Loading...
HomeMy WebLinkAboutReso 94-353 - Contract for Transmissino Service with Western Area Power Admin RESOLUTION NO. 94-�, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING APPROVING EXHIBIT A, REVISION 2, DESIGNATION OF POINTS) OF DELIVERY/RECEIPT, TRANSMISSION LOSSES, VOLTAGE LEVELS, AND TRANSMISSION RATES OF DELIVERY, EFFECTIVE JANUARY 1, 1995, TO CONTRACT NO. 88-SAO-40001 WITH THE DEPARTMENT OF ENERGY, WESTERN AREA POWER ADMINISTRATION, AND AUTHORIZING THE CITY MANAGER TO SIGN. WHEREAS, the City of Redding has entered into a Contract for Transmission Service with the Western Area Power Administration; and WHEREAS, the transmission rate of delivery in Exhibit A, Revision 1 , to said Contract has been revised; and WHEREAS, Exhibit A, Revision 2, attached hereto and made a part hereof, reflects such revision to said contract, effective January 1, 1995; NOW, THEREFORE, IT IS HEREBY RESOLVED that the City Council hereby approves the attached Exhibit A, Revision 2, Designation of Point(s) of Delivery/Receipt, Transmission Losses, Voltage Levels, and Transmission Rates of Delivery, to Contract No. 88-SAO-40001 , effective January 1 , 1995 ; and shall terminate and supersede Exhibit A, Revision 1, dated December 9, 1991 . BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to sign said Exhibit A, Revision 2 , on �,,� behalf of the City of Redding; and the City Clerk is hereby �\ directed to attest the signature of the City Manager and to impress the official seal of the City of Redding thereto. i I HEREBY CERTIFY that the foregoing Resolution approving Exhibit A, Revision 2, to WAPA Contract No. 88-SAO-40001 was introduced, read, and adopted at a regular meeting of the City Council on the 20th day of December, 1994, by the following vote: AYES: COUNCIL MEMBERS: P. Anderson, Kehoe, McGeorge, Murray and R. Anderson NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None ABSTAIN: COUNCIL MEMBERS: None OBERT C. ANDERSON, Mayor City of Redding ATTEST: ls:5/) r `CONNIE STROHMAYER, City Clerk FORM APPROVED: RANDALL A. HAYS(, City Attorney 2 Exhibit A, Revision 2 City of Redding Contract No. 88-SAO-40001 EXHIBIT A (Designation of Point(s) of Delivery / Receipt, Transmission Losses, Voltage Levels, and Transmission Rates of Delivery) 1 . This Exhibit A, Revision 2, to be effective under and as a part of Contract No. 88-SAO-40001 (Contract) , shall become effective January 1, 1995; shall terminate and supersede Exhibit A, Revision 1, dated December 9, 1991; and, shall remain in effect until either superseded by another Exhibit A or upon termination of the Contract. 2. Western will accept and deliver capacity and/or energy, less losses, for the account of the Contractor, in order to provide transmission service in accordance with the terms of the Contract, for the type and amount of Transmission Rate of Delivery, from the Point(s) of Receipt to the Point(s) of Delivery, as stated below. 3. Western has modified the format of this Exhibit A relative to the July 1, 1990 version. The modifications to the format of this Exhibit A relative to the July 1, 1990 version are not intended to change any substantive provision herein other than the revised Transmission Rate of Receipt/Delivery and the associated starting and ending dates. Points of Receipt, Delivery & Voltage Levels Transmission Rate of Receipt/Delivery (MW) Type of Start End Transmission Receipt Delivery Losses Date Date Receipt / Delivery Service Tracy Keswick 2.75 1/01/95 5/31/96 85.000 82.663 Firm (230-kV) (115-kV) and/or 2.75 6/01/96 5/31/97 93.000 90.443 Airport (230-kV) 2.75 6/01/97 5/31/98 99.000 96.278 Keswick Tracy 2.75 7/01/91 6/30/29 51.414 50' Non-Firm (115-kV) (230-kV) and/or Airport (230-kV) 6 Keswick Olinda 2 3 4 6 Firm (115-kV) (230-kV) and/or Airport (230-kV) 2 6 6 Olinda Keswick 3 6 Firm (230-kV) (115-kV) and/or Airport (230-kV) Page 1 of 2 Exhibit A, Revision 2 City of Redding Contract No. 88-SAO-40001 J The Parties acknowledge that studies are currently under way which may determine the availability of firm transmission capacity on Western's system during and after construction of the California-Oregon Transmission Project (COTP) . Western's obligation to transmit the full amount of transmission demand during and after construction of the COTP is limited to the type and quantity of Transmission Rate of Delivery to be determined by Western. J Western is currently conducting studies to determine the losses. Losses will apply to the absolute value of the bidirectional net schedule between Olinda and Keswick or Airport pursuant to Paragraph 7.2.4 of the Contract. The starting date shall be the in-service date of the COTP. The ending date shall be five (5) years after the in-service date of the COTP, when Western designates the Olinda Substation 230-kV bus as a Point of Receipt and Point of Delivery of power to the Contractor, or later as determined by Western. J To be determined pursuant to Subsection 7.4 of the Contract. J The ending date shall be coincident with the termination of the Contract and as may be provided for pursuant to Subsection 5.2 of the Contract, unless Contractor desires a shorter duration. WESTERN AREA POWER ADMINISTRATION By: Title: Area Manager Address: 1825 Bell Street, Suite 105 Sacramento, California 95825 Dated: CITY OF REDDING (Seal ) By: Title: City Manager Attest: Address: 760 Parkview Avenue By: Redding, California 96001 Title: Dated: Approved as to form: City Attorney Page 2 of 2