Cost: $1,250,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $0 $0 $75,000 $0 $0 $0 $75,000 Wastewater Rates $0 $235,000 $940,000 $0 $0 $0 $1,175,000 Total $O $235,000 $1,015,000 $V $0 $V *1'250'000 Project Development $O $235.000 $0 $U $O $O $235.000 Construction $O $0 $1.015.000 $D $O $U $1.015.800 Total $V $235.000 $1.015.000 $0 $O $V $1.250.000 Description: Increase pipe diameter from 8 -inch to 12 -inch for 1200 feet, 1 0 -inch to 18 -inch for 750 feet and 12 -inch to 18 -inch for 700 feet. Location: Eureka Way & Buenaventura Blvd Project Type: One-time Collection System Improvement Project Cost: Prior Years/Future Costs: $0 C|PCostu(detai|mdbelow) $1.750.000 Total Project Cost: $1.750.000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $V $350.000 $1,400,000 $O $O *0 $1J50,000 Project Development $0 *350.000 $0 Construction m} $O $1.400.000 Total *0 $350.000 $1.400.000 Ewe $0 $8 $O $350,00 50 $O $n *1.400.000 $0 *O $n $1.750.000 xMilsawl Description: Screening at influent pump station. Location: 2220 Metz Road Project Type: One-time Treatment System WASTEWATER Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $2,000,000 Total Project Cost: $2,000,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $0 $0 $2,000,000 $0 $0 $0 $2,000,000 Total $0 $0 $2,000,000 $0 $0 $0 $2,000,000 Project Development $0 $0 $400,000 $0 $0 $0 $400,000 Construction $0 $0 $1,600,000 $0 $0 $0 $1,600,000 Total $0 $0 $2,000,000 $0 $0 $0 $2,000,000 HINE Description: Replace outdated electrical components. Location: 2220 Metz Road Project Type: One-time Treatment System Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $0 $500,000 $0 $0 $0 $0 $500,000 Total $0 $500,000 $0 $0 $0 $0 $500,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $0 $500,000 $0 $0 $0 $0 $500,000 Total $0 $500,000 $0 $0 $0 $0 $500,000 Description: Lining of emergency retention ponds. Location: 2220 Metz Road Project Type: One-time Treatment System Project Cost: Prior Years/Future Costs: $3,631,930 CIP Costs(detailed below) $3,413,095 Total Project Cost: $7,045,025 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $0 $0 $0 $0 $176,050 $677,224 $853,274 Wastewater Rates $0 $0 $0 $0 $528,150 $2,031,671 $2,559,821 Total $0 $0 $0 $0 $704,200 $2,708,895 $3,413,095 Project Development $0 $0 $0 $0 $704,200 $0 $704,200 Construction $0 $0 $0 $0 $0 $2,708,895 $2,708,895 Total $0 $0 $0 $0 $704,200 $2,708,895 $3,413,095 C-51 Elm Description: Separate utility feed to outfall structure. Location: 6475 Airport Road Project Type: One-time Treatment System WASTEWATER Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $225,000 Total Project Cost: $225,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Connection Fees $225,000 $0 $0 $0 $0 $0 $225,000 Total $225,000 $0 $0 $0 $0 $0 $225,000 Project Development $0 $0 $0 $0 $0 $0 $0 Construction $225,000 $0 $0 $0 $0 $0 $225,000 Total $225,000 $0 $0 $0 $0 $0 $225,000 Description: Alternate chlorination chemical process. Location: 2220 Metz Road & 6475 Airport Rd Project Type: One-time Treatment System Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $500,000 Total Project Cost: $500,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $0 $0 $500,000 $0 $0 $0 $500,000 Total $0 $0 $500,000 $0 $0 $0 $500,000 Project Development $0 $0 $50,000 $0 $0 $0 $50,000 Construction $0 $0 $450,000 $0 $0 $0 $450,000 Total $0 $0 $500,000 $0 $0 $0 $500,000 Description: Alternate de -chlorination chemical process. Location: 2220 Metz Road & 6475 Airport Rd Project Type: One-time Treatment System Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $250,000 Total Project Cost: $250,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $250,000 $0 $0 $0 $0 $0 $250,000 Total $250,000 $0 $0 $0 $0 $0 $250,000 Project Development $0 $0 $0 $0 $0 Construction $250,000 $0 $0 $0 $0 Total $250,000 $0 $0 $0 $0 100M $0 $0 $0 $250,000 $0 $250,000 Description: Construction of sludge lagoons at Stillwater Treatment Plant Location: 6475 Airport Road Project Type: One-time Treatment System WASTEWATER Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $6,000,000 Total Project Cost: $6,000,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Wastewater Rates $0 $6,000,000 $0 $0 $0 $0 $6,000,000 Total $0 $6,000,000 $0 $0 $0 $0 $6,000,000 Project Development $0 $1,200,000 $0 $0 $0 $0 $1,200,000 Construction $0 $4,800,000 $0 $0 $0 $0 $4,800,000 Total $o $6,000,000 $0 $0 $0 $0 $6,000,000 C-53 Description: Rehab/repair pump stations. Location: Various Project Type: Ongoing Treatment System Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $238,810 $245,470 $252,313 $266,577 $266,577 $274,009 $1,543,756 Total $238,810 $245,470 $252,313 $266,577 $266,577 $274,009 $1,543,756 Project Development $23,881 $24,547 $25,231 $26,658 $26,658 $27,401 $154,376 Construction $214,929 $220,923 $227,082 $239,919 $239,919 $246,608 $1,389,380 Total $238,810 $245,470 $252,313 $266,577 $266,577 $274,009 $1,543,756 =MEMO IIIJBI I Description: Environmental review for replacing Pump House 1 on the Sacramento River. Alternatives include rehabbing at current location or constructing a new pump house at various upstream locations. Location: 2300 Riverside Drive Project Type: One-time Treatment System Project Cost: Prior Years/Future Costs: $939,702 CIP Costs(detailed below) $1,560,315 Total Project Cost: $2,500,017 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $1,560,315 $0 $0 $0 $0 $0 $1,560,315 Total $1,560,315 $0 $0 $0 $0 $0 $1,560,315 Project Development $1,560,315 $0 $0 $0 $0 $0 $1,560,315 Construction $0 $0 $0 $0 $0 $0 $0 Total $1,560,315 $0 $0 $0 $0 $0 $1,560,315 i M11199MM Description: Replace cast-iron, steel, asbestos, galvanized and degraded water mains throughout the City. Location: Citywide Project Type: Ongoing Distribution System Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $10,235,620 $4,945,020 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $33,180,640 Total $10,235,620 $4,945,020 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $33,180,640 Project Development $1,535,343 $741,753 $450,000 $600,000 $750,000 $900,000 $4,977,096 Construction $8,700,277 $4,203,267 $2,550,000 $3,400,000 $4,250,000 $5,100,000 $28,203,544 Total $10,235,620 $4,945,020 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $33,180,640 C-54 Description: 24" Lake Boulevard - Oasis to Northpoint (9.090 feet) Location: Lake Boulevard Project Type: One-time Distribution System Project Cost: Prior Years/Future Costs: *350.750 C|PCosts(dotailedbelow) $5.500.000 Total Project Cost: $5.850.750 Proposed 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Connection Fees $0 $486,079 $0 $0 $0 $0 $486,079 Water Rates $4,125,000 $O $0 $V $O $0 $4,125,000 Total $5,500.000 $O *u $0 *0 $0 *5.500,000 Project Development G1.100.000 $U $O $O $O $O $1.100.000 Construction $4.400.000 $0 $O $U $O $O *4.400.000 Total $5.500.000 $8 *V $V $0 $V *5'500.000 OEM WINNUUM Description: Replace 122Ofeet of existing waterline with 16" waterline to meet water system demands, water supply for new development, and improve fire flows. Location: Masonic toHilltop Project Type: One-time Distribution System Project Cost: Prior Years/Future Costs: $24.040 C|PCnmts(cletailedbelow) 82.223.105 Total Project Cost: $2.247.145 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Connection Fees $0 $486,079 $0 $0 $0 $0 $486,079 Water Rates $1.575,00 *162,026 $0 $0 $0 $0 $1.737,026 Total $1.575.000 $648.105 $V *O $V *O $2.223.105 Project Development $O $O $O $] $0 $0 $O Construction $1.575.000 $648.105 *0 *O $0 $O $2.228.105 Total s1.575.000 $648,105 $D $V $O $V $2.223.105 Description: Inspect, rehab, clean casing and screens tomaintain production capacity. Location: Various Project Type: Ongoing Treatment System Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $67,570 $211,660 $71,386 $215,586 $75,422 $219,734 $861,358 Total $67,570 $211,660 $71,386 $215,586 $75,422 $219,734 $861,358 Project Development *13.514 $42.332 $14.277 $43.117 Construction $54055 $169.328 $57.109 $172.487 Total $67,569 $211,660 $71,386 $215,584 $15,084 $45946 $172,270 $60.338 $175.787 *689.084 Total Project Cost: $3,005,770 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $2.873.000 $V *V $V *O $0 $2.873.000 Project Development $287.300 $O *O $0 $O $O $287.300 Construction $2.585.700 80 $0 $0 $O $O $2.585.700 Total $2.873.080 *V *O *O *U $0 *2.873.000 Description: Install oxidation/filtration treatment system tnremove manganese. Location: 5550 Old Oregon Trail Project Type: One-time Distribution System Project Coat: Prior Years/Future Costs: $U C|PCnats(detaibdbelow) $4.035.690 Total Project Cost: $4.035.690 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Total $0 $V $403.570 $3,632.120 *V $O $4,035,690 Project Development $O $O $403.570 $0 $U $O $403.570 Construction $D $O *O $3.632.120 $O $O $3.632.120 Total *D $V o403.570 $3.632.120 *O $0 $4.035.690 Description: Rehabilitate EVV'11ordesign and construct newweUu(onew location. Location: 5O55Good*aterAvenue Project Type: One-time Distribution System Project Coot Prior Years/FutunaCuuts: $U C|PCuxts(detailedbelow) $8.550.457 Total Project Cost: 03.550.457 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Toto *0 $V $3,550,457 $0 $0 *n *3,550,457 Project Development 30 $U $O $O $U *O $O Construction $0 $0 $3.550.457 $0 $0 $0 $3.550.457 Total $V $U $3.550,457 $V $0 $0 *3.550'457 Description: Upgrades at the Foothill Water Treatment Plant to accommodate growth and replace aging equipment. Location: 3100 Foothill Boulevard Project Type: Ongoing Treatment System Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $3,546,640 $1,460,820 $500,000 $513,939 $528,266 $542,993 $7,092,658 Total $3,546,640 $1,460,820 $500,000 $513,939 $528,266 $542,993 $7,092,658 Project Development $354,664 $146,082 $50,000 $51,394 $52,827 $54,299 $709,266 Construction $3,191,976 $1,314,738 $450,000 $462,545 $475,439 $488,694 $6,383,392 Total $3,546,640 $1,460,820 $500,000 $513,939 $528,266 $542,993 $7,092,658 Description: Construction of a 7 MGD pump station at the existing supervisory valve. This pump station will have the ability to pump in either direction between the Foothill and Enterprise pressure zones and greatly increase the flexibility of water delivery in the distribution system. Location: Cypress Avenue Project Type: One-time Distribution System Project Cost: Prior Years/Future Costs: $488,850 GIP Costs(detailed below) $2,750,610 Total Project Cost: $3,239,460 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $2,750,610 $0 $0 $0 $0 $0 $2,750,610 Total $2,750,610 $0 $0 $0 $0 $0 $2,750,610 Project Development $275,061 $0 $0 $0 $0 $0 $275,061 Construction $2,475,549 $0 $0 $0 $0 $0 $2,475,549 Total $2,750,610 $0 $0 $0 $0 $0 $2,750,610 Description: Various maintenance projects at the Buckeye Water Treatment Plant. Location: 11501 Benson Drive/3100 Foothill Boulevard Project Type: Ongoing Treatment System Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $854,077 $125,730 $129,235 $132,838 $136,541 $140,347 $1,518,768 Total $854,077 $125,730 $129,235 $132,838 $136,541 $140,347 $1,518,768 Project Development $85,408 $12,573 $12,924 $13,284 $13,654 $14,035 $151,877 Construction $768,669 $113,157 $116,312 $119,554 $122,887 $126,312 $1,366,891 Total $854,077 $125,730 $129,235 $132,838 $136,541 $140,347 $1,518,768 C-57 Description: Determine location and construct additional reservoir. Location: West Side of Redding Project Type: One-time Distribution System MUMUM Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $4,811,726 Total Project Cost: $4,811,726 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $3,205,856 $1,605,870 $0 $0 $0 $0 $4,811,726 Total $3,205,856 $1,605,870 $0 $0 $0 $0 $4,811,726 Project Development $320,586 $160,587 $0 $0 $0 $0 $481,173 Construction $2,885,270 $1,445,283 $0 $0 $0 $0 $4,330,553 Total $3,205,856 $1,605,870 $0 $0 $0 $0 $4,811,726 Description: Rehab/repair 1 MG Cascade tank and 3.5MG Enterprise tank. Location: 1987 Kenyon Drive Project Type: One-time Distribution System Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $1,975,000 Total Project Cost: $1,975,000 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Rates $475,000 $500,000 $0 $500,000 $0 $500,000 $1,975,000 Total $475,000 $500,000 $0 $500,000 $0 $500,000 $1,976,000 Project Development $47,500 $50,000 $0 $50,000 $0 $50,000 $197,500 Construction $427,500 $450,000 $0 $450,000 $0 $450,000 $1,777,500 Total $475,000 $500,000 $o $500,000 $0 $500,000 $1,975,000 moll I Now Description: Replace approximately 1,013 feet of existing waterline with 20" waterline to meet water system demands, water supply for new development, and improve fire flows. Location: Beltline Road Project Type: One-time Distribution System Project Cost: Prior Years/Future Costs: $0 CIP Costs(detailed below) $658,258 Total Project Cost: $658,258 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Connection Fees $0 $0 $164,564 $0 $0 $0 $164,564 Water Rates $0 $0 $493,693 $0 $0 $0 $493,693 Total $0 $0 $658,258 $0 $0 $0 $658,258 Project Development $0 $0 $131,652 $0 $0 $0 $131,652 Construction $0 $0 $526,606 $0 $0 $0 $526,606 Total $0 $0 $658,258 $0 $0 $0 $658,258 C-58 Description: Replace 1225 feet of existing waterline with 20" waterline to meet water system demands, water supply for new development, and improve fire flows. Location: Oasis Road Project Type: One-time Distribution System Project Cost: Prior Years/Future Costs: $0 GIP Costs(detailed below) $1,231,962 Total Project Cost: $1,231,962 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Connection Fees $0 $0 $246,392 $0 $0 $0 $246,392 Water Rates $0 $0 $985,570 $0 $0 $0 $985,570 Total $0 $0 $1,231,962 $0 $0 $0 $1,231,962 Project Development $0 $0 $246,392 $0 $0 $0 $246,392 Construction $0 $0 $985,570 $0 $0 $0 $985,570 Total $0 $0 $1,231,962 $0 $0 $0 $1,231,962 Total Project Cost: $969,434 Proposed Funding: 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 Total Water Connection Fees $0 $83,371 $333,486 $0 $0 $0 $416,857 Water Rates $0 $110,515 $442,062 $0 $0 $0 $552,577 Total $0 $193,886 $775,548 $0 $0 $0 $969,434 Project Development $0 $38,777 $155,110 $0 $0 $0 $193,887 Construction $0 $155,109 $620,438 $0 $o $0 $775,548 Total $0 $193,886 $775,548 $0 $0 $0 $969,434 Note: The Engineering Division Cost Allocation section provides an approximation of costs for the project development and construction for projects requiring the involvement of the Engineering Division. Project development costs include preliminary engineering, environmental and permitting, right-of-way, design, consultant oversight, and bidding. Construction costs include the construction contract, contract administration, inspection, and consultant oversight C-59 FUTURE PROJECTS C|PNo Project Funding Source ST -IN -HA Church Creek/HbrtmayerIntersection DD651511 ST -IN -AL Church Cemk/A|msoIntersection DD651510 ST -2005'62 Traffic Control Device: Victor Avenue 'BVista Street DD651448 O7-2005-01 Traffic Control Device: Lake Boulevard 'Santa Rosa Way DD651472 ST - 2005-60 Canyon Creek Road Area Improvements CCRT|F/Fund117 GT -2005'57 Traffic Control Device: Airport Road 'MuodnwviewDrive DD651492 Glc2005-51 Traffic Control Device: Hartnell Avenue - Lawrence Road DD651460 GT -2005-50 Traffic Control Device: Lake Boulevard - Panorama Drive QD651422 OT'F-104 Shasta View Drive Extension DD650722 Sl -F -SV Shasta View Drive/College View Drive DD651500 CIPNn Project Funding Source W-4286-01 Twin View Waterline DD651440 N-EVVT- 5 EVV120nEVV14Pipeline Water Rates W-EVV7-03 EVV14 Filtration Water Rates W-EW01 EVV11 Rehab Water Rates Note: The Future Projects list includes a variety of projects that are either beyond the 5 -year window of the CIP andlor do not have all funding sources identified mt this time. The identified Water, Wastewater, and Traffic impact fee program projects represent the basis of the relative Mitigation Fee Act (Government Code 66000) compliant programs. Reimbursement for construction of these impact fee projects may be considered in accordance with Section 16.20.090 of the Redding Municipal Code. KU FUTURE PROJECTS WITH IMPACT FEE COMPONENT STORM DRAIN CIPNu SD -DET -01 Project Local Deterring System Anticipated Construction Date Funding Source 2028-29 Storm Drain Fees o|PNu Project Anticipated Construction Date Funding Source ST -TIF -CIX Churn Creek Road/SR 2S9Interchange 2028'29 Traffic Impact Fows/DD651505 ST -TIF -CCI Churn Creek Road Widening Browning toBodanhamer 2028-29 Traffic Impact Fees GT -4220-02'2 Placer Street Improvements 'AirpanktuPleasant 2028-28 Traffic Impact Fees ST -TIF -HIL Hilltop Drive Widening - River Bend Road toBrowning Street 2028-29 Traffic Impact Fees 0T'T|F'VC1.2.8 Victor Avenue Widening Hartnell toOld A|tums 2028-29 Traffic Impact Fees ST -TIF -RA Railroad Avenue Widening Grandview Ave. toSchley Ave. 2030-31 Traffic Impact Fees ST -TIF -OLD Old A|tu/aaRoad ROW and Roundabouts atVictor Avenue, 2031'32 Traffic Impact Fees LomaRoad, and EdgewoodDrive WATER Anticipated Construction C|PNo. Pn4nut nu,e Funding Source VV -CON\ -14 New l5MGBuckeye Tank 2028-29 Water Connection Foeo/WeterRatea W/CON\-16 Construct 24'Waterline from Quartz Hill Road toKeswick Dam 2028-29 Water Connection Road Feaa&wa0erRotma W -00N\-15 Construct 50''Waterline from Buckeye Tank toQuartz Hill Road 2028'29 Water Connection Feeo/WaterRu\eo Note: The Future Projects list includes a variety of projects that are either beyond the 5 -year window of th*C/P andlor do not have all funding sources identified adthis time. The identified Water, Wastewater, and Traffic impact fee program projects represent the basis ofthe relative Mitigation Fee Act (Government Code 06000compliant programs. Reimbursement for construction of these impact fee projects may beconsidered inaccordance with Section YO.28090ofthe Redding Municipal Code. ME