Loading...
HomeMy WebLinkAboutReso. 1986 - 077 - Approving modification no. five to the contract between the city of redding and brown-boveri corportaion 410 RESOLUTION NO. g4`7 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING MODIFICATION NO. FIVE TO THE CONTRACT BETWEEN THE CITY OF REDDING AND BROWN-BOVERI CORPORATIONI, GENERAL CONTRACTORS, ON THE WHISKEYTOWN HYDROELECTRIC PROJECT, AND AUTHORIZING THE MAYOR TO SIGN SAME. WHEREAS, Brown-Boveri Corporation is the General Contractor on the Whiskeytown Hydroelectric Project; and WHEREAS, the Contract Modification attached hereto authorizes the provisional acceptance of the Hydroelectric Generation Plant at Whiskeytown Dam, in order that the City can begin operating the Plant for the purpose of producing revenue; NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Redding as follows : 1 . That the City Council of the City of Redding hereby authorizes the Mayor to sign the attached Contract Modification after receipt of notification from the Electric Department of the City of Redding that all tasks listed in Category 1 of said Contract Modification have been completed; 2. That the City Clerk is hereby authorized and directed to attest the signature of the Mayor and to impress the official , III, , III . , seal of the City of Redding on the aforesaid documents , when appropriate; and 3 . That a true copy of the Contract Modification referred to herein is attached hereto and made a part hereof. I HEREBY CERTIFY that the foregoing Resolution was introduced and read at a regular meeting of the City Council of the City of Redding on the 7th day of April , 1986 , and was duly adopted at said meeting by the following vre: AYES: COUNCIL MEMBERS: Demsher, Fulton, Gard, Pugh, & Kirkpatrick NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS : None /4614F-44g4474, 60eHOWARD D. KIRKPICK, Mayor City of Redding ATTEST: ETHEL A. NICHOLS , City Clerk FORMPPROVED: -7 RA A. HAYS, "ity Attorney , D -2- • r Brown Boveri BROWN BIOVERI Power Systems Division BBC B II wn Boveri, Inc. 1460 Livingston Avenue North Brunswick, NJ 08902 Phone: (201)932-6000 April 1, 1986 Original Copy No. 1 of 4 City of Redding 760 Parkview Avenue Redding, CA 96001 Reference: Whiskeytown Power Project, Project No. 99, Job No. 9199, Bid Schedule No. 1287 Contract Modification No. Five This contract modification authorizes the provisional acceptance of the Hydroelectric Generation Plant at Whiskeytown Dam. The basic purpose of this modification is to allow The City to begin operating the plant for the purpose of producing revenue. BBC Brown Boveri agrees that these work items will be completed no later than four months from the date of signing of this contract modification, except in the case that completion is frustrated due to circumstances outside of Brown Boveri's reasonable control. Further, The CiIity agrees to provide reasonable access and if required, turbine downtime as necessary to complete these work items. Further, The City presently holds five percent of the contract price as a retention against completion of this contract. As this outstanding work is completed, the retention will be reduced each month to a value correspond- ing to the approximate value of the outstanding work items. For this purpose, the estimated value of each work item is listed on the attachment to this letter. Notwithstanding the foregoing, under no circumstances will any retained funds be paid to Brown Boveri prior to final acceptance if there are any legal stop payment notices (verified claim and stop notice) filed with the City alleging that WAECO Power, or any other of Brown Boveri's sub-contractors, has failed to make payment for goods and services obtained in connection with this project. Beginning on the date of provisional acceptance, The City agrees to pay Brown Boveri interest on the outstanding balance of the retention, less amounts represented by stop notices properly filed with The City, at the same interest rate which The City earns on The City's pooled cash. if j a.)?6 o • S WWI Brown ®veriRO N BOVERI IiVERI Page Two This contract modification in no way modifies or replaces the terms and conditions of this contract except as specifically described above. Further, this provisional acceptance does not constitute final acceptance by The City. The project will be considered as finally accepted only upon completion of the outstanding work items to the satisfaction of The City of Redding. Sincerely, BBC BROWN BOVERI, INC. { Robert Tri' coli General Manager Power Station Electric RT:js Attachment Approved: Mayor, City of Redding Date SB4:33:js �, 4/2-A26 • ` , � � tan,, e Brown overiRO B BROWN IIOVERI Attachment WHISKEYTOWN POWER PROJECT Items Necessary for Final Acceptance, Before Authorization of Final Payment Estimated Value for the1purposeof reten- tion of Project funds 1. Final approval copies of Instruction/Operation/ $27,000 Maintenance Manuals (including parts list) 2. As-builts reproducibles of project drawings, 27,000 control and electrical equipment drawings, and FERC exhibits (including parts lists and/or Bills of Material) 3. Coat USBR penstock and manhole 6,000 4. Provide startup test reports 30,000 5. Provide loss/efficiency acceptance test reports 30,000 6. Provide list of spare parts supplied as part of 1,000 the contract 7. Repair cause of oil leak at NDE generator bearing. 3,000 8. Repair cause of water leaks beneath the batteries 5,000 next to the east wall and the southwest inside corner of the building at the 8" stand pipe 9. Install/repair insulation for the cooling water pipes 1,000 on the discharge piping at the generator cooling coils 10. Match the spot paint with the paint on the turbine, 10,000 walls and the turbine stop valve. 11. Clean area, building, and equipment 1,000 12. Provide permanent laminated operating instructions 1,000 for the USBR regulating gates SB4:33:js I�T 42./F6