Loading...
HomeMy WebLinkAboutReso 1990-221 - Authorizing the city manager to sign the following in connection with performing additional tasks o • r RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING AND AUTHORIZING THE CITY MANAGER TO SIGN THE FOLLOWING IN CONNECTION WITH PERFORMING ADDITIONAL TASKS FOR THE BENTON LANDFILL CLOSURE PLAN: "AUTHORIZATION AND CONTRACT FOR PROFESSIONAL SERVICES, " TOGETHER WITH CONTRACT MODIFICATION (CHANGE ORDER) 004 , BETWEEN THE CITY OF REDDING AND LAWRENCE & ASSOCIATES (PROJECT NO. C90 .04 . 09 ; CONTRACT NO. C-2457) , IN AN ADDITIONAL AMOUNT NOT TO EXCEED $28 ,500 .00 , TO PROVIDE LABOR, MATERIALS , AND EQUIPMENT TO DRILL EIGHT OBSERVATION WELLS IN LINDEN CANYON, CONDUCT ACQUIFER TESTS , SAMPLE WELLS, PERFORM LABORATORY CHEMICAL ANALYSES , INSTALL DEDICATED PUMPS , AND PROVIDED WRITTEN REPORT. IT IS HEREBY RESOLVED by the City Council of the City of Redding as follows : 1 . That the City Council of the City of Redding hereby approves the above-mentioned Authorization and Contract for Professional Services , together with Contract Modification (Change Order) 004 , between the City of Redding and Lawrence & I Associates, in an . additional amount not to exceed $28 ,500 .00 , true cppies of which are attached hereto and incorporated herein by reference. 2 . That the City Manager of the City of Redding is hereby authorized and directed to sign said documentation on behalf of the City Council of the City of Redding; and the City Clerk is I .. ! ' hereby authorized and directed to attest the signature of the • ('v p i 11 City Manager and to impress the official seal of the City of Redding. I HEREBY CERTIFY that the foregoing Resolution was introduced and read at a regular meeting of the City Council of the City of Redding on the 15th day of May , 1990 , and was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: Arness, Dahl , Fulton, Moss, Buffum NOES: COUNCIL MEMBERS : None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS : None C2Zf;j /7 / NCY -S,FFUM, 01/ or City bit Redding ATTEST: cY:a.ii a. e..iree.- ETHEL A. NICHOLS, City Clerk FORM A PROVED: RANDALL A. HAYS , ity Attorney -2- I, s i 'ar GMT 04 redding CONTRACT MODIFICATION (CHANGE ORDER) CONTRACT MODIFICATION NO. 004 DATE May 8, 1990 PROJECT NAME Benton Landfill Preliminary Closure PROJECT NO C89 . 03 . 09 Ot)sgrvatior} Wells Proposal JOB NO. C-2457 Lawrence & Associates CONTRACTOR BID SCH.N0. 2001 Market Street, Room 523 Redding , CA 96001 1 THE FOLLOWING MODIFICATIONS TO THE CONTRACT ARE HEREBY ORDERED: (USE ADDITIONAL PAGES IF REQUIRED) ' i Provide labor, materials , and equipment to drill 8 observation wells in Linden Canyon, conduct aquifer testsc sample wells, perform laboratory chemical analyses , install dedicated pumps , and provide written report, all as detailed in the Proposal for Services , Attachment A II CONTRACT AMOUNT CONTRACT TIME (WORKING/CALENDAR)DAYS ORIGINAL CONTRACT AMOUNT $ 48 , 731 . 31 ORIGINAL CONTRACT TIME DAYS PREVIOUS CHANGE ORDERS(ADD/DEDUCT) $ 29.c 200 . 00 PREVIOUS CHANGE ORDERS(ADD/DEDUCT) DAYS THIS CHANGE ORDER (ADD/DEDUCT) $ 28 , 500 . 00 THIS CHANGE ORDER(ADD/DEDUCT) DAYS REVISED CONTRACT AMOUNT $ 106 , 431 . 31 REVISED CONTRACT TIME DAYS • THE REVISED CONTRACT COMPLETION DATE IS: No Change 19 Ii OWNER CONTRACTOR ENGINEER City of Redding Lawrence & Associates By By By Date Dote Dote DPW-28 (1-81) 'I •P 41)• • LAWRENCE & ASSOCIATES PLEASE SIGN AND RETURN Engineering Geologists • Ground-water Hydrologists 2001 MARKET ST., RM. 523 IREDDING, CALIFORNIA 96001 • j TELEPHONE(916)244-9703 DAVID A. LAWRENCE,C.E.G.618 AUTHORIZATION AND CONTRACT FOR PROFESSIONAL SERVICES Date April 26, 1990 Project Number C90. 04. 09 Project Name City of Redding - Linden Canyon Observation Wells Client City of Redding; attn: Robert Kohn 225-4090 760 Parkview Avenue, Redding, CA 96001 Client hereby requests and authorizes Lawrence & Associates to perform the following services: Provide labor, materials, and equipment to drill 8 observation wells in Linden canyon, conduct aquifer tests, sample wells, perform laboratory chemical analyses, install dedicated pumps, and provide written report, all as detailed in the Proposal for ' f Services, Attachment A. II 1 , Compensation to be on the basis of: Time and expense in accordance with the Cost Estimate, as shown ! i on Attachment A, and the Fee Schedule, Attachment B. Estimated cost of work $28,500. I This authorization subject to PROVISIONS stated on the back of this contract I I Approved for CLIENT Accepted for LAWRENCE & ASSOCIATES P By By ./)4uuc1'ZPs4,_1J Title Title Address Date 4 2‘ /991 , I Date III ! il I I i1 • PROYISim 1. AUTHORiZATION TO PROCEED: Signing this form shall be construed as authorization by Client for Lawrence t Associates to proceed with the work unless otherwise provided herein. 2. piRECT EXPENSES: Lawrence i Associates' direct expenses shall be those costs • incurred on or directly for the Client's Project, including but not limited to, necessary transportation coats, including mileage, meals and lodging, laboratory tests and analyses, computer services, telephone, printing and binding charges. Reimbursement for these expenses shall be on the basis of the attached Schedule of Fees. Statements for services are due five days after being mailed to the Client. •j1 3. OUTSIDE TSIDE SERYICES: When technical and professional services and subcontracted labor and equipment are furnished by an outside source, reimbursement for these expenses shall be on the basis of the attached Schedule of Fees. Lawrence i Associates may require the Client to contract for, and pay for, these services directly. 4. PROFESSIONAL STANDARDS: Lawrence i Associates shall be responsible to the level of competency presently maintained by other practicing professional engineers In the same type of work in Client's community, for the professional and technical soundness, accuracy and adequacy of all designs, drawings, specifications and other work and materials furnished under this Authorization. Lawrence i Associates and/or David A. Lawrence sake no other warranty, express or implied. S. TERMINATION: Either Client or Lawrence i Associates say terminate this Authorization by giving 30 days' written notice to the other party. In such event, Client shall forthwith pay Lawrence i Associates in full for all work previously authorized and performed prior to the effective date of termination. If no notice of termination is given, relationships and obligations created by this Authorization shall be terminated upon completion of all applicable requirements of this Authorization, except for the provisions of paragraphs 4, 6, 7 and 8, which shall continue in effect as provided by law. 6. ARBITRATION: All claims, disputes and other matters in question arising out of, or ' + relating to, the work performed hereunder, this Authorization, or the breach thereof, shall be '. J decided by arbitration in accordance with the rules of the American Arbitration Association then obtaining. Either Client or Lawrence i Associates may initiate a request for such arbitration. No arbitration arising out of, or relating to, this Authorization may include, by consolidation, joinder or In any other manner, any additional party not a party to this Authorization unless agreed to in writing by both parties. 7. HOLD HARMLESS: Client agrees at all times to defend, indemnify, hold harmless and provide all legal defense and related services to David A. Lawrence, inc., Lawrence i Associates and/or David A. Lawrence (hereinafter collectively "'Lawrence"), their officers, associates, agents and/or employees for any and all claims, expenses, demands, causes of action, liability, loss or injury regardless of their nature or character in any manner whatsoever arising out of (1) any third person's use or reliance on the work performed under this Agreement; (2) any alleged or proven act or omission of Lawrence; or (3) any litigation or arbitration, or the like, regarding the work performed under this Agreement involving third persons not parties to this Agreement. 8. IITiGATION: Liabilityfor damages g proximately caused by David A. Lawrence, Inc., Lawrence i Associates and/or David A. Lawrence, or their agents, officers or employees shall be limited to cancellation of the sums due and owing or recovery of the sums already paid to Lawrence i Associates by Client. in the event the Client makes a claim against David A. Lawrence, inc., Lawrence i Associates and/or David A. Lawrence, at law or otherwise, for any alleged error, omission or other act arising out of performance of our professional services, and the Client falls to prove such claim, then the Client shalt pay all costs incurred by Lawrence A Associates and/or David A. Lawrence In defending itself against the claim. . f: 16 • • Mr. Robert Kohn Attachment A . i City of Redding Page 1 of 6 ; ,, April 26, 1990 , ! Proposal for Services I ; General ' I This proposal covers the work required to install eight monitoring wells between the base of the Benton landfill down , I Linden Canyon to West Street, as shown on the attached figure. The wells would be used to determine water quality of the iI. ' ' ground-water outflow from the landfill, and to determine aquifer i , I ' i characteristics for estimating seepage flow rates and/or for designing extraction wells. Two of the wells will be 4-inch cased wells for conducting aquifer tests on the upper and lower zones of the aquifer. These H wells will also be used to selectively monitor the water quality from the top of the zone to the bottom at 50 feet. The remaining wells will be 2-inch cased wells. Two wells will be located adjacent to the 4-inch cased wells and will be used for observation wells during the aquifer test. The remaining i ! four wells will be used for sampling the upper and lower zones at the mid-reach of the canyon and at the end of the canyon near West Street. i ' All wells will be installed under criteria set forth in Subchapter 15, Title 23 of the California Administrative Code. Dedicated submersible pumps will be installed in the 4-inch cased 1 , 1 wells, and dedicated hand-operated Brainard-Kilman pumps will be installed in the deeper of the two mid-canyon and end-canyon wells. The hand-operated pumps have been chosen because they will fit inside 2-inch casing, and the 2-inch cased wells can be installed for less cost than the 4-inch cased wells. is ; I I I ., 110 Mr. Robert Kohn Attachment A City of Redding Page 2 of 6 April 26, 1990 1i Work Items 1. Drill and complete two 4-inch cased wells, one to 50 feet and one to 25 feet: OB-7 - 50-ft deep, 3 screened intervals, landfill-toe sampling well and aquifer-test well OB-8 - 25-ft deep, 2 screened intervals, landfill-toe it sampling well and aquifer-test well ill 2 . Drill and complete six 2-inch cased wells, three to 25 feet and three to 50 feet: . j OB-9 - 50-ft deep, to be used as observation well for aquifer test conducted on OB-7 OB-10 - 25-ft deep, to be used as an observation well for aquifer test conducted on OB-8 OB-11 - 50-ft deep, mid-canyon deep sampling well 'I OB-12 - 25-ft deep, mid-canyon shallow sampling well i OB-13 - 50-ft deep, end-of-canyon deep sampling well OB-14 - 25-ft deep, end-of-canyon shallow sampling well li 3 . Survey reference point elevations of all wells relative to Observation Well 5. 11 ! 4 . Conduct constant-discharge aquifer tests on the two 4-inch cased wells. 5. Analyze aquifer-test data for transmissivity and storage coefficients. 6. Sample all wells for field analyses, and collect samples from OB-7, -8, -11, and -13 for analysis by Curtis Tompkins Laboratory for the following constituents: General mineral (major cations and anions) a Iron Manganese i Silica Total dissolved solids � Y. 1' Mr. Robert Kohn Attachment A City of Redding Page 3 of 6 April 26, 1990 7. Conduct field analyses on all wells for EC, pH, and temperature. 8. Furnish and install dedicated submersible pumps in the two 4-inch cased wells. 9. Furnish and install dedicated hand-operated Brainard-Kilman pumps in the two deep 2-inch cased wells OB-11 and OB-13 . 10. Furnish and install locking steel risers on all eight monitoring wells. 11. Provide written report covering drilling, logging, sampling, chemical analyses, aquifer-test data, water levels, findings, and conclusions. II li { • • .1' Mr. Robert Kohn Attachment A City of Redding Page 4 of 6 April 26, 1990 Cost Estimate LABOR Item Unit Qty $/unit Subtotal File plans/specs for drill permits Hr 6. 00 55. 00 330. 00 j Materials acquisition Hr 4 . 00 35. 00 140. 00 Log holes/completion inspection Hr 60. 00 55. 00 3300. 00 Survey reference-point elevations Hr 4. 00 55. 00 220. 00 Hr 4 . 00 35. 00 140. 00 Complete well-head seals and { install locking risers Hr 16. 00 35. 00 560. 00 Develop wells Hr 32. 00 35. 00 1120. 00 Sample wells (quality/water I levels) conduct field chemistry of EC, pH, and temperature Hr 18. 00 55. 00 990. 00 � I 2.00 35. 00 70. 00 Conduct aquifer tests (2 wells) Hr 16. 00 55. 00 880. 00 Hr 6. 00 35.00 210. 00 Analyze aquifer-test data Hr 8.00 55. 00 440. 00 i Prepare report Hr 32 . 00 55. 00 1760. 00 1111 Technical assistance field work Hr 8. 00 70. 00 560. 00 Review and editing of report Hr 4. 00 70. 00 280. 00 Subtotal labor 11000. 00 I 1 II DRILLING i Item Unit Qty $/unit Subtotal ii 11 CME-55 drilling rig w/ 2-man crew I � Mobilization Hr 2 . 00 135. 00 270. 00 l0-inch augers Hr 10. 00 150.00 1500. 00 I S-inch augers Hr 40.00 135. 00 5400. 00 ! I Mud/air rotary Hr 10. 00 135. 00 1350. 00 IIS Subtotal drilling 8520. 00 I I . I i III III kMr. Robert Kohn Attachment A City of Redding Page 5 of 6 , April 26, 1990 H MATERIALS j % Item Unit Qty $/unit Subtotal I 10-in steel locking riser Ea 2 . 00 225. 00 450. 00 1 8-in steel locking riser Ea 6. 00 75. 00 450. 00 2-inch PVC blank casing, sch 40 Ft 135. 00 2. 55 344 . 25 2-inch PVC screen, sch 40, 20 slot Ft 90. 00 3 . 65 328. 50 4-inch PVC blank casing, sch 40 Ft 55. 00 6.47 355.85 4-inch PVC screen, sch 40, 20 slot Ft 25. 00 14 .70 367 .50 2-inch PVC end cap Ea 6. 00 2. 00 12 . 00 4-inch PVC end cap Ea 2 . 00 2 . 00 4 . 00 ' I Lonestar #3 sand Bag 51. 00 6.50 331.50 90-lb bag concrete Ea 124. 00 4.50 558 . 00 5-gal pail bentonite Pail 4 . 00 52 .50 210. 00 3411. 60 ' I 6-1/4% Sales tax 213 .23 it Subtotal materials 3624 .83 ' 1 OUTSIDE SERVICES/EXPENSES ' I. Item Unit Qty $/unit Subtotal i ' ' Air compressor rental Day 3 . 00 55. 00 165. 00 LI Generator rental Day 2. 00 25.00 50. 00 i. Chemical analyses ; j General mineral Ea 4 . 00 180. 00 720. 00 ' I Iron and manganese Ea 4 . 00 30. 00 120. 00 H Total dissolved solids Ea 4 . 00 30. 00 120. 00 HISilica Ea 4 . 00 15. 00 60. 00 , . Shasta Cty drilling permits Ea 8. 00 120. 00 960. 00 i 2195. 00 15% handling charge 329 . 25 6 H Subtotal outside expenses 2524 . 25 1 u 1I i 1 • 1 . Mr. Robert Kohn Attachment A City of Redding Page 6 of 6 April 26, 1990 INHOUSE SERVICES EXPENSES Item Unit Qty $/unit Subtotal Mileage Mi 100. 00 .25 25. 00 Data logger rental Ea 2 . 00 100. 00 200. 00 Subtotal inhouse expenses 225. 00 ii DEDICATED PUMPS Item Unit Qty $/unit Subtotal Furnish and install dedicated submersible pumps in 4-in wells Ea 2 . 00 1100. 00 2200. 00 Furnish and install dedicated hand-operated Brainard-Kilman pumps in two 2-inch wells Ea 2 . 00 426. 00 852 . 00 Subtotal dedicated pumps 3052 . 00 COST SUMMARY Labor 11000. 00 Drilling 8520. 00 Materials 3624 . 83 Outside services/expenses 2524 . 25 Inhouse expenses 225. 00 Dedicated pumps 3052. 00 Subtotal 25894 . 08 - I� Contingency, 10% 2589.41 Total project cost $28,483 . 48 ip l 11 D . . .. . . JOS RDDCLOS INDEN CANYON WELLS C90. .09 LAWRENCE & ASSOCIATES EET SHNO. OF 2001 Market St., Rm. 523 D.A.L. I CALCULATED BY DATE REDDING, CA 96001 (916) 244-9703 CHECKED BY DATE APR 26, 1990 SCALE APPROX 1" = 550' . : • • . , . : : . : • . ' . . • . . .. ... ... .• .. . . . . . . .•• ----- -- . • . . . . . . . . , , . 1 ..... .....0 , ,;.......- •v•,•7:0- -ar....sii_ '.-111-• "" - '• 2 -.,....z,-;:,.;-:- --- • -4- • : 1 A •----".......„,.. * \ \ .. • . . 41,7411 • \ -"..ba- -744 • Z__-"z _ 71.:::41----- I I •\ •\ a) * •.1 . allkilr,* -.., ---:::,' - ....!.! •---- -;17-1-.7::- i H , , .. , •/ ..\ • Nperli) i N. \ ' ':::-.-- --.-Wc---'-.7-7. . , ,I . -_-_-_li _ .............„:„...---' ) ‘..,.• ______-• - J....„-- •// a 4././ • • \. 41,///_20 I 1 a ,, \ z; .-,. ...w:.-EZ-.-_- i ! ; . ..„-----,,,.," ---_____.-• !.., ,,i 40 •/,- \ • • \ //- - ! a , . ,..__....:-=-----.47:g; , -... 11 -eft:- '- ..-----r.--••• •.;•...•••7- -- - . ! • !-‘. ------ ,,,____„ - --a-/i * *// •.\\,,,,• )?, ----- , ------ , ,--• . .,....--." •-4"4://„...--1_,,-..-.-- ,, • f:: --=---- ;;Fr-•-::-.:i - --... - - .--;" . • i ..... ..,..-5;, . \ . ..a, j , - _......-............... .........--.S4,12-7:„:: ; — -............a* -....., •••••••• ........ ...... ........ ......... , 1 , , ..., tir -, ,- , i .,,. t, • . .....------ I . , i/ ''''.........." — • • _....;.y..0.:: ::;...7-k-.. , illi 41 -4L-a&-.tsz-u.47-..-- • '-'------•----•:.-.------ „...... y( . -voila' .arls"I r• $0\ IP?- --- --- --.......--z.:-...--sH 1 , i 14% \• .. . ....------ „,"° - ;1 t.a.,- , ::-.,--- ._,_ ------- -- • t \•ss- ..."..1 , 1 ......, -......, ------ ,----.."' 1 ..--.-----;:.*----4.'V. !i i roe......0 ........ 1 Isi ---- :, %1 ' • • i I :::....:.1-..,----i-.1,Z: 1 d C----"-- .. ."."' ., PROPOSED WELLS OB-13 AND OB-14 -7,--- ..,..•: ri ...) • .(\ r f 11....,.--- ,,----..-- --- ••A:4•:•:•! '• :_---• - , •••...%!!.:::*''•. , 1• -- \ \ \ \ EXISTING VVELLS OB-4 AND 06-5 .------ '----. --....----' .-:-:-:-:•:•:-: ?..;:-.•:;,, - . .,, '••••... --- -••••,..„---,____---- .:,.. .......„- •-•-•-•••• --:::::::::::::-... ,•.,.... • , i •---::::::4:•Atiii:: : ..... .,.. ,....,......‘..... ,,-........ ..........:.:.:.:.:.:.:... ....0.*: ...,.....„.„..... , ••••-------4:.:--,,,,..:-,..-- :.----••--•-•-•" •:•:-..-.---- :. 7 7.-.. --...'..! i - .... •:.:....---.......•.." OA .''''''..... ".'.'- .::,,........\:... .:..1.::.:•..:...... _....-.......... .:::-:.:.::.......n.:...'.111.:•:...4\- :::.....:::::::::.:::. ::,..,1:. . L/ \ .: ::.:::::::.:... 1........i............:... ... ....::::..::::?...‘"#.'".. '' ' I t :rli4\\ \ -j...:7-.I:' ---1.‘ ir"'....• :-.....- / .,....., .i.ii PROPOSED WELLS OB-11 AND OB-12 H 1 — \\....:/Th / PROPOSED WELLS': 01(6-7, -8,-9, AND1-10 i VZ ) ) ____,-__..._...... i!! , i ...... . . 6,..... . .1 ---- / .•, , ! 1 ---•• '.) 1 1 .:....---- .... ? N \ i . • ,\..) \ ,.• ,:•:.„,"-... -..,.-.--__.........:::. , -...„ ...MO ' ' a •fill • N / • r f4...........\ \ .: * , , ...a.. .. m., •••••• _ ......... _ M.,. /. / At: -.... /1 0,.... .•••....% % 1 k , 1 , ' • • • . . . . . . . . . .• : . : ' • • ! - ' . ' . • • • ' . : . 1 r - ' . .. . . • . • ; . , „ . . i : : . •,• : : . . 1 1 PROPOSED i.LOCATION OF LINDEN: CANYON .OBSERVATION:WELLS • . . ' • : . . . , L , . . .• : , . , , : : . . . , . ' . . , . . . . . : . • , . . . . J - - - III J ATTACHMENT B l J. LAWRENCE & ASSOCIATES Engineering Geologists • Ground-water Hydrologists 2001 MARKET St. RM.523 REDDING,CALIFORNIA 96001 TELEPHONE(9161 244.9703 DAVID A. LAWRENCE;C.B.G.618 SCHEDULE OF FEES Consulting Services , i Engineering Geologist/Hydrologist Principal $70/hour Associate 55 Assistant 45 Technical and Secretarial 35 Deposition and Court Appearance Minimum charge � % $900/part or full day Preparation at consulting-service rates . . . . . as listed above Drilling Services (CME 55 Drilling Rig) 7-5/8 OD augers with operator and helper $135/hour ' 9-5/8 OD augers with operator and helper 150/hour Mobilization (plus mileage) 135/hour j Other In-house Equipment (provided at quoted prices) i Test Pumps (submersible) Campbell 21X Dataloggers ggers w/ transducers, conductivity and temperature probes H Meteorological station (wind direction and speed) . Gas-extraction and air-monitoring pumps pi Expenses, Materials, Outside Services 0 H Mileage (other than drill rig) $0.25/mile; $ 25%mile. Mileage (drill rig) 0.50/mile i i Per diem (field work) 55. 00/day Reproduction, travel, lodging, subsistence other direct job H - related, rental equipment, materials, subcontracted labor and equipment at cost + 15% I 5/12/89 - Schedule A ' i I , �1