HomeMy WebLinkAboutReso 1990-201 - Approving the "authorization for professional services' n
ill 111
RESOLUTION NO. 9'0 ' 070)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
APPROVING THE "AUTHORIZATION FOR PROFESSIONAL SERVICES"
AGREEMENT DATED APRIL 2 , 1990 , BETWEEN THE CITY OF REDDING
AND ELECTRICAL AND CONTROL SYSTEM ENGINEERING, INC. TO
PERFORM ELECTRICAL AND CONTROL SYSTEM DESIGN FOR CITY OF
REDDING PUMPHOUSE 5 , AND AUTHORIZING THE MAYOR TO SIGN.
BE IT RESOLVED by the City Council of the City of Redding as
follows :
1 . That the City Council hereby approves the
"Authorization for Professional Services" Agreement dated
April 2 , 1990 , between the City of Redding and Electrical and
Control System Engineering, Inc. covering the Project set forth
above.
2 . That the Mayor of the City of Redding is hereby
authorized and directed to sign said Letter Agreement on behalf
of the City of Redding; and the City Clerk is hereby authorized
and directed to attest the signature of the Mayor and to impress
the official seal of the City of Redding.
3 . That a true copy of said Agreement is attached hereto
and incorporated herein by reference.
I HEREBY CERTIFY that the foregoing Resolution was
introduced and read at a regular meeting of the City Council of
the City of Redding on the 1st day of May , 1990 , and was duly
adopted at said meeting by the following vote:
AYES: COUNCIL MEMBERS : Arness, Dahl , Fulton, Moss, & Buffum
NOES : COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS : None
ABSTAIN: COUNCIL MEMBERS: None
I ANCYBUFUM, Mayor
City of Redding
ATTEST: FO PPROVED:
-ac.e a vi,64e---' ae.,,fe,e4/,4eA;a_-
ETHEL A. NICHOLS , City Clerk NDALL A. HAYS , City Attorney
r
CN
ELECTRICAL CONTROL SYSTEM ENG
INEERII3, INC.
. CALIFORNIA96099 • 6)244-3056
P.O. BOX 1410 • BEDDING,CAL (�
AUTHORIZATION FOR PROFESSIONAL SERVICES
Date: 2 April 1990
Project Name: City of Redding Pumphouse No. 5
Project Number:
Client: City of Redding
Address: 760 Parkview Avenue
Redding, CA 96001
hereby requests and authorizes Electrical and Control System
Engineering, Inc. , (hereinafter called E&C) to perform the
following services:
Perform electrical and control system design for City
of Redding Pumphouse 5, in accordance with the attached
Statement of Work dated 2 April 1990.
Compensation shall be on the basis of:
X Fixed Fee: $7 , 400
Billing Rate Plus Direct Expenses and Outside Services
Other
Miscellaneous:
E&C and Client hereby agree to PROVISIONS stated on the back of
this form.
Approved for Client: Accep ed fo E&C rs A
By By .
Title Tit President
• •
PROVISIONS
AUTHORIZATION TO PROCEED
Signing this form constitutes authorization by Client for E&C to
proceed with the work, unless otherwise indicated in the
Authorization.
COST ESTIMATE
Cost estimates provided by E&C will be on the basis of experience
and judgement, but since E&C has no control over market
conditions or bidding procedures, E&C cannot warrant that bids or
ultimate construction costs will not vary from these cost
estimates.
OUTSIDE SERVICES
When technical or professional services are furnished by an
outside source, a markup will be added to these costs for E&C' s
administrative costs.
PAYMENT OF COMPENSATION
Payment is due upon receipt of invoice. If payment by Client of
any amount due E&C under this Authorization is not made within 30
days of becoming due, Client agrees to pay the amount due plus
interest commencing on the due date at a rate of 1 percent per
month or fraction of a month until such payment is made. Client
also agrees to pay legal fees incurred by E&C for action taken to
collect amounts due and not paid under this Authorization.
STATEMENT OF WORK
PUMPHOUSE 5, ELECTRICAL DESIGN
JOB KM 2 APRIL 1990
Provide design of electrical and control systems for Pumphouse 5,
a booster pumping station having four equal-sized adjustable-speed
pumps.
Provide complete electrical plans and specifications, including the
following:
o One-line diagram
o Building plan (lighting and power)
o Panelboard schedules
o Control schematic/control diagrams
o Details and elevations
o Electrical specification
o Adjustable-speed drive specification
Furnish a 10-percent design submittal which will include design
criteria, a control schematic, the control strategy, and motor
sizes.
Furnish a 90-percent design submittal which is a complete design
with the exception of the presence of red marks on the drawings and
specifications, and the omission of selected elevations and
details.
Design Guidelines
o The pumping station will have the following features: three
pumps installed now and one in the future, each being
approximately 100 hp.
o Pumps will be sequenced and controlled to maintain a constant
pressure in the system at the pump station.
c The pump station will be turned on and off from a remote
location (the water filter plant) .
o The following information will be transmitted to the water
filter plant:
Pump status for each pump (four on/off signals)
Suction pressure
Discharge pressure
Pump station flow
A common alarm (one signal)