Loading...
HomeMy WebLinkAboutReso. 1985 - 002 - Approving the cost of the architectual contract for the building addition at the redding museum and art center • RESOLUTION NO. $5',1- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING THE COST OF THE ARCHITECTURAL CONTRACT FOR THE BUILDING ADDITION AT THE REDDING MUSEUM AND ART CENTER. WHEREAS , an architectural proposal has been submitted to the City of Redding for the design of the building addition at the Redding Museum and Art Center; and WHEREAS, the City Council deems it to be in the best inter- ests of the City of Redding to approve said contract; and WHEREAS, it has been determined that this matter is not subject to the provisions of CEQA; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Redding as follows: 1 . The Architectural Contract between the City of Redding and Allyn Martin, Architect, dated December 12 , 1984 , is hereby approved. 2 . The cost of said Architectural Contract shall not exceed $7, 000 . 00 and shall be completed within four (4) months. 3. A true copy of the said Architectural Contract referred to herein is attached hereto and made a part hereof. I HEREBY CERTIFY that the foregoing resolution was intro- duced and read at a regular meeting of the City Council of the City of Redding on the 7th day of January , 1985 , and 1 S was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: Demsher, Fulton, Pugh, & Kirkpatrick NOES : COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: Gard ABSTAIN: COUNCIL MEMBERS: None > z' f /';xi/ HOWARD D. KIRKPAT'ICK, Mayor City of Redding ATTEST: ETHEL A. NICHOLS, City Clerk FORM APPROVED: N ALL /� RAA. HAYS, CitAttorney -2- • • Allyn Martin, Architect 1376 West Street Redding, CA 96001 December 12, 1984 Carolyn Bond, Director Redding Museum and Art Center P. 0. Box 427 Redding, CA 96099 Dear Carolyn: Based on the directions in the Redding Museum and Art Center Proposal and Design Requirements paper, from conferences with and technical advice from the Museum staff, from the design of the accepted schematic 'plans, I will do the preliminary design phase of the work. This will include the follow- ing: a. Prepare large scale plans of all parts of building area and prepare cross section views of the structure, prepare interior perspectives of all the developed areas , revise the exterior perspectives to show any changes from the schematic drawings . The above will show all the equipment and fittings, etc . b. Revise the site plan as needed to match this phase of design. c. Prepare the written description of the construction and equip- ment. d. Prepare a preliminary estimate of the probable cost of construc- tion. I estimate this work can be done in four months. My fee for this work will be $7,000. Yours truly, ye Allyn Martin Architect AM:jw