Loading...
HomeMy WebLinkAboutReso. 1989-098 - Approving the letter agreement dated march 7, 1989 _4' III 1 N ► i � RESOLUTION NO. Ur 9~ n . II iA RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING L APPROVING THE LETTER AGREEMENT DATED MARCH 7 , 1989 , BETWEEN 1 THE CITY OF REDDING AND THE COUNTY OF SHASTA COVERING THE HILLTOP DRIVE PROJECT, AND AUTHORIZING THE MAYOR TO SIGN THE i NECESSARY DOCUMENTATION. N BE IT RESOLVED by the City Council of the City of Redding as follows : i! iI 1 . That the City Council hereby approves the Letter Agreement dated March 7 , 1989 , between the City of Redding and the County of Shasta covering the relocation of City water and ' sewer utilities resulting from Shasta County' s relocation and realignment of Hilltop Drive at Lake Boulevard, as well as the signalization of the Lake Boulevard/Hilltop Drive intersection. A true copy of said letter agreement is attached hereto and i incorporated herein by reference. i' i; 2 . That the Mayor of the City of Redding is hereby I , i authorized and directed to sign the necessary contractual items, s I including said Letter Agreement, on behalf of the City of Redding; and the City Clerk is hereby authorized and directed to attest the signature of the Mayor and to impress the official seal of the City of Redding on the necessary documentation, when appropriate. I HEREBY CERTIFY that the foregoing Resolution was introduced and read at a regular meeting of the City Council of k 1 �b i °'4 L • • • the City of Redding on the 21st day of March , 1989 , and was !., duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS : Buffum, Carter, Dahl , Fulton, and Johannessen NOES: COUNCIL MEMBERS : None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS : None f1 K. MAURICE JOHANNESSEN, Mayor City of Redding ATTEST:(re: e 74 ETHEL A. NICHOLS, City Clerk Oi)•PROVED: DALL A. HAYS, Ci Attorney ip -2- �d t . DEPAR RENT OF PUBLIC WORS COUNTY OF SHASTA 4'44(414 / '_ ��'.. 414,9 rF %-._" County Office Building ARD •'%. CURRY ^i r34.,„„vr4p,.-. 1855 Placer Street ` ECTOR IV Redding, California 96001 oR ` 225 5661 March 7, 1989 , i Mr . Robert Galusha Public Works Director H1 City of Redding II , ill 760 Parkview Avenue ' I Redding, CA 96001 , Subject: Hilltop Drive Project Dear Bob: The intent of this letter is to constitute an agreement between the City of Redding and the County of Shasta when II it is signed by both parties . H The County is realigning Hilltop Drive and will require the relocation of part of the City' s utilities, and the City has asked that there be a betterment of their utilities . Therefore, it is agreed that the County will I pay for its share of the sewer and water line relocation ii; as shown on Exhibit "A, " and the City will pay for its 1;, share of the relocation also as shown on Exhibit "A. " The County shall administer the construction contract and the City shall inspect the installation of the utilities • at the time they are installed. The City will reimburse the County for the actual cost of the work done based upon the completed project costs in the County' s con- tract . The payment shall be made to the County within 60 days of the County ' s billing the City. H I,1' The City has asked that approximately 540 feet of Hilltop IS Drive beyond the scope of this project and within the 1 it City be overlaid. The County agrees to include this within its project, estimated at 220 tons, and the City 1 agrees to pay for the work based on the actual bid price per ton. The estimated cost is $9 ,000. '. i The County desires for the City to include the signal system for the intersection of Hilltop Drive and Lake � Blvd . within their upcoming signal contract . The esti- ' mated cost of this work is $120, 000 . The City agrees to i II ill BOARD OF SUPERVISORS John Reit Bob Bosworth Francie Sullivan Molly Wilson Roy F. "Pete" Peters I - Robert Galusha March 7, 1989 Page Two design, bid and supervise the construction of the signal contract, and the County agrees to pay to the City within 30 days of receipt of bids the amount bid by the contrac- tor fo the installation of the signals and to pay the bala e of the costs within 60 days of the City billing upo c'mpletion of the project . Very truly, 7,ritrt, ' 1 COUNTY OF SHASTA ' I i, `ri tAr char.' ; .JC r director John Reit , Chairman RWC/mlc :oard of Supervisors, State of California i Approved as to form: j CITY OF REDDING ' 11 Karen Keating Jahr County Counsel ' s Office FON PPR VED id 4CITY LEGAL DEPT. L I � 1 • - . • EXHIBIT "A" SEWER LINE RELOCATION County Share. 1. 395 LF 6" Sewer pipe @ $35 .00 $13,825 2. 1 EA 4 ' Std. manhole @ $2,000.00 2,000 3. 6 EA Service reconnects @ $250.00 1,500 4 . 1 EA Tie in old 6" line @ $500 .00 500 5. 1 EA Service connection to existing manhole and raise manhole 1,000 1 . 6. Contingency 1,875 Total County Estimated Cost $20,700 City Share , I I 1. 260 LF 6" Sewer pipe @ $35 . 00 $ 9,100 2 . 1 EA 4 ' Std. manhole @ $2,000 .00 2,000 3. Contingency 1,900 Total City Estimated Cost $13,000 WATERLINE RELOCATION County Share 1. 400 LF 6" water pipe @ $25 . 00 $10,000 2. 66 LF 8" water pipe @ $35 .00 2,310 3. 4 EA 6" gate valves @ $300. 00 1,200 4 . 1 EA 12" x 8" tapping sleeve and valve @ $600. 00 600 5 . 5 EA Relocate water services @ $300.00 1,500 6. 1 EA Concrete vault @ $1, 000. 00 1,000 7 . 1 EA Relocate fire hydrant @ $1, 000 . 00 1,000 li 8. Contingency 1,790 Total County Estimated Cost $19,400 City Share 1 . 740 LF 6" Waterline @ $25. 00 $18,500 2 . 3 EA 6" Gate valves @ $300 . 00 900 3. 1 EA 6" Std. fire hydrant @ $1 ,700. 00 1,700 II 4 . Contingency 2,900 Total City Estimated Cost $24,000 1 II