HomeMy WebLinkAboutReso 92-026 - Approve & Authorize the mayor to sign the 2nd Amendment to agreement No. C-2843 for caretaking & support services between the COR & Black & Veatch Const Inc for consulting services associated ith Redding Power Project RESOLUTION NO. �'
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
APPROVING AND AUTHORIZING THE MAYOR TO SIGN THE SECOND
AMENDMENT TO AGREEMENT NO. C-2843 FOR CARETAKING AND
SUPPORT SERVICES BETWEEN THE CITY OF REDDING AND BLACK
& VEATCH CONSTRUCTION, INC. FOR CONSULTING SERVICES
ASSOCIATED WITH THE REDDING POWER PROJECT.
WHEREAS, the City of Redding entered into an Agreement for
Caretaking and Support Services with Black & Veatch Construction
Inc. on July 29 , 1991; Contract No. C-2843 ; and
. WHEREAS, on October 1 , 1991, by Resolution No. 91-419, City
Council approved a First Amendment to said Agreement to include
the preparation of an independent engineer ' s report of the
proposed Industrial Power Technology project, and to provide
support services for the City' s new Project Manager; and
WHEREAS, staff has recommended that the scope of services be
revised by a Second Amendment to said Agreement to include the
items set forth in the attached Report to City Council; that the
not-to-exceed payment under said Agreement be increased by
$48, 470 . 00 ; and that the City' s Contract No. 2821 with Black &
Veatch be terminated; and
WHEREAS, attached is a true copy of the proposed Second
Amendment to the Black & Veatch Construction, Inc. Agreement
C-2843 for Council' s consideration; and
WHEREAS, it is the recommendation of staff that City Council
approve said Second Amendment;
NOW, THEREFORE, IT IS HEREBY RESOLVED that the City Council
of the City of Redding hereby approves the attached Second
Amendment to Agreement for Caretaking and Support Services; that
the Mayor of the City of Redding is hereby authorized and
directed to sign said Amendment on behalf of the City of Redding;
and the City Clerk is hereby authorized and directed to attest ]
I _
0
the signature of the Mayor and to impress the official seal of
the City of Redding thereto.
BE IT FURTHER RESOLVED that the not-to-exceed payment under
Agreement No. C-2843 be increased by $48,470. 00; and that by this
Second Amendment the City' s Contract No. 2821 is terminated.
I HEREBY CERTIFY that the foregoing Resolution was
introduced and read at a regular meeting of the City Council of
the City of Redding on the 21st day of January , 1991 , and was
duly adopted at said meeting by the following vote:
AYES: COUNCIL MEMBERS: ARNESS, BUFFUM, FULTON, MOSS & DAHL
NOES: COUNCIL MEMBERS: NONE
ABSENT: COUNCIL MEMBERS: NONE
ABSTAIN: COUNCIL MEMBERS: NONE
c
MIKE DAHL, Mayor
City of Redding
I
ATT T: _...
'1 CONNIE STROHMAYER, otly,
Clerk
O PROVED:
RADALL A. HAYS, ity Attorney
2
r
SECOND AMENDMENT TO
AGREEMENT FOR CARETAKING AND SUPPORT SERVICES
BETWEEN
CITY OF REDDING, CALIFORNIA
AND BLACK & VEATCH CONSTRUCTION,
INC.
The Second Amendment to the "Agreement for Caretaking and Support
Services Between City of Redding, California (Owner) and Black & Veatch
Construction, Inc. (Contractor)" dated July 29, 1991 (hereinafter called
"Agreement") is made this 15th day of January, 1992, by and between
Owner and Contractor.
i
Recitals
I
1. Owner and Contractor entered into the Agreement whereby Contractor
was to provide Owner with certain caretaking and support services.
i
2. Owner and Contractor mutually wish to amend that Agreement to
extend its term; the expand the scope of engineering services to
include supporting the City in its acquisition of additional
peaking capacity to be located at the Redding Power site; and to
modify certain terms and conditions in the Agreement.
NOW, THEREFORE, in consideration of the mutual covenants contained
herein, Owner and Contractor agree as follows.
a. Article 3 - Services to Be Performed by Contractor
The following change is made:
Contractor shall perform the Services described in the
Revised Attachment A, Scope of Services (copy attached).
b. Article 4 - Compensation
The following change is made:
Owner shall pay Contractor in accordance with the Revised
Attachment B, Compensation (copy attached).
C. The Engineering Services Agreement dated June 19, 1991 for
i services associated with Redding Power is hereby terminated.
II d. Except as expressly modified by this Amendment No. 2, all of
the terms and conditions of the Agreement shall remain in
full force and effect.
�I
'! 011692 1
i�
li
IN WITNESS WHEREOF, the parties have caused this Amendment No. 2 to be
signed the day and year above-mentioned.
CITY OF REDDING, CALIFORNIA BLACK & V TC C STRUCTION, INC.
Owner Cont acto
By
By n
Title Title
Date Date I� �-
I
�I
I
{
I
I
If�
I
j
011692 2
REVISED ATTACHMENT A
REDOING POWER
CARETAKING AND SUPPORT SERVICES
SCOPE OF SERVICES
The following summarizes the scope of services associated with the
caretaking effort and permitting and management support services in
support of the City's acquisition of the Redding Power project and
peaking power generation additions.
1
B ack & Veatch Construction, Inc. (Contractor) will provide the services
as described below. Contractor intends to provide such services using
Townsend and Bottum and Black & Veatch as subcontractors as appropriate.
The dates indicated below are provided to tie compensation estimates to
a point in time. Contractor understands that the schedules may be
adjusted by up to six months.
1
Task 1.1 - Caretaker Support
The Contractor will provide caretaker services associated with the
project. The objective of this task is to maintain the project in the
as-provided condition from the point of financial closing until the
project is assigned to another party by the City. This assignment is
assumed to occur on or before initiation of modification construction.
The work will be performed and documented in such a fashion to
facilitate transfer of the work. The task has the following separate
subtasks.
i
Task 1.1A - Project Inventory
Contractor will inventory the entire project starting on or about July
29, 1991. Contractor will compare its inventory against one previously
provided and note any discrepancies to the City. If requested,
Contractor will assist the City as requested to resolve any
discrepancies.
Task 1.16 - Transition to the City's Control
The Contractor will review previously developed lay-up and maintenance
plans, available Instruction Manuals, Operation Plans, Maintenance
Plans, and other documents and, based on the recommendations contained
therein, develop a Standby Maintenance Plan. Black & Veatch will assist
the Contractor in the development of the Standby Maintenance Plan. The
Plan will serve as the basis for the long-term lay-up of the project.
i The contents of the plan are as follows.
i
A-1
REVISED ATTACHMENT A
A. Document control to ensure a system of filing and recording
which provides ready access for efficient maintenance and
correction, performance forecasting and costing. In
addition
� , establish a technical library.
b. Computerized planned preventive maintenance program and
maintenance management program.
c. Spare parts program.
j d. Control and usage of tools and test equipment.
i
e. Maintenance/caretaking analysis.
f. Weekly planned preventive maintenance/caretaking assignments
and schedule.
g. Planned preventive maintenance/caretaking list.
h. Property accounting and material control system.
The Contractor will review the documentation which results from the
effort of the current lay-up contractor. Any noted discrepancies
between the proposed Standby Maintenance Plan and past lay-up work will
be noted to the City. The Contractor will assist the City in evaluating
the effects of any lay-up deficiencies.
Task 1.1C - Standby Maintenance
The Contractor will implement the Standby Maintenance Plan, provide
custodial services, and 24-hour site security. The Contractor will
maintain records .of maintenance and repair activities and maintain a log
of all on-site activities.
The Contractor will acquire miscellaneous tools and expendables
necessary to support his work. Any tools or equipment acquired by the
Contractor and which is treated as a pass through expense will become
the property of the City at the completion of the work.
The Contractor, through its subcontractor, intends to use direct hires
in the support of this effort. To the extent practical, the Contractor
plans to use personnel, who were previously involved in operation, lay-
up or maintenance of the project.
i
i
!I
A-2
j
REVISED ATTACHMENT A
Task 1.1D - Transition to Others
The Contractor will cooperate with the City in the transition from the
Contractor providing caretaking services to others. The Contractor
assumes that complete responsibility for caretaking will be transferred
prior to the initiation of modification construction. Up until the
point of transfer, the Contractor will continue to implement the Standby
Maintenance Plan.
During the transition period, the Contractor will provide the successor
or prospective successors with access to the Standby Maintenance Plan
and maintenance records. Once a successor is selected, the Contractor
will jointly develop turnover procedures to ensure continuous lay-up
support and will assist the City in monitoring the successor's lay-up
and maintenance effort.
i Task 1.2 - Additional Lay-Up Mork
As a result of previous investigations and inaction by current owners,
lay-up activities recommended by other consultants and not currently
implemented, may need to be undertaken. For those items which cannot be
reasonably performed by the caretaking staff, the Contractor, using the
services of its subcontractor Black & Veatch for specification and
drawing preparation, will assist the City in completing the required
work. The work anticipated includes the following.
o Developing procurement packages
o Preparing specifications and drawings for each procurement
package
o Evaluating bids
o Providing construction management services for the lay-up
work
The lay-up work will be done by other contractors.
The services of these contractors will be acquired through competitive
bidding and using the City's procurement process and purchasing
documentation.
Task 1.3 - Liquidation Support
Contractor will assist the City in the liquidation of assets, including
equipment, buildings, and parts associated with the site. Such support
will primarily include developing a liquidation plan and assisting the
City in implementing that plan.
�j
A-3
i
REVISED ATTACHMENT A
Task 2.1 - Project Permitting
Contractor will assist the City in securing the transfer of existing
permits and licenses and acquiring any new permits and licenses
necessary to support modification and operation of the project. The
work includes the following subtasks.
Task 2.1A - Engineering Support
Contractor will furnish engineering evaluations to determine the
proposed configuration of the facility to be licensed. The work will
include developing project descriptions and drawings which depict the
project and anticipated construction activities associated with the
i
modification work.
Contractor assumes that sufficient site characterization work exists and
is available to Contractor to support the licensing and final
engineering for the project and that additional on-site investigations
are not required.
All work requiring a professional license will actually be performed by
Black & Veatch under a subcontract with Contractor.
Task 2.1B - Permit Application Preparation
Contractor will prepare applications to transfer existing permits and
licenses from the previous owner-operator-licensee to the City.
Contractor will also prepare applications for any new licenses
associated with the electric generating facilities.
Contractor will provide licensing expertise and technical support to
assist the City in transferring and/or obtaining the licenses, permits,
i and approvals for modification and operation of the Redding Power
facility as identified in the Independent Engineers Report and
summarized as follows.
1A. Transfer/Modification of Air Permit to Operate
o Application for permit transfer and associated analysis will
be performed by Contractor.
o Contractor assumes no daily or annual increase in NO,
emissions plus limits on annual operating hours as necessary.
-- or --
A-4
i
.I
I
REVISED ATTACHMENT A
1B. Application for New Air Permit to Operate (If required)
o Contractor will provide offset modeling of 5 sources and
BACTAAER analysis.
o Contractor assumes National Weather Service meteorological
data is used for modeling and no preconstruction air quality
monitoring required.
2. Transfer of Wastewater Discharge Permit
o Application for permit transfer and preparation of new
wastewater discharge report performed by Contractor.
!j
3. Transfer of City of Redding Use Permit
I '
4. Transfer of Permit to Operate Steam Boiler
5. Other approvals required by law of which Contractor has knowledge
or should reasonably have knowledge.
i
Except as covered by Tasks 2.2 and 2.3, any additional approvals which
may become necessary for modification and operation of the Redding Power
facility can be provided under modified or separate scope of services.
Contractor assumes that the City of others will prepare applications as
required to support City or other facilities on the site including any
electric substations and transmission lines and other City facilities.
The City will obtain all land and water rights necessary to support the
project including title searches and legal surveys, if required.
Task 2.1C - Consultation Support
Contractor will consult as required with local, state, and federal
resource agencies regarding securing the necessary transfer of licenses
and permits and any new licenses and permits required to modify and
operate the Redding Power Project. This work shall include initial
consultations on filing requirements, coordinating and conducting
consultation meetings, expediting agency review and processing of
filings, and supporting any statutory public hearing required in the
! licensing and permitting of the Redding Power Project.
,I
I
,I A-5
REVISED ATTACHMENT A
Task 2.2 - Fuel Gas Service Support
Contractor will assist the City in completing any permit applications
and other obligations of the City to ensure and/or expedite installation
of fuel gas service to the site. The support primarily covers working
with local gas supply interests, resource agencies, and other City
departments. The support is not envisioned to include direct support in
gas supply (commodity) contract or transmission contract negotiations.
Task 2.3 - Permits to- Remove Existing Facilities
If required to support liquidation of any existing assets, Contractor
will assist the City in securing any permits or compiling with any
regulations regarding the liquidation of the facilities.
I -
Task 2.4 - Project Management Support
Contractor will furnish, under its subcontract with Black & Veatch, home
office engineering services to assist in planning and implementing the
activities necessary.to complete the modifications and restart of the
project.
Task 2.4A - Site Master Plan
Contractor will work with the City and its various departments to
develop a master plan for the use of the site. Contractor will assist
the Electric Department to insure that the areas needed to modify,
operate and maintain the Redding Power electric generating facility and
to construct, maintain and operate a future simple-cycle or combined
j cycle facilities are preserved.
,I
Task 2.46 - Engineering Services Support
Contractor shall assist the City in planning and implementing the
activities necessary to complete the modifications and restart of the
project.
Contractor will assist the City in developing a request for proposals
and evaluating proposals to secure engineering or design-build services
it for the boiler modifications and interconnection facilities. If this
task is furnished by Contractor, Contractor understands that it and
j Black & Veatch will be prohibited from providing subsequent engineer or
i
design-build services.
Task 2.4C - Schedule and Cost Control
Contractor will assist the City in establishing a management control
+ schedule, cost estimate, and cash flow to support modifications and
l
!� A-6
J
REVISED ATTACHMENT A
initial operation of the electric generating facility. The work will
use project management and spreadsheet PC-based programs, compatible
with or provided by the City.
Task 2.40 - OW Plan
Contractor will assist the City in developing an Operation and
Maintenance (0&M) Plan for the electric generating facility. The plan
will identify the major 0&M work and the approach to be employed by the
City in implementing the plan. The plan will include descriptions of
any required O&M procedures which must be developed and identify the
parties and level of effort required to complete the development. The
plan will identify minimum staffing requirements, employee
qualifications (for key operating personnel), and how the services will
be obtained, i.e. direct hires or service contractors. The plan will
also outline training requirements, both initial and on-going, for key
operating personnel and how the training will be achieved.
Task 2.4E - Alternate Steam Generator
Assess the feasibility of adding an independent gas-fired steam
generator at the Redding Power site in lieu of modifying the existing
boilers to dual fire wood and natural gas.
I
Task 3.1 - Peaking Power Additions
The City is proposing to procure rehabilitated combustion turbine units
on a turn key basis. These units would be located at the Redding Power
plant site. The task has the following subtasks..
Task 3.1A - IPT/ESI Proposal Assessments
i
Contractor will assist the City in assessing peaking power generation
additions proposed by the Industrial Power Technology (IPT) and Energy
Services, Inc. (ESI). Both proposals use multiple rehabilitated
combustion turbine simple cycle peaking units.
The services to be provided include, but are not limited to, reviewing
submittals by each proposer, providing a preliminary assessment of
proposals at utility commission meetings, responding to utility
commission and staff questions regarding proposal by requesting
supplemental filings by proposers, attending a presentation by
proposers, and providing other consultation services as requested by the
staff.
'I
A-7
i
REVISED ATTACHMENT A
Task 3.1B - IPT Proposal Review
Contractor will assist the City in providing a technical assessment of
IPT' s offering during proposal negotiations. The following subtasks are
included.
1. Review and inspect IPT equipment (as identified by IPT) . The
inspection report should include, to the extent that such
information is reasonably available, such information as hours of
operation, description of duty cycle, summary of operation and
maintenance, and description of major overhauls and
rehabilitations. Based on documentation reasonably available and
visual inspections, provide an opinion on the suitability of the
proposed equipment to be modified and rehabilitated.
i
2. Provide capital costs, indirect costs, operation and maintenance
costs, and performance projections to the City's financial
consultant.
3. Review IPT's acceptance test plan and provide written comments to
City staff.
4. Review IPT's technical description of the project and provide
written comments to the City staff.
5. Review IPT's contract exhibits.
Task 3.1C - Site Integration Assessment
Evaluate the impacts of locating the IPT power block at the Redding
Power site. The review should include the following.
i
1. Assess impact of relocating dispatch/control center to the site.
2. Assess the impact on converting the simple cycle combustion
turbines to combined cycle operation. This assessment will
include site arrangements, fuel supply, and water supply. The
City will provide standards and criteria for assessing on site
electric substation and interconnection. The City will assess
coordination studies and relaying and offsite interconnections.
Task 3.1D - Independent Engineering Statement
Revise the existing independent engineering statement for the Redding
Power project to include the peaking plant and other site modifications.
The statement will also include a summary statement which conforms to
j the bonding firms requirements. The combined statement should include
costs and descriptions for the facilities -- dual fueled steam
A-8
l
REVISED ATTACHMENT A
generation plant, gas-fired combustion turbine peaking plant, gas line,
substation, transmission line, and dispatch/control center.
The peaking power assessment will include the following.
1. Review IPT qualifications and render opinion.
2. Review IPT's proposed equipment and render opinion.
3. Provide an opinion on the useful life of the proposed addition.
4. Estimate the cost to interconnect the proposed addition to the
City's 115 kV transmission system. A list of major activities to
be performed and major new equipment requirements will be
provided.
5. Assess the general availability of natural gas to fuel the
proposed addition including contacting PG&E to identify the
facilities and cost necessary to get the fuel to the project site.
The City will cooperate and provide input with respect to gas
sources.
6. Identify labor and material cost estimates for operating and
maintaining the proposed addition including escalations and
expected p d schedule and cost of major overhauls.
7. Provide synergenistic benefits of IPT additions/Redding Power.
8. Review IPT's proposed permitting and licensing plan and advise the
City of its adequacy and assist the City by providing technical
input.
9. Estimate market value of the proposed addition.
10. Estimate or render an opinion on the City's estimates of the fixed
and variable costs for the proposed addition including startup,
annual 0&M, insurance, taxes (in lieu of fees), capitalized
interest, financing costs and escalation rates.
11. Review the City's projections of alternative costs.
12. Incorporate the proposed addition in the previously submitted
draft of the Redding Power Plant report.
J
i
A-9
i
REVISED ATTACHMENT B
REDDING POWER
j CARETAKING AND SUPPORT SERVICES
COMPENSATION
This attachment covers compensation for Caretaking and Engineering
Support Services for the Redding Power facility. The anticipated scope
of services is summarized in Attachment A. The assumed schedule
includes beginning work on or about July 29, 1991, and completing tasks
on or about the start of construction. Black & Veatch Construction,
Inc. (Contractor) understands that the actual schedule may be adjusted
up to six months. The assumptions provided were used to arrive at the
estimated costs. The rates are based on 1991 rates and will increase at
the end of 1991 and on an annual basis with the general rate of
inflation.
For work performed by subcontractors and direct hires, Owner shall pay
I
to Contractor the rates proposed below and expenses as noted.
For work performed by Contractor and subcontractors based at their home
offices, Owner shall pay to the Contractor for the performance of the
Services the sum of the following amounts.
(1) The amount of 2.00 times payroll costs for the actual
time of personnel applied to the Services.
Payroll costs include actual salary plus allowances for
holidays, vacation, sick leave, FICA and unemployment
taxes, worker's compensation insurance, and employee
benefits, including medical insurance, supplemental
retirement programs, life insurance, incentive
compensation, tuition reimbursements, and other
miscellaneous benefits.
The payroll allowance shall be fixed for the term
of this Agreement at thirty-four (34) percent of
the hourly salary rate. Hourly salary rates shall
be equal to the annual salary divided by 2,080.
(2) An amount equal to the actual out-of-pocket costs
4 or standard charges for all expenses incurred by
Contractor directly chargeable to the Services
'j rendered pursuant to this Agreement. Such expenses
shall specifically include, but are not necessarily
limited to, the following.
i a Long distance telephone expenses.
B-1
REVISED ATTACHMENT B
(b) Standard charges for operating time actually applied to
the Services of Contractor's computer center, other
computer centers, and Contractor's automated drafting
systems.
(c) Prints, reproduction, work processing, and printed
documents at standard rates.
(d) Reasonable traveling and living expenses for personnel.
! (e) The actual cost paid by the Contractor to third parties.
(f) Other direct expenses related to the Services.
The Contractor' s fiscal year is divided into twelve accounting periods.
Contractor will submit to Owner invoices for Services performed over the
accounting period. Each invoice will be submitted by about the tenth
day of the period following the period during which such Services were
performed. Owner agrees to pay Contractor's period invoice upon receipt
and to pay Contractor a carrying charge of 1-1/2 percent per month (18
percent per year) or the maximum rate allowed by law, if less, on all
amounts remaining unpaid after 30 days following an invoice date.
Owner has the right to audit the time records of personnel and charges
for direct expenses for assignments for which cost-plus compensation is
provided.
Costs based on the Contractor's Scope of Services described in
Attachment A are submitted as follows.
The proposed compensation varies by task and are summarized as follows.
o Some of the tasks will be done on a time and materials basis.
j For these tasks, Contractor has provided an estimate to
perform the work indicated or support twelve months of.
'i caretaking.
o Other tasks are proposed on a cost not-to-exceed basis. The
upper limit is provided for these tasks._ ..A contingency has
been added to any not-to-exceed costs to cover uncertainty in
the scope of final services. The contingency accounts will
be used only with the concurrence of the Electric Department
regarding the circumstances, scope, and amount of contingency
applied.
:I
B-2
REVISED ATTACHMENT B
Task 1.1 - Caretaker Support
Unless otherwise indicated, this portion of the work will be done on a
time and material basis. Rates for the personnel involved are as
follows.
Lead Coordinator $528.00 per day plus expenses
Plant Supervisor $242.11 per day
Plant Staff-1 $163.20 per day
Plant Staff-2 $150.35 per day
I
The actual rates billed may vary depending upon the actual compensation
paid. The expected rates are for an eight hour day. Any overtime work
will be billed at 1.5 times the daily rates pro rated on an hourly
basis.
Task 1.1A - Project Inventory
The not-to-exceed cost to conduct the inventory and summarize findings
is $6,820. This includes a $620 contingency allowance. Any effort to
i
resolve differences are not included.
Task 1.1B - Transition to the City's Control
The estimated costs for this effort is $10,010. The estimate is based
on 15 staff days of effort. Efforts to evaluate and resolve past
deficiencies are not included.
Task 1.1C - Standby Maintenance
Expenses associated with tools and expendables will be invoiced at cost
,) with a 5 percent markup for administrative services and payment offsets.
Engineering services, if required, will be performed by Contractor's
subcontractor, Black & Veatch. Black & Veatch will bill Contractor on a
comparable basis to the compensation provisions between Black & Veatch
and the City. Contractor will not add any markup of Black & Veatch
costs to Contractors billing to the City.
Based on the above considerations and assuming five local hires,
Contractor estimates the monthly billings to be $35,000 which includes
$25,000 in labor and $10,000 in expenses and materials. The total costs
for 12-months of Caretaking would be approximately $420,000.
The above rates include worker compensation and general liability
insurance.su ante. The City will provide property and boiler and machinery
i
B-3
REVISED ATTACHMENT 8
insurance coverages, and Builder's Risk is not required due to the
nature of the work. Waivers of subrogation to Contractor and its
subcontractors will be provided.
The City will provide and pay for all utilities.
'I Task 1.1D - Transition to Others
The estimated costs for this effort is $10,010. The estimate is based
on 15 staff days of effort.
Task 1.2 - Additional Lair-Up Work
The engineering services work will be done on a time and material basis.
Based on total lay-up costs of $150,000 or less, the not-to-exceed cost
will be $16,500 for engineering services. This estimate includes a
$1,500 contingency allowance.
Task 1.3 - Liquidation Support
This work will be done on a time and material basis. Contractor
estimates the costs to be $16,500 for this effort.
Task 2.1 - Project Permitting
Project Permitting will be done on a time and material basis with an
upper limit. The upper limit will not be exceeded without prior
concurrences from the City.
Contractor estimates that the project permitting will require 78 staff
days of effort assuming annual increases in NOx emissions remain below
threshold increments. If threshold increments are exceeded a new air
permit must be obtained. This action would increase the level of effort
to 142 staff days.
Contractor estimates the project permitting costs to be $65,650. This
includes a $5,970 contingency allowance. Contractor further requests a
contingency allowance of $48,960 to be used if the current air permit
cannot be transferred and a new permit is required.
Task 2.2 - Fuel Gas Service Support
This work will be done on a time and expense basis. Contractor
,I estimates the cost to be $10,010 for this effort.
,I
B-4
i
i
y
REVISED ATTACHMENT B
Task 2.3 - Permits to Remove Existing Facilities
This work will be done on a time and expense basis. Contractor is
unaware of any permits to support liquidating assets. Contractor
recommends a contingency allowance of $10,000 be established.
Task 2.4 - Project Management Support
Project Management Support will be accomplished on a time and expense
basis. Contractor estimates the following amounts will be expended to
complete the subtasks identified.
Task 2.4A - Site Master Plan
Contractor estimates that $7,425 will cover this task.
Task 2.48 - Engineering Services Support
Contractor estimates that $50,000 will cover this task.
i
Task 2.4C - Schedule and Cost Control
i
Contractor estimates that $7,425 will cover this task.
Task 2.40 - OW Plan
Contractor estimates that $11,000 will cover this task.
Task 2.4E - Alternate Steam Generation
Contractor estimates that $5,000 will cover this task.
i
Task 3.1A - IPT/ESI Proposal Assessments
Contractor estimates that $30,000 will cover this task.
Task 3.1B - IPT Proposal Review
Contractor estimates that $15,000 will cover this task.
it Task 3.1C - Site Integration Assessment/System Operations Facilities
Contractor estimates that $8,000 will cover this task.
Task 3.1D - Independent Engineer's Statement
Contractor estimates that $35,000 will cover this task.
B-5
i
REVISED ATTACHMENT B
In summary, the potential cost for the proposed services is as follows.
I. Not-to-Exceed Tasks:
Base
Amount Contingency
Task 1.1A 6,820 620
Task 1.2 16,500 1,500
Task 2.1 65 650 54,930
Subtotals $57,050
Base & Contingency $146,020
II. Time and Material Tasks:
Task 1.1B $ 10,010
Task 1.1C 420,000
Task 1.1D 10,010
Task 1.3 16,500
Task 2.2 10,100
Task 2.3 10,000
' Task 2.4A 7,425
Task 2.46 50,000
i Task 2.4C 7,425
Task 2.40 11,000
Task 2.4E 5,000
Task 3.1A 30,000
Task 3.1B 15,000
Task 3.1C 8,000
Task 3.10 35 000
Subtotal 645,410
i
III. Recommended total contract not-to-exceed amount:
Not-to-Exceed Task $146,020
Time and Material Task 645,470
i
Total $791,490
I
This price will not be exceeded without prior City authorization.
11
i
I
i
'! B-6
,II