RESOLUTION NO. Ur 9~ n .
II
iA RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
L APPROVING THE LETTER AGREEMENT DATED MARCH 7 , 1989 , BETWEEN
1 THE CITY OF REDDING AND THE COUNTY OF SHASTA COVERING THE
HILLTOP DRIVE PROJECT, AND AUTHORIZING THE MAYOR TO SIGN THE
i NECESSARY DOCUMENTATION.
N
BE IT RESOLVED by the City Council of the City of Redding as
follows :
i!
iI 1 . That the City Council hereby approves the Letter
Agreement dated March 7 , 1989 , between the City of Redding and
the County of Shasta covering the relocation of City water and
' sewer utilities resulting from Shasta County' s relocation and
realignment of Hilltop Drive at Lake Boulevard, as well as the
signalization of the Lake Boulevard/Hilltop Drive intersection.
A true copy of said letter agreement is attached hereto and
i incorporated herein by reference.
i'
i; 2 . That the Mayor of the City of Redding is hereby
I ,
i authorized and directed to sign the necessary contractual items,
s
I including said Letter Agreement, on behalf of the City of
Redding; and the City Clerk is hereby authorized and directed to
attest the signature of the Mayor and to impress the official
seal of the City of Redding on the necessary documentation, when
appropriate.
I HEREBY CERTIFY that the foregoing Resolution was
introduced and read at a regular meeting of the City Council of
k
1 �b
i °'4
L
• •
•
the City of Redding on the 21st day of March , 1989 , and was
!.,
duly adopted at said meeting by the following vote:
AYES: COUNCIL MEMBERS : Buffum, Carter, Dahl , Fulton, and Johannessen
NOES: COUNCIL MEMBERS : None
ABSENT: COUNCIL MEMBERS: None
ABSTAIN: COUNCIL MEMBERS : None
f1
K. MAURICE JOHANNESSEN, Mayor
City of Redding
ATTEST:(re: e 74
ETHEL A. NICHOLS, City Clerk
Oi)•PROVED:
DALL A. HAYS, Ci Attorney
ip
-2-
�d t . DEPAR RENT OF PUBLIC WORS
COUNTY OF SHASTA 4'44(414
/
'_ ��'..
414,9 rF
%-._" County Office Building ARD •'%. CURRY
^i
r34.,„„vr4p,.-. 1855 Placer Street ` ECTOR
IV
Redding, California 96001 oR
` 225 5661
March 7, 1989
, i
Mr . Robert Galusha
Public Works Director
H1 City of Redding
II ,
ill 760 Parkview Avenue
' I Redding, CA 96001
, Subject: Hilltop Drive Project
Dear Bob:
The intent of this letter is to constitute an agreement
between the City of Redding and the County of Shasta when
II it is signed by both parties .
H The County is realigning Hilltop Drive and will require
the relocation of part of the City' s utilities, and the
City has asked that there be a betterment of their
utilities . Therefore, it is agreed that the County will
I pay for its share of the sewer and water line relocation
ii; as shown on Exhibit "A, " and the City will pay for its
1;, share of the relocation also as shown on Exhibit "A. "
The County shall administer the construction contract and
the City shall inspect the installation of the utilities
•
at the time they are installed. The City will reimburse
the County for the actual cost of the work done based
upon the completed project costs in the County' s con-
tract . The payment shall be made to the County within
60 days of the County ' s billing the City.
H
I,1' The City has asked that approximately 540 feet of Hilltop
IS Drive beyond the scope of this project and within the 1
it City be overlaid. The County agrees to include this
within its project, estimated at 220 tons, and the City
1 agrees to pay for the work based on the actual bid price
per ton. The estimated cost is $9 ,000.
'. i
The County desires for the City to include the signal
system for the intersection of Hilltop Drive and Lake
� Blvd . within their upcoming signal contract . The esti-
' mated cost of this work is $120, 000 . The City agrees to
i
II
ill
BOARD OF SUPERVISORS
John Reit Bob Bosworth Francie Sullivan Molly Wilson Roy F. "Pete" Peters
I -
Robert Galusha
March 7, 1989
Page Two
design, bid and supervise the construction of the signal
contract, and the County agrees to pay to the City within
30 days of receipt of bids the amount bid by the contrac-
tor fo the installation of the signals and to pay the
bala e of the costs within 60 days of the City billing
upo c'mpletion of the project .
Very truly, 7,ritrt, '
1 COUNTY OF SHASTA
' I
i, `ri tAr
char.' ; .JC r director
John Reit , Chairman
RWC/mlc :oard of Supervisors,
State of California
i
Approved as to form:
j CITY OF REDDING
' 11
Karen Keating Jahr
County Counsel ' s Office
FON
PPR VED
id 4CITY LEGAL DEPT.
L I
� 1
•
- .
•
EXHIBIT "A"
SEWER LINE RELOCATION
County Share.
1. 395 LF 6" Sewer pipe @ $35 .00 $13,825
2. 1 EA 4 ' Std. manhole @ $2,000.00 2,000
3. 6 EA Service reconnects @ $250.00 1,500
4 . 1 EA Tie in old 6" line @ $500 .00 500
5. 1 EA Service connection to existing manhole
and raise manhole 1,000
1 . 6. Contingency 1,875
Total County Estimated Cost $20,700
City Share
, I I
1. 260 LF 6" Sewer pipe @ $35 . 00 $ 9,100
2 . 1 EA 4 ' Std. manhole @ $2,000 .00 2,000
3. Contingency 1,900
Total City Estimated Cost $13,000
WATERLINE RELOCATION
County Share
1. 400 LF 6" water pipe @ $25 . 00 $10,000
2. 66 LF 8" water pipe @ $35 .00 2,310
3. 4 EA 6" gate valves @ $300. 00 1,200
4 . 1 EA 12" x 8" tapping sleeve and
valve @ $600. 00 600
5 . 5 EA Relocate water services @ $300.00 1,500
6. 1 EA Concrete vault @ $1, 000. 00 1,000
7 . 1 EA Relocate fire hydrant @ $1, 000 . 00 1,000
li 8. Contingency 1,790
Total County Estimated Cost $19,400
City Share
1 . 740 LF 6" Waterline @ $25. 00 $18,500
2 . 3 EA 6" Gate valves @ $300 . 00 900
3. 1 EA 6" Std. fire hydrant @ $1 ,700. 00 1,700
II
4 . Contingency 2,900
Total City Estimated Cost $24,000
1
II