HomeMy WebLinkAboutReso 94-353 - Contract for Transmissino Service with Western Area Power Admin RESOLUTION NO. 94-�,
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDDING
APPROVING EXHIBIT A, REVISION 2, DESIGNATION OF
POINTS) OF DELIVERY/RECEIPT, TRANSMISSION LOSSES,
VOLTAGE LEVELS, AND TRANSMISSION RATES OF DELIVERY,
EFFECTIVE JANUARY 1, 1995, TO CONTRACT NO. 88-SAO-40001
WITH THE DEPARTMENT OF ENERGY, WESTERN AREA POWER
ADMINISTRATION, AND AUTHORIZING THE CITY MANAGER TO
SIGN.
WHEREAS, the City of Redding has entered into a Contract for
Transmission Service with the Western Area Power Administration;
and
WHEREAS, the transmission rate of delivery in Exhibit A,
Revision 1 , to said Contract has been revised; and
WHEREAS, Exhibit A, Revision 2, attached hereto and made a
part hereof, reflects such revision to said contract, effective
January 1, 1995;
NOW, THEREFORE, IT IS HEREBY RESOLVED that the City Council
hereby approves the attached Exhibit A, Revision 2, Designation
of Point(s) of Delivery/Receipt, Transmission Losses, Voltage
Levels, and Transmission Rates of Delivery, to Contract No.
88-SAO-40001 , effective January 1 , 1995 ; and shall terminate and
supersede Exhibit A, Revision 1, dated December 9, 1991 .
BE IT FURTHER RESOLVED that the City Manager is hereby
authorized and directed to sign said Exhibit A, Revision 2 , on �,,�
behalf of the City of Redding; and the City Clerk is hereby �\
directed to attest the signature of the City Manager and to
impress the official seal of the City of Redding thereto.
i
I HEREBY CERTIFY that the foregoing Resolution approving
Exhibit A, Revision 2, to WAPA Contract No. 88-SAO-40001 was
introduced, read, and adopted at a regular meeting of the City
Council on the 20th day of December, 1994, by the following vote:
AYES: COUNCIL MEMBERS: P. Anderson, Kehoe, McGeorge, Murray and R. Anderson
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
ABSTAIN: COUNCIL MEMBERS: None
OBERT C. ANDERSON, Mayor
City of Redding
ATTEST:
ls:5/) r
`CONNIE STROHMAYER, City Clerk
FORM APPROVED:
RANDALL A. HAYS(, City Attorney
2
Exhibit A, Revision 2
City of Redding
Contract No. 88-SAO-40001
EXHIBIT A
(Designation of Point(s) of Delivery / Receipt, Transmission Losses,
Voltage Levels, and Transmission Rates of Delivery)
1 . This Exhibit A, Revision 2, to be effective under and as a part of
Contract No. 88-SAO-40001 (Contract) , shall become effective January 1, 1995;
shall terminate and supersede Exhibit A, Revision 1, dated December 9, 1991;
and, shall remain in effect until either superseded by another Exhibit A or
upon termination of the Contract.
2. Western will accept and deliver capacity and/or energy, less losses, for
the account of the Contractor, in order to provide transmission service in
accordance with the terms of the Contract, for the type and amount of
Transmission Rate of Delivery, from the Point(s) of Receipt to the Point(s) of
Delivery, as stated below.
3. Western has modified the format of this Exhibit A relative to the
July 1, 1990 version. The modifications to the format of this Exhibit A
relative to the July 1, 1990 version are not intended to change any
substantive provision herein other than the revised Transmission Rate of
Receipt/Delivery and the associated starting and ending dates.
Points of Receipt, Delivery & Voltage Levels Transmission Rate of Receipt/Delivery (MW)
Type of
Start End Transmission
Receipt Delivery Losses Date Date Receipt / Delivery Service
Tracy Keswick 2.75 1/01/95 5/31/96 85.000 82.663 Firm
(230-kV) (115-kV)
and/or 2.75 6/01/96 5/31/97 93.000 90.443
Airport
(230-kV) 2.75 6/01/97 5/31/98 99.000 96.278
Keswick Tracy 2.75 7/01/91 6/30/29 51.414 50' Non-Firm
(115-kV) (230-kV)
and/or
Airport
(230-kV)
6
Keswick Olinda 2 3 4 6 Firm
(115-kV) (230-kV)
and/or
Airport
(230-kV)
2 6 6
Olinda Keswick 3 6 Firm
(230-kV) (115-kV)
and/or
Airport
(230-kV)
Page 1 of 2
Exhibit A, Revision 2
City of Redding
Contract No. 88-SAO-40001
J The Parties acknowledge that studies are currently under way which may
determine the availability of firm transmission capacity on Western's system
during and after construction of the California-Oregon Transmission Project
(COTP) . Western's obligation to transmit the full amount of transmission
demand during and after construction of the COTP is limited to the type and
quantity of Transmission Rate of Delivery to be determined by Western.
J Western is currently conducting studies to determine the losses. Losses
will apply to the absolute value of the bidirectional net schedule between
Olinda and Keswick or Airport pursuant to Paragraph 7.2.4 of the Contract.
The starting date shall be the in-service date of the COTP.
The ending date shall be five (5) years after the in-service date of the
COTP, when Western designates the Olinda Substation 230-kV bus as a Point of
Receipt and Point of Delivery of power to the Contractor, or later as
determined by Western.
J To be determined pursuant to Subsection 7.4 of the Contract.
J The ending date shall be coincident with the termination of the Contract
and as may be provided for pursuant to Subsection 5.2 of the Contract, unless
Contractor desires a shorter duration.
WESTERN AREA POWER ADMINISTRATION
By:
Title: Area Manager
Address: 1825 Bell Street, Suite 105
Sacramento, California 95825
Dated:
CITY OF REDDING
(Seal ) By:
Title: City Manager
Attest: Address: 760 Parkview Avenue
By: Redding, California 96001
Title: Dated:
Approved as to form:
City Attorney
Page 2 of 2