Loading...
HomeMy WebLinkAboutReso.1988-394 - Approving cooperative agreement no. 02-sha-5-r13.95, 02800-26014g, for hartnell overcrossing RESOLUTION NO. ?8i99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING COOPERATIVE AGREEMENT NO. 02-SHA-5-R13 . 95 , 02800-26014G, FOR THE HARTNELL OVERCROSSING (BRIDGE NO. 6-124) BETWEEN THE CITY OF REDDING AND THE STATE OF CALIFORNIA, ACTING BY AND THROUGH ITS DEPARTMENT OF TRANSPORTATION, AND AUTHORIZING THE MAYOR TO SIGN SAME . WHEREAS , the Hartnell Bridge over I-5 is to be widened, and the project is currently being designed; and WHEREAS , the Redding Redevelopment Agency is funding the project, and the City of Redding will provide construction engineering services; and WHEREAS , Cal-Trans is involved to the extent that the project, in part, encroaches on State Freeway right-of-way, and a Cal-Trans standard bridge is to be selected to facilitate its approval; and WHEREAS , it is necessary for Cal-Trans and the City of Redding to enter into an agreement of understanding of the roles and obligations of each in said project; NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Redding as follows: 1 . That the City Council of the City of Redding hereby approves the above-mentioned Cooperative Agreement No. 02-Sha-5-R13 . 95 , 02800-26014G, a true copy of which is attached hereto and incorporated herein. 00 Op I W 111 110 2 . That the Mayor of the City of Redding is hereby authorized and directed to sign said Cooperative Agreement on behalf of the City Council of the City of Redding, and the City Clerk is hereby authorized and directed to attest the signature of the Mayor and to impress the official seal of the City of Redding on the aforesaid document, when appropriate. I HEREBY CERTIFY that the foregoing Resolution was introduced and read at a regular meeting of the City Council of the City of Redding on the 1st day of November , 1988 , and was duly adopted at said meeting by the following vote: AYES : COUNCIL MEMBERS: Buffum, Carter, Dahl , Fulton, & Johannessen NOES : COUNCIL MEMBERS : None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS : None / K. AgRICE/JOHANNESSEN, Mayor City of Redding ATTEST: ETHEL A. NICHOLS , City Clerk FORM ,'PROVED: RA 'DALL A. HAY , C ty Attorney -2 111 4 02—Sha-5—R13 .95 02800 — 26014G Hartnell Overcrossing (Bridge No. 6- 124 ) District Agreement No . COOPERATIVE AGREEMENT This AGREEMENT entered into on , 19 is between the STATE OF CALIFORNIA, acting by and through its Department of Transportation , referred to herein as STATE , and CITY OF REDDING a body politic and a municipal corporation of the State of California, referred to herein as CITY • 410 RECITALS ( 1 ) STATE and CITY , pursuant to Streets and Highways Code Section 130 , are authorized to enter into a Cooperative Agreement for improvements to State highways within the CITY. (2) CITY desires State highway improvements consisting of structure widening on Route 5 at Hartnell Avenue referred to herein as "PROJECT" , and is willing to fund one hundred ( 100) percent of all capital outlay and staffing costs, including costs of STATE ' s project development review and coordination through completion of PROJECT construction . ( 3) This Agreement supersedes the prior Memorandum of Understanding (MOU) relating to PROJECT and executed by the CITY on February 2, 1988. ( 4 ) Construction of said PROJECT will be the subject of a separate future agreement . ( 5 ) The parties hereto desire to define herein the terms and conditions under which said PROJECT will be developed and designed and under which the STATE is to be reimbursed for review and coordination costs . SECTION I CITY AGREES : ( 1 ) To fund one hundred ( 100 ) percent of all preliminary engineering costs , including, but not limited to, costs for preparation of contract documents and advertising and awarding the PROJECT construction contract , costs of any right of way oversight provided by STATE , and costs of STATE's project development review and coordination through completion of PROJECT construction . ( 2) To have a Project Report ( PR) , Environmental Document (ED) , and detailed Plans , Specifications and Estimate ( PSE) prepared at no cost to STATE and to submit each to STATE for review and approval at appropriate stages of development. Final plans shall be signed by a civil engineer registered in the State of California . ( 3) If requested by STATE, to discontinue the services of any consultant considered to be unqualified on the basis of credentials, professional expertise, failure to perform in accordance with scope of work and/or other pertinent criteria . ( 4 ) To deposit with STATE the sum of $50 , 000 , within twenty (20) days after CITY execution of this Agreement and before • • commencement of project development activities, to cover the estimated total review and coordination costs to be performed by STATE throughout project development and construction , including oversight of right of way activities. CITY further agrees to make additional advance deposits if review and coordination costs are expected to exceed the original deposit. STATE has no obligation to perform any work should costs of STATE effort exceed, at any time, the advance deposit of funds from CITY paid to STATE . ( 5 ) CITY and/or consultants will be available to STATE through completion of construction of PROJECT to discuss problems which may arise during construction or to make design revisions for contract change orders. ( 6) Not to use Federal-Aid funds for design of this project . (7) To make formal application to STATE for necessary encroachment permits authorizing entry onto STATE 's right of way to perform surveying and other investigative activities required for preparation of the PR , ED and/or PS&E . ( 8) To reimburse STATE for traffic control cost associated with this project when required within Interstate 5 right of way. ( 9) To identify and locate all high and low risk under- ground facilities within the project area, and protect or otherwise provide for such utilities, all in accordance with STATE 'S "Manual on High and Low Risk Underground Facilities Within Highway Rights of Way" . ( 10) If any existing public and/or private utilities conflict with the construction of project, CITY will make all necessary arrangements with the owners of such utilities for their protection, relocation, or removal . CITY will inspect the protection, relocation , or removal , and if there are costs of such protection, relocation , or removal which STATE and/or CITY must legally pay, CITY will bear the cost of said protection , relocation, or removal , plus cost of engineering overhead and inspection. If any protection, relocation , or removal of utilities is required, such work will be performed in accordance with STATE policy and procedure for those within STATE ' s right of way and in accordance with CITY policy for those outside STATE ' S right of way. ( 11 ) To furnish evidence to STATE, in a form acceptable to STATE , that arrangements have been made for the protection , relocation , or removal of all conflicting utilities within the STATE 'S right of way and that such work will be completed prior to the award of the contract or as covered in the Special Provisions. This evidence shall include a reference to all required State highway encroachment permits . • • ( 12) To relocate utility facilities within STATE 'S right of way to STATE specifications per STATE' s Encroachment Manual and the Manual on High and Low Risk Underground Facilities Within Highway Rights of Ways. ( 13) To comply with the terms and conditions of the Highway Encroachment Permits, existing California Law including Statutory and Case Law, and all existing property rights when determining liability for utility relocation costs. ( 14) To perform all right of way activities at no cost to STATE in accordance with procedures acceptable to STATE, and in compliance with all applicable State and Federal laws and regulations, subject to STATE oversight , to assure that the completed work is acceptable for incorporation into the State Highway System. ( 15) To utilize the services of a qualified local public agency in all R/W acquisition related matters in accordance with STATE procedures as contained in R/W Procedural Handbook , Vol— ume 9 . If outside right of way consultants are employed , administration of the consultant contract shall be performed by qualified public agency employees . ( 16) To certify legal and physical control of rights of way ready for construction , and that all rights of way were acquired in accordance with applicable State and Federal laws and regula— tions subject to review and concurrence by STATE prior to the advertisement for bids for construction of PROJECT. ( 17) To deliver to STATE legal title to the right of way , free and clear of all encumbrances detrimental to STATE ' S present and future uses not later than the date of acceptance by the STATE of maintenance and operation of the highway facility. ( 18) If additional right of way is required , to acquire all necessary additional right of way that will permit full posses— sion and control of said right of way , and transfer it in fee to STATE, at no cost to STATE, and subject to prior examination and acceptance by STATE of the degree of title to be conveyed to STATE. Full possession and control shall be obtained prior to advertising the PROJECT for construction, in the event title has not passed . SECTION II STATE AGREES: ( 1 ) To provide prompt reviews and approvals as appropriate of submittals by CITY , and to cooperate in timely processing of the PROJECT . 4 • (2) To provide oversight of all right of way activities undertaken by CITY , or its designee , pursuant to this Agreement . STATE oversight shall be performed at CITY cost . ( 3) To issue , upon proper application , an encroachment permit to CITY authorizing entry by CITY staff and consultant ( s) onto STATE ' s right of way to perform survey and other investiga— tive activities required for preparation of the PR , ED and/or PSE. ( 4) To prepare and submit signed itemized invoices quar— terly, in triplicate, with specific details of all review and coordination costs incurred during the period of the invoice. Invoices may include requests for additional advance deposits if review and coordination costs are expected to exceed the original deposit specified in Section I , Article 4 . (5 ) To submit a final report of expenditures within thirty ( 30) days after completion and acceptance of the construction contract for PROJECT. ( 6) To return any CITY funds remaining on deposit with STATE to cover STATE costs within thirty ( 30) days after completion and acceptance of the construction contract for PROJECT and delivery of acceptable title to the rights of way in accordance with Section I , Article 16. SECTION III IT IS MUTUALLY AGREED : ( 1 ) That the costs to be charged CITY for STATE' s review and coordination will include all direct and indirect costs ( functional and administrative overhead assessment ) attributable to such work applied in accordance with STATE 's standard account— ing procedures. ( 2) That this Agreement will continue through the project construction phase to cover possible design review and coordination costs . ( 3) It is understood that a separate Cooperative Agreement will be required to cover responsibilities and reimbursement for the PROJECT construction phase. ( 4 ) It is understood and agreed that neither STATE nor any officer or employee thereof is responsible for any damage or liability occurring by reasons of anything done or omitted to be 110 done by CITY under or in connection with any work, authority or jurisdiction delegated to CITY under this Agreement . It is under- stood and agreed that, pursuant to Government Code Section 895. 4 , CITY shall fully defend , indemnify and save harmless the State of California, all officers and employees from all claims , suits or actions of every name , kind and description brought for or on account of injury ( as defined in Government Code Section 810. 8) occurring by reason of anything done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction delegated to CITY under this Agreement . ( 5 ) It is understood and agreed that neither CITY nor any officer or employee thereof is responsible for any damage or liability occurring by reasons of anything done or omitted to be done by STATE under or in connection with any work, authority or jurisdiction delegated to STATE under this Agreement . It is understood and agreed that , pursuant to Government Code Section 895 . 4 STATE shall defend , indemnify and save harmless the CITY from all claims , suits or actions of every name , kind and description brought for or on account of injury ( as defined in Government Code Section 810 . 8 ) occurring by reason of anything done or omitted to be done by STATE under or in connection with any work , authority or jurisdiction delegated to STATE under this Agreement . ( 6 ) The parties hereto will carry out the PROJECT In accordance with the Scope of Work, attached and made a part of this Agreement , which outlines the specific responsibilities of the parties hereto. The attached Scope of Work may in the future be modified to reflect changes in the responsibilities of the respective parties. Such modifications shall be concurred with by CITY ' s Director of Public Works or other official designated by CITY and STATE ' s Director for District 2 and become a part of this Agreement as a supplement to this Agreement after execution by the respective offices of the parties . ( 7) Prior to award of a construction contract , CITY may terminate the PROJECT and this Agreement in writing, provided the CITY reimburses STATE for all PROJECT costs incurred prior to termination . ( 8) Except as otherwise provided in Article ( 8) above , this Agreement shall terminate upon completion and acceptance of the construction contract for PROJECT or on June 31 , 1991 , which- ever is earlier in time. Any STATE refunds due CITY shall be determined after final accounting of costs . • III I . STATE OF CALIFORNIA CITY OF REDDING Department of Transportation ROBERT K . BEST Director of Transportation By Attest : By (City Clerk) Approved as to form and procedure Fa*. APPROVED Attorney , Department of Transportation CITY LEGAL DE' . Certified as to funds and procedure District Accounting Officer RWK :ch • • 02800 — 26014G Hartnell Overcrossing (Bridge No. 6- 124) This Scope of Work outlines the specific areas of responsibility for various project development activities for the proposed widening of Hartnell Overcrossing from a 2—lane to a 4—lane structure . Widening will be on both sides and use construction methods not requiring falsework . 1 ) CITY will provide the necessary environmental clearance for this project. CITY will perform all studies to document the Categorical Exemption/Categorical Exclusion (CE/CE) determination. STATE will sign the CE/CE deter— mination sheet . If information is obtained which requires the preparation of environmental studies and/or an environmental clearance document , this Agreement will be amended to include completion of these additional tasks by CITY. 2) CITY and STATE concur that the proposal is a Category 5 as defined in STATE ' s Project Development Procedures Manual . 3 ) CITY will submit drafts of environmental technical reports , and of individual sections of the draft environmental documents to STATE, as they are developed , for review and comment. Traffic counts and projections to be used in the various reports shall be supplied by STATE if available , or by the CITY. Existing traffic data shall be furnished by CITY. 4 ) STATE will review, monitor , and approve all project development reports , studies, and plans, and provide all necessary implementation activities through advertising of the project . 5 ) Existing freeway agreement need not be revised. 6) All phases of the project , from inception through construction , whether done by CITY or STATE, will be developed in accordance with all policies, procedures , practices, and standards that STATE would normally follow. 7) Detailed steps in the project development process are appended to this Scope of Work. This appendix is intended as a /uide to STATE and CITY staff. III APPENDIX A: PLANNING PHASE ACTIVITIES RESPONSIBILITY PROJECT ACTIVITY STATE CITY 1 . ENVIRONMENTAL ANALYSIS & DOCUMENT PREPARATION Establish Project Development Team (PDT) X X Approve PDT X Project Category Determination X Prepare Preliminary Environmental Assessment X Identify Preliminary Alternatives and Costs X Prepare and Submit Environmental Studies and Reports X Review and Approve Environmental Studies and Reports X Prepare and Submit Draft Environmental Document (DED) X Review DED in District X 2 . PROJECT STUDY REPORT Prepare Existing Traffic Analysis X Prepare Future Traffic Volumes for Alternatives X Prepare Layouts and Estimates for Alternatives X Prepare Operational Analysis for Alternatives X Prepare Project Study Report for Concept Approval X Review and Approve Project Geometries and Operational Analysis Concepts X Prepare Cooperative Agreement X Request 0—Phase EA X 3. PROJECT APPROVAL Certify ED in Accordance to City ' s Procedures X Prepare Draft Project Report ( DPR ) X Finalize and Submit Project Report with Certified ED for Approval X Approve Project Report X • • APPENDIX B : DESIGN PHASE ACTIVITIES RESPONSIBILITY PROJECT ACTIVITY STATE CITY 1 . PRELIMINARY COORDINATION Request 1 — Phase EA X Field Review of Site X X Provide Geometries X Approve Geometries X Obtain Surveys & Aerial mapping X Obtain Copies of Assessor Maps and Other R/W Maps X Obtain Copies of As—Builts X Send Approved Geometries to Local Agencies for Review X Revise Approved Geometries if required X Approve Final Geometries X Determine Need for Permits from Other Agencies X X Request Permits X Initial Hydraulics Discussion with District Staff X Initial Electrical Design Discussion with District Staff X Initial Traffic & Signing Discussion with District Staff X Initial Landscape Design Discussion with District Staff X Plan Sheet Format Discussion X X 2. ENGINEERING STUDIES AND REPORTS Prepare & Submit Materials Report ' & Typical Section X Review and Approve Materials Report & Typical Section X Prepare & Submit Landscaping Recommendation X Review & Approve Landscaping Recommendation X Prepare & Submit Hydraulic Design Studies X Review & Approve Hydraulic Design Studies X Prepare & Submit Bridge General Plan & Structure Type Section X Review & Approve Bridge General Plan & Structure Type X 3 . R/W ACQUISITION & UTILITIES Request Utility Verification X Request Preliminary Utility Relocation from Utilities X • • • RESPONSIBILITY PROJECT ACTIVITY STATE CITY Prepare R/W Requirements X Prepare R/W and Utility Relocation Cost Estimates X Submit R/W Requirements & Utility Relocation Plans for Review X Review and Comment on R/W Requirements X Longitudinal Encroachment Review X X Longitudinal Encroachment Application X Approve Longitudinal Encroachment Application X Request Final Utility Relocation Plans X Check Utility Relocation Plans X Submit Utility Relocation Plans for Approval X Approve Utility Relocation Plans X Submit Final R/W Requirements for Review & Approval X Fence and Excess Land Review X R/W Layout Review X Approve R/W Requirements X Obtain Title Reports X Complete Appraisals X Review and Approve Appraisals for Setting Just Compensation X Prepare Acquisition Documents X Acquire R/W X — Open Escrows and Make Payments X — Obtain Resolution of Necessity X — Perform Eminent Domain Proceedings X Provide Displacee Relocation Services X Prepare Relocation Payment Valuations X Provide Displacee Relocation Payments X Perform Property Management Activities X Perform R/W Clearance Activities X Prepare and Submit Certification of R/W X Review and Approve Certification of R/W X Transfer R/W to STATE — Approve and Record Title Transfer Documents X Prepare R/W Record Maps X 4 . PREPARATION OF PLANS , SPECIFICATIONS AND ESTIMATES Prepare and Submit Preliminary Stage Construction Plans X Review Preliminary Stage Construction Plans X Calculate and Plot Geometries X Cross Sections & Earthwork Quantities Calculation X Prepare and Submit Preliminary Estimate X , • • RESPONSIBILITY PROJECT ACTIVITY STATE CITY Local Review of Preliminary Drainage Plans and Sanitary Sewer and Adjustment Details X Prepare & Submit Preliminary Drainage Plans X Review Preliminary Drainage Plans X Prepare Traffic Striping and Roadside Delineation Plans and Submit for Review X Review Traffic Striping and Roadside Delineation Plans X Prepare & Submit Landscaping and/or Erosion Control Plans Review Landscaping and/or Erosion Control Plans X Prepare & Submit Preliminary Electrical Plans X Review Preliminary Electrical Plans X Prepare & Submit Preliminary Signing Plans X Review Preliminary Signing Plans X Quantity Calculations X Safety Review X X Prepare Specifications X Prepare & Submit Checked Structure Plans X Review & Approve Checked Structure Plans X Prepare Final Contract Plans X Prepare Lane Closure Requirements X Review and Approve Lane Closure Requirements X Prepare & Submit Striping Plan X Review & Approve Striping Plan X Prepare Final Estimate X Prepare & Submit Draft PS&E X Review Draft PS&E X Finalize & Submit PS&E to District X