HomeMy WebLinkAboutReso. 1984 - 077 - establishing general service interruptible or time of use 111
` J411
RESOLUTION NO. -77
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
ESTABLISHING GENERAL SERVICE - INTERRUPTIBLE OR TIME-OF-USE
- INTERRUPTIBLE ELECTRIC RATES.
WHEREAS, the City of Redding has a finite allocation of
power from the Federal Government; and
WHEREAS, the City faces the possibility of its peak elec-
trical demand exceeding that power allocation; and
WHEREAS, it is in the best interest of the City to encourage
peak load reduction;
NOW, THEREFORE, IT IS HEREBY RESOLVED that general service -
interruptible or time-of-use - interruptible electric rates are
established pursuant to the attached Exhibit "A" , incorporated
into and made a part of this resolution.
I HEREBY CERTIFY that the foregoing resolution was intro-
duced and read at a regular meeting of the City Council of the
City of Redding on the 2nd day of April , 1984 , and
was duly adopted at said meeting by the following vote:
AYES: COUNCILMEN: Demsher, Fulton, Kirkpatrick, Pugh, and Gard
NOES: COUNCILMEN: None
ABSENT: COUNCILMEN: None
ABSTAIN: COUNCILMEN: None
adi111.0 Is • k / 0,
B£ ' :ARA ALLEN GARD, Mayor
City of Redding
ATTEST:
cf 7Zi�,e,�
ETHEL A. NICHOLS , City Clerk
T\.
v
�1
111
FORM APPROVED:
1 / zzt‘e?''
RANDALL A. HAYS, City,
ity ttorney
-2-
• 1110 •
City of Redding
Municipal Utilities
Supplemental Schedule of Rates
ELECTRIC
General Service - Interruptible
or
Time-Metered - Interruptible
APPLICABILITY
Applicable to separately demand-metered interruptible three-phase service customers with interruptible
demands in excess of 300 kW and available only under contract with the City of Redding hereinafter referred
to as "the City".
CHARACTER OF SERVICE
Three-phase, 60 Hertz, at one standard nominal voltage as mutually agreed to by the Customer and the
City and subject to availability at the point of delivery.
DEMAND CHARGE CREDIT
1. City-controlled Interruptible Demand:
Applicable where the Customer elects to provide only City-controlled Interruptible Demand.
The total monthly demand charge as determined under the applicable General Service or
Time-metered Schedule shall be reduced by the following percentage formula:
Db = [1 - (F / (F+IL))] x 5%
Where:
D% = Demand Charge Reduction Percentage
F = Estimated On-peak Firm Service Demand
IL = Estimated On-peak City-controlled Interruptible Demand
2. Customer-controlled Interruptible Demand:
Applicable when the Customer elects to provide only Customer-controlled Interruptible Demand.
The total monthly demand charge as determined under the applicable General Service or
Time-metered Schedule shall be reduced by the following percentage formula:
D% = [1 - (F / (F+IC))] x 2.5%
Where:
D% = Demand Charge Reduction Percentage
F = Estimated On-peak Firm Service Demand
IC = Estimated On-peak Customer-controlled Interruptible Demand
BUD2:003 1
1111
3. Contract for Service: The estimated On-peak Interruptible Demand and estimated On-peak Firm
Service Demand shall be mutually agreed upon and set forth in the Contract for Service.
BILLING
1. Meter-recording Service Charge: A monthly service charge shall be applied to each bill according
to the applicable rate:
MONTHLY
(A) General Service - Interruptible, service charge $16.00
(B) Time-metered - Interruptible, service charge $15.00
2. Interrupted Demand Billing Reduction: During any billing period when one or more Demand inter-
ruptions are requested of the Customer by the City and are fully accomplished by the Customer, the
Customer's total demand charge shall be based upon the applicable General Service or Time-metered demand
rate multiplied by the Customer's maximum metered demand that occurred during any of the Demand Inter-
ruption Periods.
3. Penalty for Non-compliance: Under the conditions applicable to Customer-controlled Interruptible
Demand if, at any time, the Customer fails to reduce his demand to the On-peak Firm Service Demand
level when requested to do so by the City, the Customer shall, in addition to all other non-demand
related charges, (i.e. service charge, energy charge, primary service discount, and power factor
adjustment) pay a demand charge for the sum of:
(A) An amount equal to the applicable on-peak demand charge multiplied by the On-peak Firm
Service Demand; plus
(B) The greater of:
(1) An amount equal to 5 times the applicable on-peak demand charge multiplied by the net of
the Customer's maximum metered demand less the On-peak Firm Service Demand during any
interruption period within the billing period;
or
(2) An amount equal to the sum of the additional costs to the City for supplemental purchase
power and related transmission and transportation costs (expressed in $/kW) multiplied
by the net of the maximum metered demand less the On-peak Firm Service Demand during any
interruption period within the billing period.
If more than one interruption request occurs during a billing period and the Customer fully complies
with at least one interruption request and does not fully comply with at least one other interruption
request, the penalty for non-compliance charges under Section 3.(B), will be reduced by multiplying it
by the proportion of the total number of interruptions with which the Customer failed to comply fully
to the number of interruptions requested.
In addition to the above penalty charges, the Demand Charge Credit will be forfeited for the month in
which any non-compliance occurs.
BUD2:003 2
• •
SPECIAL CONDITIONS OF SERVICE
1. Demand Interruption Periods: During system peak load conditions, where the City's demand is
approaching its Western Area Power Administration CVP power allocation limit and the City would incur
higher wholesale power costs for additional power purchases, Demand Interruption Periods will be
initiated. The City will endeavor to reduce system load consistent with good utility practice as
follows:
(A) City facilities electric demand reduction.
(B) Load management activation.
(C) Interruptible demand activation.
2. Non-intentional Demand Interruptions: Interruptions of service other than intentional inter-
ruptions as requested and logged by the City shall be defined as:
(A) Interruptions caused by Acts of God, public enemy, strikes, state, or other governmental
interference, windstorm, flood, fire, explosion, or any matter or thing over which the City
has no control, whether in connection with the operations or property of either Customer or
City, or,
(B) Interruptions caused by emergencies that cause the City to order curtailment of service to
firm customers in order to protect the general public and preserve the integrity of its
system and the systems of neighboring utilities whose electric systems are interconnected
with the electric system of the City.
Such Non-intentional Demand Interruptions shall not be credited towards the Customer's Interrupted
Billing Demand Reduction.
3. On-peak Firm Service Demand: Firm Service Demand is the maximum demand which the City is expected
to supply during periods when the City has called for interruptible demand to be disconnected from the
City's lines. The On-peak Firm Service Demand levels shall be specified by the Customer within the
Contract for Service. Any changes in On-peak Firm Service Demand are subject to check and approval of
the City.
4. City-controlled Interruptible Demand: Such interruptible demand is that demand which the Customer
agrees shall be disconnected by the City from the City's lines during Demand Interruption Periods.
Such interruptible demand shall be specified by the Customer, with initial demand and subsequent
changes subject to check and approval by the City.
5. Customer-controlled Interruptible Demand: Such interruptible demand is that demand which the
Customer agrees shall be disconnected by the Customer from the City's lines upon notice by the City.
Such interruptible demand shall be specified by the Customer, with initial demand and subsequent
changes subject to check and approval by the City.
6. Notice of Interruption: The City shall attempt to give the Customer not less than 10 minutes
notice before interruption of the City-controlled Interruptible Demand. The City shall attempt to give
the Customer not less than 30 minutes notice before interruption of the Customer-controlled Interrupt-
ible Demand should be accomplished before penalty charges would be assessed.
Notice of Interruption shall be given to the Customer by telephone from the City and logged
according to time and contacted person. It shall be the Customer's responsibility to insure proper
BUD2:003 3
•
contact can be made during Demand Interruption Periods. Failure to make telephone contact with the
Customer during Demand Interruption Periods shall not:
(A) Cause the City to incur any liability for damages arising from City-controlled Interruptible
Demand being interrupted, or;
(B) Relieve the Customer of any liabilities incurred due to failure of the Customer to interrupt
Customer-controlled Interruptible Demand.
After any interruption hereunder, the Customer shall not resume use of electric power except upon
notice from the City.
7. Contract: A contract will be required for a period of 3 years when service is first rendered
under the schedule and for subsequent periods of one year thereafter, continuing until cancelled by
either party by written notice one year in advance of the initial period or any subsequent period,
provided, however, that if the Customer requests a change at the end of the initial period or any
subsequent period from service under this schedule to General Service, one year's written notice must
be given. •
8. Communications and Metering: The Customer shall provide to the City's specification communication
channels to the City's Control Center for the purposes of alarming, telemetering, and signaling. To
carry out the provisions of this schedule, the City shall provide and install recording watt and var
meter equipment. The City shall have the right to inspect and test relay facilities, communications
equipment, recording meters, and interruption equipment upon reasonable notice to the Customer.
9. Liability: The City shall not be liable for any loss or damage caused by or resulting from any
interruption of service.
BUD2:003 4
" •
CONTRACT FOR SERVICE
General Service or Time-metered Interruptible Supplemental Service
The CITY OF REDDING (the "City") hereby agrees to supplement electric
service under this Interruptible Schedule to ("Customer")
located at
with service under the applicable service schedule and the above-referenced
supplement as these schedules now exist or may hereafter be amended or
superseded, copies of which are attached hereto and by this reference
incorporated herein. The City and Customer agree as follows:
1. Customer elects to have service under this Interruptible Schedule as
follows:
Estimated On-peak City-controlled Interruptible Demand: kVA
or;
Estimated On-peak Customer-controlled Interruptible
Demand: kVA
and
Estimated On-peak Firm Service Demand which the City
is expected to supply: kVA
2. The City shall provide and install all necessary meter-recording
equipment and protection equipment.
3. If demand interruption is to be City controlled, the Customer shall
supply demand interruption equipment manufactured and installed to the City's
specification. Ownership of said equipment shall be transferred to the City
upon establishment of service under this Contract. The City shall operate and
maintain said equipment for the duration of this Contract and may remove any
equipment on termination of this Contract.
4. Service under this Interruptible Schedule shall commence on
5. Periods of Interruption shall be initiated only during the on-peak
periods as specified in the General Service Time-Metered Rate Schedule when
the City determines, in its sole judgment, that the electrical system demand
could exceed the City's then current power allocation from the Western Area
Power Administration. The City makes no representation as to the number or
average duration of Periods of Interruption it may initiate.
The City shall terminate a Period of Interruption when it determines, in
its sole judgment, that the system conditions necessitating the Period of
Interruption have ended. The City may notify Customers of the termination
sequentially within a 30-minute period of time if system conditions so
require.
6. The Customer shall defend at its own costs and indemnify and hold
harmless the City's elected officials, officers, agents, employees, assigns
and successors in interest from and against any and all liability (including
but not limited to, liability, based upon negligence and liability without
fault) , damages, costs, losses, claims, demands, actions, causes of action,
attorney's fees and expenses, or any of these resulting from the death or
injury to any person or damage to any property and/or personnel of the City,
to the extent caused by a Period of Interruption initiated by the City under
this Contract and by the subsequent connection or disconnection of electric
service to Customer by the City or Customer, pursuant to the terms of this
Contract.
7. This Contract shall be binding upon the heirs, successors, or
assigns of the Customer.
• •
IN WITNESS WHEREOF, the City of Redding and Customer have executed this
Contract this day of , 19
CUSTOMER CITY OF REDDING
By By
Address Title
ATTEST:
City Clerk