Loading...
HomeMy WebLinkAboutReso 91-440 - Approve & Authorize the CM to sign Change Order #10 between COR & Lawrence & Associates (Project No. C91-08-04, Contract No. C-2457) to provide Gas Extraction System Design - Benton Landfill Closure RESOLUTION NO. 91- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING AND AUTHORIZING THE CITY MANAGER TO SIGN THE FOLLOWING IN CONNECTION WITH PERFORMING ADDITIONAL TASKS FOR THE BENTON LANDFILL CLOSURE PLAN: "AUTHORIZATION AND CONTRACT FOR PROFESSIONAL SERVICES," TOGETHER WITH CONTRACT MODIFICATION (CHANGE ORDER) 010, BETWEEN THE CITY OF REDDING AND LAWRENCE & ASSOCIATES (PROJECT NO. C91.08.04; CONTRACT NO. C-2457) , TO PROVIDE GAS EXTRACTION SYSTEM DESIGN FOR THE FINAL CLOSURE PLAN FOR THE BENTON LANDFILL, IN AN AMOUNT NOT TO EXCEED $86,000. IT IS HEREBY RESOLVED by the City Council of the City of Redding as follows: 1 . That the City Council of the City of Redding hereby approves the above-mentioned Authorization and Contract for Professional Services, together with Contract Modification (Change Order) 010, between the City of Redding and Lawrence & Associates, in an additional amount not to exceed $86,000 . 00 , true copies of which are attached hereto and incorporated herein by reference. 2. That the City Manager of the City of Redding is hereby authorized and directed to sign said documentation on behalf of the City Council of the City of Redding; and the City Clerk is f hereby authorized and directed to attest the signature of the A City Manager and to impress the official seal of the City of Redding. I HEREBY CERTIFY that the foregoing Resolution was introduced and read at a regular meeting of the City Council of the City of Redding on the 15th day of October , 1991, and was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: Arness, Buffum, Fulton, Moss & Dahl NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None 1 MIKE DAHL, Mayor City of Redding ATTEST: E L NICHOLS, � Clerk FO APPROVED: 2Ir ALL A. HAYS, ity Attorney 2 Com' G OQ reddins CONTRACT MODIFICATION (CHANGE ORDER) CONTRACT MODIFICATION NO. -C-2457 CHANGE ORDER NO. 010 DATE 10-15-91 - - -- ----- -- ------------ ---------•-- PROJECT NAME _FINAL CLOSURE AND POSTCLOSURE BENTON GAS— PROJECT NO.___�91:08:04 ------------------------------------------------------------------ ----------- EXTRACTION SYSTEM __•_•__ JOB NO. ...._5514-27 -•------------------------------------------------•--------------------------_ --•- - - - --- - CQNTRACTpR LAWRENCE & ASSOCIATES --------------------------- BID SCH.NO..._.C-245 --------------- 2001 -------__..__-.2001 MARKET STREET ROOM 523 - -•---------------------------------------------------------------------•---------•-- REDDING CA 96001 THE FOLLOWING MODIFICATIONS TO THE CONTRACT ARE HEREBY ORDERED: (USE ADDITIONAL PAGES IF REQUIRED) DRILL 12 TEST BORINGS, INSTALL_ GAS-EXTRACTION TESTING__WELLSa-__PERFORM GAS_ ----------------------------------------- --------------- DRAWDOWN TEST, INTERPRET-THE_DATA,_ AND PROVIDE EXTRACTION—SYSTEM DESIGN FOR A - - - --- - - ---------------------•-------------------..-.---------.-_..-------------------------------- GAS—EXTRACTION SYSTEM AT THE CITY OF REDDING BENTON••LANDFILL�_ AS DESCRIBED IN - ---------------- - - - -- - - ATTACHMENT A (ATTACHED) . - TIME--- EXPENSE IN ACCORDANCE WITH COST ESTIMATE, AS - - -------------------- -----•--------------------•------•-------•------------------------------------ OUTLINED IN ATTACHMENT A, AND- THE FEE SCHEDULE,_ ATTACHMENT_ B---_(ATTACHED): COST -------------------------------------------•-------------- OF WORK ESTIMATED TO BE $86,000. --------------------------•--------------------------------•--------------------------...----------------------•--------------------------------------•------------- ----------------------------------------------------------------•------------...---------•------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------•------------------------------------------------ ---------------------------------------------------------------------------------------------------•-------------------------------------------------------------- -------------------------------------------------------------------------------------------------------------------------------------------------------------------- -----------------------------------------------------------------------------------------------------•------•------------------------------------------------------ -----------------------------------------------------------•-----------------------------------------------------------------------------------•------------------ ----------------------•----------------------------------------------------------------------------•--•------•-------------------------------------------------- ---------------------------------------------------------------------•--------------------------------------------_..-------••---------------------------------- CONTRACT AMOUNT CONTRACT TIME(WORKINGICALENDAR)DAYS 71 ORIGINAL CONTRACT AMOUNT $__48_,_7_3_1_,_3_1 ORIGINAL CONTRACT TIME ----------- DAYS PREVIOUS CHANGE ORDERS(ADD/DEDUCT) $253,815.:86 _ __ PREVIOUS CHANGE ORDERS(ADD/DEDUCT) ----------- DAYS THIS CHANGE ORDER (ADD/DEDUCT) $__86,_0_0_0_._0_O THIS CHANGE ORDER (ADD/DEDUCT) ----------- DAYS REVISED CONTRACT AMOUNT $3889547,-17 1 - ___ REVISED CONTRACT TIME ----------- DAYS THE REVISED CONTRACT COMPLETION.DATE IS: — NO CHANGE --------- 19 -------------- OWNER CONTRACTOR CITY MANAGER, CITY OF REDDING PRES NT, LAWRENCE & ASSOCIATES --•-------------------------------------------------- ----- ;--- — - ---- By----------------------------------------------------- BY - - ------------ Date--------------------------------------------------- Date---lBf �--------------------------------- -+_ f,_o, ti PLEASE SIGN•. & RETURN r. AWRENCE & ASSOCIATES • Engineering Geologists • Ground-water Hydrologists 2011 MARKET ST.,RM 523 REDDING,CALIFORNIA 96001 TELEPHONE(916)244-9703 FAX(916)244-5021 DAVID A.LAWRENCE,C.E.G.618 AUTHORIZATION AND CONTRACT FOR PROFESSIONAL SERVICES Date September 25, 1991 Project Number C91.08. 04 Project Name City of Redding - Benton gas-extraction system Client City of Redding, ATTN: Ms. Sue Anderson Address 760 Parkview Drive, Redding, CA 96001 Phone (916) 225-4408 Client hereby requests and authorizes Lawrence & Associates to perform the following services: 1) drill 12 test borings, 2) install gas-extraction testing wells, 3) perform gas-drawdown tests, 4) interpret the data, and 5) provide extraction-system design for a gas-extraction system at the City of Redding Benton Landfill, as described in Attachment A. Compensation to be on the basis of: Time and expense in accordance with the Cost Estimate, as outlined in Attachment A, and the Fee Schedule, Attachment B. Cost of work estimated to be $86, 000. Miscellaneous: Client to provide drivable access to drill sites. This authorization subject to PROVISIONS stated on the back of this contract Approved for CLIENT Accepted for LAWRENCE & ASSOCIATES By By , �.�� �.,�. Title Title � �, Address Date Date PROVISIONS 1. AUTHORIZATION IQ PROCEED: Signing this form shall be construed as authorization by Client for Lawrence Z Associates to proceed with the work unless otherwise provided herein. 2. DIRECTX�PENS_,,E : Lawrence i Associates' direct expenses shall be those costs incurred an or directly for the Client's Project, including but not limited to, necessary transportation casts, including mileage, meals and lodging, laboratory tests and analyses, computer services, telephone, printing and binding charges. Reimbursement for these exposes shall be on the basis of the attached Schedule of Fees. Statements for services are due five days after being mailed to the client. 3. OUTSIDE SERVICES: When technical and professional services and subcontracted labor and equipment are furnished by an outside source, reimbursement for these expenses shall be on the basis of the attached Schedule of Fees. Lawrence i Associates may require the client to contract for, and pay for, these services directly. i. PROFESSIONAL STANDARDS: Lawrence i Associates shall be responsible to the level of competency presently maintained by other practicing professional engineers in the same type of work in Client's community, for the professional and technical soundness, accuracy and adequacy of all designs, drawings, specifications and other work and materials furnished under this Authorization. Lawrence i Associates and/or David A. Lawrence make no other warranty, express or implied. 5. TERMINATION: Either Client or Lawrence i Associates may terminate this Authorization by giving 30 days' written notice to the other party. In such event, Client shall forthwith pay Lawrence 3 Associates in full for all work previously authorized and performed prior to the effective date of termination. If no notice of teraination is given, relationships and obligation created by this Authorization shall be terminated upon completion of all applicable requirements of this Authorization, except for the provisions of paragraphs 4, 6, 7 and 8, which shall continue in effect as provided by Law. 6. ARBITRATION: All claim, disputes and other matters in question arising out of, or relating to, the work performed hereunder, this Authorization, or the breach thereof, shall be decided by arbitration in accordance with the rules of the American Arbitration Association then obtaining. Either Client or Lawrence b Associates may initiate a request for such arbitration. No arbitration arising out of, or relating to, this Authorization may include, by consolidation, joinder or in arty other manner, any additional party not a party to this Authorization unless agreed to in writing by both parties. 7. HOLD HARMLESS: Client agrees at all times to defend, indemnify, hold harmless and provide all legal defense and related services to David A. Lawrence, Inc., Lawrence & Associates and/or David A. Lawrence (hereinafter collectively •Lawrence■), their officers, associates, agents and/or employees for any and all claims, expenses, demands, causes of action, liability, loss or injury regardless of their nature or character in any mariner whatsoever arising out of (1) any third person's use or reliance on the work performed under this Agreement; (2) any alleged or proven act or omission of Lawrence: Or (3) any Litigation or arbitration, or the like, regarding the work performad under this Agreement involving third persons not parties to this Agreement. 8. LITIGATION: Liability for damages proximately caused by David A. Lawrence, Inc., Lawrence 3 Associates and/or David A. Lawrence, or their agents, officers or employees shall be limited to cancellation of the suss due and owing or recovery of the sums already paid to Lawrence i Associates by Client. In the event the Client makes a claim against David A. Lawrence Inc., Lawrence L Associates and/or David A. Lawrence, at Law or otherwise, for any alleged error, omission or other act arising out of performance of our professional services, and the Client fails to prove such claim, then the Client shall pay all costs incurred by Lawrence i Associates and/or David A. Lawrence in defending itself against the claim. t Ms. Sue Anderson Attachment A City of Redding September 25, 1991 Page 1 of 7 Proposal For services This proposal describes the work necessary to determine the soil/gas characteristics and to provide a design for a gas- extraction system along portions of the northeastern and southwestern boundaries of the Benton landfill, Redding, California. The work will include the following items: Item 1 - Define Extent of Waste To determine the extent of landfill waste along the southwestern boundary of the landfill, 12 shallow test borings are proposed. The extent of the waste must be determined to assure the proper distance between the waste and the gas-collection barrier. Item 2 - Install Gas-Extraction and Testing Wells To determine the soil permeability, gas-extraction wells GEX-1, GEX-2 , and GEX-3, and gas-extraction test wells GEXT-1 through and GEXT-6 will be installed along the proposed extraction-system alignment in the locations shown on Plate 1. The holes will be drilled to the water table and will then be completed with 2-inch casing screened from a depth of 5 feet below ground surface to 5 feet below the water table. The wells will be tested to determine the soil permeability as described in Item 4 below. Item 3 - Performing vacuum Testing To determine the soil permeability and to assess the effects of pumping, a vacuum (gas-drawdown) test is proposed. For one week before performing the gas-drawdown test, static (without vacuum being applied to pumping well) pressure/vacuum measurements will be performed on LFG-1 through LFG-5, and GM-1, GEX-1, GEXT-2, and GEX-3 . Ms. Sue Anderson Attachment A City of Redding September 25, 1991 Page 2 of 7 Proposal for Services (continued) The gas-drawdown test would be performed by applying a vacuum to the well using a Rotron DL 404 regenerative blower. Flow and vacuum would be measured in the extraction well (GEX-1, GEX-2 and GEX-3) while vacuum/pressure would be measured in the adjacent observation wells (GEXT-1 through GEXT-6) . The results from the gas-drawdown test and static-pressure testing would be used to determine anticipated well vacuum, flow, and spacing as described in Item 4 . The cost estimate assumes 24 hours of pumping and 8 hours of recovery-data collection. Item 4 - Data Reduction and Reporting Static measurements will be used to determine the pressure gradient. The flow and vacuum/pressure data from the gas-drawdown test will be used to determine soil permeability. The pressure gradient and permeability will be used to determine the maximum anticipated flow from the landfill. The minimum well spacing, vacuum, and flow, which will capture all of the gas migrating from the landfill under the maximum expected pressure-gradient conditions, will then be determined. The data and recommendations for spacing, vacuum and flow will be submitted to the client and to Russ Fetrow for design of the blower and header. Item 5 - Blower Building and Control Design The blower-building design will be performed by Russ Fetrow Engineering, Inc. of Salem, Oregon, under the supervision of Lawrence & Associates (see Attachment C for Fetrow estimate) . Ms. Sue Anderson Attachment A City of Redding September 25, 1991 Page 3 of 7 Proposal for Services (continued) The blower building will be designed assuming the following: (1) Expected vacuum provided by Lawrence & Associates. (2) System flow provided by Lawrence & Associates. (3) Well spacing provided by Lawrence & Associates. (3) The blower building will be constructed of concrete block, with a metal roof or as requested by the City. The building will consist of a mechanical room, and a control room. (4) The blower building will collect gas from both the perimeter- collection system and the gas discharge from the leachate- collection system. The gas from the leachate-collection system will be burned using a gas-burner assembly. Cost Estimate Item 1 - Define Extent of Waste Labor --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Geologist II, inspect borings Hr 12 50. 00 600. 00 Total Labor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 600. 00 Drilling Services --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- CME 55 Drill w/ 2-man crew Hr 12 135. 00 1, 620. 00 Total Drilling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1, 620. 00 TOTAL ESTIMATED COST OF ITEM I . . . . . . . . . . . . . . . . . . . . . 2 , 220. 00 Ms. Sue Anderson Attachment A City of Redding September 25, 1991 Page 4 of 7 Cost Estimate (continued) Item 2 - Install Gas-Testing Wells Install 1 gas-extraction well, 2 gas-extraction monitoring well at three locations. Labor --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Associate Geologist, locate holes Hr 4 65. 00 260. 00 Geologist II, inspect borings Hr 80 55. 00 4, 400.00 Geologist II, draft logs Hr 40 55. 00 2 , 200. 00 Total Labor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6,860.00 Drilling Services --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- CME 55 Drill w/ 2-man crew Hr 75 135. 00 10, 125. 00 Total Drilling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10, 125.00 Materials --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- 8-inch locking aluminum lid w/ lock Ea 12 47. 13 565. 56 8-inch x 3-foot steel riser Ea 12 30. 00 360. 00 1/4-inch s.s. pump adapter Ea 12 6. 00 72 .00 1/4-inch PVC ball valve Ea 12 20. 00 240.00 1/4-inch nylon nipple Ea 12 1. 00 12 .00 2-inch PVC threaded cap, sch 40, Ft 12 2 . 00 24 .00 2-inch PVC screen, sch 40, 40 slot Ft 450 3 . 65 1, 642 . 50 2-inch PVC blank casing, sch 40 Ft 90 1. 91 171.90 2-inch PVC slip cap, sch 40 Ea 12 .93 11. 16 Ms. Sue Anderson Attachment A City of Redding September 25, 1991 Page 5 of 7 Cost Estimate (continued) Item 2 - Install Gas-Testing Wells (continued) Materials (continued) --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- 2-inch Viton "o" rings Ea 60 1. 00 60. 00 Load 1-inch gravel, delivered Ea 3 250. 00 750. 00 94-1b bag concrete Ea 45 4 . 50 202.50 5-gal bucket bentonite pellets Ea 3 78.71 236. 13 10-liter Tedlar Bags Ea 6 21.97 131.82 Subtotal Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4, 479.57 7 . 25% Sales Tax . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 324.77 Total Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4, 804 . 34 In-house Expenses --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Mileage Mi 200 . 30 60. 00 Total Outside Expenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60.00 TOTAL ITEM 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21, 849.34 Item 3 - Perform Gas-Drawdown Tests Labor --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Associate Geologist, direct test Hr 4 65. 00 260.00 Geologist II, prepare for test Hr 8 55. 00 440.00 Geologist II, conduct tests Hr 90 55. 00 4,950. 00 Associate Geologist, reduce data Hr 90 65. 00 5,850. 00 Technician help set-up Hr 24 45. 00 1, 080. 00 Ms. Sue Anderson Attachment A City of Redding September 25, 1991 Page 6 of 7 Cost Estimate (continued) Item 3 - Perform Gas-Drawdown Tests (continued) Labor --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Geologist I, sample extraction well before & after test Hr 4 50. 00 200. 00 Total Labor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120, 780. 00 In-House Expenses --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Mileage Mi 200 . 30 60. 00 Pressure-transducer rental Wk/Ea 4 30. 00 120.00 Gas-Extraction Pump Rental wk 1 300. 00 300. 00 Generator rental wk 1 500. 00 500. 00 Data Logger Rental wk 1 100. 00 100. 00 Total Outside Expenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11080. 00 TOTAL FOR ITEM 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13,860. 00 Item 4 - Interpret data and report findings Labor --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Associate Geologist, interpret data and report findings Hr 40 65. 00 2, 600. 00 Clerical, bind report Hr 2 35. 00 70. 00 TotalLabor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2, 670. 00 Ms. Sue Anderson Attachment A City of Redding September 25, 1991 Page 7 of 7 Cost Estimate (continued) Item 4 - Interpret data and report findings (continued) In-House Expenses -----------------7--------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Binding materials LS 1 50.00 50.00 Total In-House Expenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50. 00 TOTAL FOR ITEM 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 , 720.00 Item 5 - Blower, Building, and Control Design Subcontracted Labor --------------------------------------------------------------- Item Description Units Qty $/Unit Total $ --------------------------------------------------------------- Russ Fetrow Design LS 1 45, 000 45,000.00 Total Outside Expenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45, 000. 00 TOTAL FOR ITEM 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45, 000. 00 Cost Summery by Item Item 1 - test holes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2, 220. 00 Item 2 - extraction test wells . . . . . . . . . . . . . . . . . . . . . 21,849.34 Item 3 - gas-drawdown test . . . . . . . . . . . . . . . . . . . . . . . . . 13 ,860.00 Item 4 - data interpretation . . . . . . . . . . . . . . . . . . . . . . . 2 ,720. 00 Item 5 - blower building design . . . . . . . . . . . . . . . . . . . . 45, 000.00 Total Estimate for All Items . . . . . . . . . . . . . . . . . . . . . . . $85, 649. 34 'PAWRENCE & ASSOCIATES Engineering Geologists • Ground-water Hydrologists 2001 MARKET ST,RM 523 BEDDING,CALIFORNIA 96001 TELEPHONE(916)244-9703 FAX(916)244.5021 DAVID A.LAWRENCE,C.F.G.619 Attachment B SCHEDULE OF FEES Professional Services Engineering Geologist/Hydrologist Principal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $75/hour Associate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 AssistantI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 Assistant II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 Registered civil engineer . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 Technical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Secretarial . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Deposition and Court Appearance Minimum charge . . . . . . . . . . . . . . . . . . . . . . $900/part or full day Preparation at consulting-service rates . . . . . as listed above Drilling services (CME 55 Drilling Rig) 7-5/8 OD augers with operator and helper . . . . . . . . . $135/hour 9-5/8 OD augers with operator and helper . . . . . . . . . . 150/hour Mobilization (plus mileage) . . . . . . . . . . . . . . . . . . . . . . . . 135/hour Other In-house Equipment (provided at quoted prices) Test Pumps (submersible) Campbell 21X Dataloggers w/ transducers (water and gas) , conductivity and temperature probes Meteorological station (wind direction and speed) Gas-extraction and air-monitoring pumps Expenses, Materials, Outside Services Mileage (other than drill rig) . . . . . . . . . . . . . . . . . . $0. 30/mile Mileage (drill rig) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0. 50/mile Per diem (field work with drill) . . . . . . . . . . . . . . . . 55 . 00/day Reproduction, travel, lodging, subsistence, other direct job related, rental equipment, materials, subcontracted labor and equipment . . . . . . . . . . . . at cost + 15% 6/1/91 8-INCH ALUMINUM LOCKING LID, W/ LOCK 2.5 FT. - 2-INCH PVC MALE ADAPTER 8-INCH X 3-FOOT LONG STEEL RISER TEMPORARILY INSTALLED 7.5/8-INCH DIAMETER HOLE OR LARGE CONCRETE SEAL 2-INCH PVC BLANK CASING, SCH 40, W/ THREADED ENDS FOR FLUSH- COUPLED JOINTS S.0 FT.- BENTONITE GROUT BARRIER, WETTED AND ALLOWED TO HYDRATE 5.5 FT.- BEFORE GROUTING 2-MCH PVC SCREEN, SCH 40, 0.04 SCOT W/ THREADED ENDS FOR FLUSH-COUPLED JOINTS DEPTH TO BE DETERMINED IN THE FIELD BASED ON = GEOLOGIC - CONDITIONS 1-INCH WELL-ROUNDED GRAVEL WATER LEVEL S FEET BELOW = WATER LEVEL 4-INCH PVC SLIP CAP, SCH 40, SECURED TO CASING W/ STAINLESS-STEEL SCREWS CALF: PROPOSED CONSTRUCTION DETAIL FOR PREPARED BY: NOT TO SCALE LAWRENCE&ASSOCIATES ATE: GAS-EXTRACTION WELLS AND GAS- 2001 MARKET STREET,RM 523 9-25-91 REDDING,CA 96001 EXTRACTION TEST WELLS PHONE:(916)2449703 JOB NO.: FAX: (916)2445021 C.91.08.03 CLIENT: PROJECT: RAWN BY: CITY OF REDDING GAS-EXTRACTION SYSTEM C.COLES FIGURE 1