Loading...
HomeMy WebLinkAboutReso 91-453 - Authorize filing of pre-app for Const of Airport Industrial Park & improvements - With Econ Dev, US Dept of Commerce, USA - Grant RESOLUTION NO- 11-Y,0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING AUTHORIZING THE FILING OF A PRE-APPLICATION WITH THE ECONOMIC DEVELOPMENT ADMINISTRATION, UNITED STATES DEPARTMENT OF COMMERCE, UNITED STATES OF AMERICA, FOR A GRANT UNDER THE TERMS OF THE PUBLIC WORKS AND ECONOMIC DEVELOPMENT ACT OF 1965, AS AMENDED FOR CONSTRUCTION OF THE AIRPORT INDUSTRIAL PARK AND RELATED AIRPORT IMPROVEMENTS WHEREAS, under the terms of the Public Works and Economic Development Act of 1965, as amended, the United States of America has authorized the making of grants to public bodies and private non-profit organizations or associations to aid in financing the construction of specific projects; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Redding hereby authorizes City Manager Robert E. Christofferson to execute and file a pre-application on behalf of the City of Redding with the Economic Development Administration, United States Department of Commerce, for a grant to construct Airport Industrial Park Improvements and Related Airport Improvements in the Redding Municipal Airport Area. BE IT FURTHER RESOLVED that the City Manager of the City of Redding is hereby_ authorized and directed to furnish such information as the Economic Development Administration may reasonably request in connection with the pre- application herein authorized to be filed and that he is authorized to accept any offer of grant which may be tendered. BE IT FURTHER RESOLVED that the City Council of the City of Redding hereby establishes said project as its Number One priority Public Works project for the 1992-93 fiscal year. I HEREBY CERTIFY that the foregoing resolution was introduced and read at a regular meeting of the City Council of the City of Redding on the 15th day of October 1991, and was duly adopted at said meeting by the following vote: CA AYES: COUNCIL MEMBERS: Arness, Buffum, Fulton, Moss & Dahl NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None MIKE DAHL, Mayor City of Redding ATTEST: Az iHE�ICHa S ity ClerkM APPROVED: -AAf DALL A. HA ity Attorney - 2 - JAMW EDAGRANT ' a � � III � .i • I j A EMU cc 1 I 1 i o ° — � �- ' �� •/ III Dmf " I Znos 1 ' H,exr eN I I I $ '- aor.o eHn A _ 0 1 : Ri eg3 II I Z 0 $• II oa c� 9 ♦ i g o A e 1 ♦♦ , r� 4. m m C t e ♦ �� � I I � � � I 1 2 a- c 1 0 0 k, \ 0 � ar trn �. COST SUMMARY Subtotal construction = $ 1,605,385 + contingency = $ 160,000 Total construction = 1,765,385 J Design engineering = $ 100,000 Field Engineering & Inspection = $ 50,000 TOTAL PROJECT COST = $ 1,915,385 _ $ 1,915,000 (R) tc/ka/2 CITY OF REDDING PUBLIC WORKS DEPARTMENT ------------------------------------------------------------------------------ REDDING MUNICIPAL AIRPORT - COST SUMMARY FOR WESTSIDE INDUSTRIAL IMPROVEMENTS ------------------------------------------------------------------------------ ------------------------------------------------------------------------------ The following Engineer's Cost Estimate is based on current area prices for the items of work listed. The prices have been projected to construction date prices, using the current Consumer Cost Index (CCI) . ROADS 1. Knighten Road Extension = 56,020 SF x $3.00 - - - - - - - - - - $ 168,060 2. South frontage road extension = 86,200 SF x $3.00 - - - - - - - $ 258,600 3. North frontage road extension = 81,700 SF x $3.00 - - - - - - - $ 245,100 4. Median landscape on Knighten Road - - - - - - - - - - - - - - - $ 10,000 5. Landscape trees along Airport Road - - - - - - - - - - - - - - $ 20,000 6. Street lights = 25 EA x $2000 - - - - - - - - - - - - - - - - - $ 50,000 Subtotal = 751,760 WATER 1. 12-inch ductile iron pipe = 3955 LF x $35 - - - - - - - - - - - $ 138,425 2. 6-inch ductile iron pipe = 1060 LF x $20 - - - - - - - - - - - $ 21,200 3. 6-inch fire hydrant = 6 EA x $2000 - - - - - - - - - - - - - - $ 12,000 4. 12-inch tee w/2-12" valves - - - - - - - - - - - - - - - - - - $ 3,500 5. 12" x 6" tee w/6" valve = 5 EA x $1500 - - - - - - - - - - - - $ 7,500 Subtotal = 182,625 SEWER 1. 10-inch sewer line = 140 LF x $30 - - - - - - - - - - - - - - - $ 4,200 2. 8-inch sewer line = 3970 LF x $25 - - - - - - - - - - - - - - - $ 99,250 3. 4' sewer manhole = 10 EA x $2000 - - - - - - - - - - - - - - - $ 20,000 Subtotal = 123,450 STORM DRAIN 1. 8' x3' box culvert = 640 LF x $200 - - - - - - - - - - - - - - $ 128,000 2. 6' x3' box culvert = 360 LF x $145 - - - - - - - - - - - - - - $ 52,200 3. 4' x2' box culvert = 430 LF x $100 - - - - - - - - - - - - - - $ 43,000 4. Backfill existing ditch = 570 LF x $10 - - - - - - - - - - - - $ 5,700 5. Storm Drain junction box - - - - - - - - - - - - - - - - - - - $ 2,500 6. 15-inch pipe = 160 LF x $30 - - - - - - - - - - - - - - - - - - $ 4,800 7. 18-inch pipe = 730 LF x $35 - - - - - - - - - - - - - - - - - - $ 25,550 8. 24-inch pipe = 2660 LF x $50 - - - - - - - - - - - - - - - - - $ 133,000 9. No. 3 catch basin = 14 EA x $1700 - - - - - - - - - - - - - - - $ 23,800 Subtotal = 418,550 UTILITIES 1. Joint utility trench = 2600 LF x $40 - - - - - - - - - - - - - $ 104,000 2. Secondary utility trench w/boxes = 2500 LF x $10 - - - - - - - $ 25,000 Subtotal = 129,000 Exhibit IV-D-4