Loading...
HomeMy WebLinkAboutReso 94-073 - Approve & Authorize the CM to sign the contract for professional services, together with CO 003, between COR & URS Consultants, Inc (Acct# 149-557-4941; contract C-3079) services by Sharrah , Dunlap, Sawyer -- Corp Yard RESOLUTION NO. 94-13 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING AND AUTHORIZING THE CITY MANAGER TO SIGN THE FOLLOWING IN CONNECTION WITH PERFORMING ADDITIONAL TASKS RELATED TO THE TRANSFER STATION DESIGN PROJECT: AUTHORIZATION AND CONTRACT FOR PROFESSIONAL SERVICES, TOGETHER WITH CONTRACT MODIFICATION (CHANGE. ORDER) 003, BETWEEN THE CITY OF REDDING AND URS CONSULTANTS, INC. (ACCOUNT NO. 149-557-4941; CONTRACT NO. C-3079) , TO PROVIDE ADDITIONAL SERVICES BY SHARRAH, DUNLAP, SAWYER, INCLUDING ENGINEERING, SURVEYING, AND CONSTRUCTION PERIOD-SERVICES APPLYING LARGELY TO THE CORPORATION YARD, IN AN ADDITIONAL AMOUNT NOT TO EXCEED $67,320. IT IS HEREBY RESOLVED that the City Council of the City of Redding hereby approves the above-mentioned Authorization and Contract for Professional Services, together with Contract Modification (Change Order) 003 , between the City of Redding and URS Consultants, Inc. , in an additional amount not to exceed $67, 320 . 00, true copies of which are attached hereto and incorporated herein by reference. BE IT FURTHER RESOLVED that the City Manager of the City of Redding is hereby authorized and directed to sign said documentation on behalf of the City Council of the City of Redding; and the City Clerk is hereby authorized and directed to attest the signature of the City Manager and to impress the official seal of the City of Redding. I HEREBY CERTIFY that the foregoing Resolution was introduced and read at a regular meeting of the City Council of the City of Redding on the 5th day of April, 1994, and was duly adopted at said meeting by the following vote: AYES: COUNCIL MEMBERS: Anderson, Kehoe, Moss and Arness NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: Dahl ABSTAIN: COUNCIL MEMBERS: None -� G CARL ARNESS, Mayor City of Redding A ST: FORM PROVED: CONNIE ST1i0HMAYER, ty Clerk ALL A. HAYS, City Attorney CONTRACT MODIFICATION ( CHANGE ORDER) CHANGE ORDER NO. : 003 PROJECT NAME: Transfer Station Design CONTRACTOR: URS Consultants, Inc. ADDRESS: 500 Northeast Multnomah Street CITY/STATE/ZIP: Portland, OR 97232 CONTRACT NO. : C-3079 DATE: April 5 , 1994 RESOLUTION NO. : 94- ACCOUNT NO. : 149-557-4941 JOB NO. : 9922-21 --------------------------------------------------------------- The Following Modifications to the Contract are Hereby Ordered: ---------------------------------------------------------------- Contractor will provide additional services by Sharrah, Dunlap, Sawyer including engineering, surveying, and construciton period services applying largely to the Corporation Yard. The scope of additional work by SDS is described in detail in the attachments to these Contract Details. The attached scope of work is not to exceed $67 , 320. ---------------------------------------------------------------- CONTRACT AMOUNT ---------------------------------------------------------------- ORIGINAL CONTRACT AMOUNT: $542 ,000. 00 PREVIOUS CHANGE ORDERS (ADD/DEDUCT) : 27, 300. 00 THIS CHANGE ORDER (ADD/DEDUCT) : 67,320. 00 REVISED CONTRACT AMOUNT: $636,620. 00 ---------------------------------------------------------------- OWNER ------------------------------------- -------------------------- CITY OF REDDING CITY MANAGER ROBERT M. CHRISTOFFERSON BY: DATE: ---------------------------------------------------------- CONTRACTOR ---------------------------------------------------------------- URS CONSULTANTS, INC. BY: DATE: --------------------------------------------- ------------------ GENERAL SERVICES DEPARTMENT --------------------------------------------------------------- CITY OF REDDING DEPARTMENT DIRECTOR RON MASINGALE i BY: DATE: March 29 , 1994 RPTLS. 041 03-29-94 CONTRACT DETAILS ` . PAGE 1 OF 2 1. Additional Services from Sharrah, Dunlap, Savvy I a. Background The City requested that Sharrah, Dunlap, Sawyer (SDS) provide additional engineering, surveying and construction period services. Although most of this work applies to the Corporation Yard, the City requested that it be conducted under the City-URS Agreement. The work represents a changed condition with respect to the Scope of Work included in the City-URS Agreement. 1 b. Additional Services The scope of additional work by SDS is described in detail in the attachments to this section. These attachments are in the form of draft amendments to the URS-SDS subcontract for the MRF/Transfer Station project. As mentioned in paragraph a, all of these services were specifically requested by the City. C. Request for Additional Compensation i Based on the changed condition, URS requests that its lump sum compensation be increased by $67,320. This amount includes a 10 percent mark-up of SDS's charges to cover URS's cost for subcontract administration, accounting costs, and insurance risk. j Set out below is a breakdown of the total additional compensation, allocated between the Corporation Yard and MRF/Transfer Station projects. i 1) Corporation Yard • Rights-of-way acquisition for Corporation Yard $19,000 • Additions to Corporation Yard off-site construction documents 4,000 • Additional engineering due to change from Bella Vista Water District to City of Redding Water Service: 50% of $10,000 5,000 • Field surveying for Corporation Yard off-site roadway work and the regional detention basin 15,400 Additional meetings and coordination between Corporation Yard and Transfer Station projects: 50% of $6,000 3,000 • Revise detention pond grading plan: 50% of $1,800 900 Subtotal $47,300 • URS mark-up for subcontract administration/ r accounting and insurance risk @ 10% 4,730 t Compensation Adjustment - Corporation Yard $52,030 :I 1-1 I t i , CONTRACT DETAILS PAGE 2 OF 2 2) Transfer Station • Additional engineering due to change from Bella Vista Water District to City of Redding Water Service: 50% of $10,000 $ 5,000 • Addition of regional detention basin for upper portion of Clover Creek 2,50C • Additional meetings and coordination between Corporation Yard and Transfer Station projects: .i 50% of $6,000 3,OOC • Revise detention pond grading plan: 50% of $1,800 90C • Revise landscape/landscape irrigation design 2.500 Subtotal $13,900 • URS mark-up for subcontract administration/ accounting and insurance risk @ 10% 1,390 Compensation Adjustment - Transfer Station $15,290 I Attachment: Change Order No. 1 Change Order No. 1 (Additions) i 1-2